GUJARAT TECHNOLOGICAL UNIVERSITY


BE SEM-VII Examination-Nov/Dec.-2011
Subject code: 171901
Subject Name: Operation Research
Time: 10.30 am-01.00 pm

Date: 19/11/2011
Total marks: 70

Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.

Q.1 (a) Discuss the Various phases in solving an Operation Research model
(b) Use the graphical method to solve the following LP problems
Maximize Z=2X1+X2
Subject to the constraints:
X1 + 2X2 <= 10
X1 + X2 <= 6
X1 - X2 <= 2
X1 -2X2 <= 1
and X1 , X2 >= 0

07
07

Q.2 (a) An advertising company wishes to plan an advertising campaign in three 07


different media: television, radio and a magazine. The purpose of the
advertising is to reach as many potential customers as possible.Following
are the result of a market study:
Television
Prime
Prime
Radio
Magazine
Day Rs.) Time Rs. Rs.
Rs.
Cost of an 40,000
75,000
30,000
15,000
advertising
unit
Nuber of 4,00,000 9,00,000 5,00,000 2,00,000
potential
customers
reached
/unit
Number of 3,00,000 4,00,000 2,00,000 1,00,000
Women
customers
reached
/unit
The company does not want to spend more than Rs.8,00,000 on
advertising. It is further required that
(i) at least 20,00,000 exposures take place among women
(ii) advertising on television be limited to Rs. 5,00,000
(iii) at least 3 advertising units be bought on prime day and two units during
prime time; and (iv) the number of advertising units on radio and magazine
should each be between 5 and 10. Formulate this problem as an L.P. model
to maximize potential customer reach
1

(b) State the general rules for formulating a dual LP problem from its primal. 07
Write the dual to the following LP problem.
Maximize Z = X1-X2+3X3
Subject to Constraints
X1 + X2 + X3 <= 10
2X1 - 0X2 - X3 <= 2
2X1 -2X2 -3 X3 <= 6
and X1 , X2 , X3 >= 0
OR
(b) Use the simplex method to solve the following L.P. problem
07
Max (Total Profit) Z= 4X1+ 3X2
Subject to Constraints
2X1 + X2 <= 1000
X1 + X2 <= 800
X1 <= 400
X2 <= 700
and X1 , X2 >= 0
Q.3 (a) Explain in brief the main characteristics of the queuing system
(b) A self service store employs one cashier at its counter ,Nine customers
arrive on an average every 5 minutes while the cashier can serve 10
customers in 5 minutes. Assuming Poisson distribution for arrival rate and
exponential distribution for service rate, find
1. Average number of customers in the system
2. Average number of customers in queue
3. Average time a customer spends in the system
4. Average time a customer waits before being served.
OR
Q.3 (a) Explain clearly with suitable examples the different costs that are involved
in the inventory problems.
(b) The production department for a company requires 3,600 Kg of raw
material for manufacturing a particular item per year. It has been estimated
that the cost of placing an order is Rs. 36 and the cost of carrying inventory
is 25 per cent of the investment in the inventories .The price is Rs. 10 per
Kg. The purchase manager wishes to determine an ordering policy for raw
material.Calculate (1) The optimal lot size (2) The optimal order cycle time
(3) The minimum yearly variable inventory cost (4) The minimum yearly
total inventory cost

07
07

07
07

Q.4 (a) A computer centr has three expert programmers. The centre wants three 07
application programmes to be developed. The head of the computer centre,
after studying carefully the programmes to be developed,estimates the
computer time in minutes required by the experts for the application
programmes as follows.
Programmes

Programmers
A
B
C
1
120
100
80
2
80
90
110
3
110
140
120
Assign the programmers to the programmes in such a way that the total
computer time is minimum
2

(b)

A firm is considering replacement of a machine, whose cost price is Rs. 07


12,200 and the scrap value Rs. 200. The running costs are found from
experience to be as follows.
Year
1
2
3
4
5
6
7
8
Running 200 500 800 1,200 1,800 2,500 3,200 4,000
Cost Rs.
When should the machine be replaced?
OR

