L&T FORMWORK SYSTEM

L&T FOUNDATION FORMWORK


(For heights up to 1.5m)

SYSTEM DESCRIPTION:

The side forms shall be made of steel and shall be rigid enough to take
the
Load and pressure exerted by concrete. When checked with a straight
edge they shall not deflect by 3 mm and shall not settle down.
The side forms shall be fixed rigidly in vertical position within tolerance
limits Of 5 mm in line and 3 mm in top level. The form shall be
secured in position using wedges, clamps etc. so that they will not
deviate from their alignment during concreting. Before erecting the
forms, good shuttering oil / grease should be applied properly for easy
de-shuttering after it is cast.
The forms shall be removed without injuring the concrete. The forms
shall be stripped when the concrete is sufficiently hardened and gained
strength as per the codal provisions.

Sectional Elevation
Plan

L&T FOUNDATION FORMWORK


(For heights above 1.5m)
SYSTEM DESCRIPTION:

When foundations are huge say mass raft foundations and of heights
greater
than 1.5m, then they are executed using L&T Wall Formwork System.
L&T Wall Formwork is a complete Formwork system, which mainly
consists of plywood sheathing backed by timber H-Beams and Steel
walers (ISMC 100 B/B channels). The support is given by double nut
alignment props which can be used to align the shutters to the required
angle. These shutters can be erected manually & also can be handled
by crane.
Besides giving smooth concrete finish this system comes with inbuilt
safety and working accessories.

HY-RIB Stoppers for as construction joints:


Whatever be the type of shutters being used on the external side say L&T Foundation or
Wall Formwork, to ease the construction of mass raft foundations where the rebars
projecting out are the biggest hindrance, Hy-rib stoppers are generally being used to stop
the concrete.

Hy-rib permanent formwork comprises of Zinc-coated steel which are


formed into a ribbed expanded mesh.

It is for use as permanent formwork for concrete to form construction joints,


stop-ends for retaining walls, columns & beams. It can also be used to
support horizontal slab flooring.

It will produce a surface which will bond directly with the next pour or, in case
of retaining walls and columns, be suitable for rendering or tiling.

L&T COLUMN FORMWORK


SYSTEM DESCRIPTION:

L&T Column Formwork is a complete Column Formwork system,


mainly consists of plywood sheathing backed by timber H-Beams
and Steel walers (ISMC 100 B/B channels)which can be erected
manually & also can be handled by crane.
Besides giving smooth concrete finish this system comes with
inbuilt safety and working accessories.

Sectional Elevation

Plan

L&T WALL FORMWORK


SYSTEM DESCRIPTION:

L&T Wall Formwork is a complete Formwork system, which


mainly consists of plywood sheathing backed by timber H-Beams
and Steel Walers (ISMC 100 B/B channels). The support is given by
double nut alignment props which can be used to align the
shutters to the required angle and position. These shutters can be
erected manually & also can be handled by crane.
Besides giving smooth concrete finish this system comes with
inbuilt safety and working accessories.

Sectional Elevation

Plan

LIFT CORE WALL - CLIMBING FORMWORK


Formwork System for the construction of the LIFT CORE WALL:

Salient features of the Formwork used for the Construction of LIFT CORE
WALLS:
Formwork details:
1. L&T Wall formwork with Travelling climbing system (CB 150F) used for Outer
face of core wall.
2. L&T Lift shaft platform system used with wall formwork for Inner face / opening.
3. Approx. max. size of wall panel (inner side) is 2.40m x 4.00m.
4. Outer shutter panels are supported on a pair of brackets the max. size being
2.40m x 4.00m.
5.
Each pair of shutter panel with brackets is having in-built safety such as
necessary handrails for concreting & shutter platforms.
6. Tower cranes are used for lifting of shutters from one pour to another.

SYSTEM DESCRIPTION:

The lift shaft platform system is suitable for lift core / RC-walls close to each
other.

The Lift Shaft Formwork System comprises of shaft main beam resting in pockets
provided in the already cast RC-Wall. The cross beams are provided over this.

Wooden planks over the cross beams form the lift shaft platform. Leveling of the
platform is possible by operation of spindle within the gravity pawls.
The main beam has gravity pawls which unlocks itself from the pockets when lifted
upwards by tower crane and locks itself at the next pocket location. The gravity
pawls are hinged and have one way movement only, the platform thus has high
levels of safety.
The platforms as a whole along with the main beam, gravity pawls, cross beams
and platform can be lifted as one unit.
This platform facilitates resting of the wall formwork and alignment.

Lift shaft
platform resting
in the pockets

Sling from Crane


To be cast

Lifting Bracket.