Q.4 (a) What is degeneracy in transportation problems? Explain how to resolve 07


degeneracy in a transportation problem
(b) A company has factories at F1, F2 and F3 which supply to warehouses at 07
W1, W2, W3. Weekly factory capacities are 200 ,160 and 90 units,
respectively. Weekly warehouses requirement are 180,120 and 150 units,
respectively. Unit shipping costs(in Rs.) are as follows. Determine the
optimal distribution to minimize total transportation cost
Warehouse
Factory
W1
W2
W3
Supply
F1
16
20
12
200
F2
14
8
18
160
F3
26
24
16
90
Demand
180
120
150
450
Q.5 (a) Listed in the table are the activities and sequencing necessary for a 07
maintenance job on the heat exchangers in a refinery. Draw a network
diagram for the project.
Activity Description
Predecessor
Activity
A
Dismantle pipe connections
B
Dismantle heater ,closure, and A
floating front
C
Remove tube bundle
B
D
Clean bolts
B
E
Clean heater and floating head B
front
F
Clean tube bundle
C
G
Clean shell
C
H
Replace tube bundle
F, G
I
Prepare shell pressure test
D,E,H
J
Prepare tube pressure test and I
reassemble

(b) A company management and the labour union are negotiating a new three 07
year settlement. Each of these has 4 strategies:
I: Hard and aggressive bargaining
II: Reasoning and logical approach
III:Legalistic strategy
IV: Conciliatory approach
The cost to the company are given in the fo;;owing table for every pair of
strategy choice. What strategy will the two side adopt ? Also determine the
value of the game.
Company Strategies
Union
Strategies I
II
III
IV
I
20
15
12
35
II
25
14
8
10
III
40
2
10
5
IV
-5
4
11
0
OR
07
Q.5 (a) Define the following dynamic programming terms:
(i) Stage (ii) State Variable (iii) Decision variable (iv) Immediate
return(v)Optimal return(vi) State transformation function
07
(b) What are the advantages and limitations of simulation models
_______________

Seat No.: ________

Enrolment No.______________

GUJARAT TECHNOLOGICAL UNIVERSITY


BE- VIIth SEMESTEREXAMINATION MAY/JUNE- 2012

Subject code: 171901


Subject Name: Operation Research
Time: 02:30 pm 05:00 pm

Date: 24/05/2012
Total Marks: 70

Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
Q.1

(a) Explain significance of any two assumptions of Linear Programming


Problem (LPP).

07

A small fabrication industry is faced with a problem of scheduling


production and subcontracting for three products A, B and C. Each
product requires casting, machining and assembly operations. Casting
operation for product A and B can be subcontracted but product C
requires special tooling hence it can not be subcontracted. Each unit of
product A, B and C requires 6, 10 and 8 minutes of casting time in the
foundry shop of a company. Machining times per unit of products A, B
and C are 6, 3 and 8 minutes while assembly times are 3, 2 and 2 minutes
respectively. The time available per week in foundry, machining and
assembly shop are 8000, 12000 and 10000 minutes respectively. If
product A, B and C are produced completely in the company, the overall
profits per unit of product are Rs. 700, Rs. 1000 and Rs. 1100
respectively. When castings are obtained from subcontractors, the profit
per unit of product A and B are Rs. 500 and 900 respectively. Formulate
above problem as LPP so as to maximize the profit for company by
scheduling its production and subcontracting.
(b) Solve the following LPP using Simplex method;
Maximize ( Z ) = 6 x1 + 4 x2

07

subject to
2 x1 + 3 x2 30 ; 3 x1 + 2 x2 24 ; x1 + x2 3
x1 , x2 0
Q.2

(a) A transport company has 5, 10, 7 and 3 trucks available at four different
sites A, B, C and D. Its customers have requirement of 5, 8 and 10 trucks
at three different destinations X, Y and Z respectively. The distance (in
kms.) from an origin to destination is summarized in following table.
Customers
Sites X Y Z
A
70 30 60
B
40 60 80
C
50 80 40
D
80 40 30
Formulate above problem as a transportation problem and determine
strategy for a company using VAM. Test the optimality of VAM solution
and determine optimum strategy for the transport company.

07

(b)

i. What do you mean by Infeasibility and Unboundness in LPP? How


are the following issues identified from the simplex tableau?

03

ii. Construct the dual of following Primal Problem;


Minimize ( Z ) = 5 x1 6 x2 + 4 x3

04

subject to
3 x1 + 4 x2 + 6 x3 9 ;

x1 + 3 x2 + 2 x3 5; 7 x1 2 x2 x3 10

x1 2 x2 + 4 x3 4 ; 2 x1 + 5 x2 3 x3 = 3 ; x1 , x2 , x3 0
OR
(b) The following tableau for a maximization type LPP is produced after few
iterations of simplex method;
8.5 10.5
0
0
0
Mix Qty (bi) X1 X2
S1
S2
S3
X2
300
0
1
3/5 -2/5
0
X1
300
1
0
-2/5
3/5
0
S3
400
0
0
-1/5 -1/5
1
Answer the following questions with brief reasons from above table;
i. Does the tableau represent an optimal solution? If not, carry out
necessary iterations and obtain an optimal solution.
ii. Is this solution degenerate?
iii. Are there more than single optimal solution to above problem?
iv. What are the shadow prices or dual values of resources?
v. What is optimum objective function value for the problem?
vi. If S1 represent the slack for production capacity constraint, how
much should company be willing to pay for each additional unit of
production capacity?
Q.3

Q.3

07

(a) What do you understand by zero-sum in the context of game theory?


Explain the meaning following terms used in game theory;
i. Saddle Point
ii. Pure Strategy
iii. Mixed Strategy

07

(b) The captain of a cricket team has to allot five middle order batting
positions to six batsmen available for selection. The average runs scored
by each batsmen at these positions are summarized in a table below
Batting Position
Batsman III IV V VI VII
A
40 40 35 25 50
B
42 30 16 25 27
C
50 48 40 60 50
D
20 19 20 18 25
E
58 60 59 55 53
F
45 52 38 50 49
Using Assignment model, determine the assignment of batsmen to
positions which would give maximum runs in favor of team. Which
batsmen will not qualify for selection based on the solution obtained?
OR
(a) What is dominance rule in game theory? How can a two person-zero
sum game problem be converted into LP problem? Illustrate with
example.

07

07

Q.4

(b) A solicitors firm employs typists on hourly piece-rate basis for daily
work. There are five typists available with hourly charges and speed
mentioned in table below.
Typist
A B C D E
Rate per hour (Rs.)
5 6 3 4 4
No. pages typed/hour 12 14 8 10 11
There are five jobs available to the firm and it wishes to allocate one job
to one typist only. The typist is paid for full hour even if he works for
fraction of an hour. The details of job are given in table below.
Job
P
Q
R
S
T
No. of Pages 199 175 145 298 178
Find least cost allocation for the firm using Assignment model.

07

(a) Following failure rates have been observed for certain type of light bulbs;
Month
1 2 3 4
5
Percentage of items failing by end of month 10 25 50 80 100
There are total 1000 bulbs in use and it costs Rs. 10 to replace an
individual bulb which has fused out. If all bulbs are replaced
simultaneously, it would cost Rs. 4 per bulb. Two policies are being
considered for replacement of bulbs; First, replace all bulbs
simultaneously at fixed interval whether failed or not and do individual
replacement in intermediate periods. Secondly, individual replacement of
bulbs as and when it fails. Determine the optimum policy for replacement
of bulbs based on above failure data and costs.
(b) What is simulation? What are different phases of simulation process?
Differentiate between deterministic and stochastic simulation models.
What are the advantages and limitations of simulation?

07

07

OR

Q.4

Q.4

(a) An electronic item contains 10000 resistors. When any resistor fails, it is
replaced. The cost of replacing a resistor individually is Rs. 1 only. If all
resistors are replaced at the same time, the cost per resistor reduces to 35
paisa. The probability of failure of a resistor by the end of month is given
in table below.
Month
1
2
3
4
5
6
Prob. of items failing by 0.03 0.07 0.2 0.4 0.15 0.15
end of month
Two policies are being considered for replacement of resistors; First,
replace all items simultaneously at fixed interval whether failed or not
and do individual replacement in intermediate periods. Secondly,
individual replacement of items as and when it fails. Determine optimum
policy for replacement of bulbs based on above failure data and costs.
(b) i. Explain the meaning of following items in inventory management;
a. Re-order Level
b. Buffer Stock
ii. A purchase manager has decided to place an order for a minimum
quantity of 500 units of a particular item of inventory in order to get
discount of 10%. Past records reveal that 8 orders (each of 200 units)
were placed last year. Given ordering cost = Rs. 500 per year,
Inventory carrying cost = 40% of inventory value and price of item =
Rs. 400 per unit. What is the effect of this decision on company?