Pocket to suit Pawl

Freshly cast

Already Cast Wall


Pocket to suit Pawl
Climbing Pawl
Lift shaft Platform

LIFT SHAFT PLATFORM SYSTEM

Lift shaft platform


being lifted to the
next level

Sling from Crane

To be cast

Pocket to suit Pawl

Freshly cast
Lift shaft Platform

Already Cast Wall


Climbing Pawl

LIFT SHAFT PLATFORM SYSTEM

SALIENT FEATURES:

Ideal system for speedy construction.


Eliminates the need for scaffolding to support the Wall Formwork.
High levels of safety - full proof system.
Minimum skill & operation for anchoring & shuttering at each
level.

Alufo COLUMN FORMWORK

SYSTEM DESCRIPTION:
L&T Alufo is a complete Column Formwork system, mainly consists
of Lightweight panels which can be quickly erected manually.
Besides giving very smooth concrete finish this system comes with high

performance, safety and working accessories.

Sectional Elevation

Plan

L&T Alufo Column Formwork system


Forms square-section and rectangular-section columns quickly
and easily....
With

the wide range of adjustment from 200 to 750 mm in


a 50 mm grid.
With

fair-faced concrete quality - The sheeting is fixed from


behind, so it leaves no indentations in the fair- faced
concrete.
By

simple process of fixing the panels together.

With a quick-insertion front triangular ledge - no nailing.

Permissible fresh-concrete pressure up to 80 kN/m.

Advantages of Alufo-Column Formwork


Each panel weights about 25Kg, so can be handled
Manually.
Since this involves a simple process of fixing the panels
together, Alufo System results in enhancement of labour
productivity.
Numbers of components are less, so reconciliation of
Material becomes that much easier.
Better concrete finished surface.

THE L&T AUTOMATIC CLIMBER SKE


(FOR STOREY-HIGH CLIMBER)
The L&T Automatic Climber SKE lifts the large area
formwork element together with the climbing scaffold and all
working platforms in one step by a whole concrete lift - without
a crane. There are two Automatic Climbers SKE in a climbing
element, arranged optimally each with one climbing bracket.
The outstanding advantages of the L&T Automatic Climber
SKE for use on high buildings are:
Optimum adaptability to every The L&T Automatic Climber SKE
is a
Plan shape single lifting device and can therefore be arranged
independently of the plan shape.
The width of the elements can thus always be arranged
favorably. This means that the most economical solution for all
plan shapes of buildings, piers or shafts is achieved.
Storey - high climbing in one step
The L&T Automatic Climber SKE climbs storey by storey, even
concrete lifts of up to 3.5 m in height need no intermediate
steps or intermediate anchoring. This provides enormous
savings in anchoring, working time and thus money.
High bearing capacity
Because of its robust and strong construction the L&T
Automatic Climber SKE offers the possibility of climbing large
area formwork elements of up to 24 m2 in one lift.
Automatic hydraulic drive
The L&T Automatic Climber SKE is driven by light hydraulic
cylinders which are moved extremely easily and quickly from
element to element. The hydraulic devices are fitted with all

necessary control equipments for the simultaneous running


operation of two or more lifting cylinders. A suitable remotecontrolled electric system provides easy climbing.

Safety
A high degree of safety is based in the L&T Automatic
Climber SKE and its hydraulic drive. The lifting mechanism is
always coupled with the climbing section and therefore safe.
The hydraulic cylinders for the drive of the L&T Automatic
Climber SKE are equipped with a pipe breakage safety device.
Economy with system
The standard parts of the proven L&T climbing formwork
provide, together with the Automatic Climber SKE, a simply
operated and therefore extremely economical self-climbing
formwork.

ADVANTAGES
1. Its modular system:
optimum adaptability to any project
small number of different parts
inclination adjustments of up to +/- 15o possible for
formwork and scaffold
uniform design of suspended platform and pouring
platform
platforms are pre-assembled, i.e rapid on-site erection
direct connection facility to L&T Automatic Climber SKE

1st pouring section can be formed using system


components.

2.

Its ease of operation:

formwork can be erected and struck without a crane and


with minimal manpower.
entire unit is lifted in one piece, quickly and easily (i.e
minimal crane time)
swift, precise formwork adjustment in all directions.
simple inclination adjustment.

3. Its practice-oriented design:


high load ability (50 kN per climbing bracket)
formwork heights of up to 3.6 m
suitable for beamed and framed formwork panels and
formwork made of timber beams.
wide working platforms (2.40 m)
formwork retractable by up to 60 cm
economical anchoring (small number of separate parts)
can climb over concrete projections with cantilever of up
to 25 cm

complete safety in all phases of the work


climbing brackets can be used as heavy scaffold
platforms.