07

03

04

Q.5

Q.5

(a) Arrival rate of telephone calls at a telephone booth follows Poisson


distribution with an average time of 9 minutes between two consecutive
calls. The length of telephone call is assumed to be exponentially
distributed with mean of 3 minutes.
i. Determine the probability that a person arriving at the telephone
booth have to wait.
ii. Find the average queue length that is formed from time to time.
iii. The telephone company will install a second booth when convinced
that an arrival would expect to have to wait at least four minutes for
the phone. Find increase in rate of arrival which will justify a second
booth.
A
small
project is composed of 7 activities whose time estimates are
(b)
listed in the table below. Activities are identified by their beginning and
ending node numbers.
Activity
1-2 1-3 1-4 2-5 3-5 4-6 5-6
Time
Optimistic
1
1
2
1
2
2
3
Estimates Most Likely 1
4
2
1
5
5
6
(weeks) Pessimistic
7
7
8
1 14 8 15
i. Draw the project network.
ii. Find the expected duration and variance for each activity.
iii. What is the expected project length and standard deviation?
iv. What is the probability that the project will be completed 3 weeks
later than the expected time?
OR
(a) How is dynamic programming problem different from LPP? Explain the
meaning of following terms used in dynamic programming;
i. Stages
ii. States
iii. Principle of optimality
(b) The time estimates and precedence relationships of different activities
constituting a small construction project is given in following table;
Activity
A B C D E F G
H
I
Predecessor - - B B A A F C, E, G F
Duration
3 8 6 5 13 4 2
6
2
(days)
i. Draw the project network.
ii. Determine project completion time.
iii. What is critical path?

07

07

07

07

*************

Seat No.: ________

Enrolment No._________

GUJARAT TECHNOLOGICAL UNIVERSITY


B. E. - SEMESTER VII EXAMINATION WINTER 2012

Subject code: 171901


Subject Name: Operation Research
Time: 10.30 am - 01.00 pm

Date: 26/12/2012
Total Marks: 70

Instructions:
1. Attempt any five questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.

Q.1 (a) Do as directed:


(i) What is the degeneracy in simplex method? How it can be resolved?
(ii) Illustrate graphically;
(a) No-feasible solution (b) Unbounded solution.
(iii) Classify the Assignment problems in detail.
(iv) Explain the following term in the context of game theory
(a) Saddle point (b) Two persons Zero-sum game

08

(b) (i) Find the maximum value of following LPP using graphical approach
Z = x1 + 2x 2
S / t, x1 + 3x 2 10
x1 + x 2 6
x1 x 2 2
x1 and x 2 0

04

02

(ii) Write down the dual of above LPP

Q.2 (a) Write note on scope of Operation research in the various sector.
(b) Solve following LPP using Penalty method
Maximize
Z = 3x1 x 2

04
10

S / t, 2x1 + x 2 2
x1 + 3x 2 3
x2 4
x1 and x 2 0
OR
(b) A firm manufactures two product A & B on which the profit earned per
unit are Rs. 3 and Rs.4, respectively. Each product is processed on two
machines M1 and M2. Product A requires one minute of processing time
on M1 and two minutes on M2, while product B requires one minute of
processing time on M1 and one minute on M2. Machine M1 is available
for not more than 7 hrs and 30 minutes, while machine M2 is available
for 10hrs during any working day. Find
(i) Formulate the problem as LPP
04
(ii) Solve the above LPP using Simplex method
06
Page 1 of 3