Formwork for Slab


Flex System:
The forms shall be made with plywood backed by timber beams &
supported using props. The props are the members which take the load and shall be
erected in position using tripods for stability. The spacing between the timber beams
shall be in accordance with design criteria & should be properly nailed to the
plywood and properly placed over the props to avoid toppling.
The props are designed to take care of the vertical loads which are tested under
max. loading conditions. The spacing will be decided based on the thickness of the
slab i.e. load coming from the slab & the prop height required. The more the height,
the lesser the capacity so it should be ensured that usage of props in the fully
extended conditions are avoided.
Heavy Duty Tower System (HDT):
The forms shall be made with plywood backed by timber beams &
steel elements. These elements are supported on HDT which are designed to take
care of the vertical loads. Each tower leg has a load carrying capacity of 62.5 KN
and shall be designed for the same based on the slab/beam depths.
Proper application of shuttering oil/grease should be ensured for easy de-shuttering.
.

Flex System with


Finished View

HDT
SYSTE
M

WORKING SEQUENCE OF MF FOR WALL

STEP BY STEP PROCEDURE


1. Remove the all tie rods & cone screws after the allowed setting time for
de-shuttering is reached.
2. De-shutter and Roll back the shutter after removing the running gear wedges,
with the use of 2 way ratchet.
3. Fix the suspension shoe in the new position with the cone screw.
4. Change the position of lever in the lifting mechanism to the top portion for
lifting the climbing profile.
5. Lift the climbing profile for one stroke then remove climbing profile wedge and
then lift the climbing profile to the next lift level. Stop lifting 100mm below the
suspension shoe level. Lift the climbing profile one at a time by closing the
shut-off valve of other cylinders. Ensure proper entry of profile into the shoe
and lift until the slot hole for the wedge is clear off from the shoe.
6. Insert the climbing profile wedge into its slot and lower the profile by releasing
the cylinder. Ensure that the wedge rests on the suspension shoe top.

7. Change the position of the lever in the lifting mechanism to bottom position for
platform lifting.
8. Unscrew the supporting carriage . ensure a gap of minimum 40 mm
9. Remove the safety bolt (Safety pin)
10. Lift the platform MF bracket for one stroke then remove the suspension pin &
continue the lifting upto next level until the climbing carriage touches the
climbing profile wedge.
11. Insert the suspension pin inside the suspension shoe slot & place the climbing
carriage in the suspension pin by releasing the cylinder.

12. Insert the safety bolt in the suspension shoe.


13. Screw in the supporting carriage against the wall.
14. Remove the lower most suspension shoe standing from suspended platform
and take it to the working platform for next level.
15. Move the shutter towards the wall after necessary cleaning and application of
release agents.
16. Fix the tie rods , universal climbing cone & Positioning disc at top
17. Follow the sequence from 1 for subsequent lifting of climbing profile & MF
bracket.

Sequence of erection:
a)

Pair of horizontal profile with platform member to be assembled.

b)
Vertical profile with pressure strut short & long to be assembled with the
horizontal profiles without pin on one side..
c)
At the time of erection lift the assembled one with crane put the strut pin &
fix it on the suspension shoe .
d)

Insert the climbing profile.

e)
Assemble the vertical waling , plumbing spindle, running gear (preassembled) with shutter and lift and position it on the bracket.

Safety measures to be taken in operation.

1)

Remove suspension pin from suspension shoe before lifting the platform to
next level, immediately after the first stroke,

2)

Remove climbing profile wedge before lifting the climbing profile to next
level, immediately after the first stroke,

3)

While lifting the climbing profile to next level , insert the wedge in to the
climbing profile, before changing the direction of lifting mechanism, and see
to that it is fully4rested On the suspension shoe.

4)

Grade & Brand of hydraulic oil should not be mixed.

5)

Unscrew the supporting carriage before lifting the platform to next level.

6)

Safety pin to be removed first before lifting the bracket assembly & should
be fixed in the last after the bracket is fixed into the next level on the
suspension pin.

UNIFO COLUMN FORMWORK


SYSTEM DESCRIPTION:

L&T Unifo is a complete Column Formwork system with


Plywood as a sheathing member and Steel as its backing
member.
This column formwork produces finished surfaces to meet
extra-high requirements (fair-faced concrete).
Precision-manufacturing ensures that the column crosssection
is perfectly square or rectangular, even at the shell joins.

Advantages of Unifo-Column Formwork


No making is required at site.
Each panel weighs about 35 kg, which can be handled
Manually.
Enhanced labour productivity.
Much easier to reconcile, because of lesser components.
can withstand pressure up to 80kN/m2.