Q.3 (a) State the name of method which divides inventories into three classes 05
and describe it in detail.
(b) Find the optimal solution of the following Transportation problem using 09
MODI method. Use VAM to find IBFS.
M1 M2
M3
M4
Supply
F1
3
2
4
1
20
F2
2
4
5
3
15
F3
25
3
5
2
6
F4
40
4
3
1
4
25
Demand
30
20
25
OR
Q.3 (a) A machine cost Rs 500. Operation and maintenance cost are zero for 07
the first year and increases by Rs. 100 every year. If money is worth 5%
every year, determine the best age at which the machine should be
replaced. The resale value of the machine is negligibly small. What is
the weighted average cost of owning and operating the machine?
(b) The following information is provided for an item:
07
Annual usage = 1200, Ordering cost = Rs 60 per order, Carrying costs
10%, Unit cost of item = Rs 10, and lead time 10 days.
Find (i) EOQ (ii) Number of order per years (iii) Average usage if there
are 300 working days per year (iv) Safety stock if highest usage rate is
70 units per day (v) R. O. L (vi) Average inventory (vii) Inventory
carrying cost per year.
Q.4 (a) A chemical company distributes its products by trucks loaded at its only 06
loading station and loading station is working 24 hours, continuously.
Both companys trucks and contractors trucks are used for this purpose.
It was find out that on an average 10 minutes one truck arrived and
average loading time was 6 minute. If 50% trucks are contractors trucks
find (i) Traffic intensity factor, (ii) Weighting time of trucks in system,
(iii) The expected weighting time of contractors trucks per day.
(b) The captain of cricket team has to allot five middle batting positions to
08
five batsmen. The average runs scored by each batsman at these
positions are as follows:

Batsmen
P
Q
R
S
T

I
40
42
50
20
58

Batting position
II
III
IV
40
35 25
30
16 25
48
40 60
19
20 18
60
59 55

V
50
27
50
25
53

Find the assignments of batsmen to positions which would give the


maximum number of runs.
OR

Page 2 of 3

Q.4 (a) Solve the following game by using Dominance method

Player
A

A1
A2
A3

B1
4
6
4

Player B
B2
5
4
2

07

B3
8
6
4

(b) Explain the various elements of queuing system

07

Q.5 (a) The details of activity in project management are given below.

Normal
Crash
Time (Days) Cost (Rs.) Time (Days)
Cost (Rs.)
1-2
3
300
2
400
2-3
6
480
4
520
2-4
7
2100
5
2500
2-5
8
400
6
600
3-4
4
320
3
360
4-5
5
500
4
520
03
Find (i) Critical path & Project duration
(ii) Optimum project cost with considering indirect cost is 100 Rs.er 05
day.
Activity

(b) What is the simulation? Classify the simulation model? Explain the 06
general Simulation methodology.
OR
(I) The details of activity and duration are shown below.
Q.5 (a)

Activity Immediate predecessor activity Duration (Days)


A
10
B
A
5
C
A
4
D
A
7
E
B, C
6
F
C, D
4
G
E, F
7
Find
(i)
Draw a network
(ii)
Find the critical path
(iii)
Project duration
(II) What is the meaning float in project management? State the
various types float.
(b)

Do as directed with reference to dynamic programming


(i) Explain the terms: State, Stage and Policy
(ii) Explain Bellmans Principle of Optimality
(iii) Explain: Transformation function and Return function

02
02
01
02

03
02
02

*************

Page 3 of 3

Seat No.: ________

Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY


BE - SEMESTERVII EXAMINATION WINTER 2013

Subject Code: 171901


Subject Name: Operation Research
Time: 10.30 am - 01.00 pm

Date: 26-11-2013
Total Marks: 70

Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.

Q.1

(a) What are phases of OR Project, explain in detail


(b) A coffee company mixes Brazilian, Columbian and African coffee to make two
brands of coffee plains A and B. The characteristics used in blending the coffee
include strength, acidity and caffine. The test result of the available supply of
Brazilian, Columbian and African coffee.
Price/kg
Strength
Acidity
%coffine
Supply
available
Brazilian
60
6
4
2
50000
Columbian
70
8
3
2.5
30000
African
65
5
3.5
1.5
25000

07
07

The requirement for A and B coffee are given as below.


Plain
Price/kg
Min
Max
Max
% Quantity
coffee
strength
acididty
coffine
Demanded
A
75
6.5
3.8
2.2
65000
B
85
6.0
3.5
2
55000
Assume that 35000 kg of plains A and 25000 kg of plain B are to be sold
formulate LPP.
Q.2

Q.3

(a) Minimize z = -3x1 + x2 2x3


Subject to
x1 + 3x2 + x3 5
2x1 x2 + x3 2
4x1 + 3x2 2x3 = 5
x1, x2, x3 0
(b) Consider the transportation problem shown in table below
Find the initial basic feasible solution using Northwest corner method
1
2
3
4
5
supply
PLANT
1
20
4
32
28
20
3000
2
12
36
24
26
32
5000
3
16
8
28
24
20
8250
4
28
44
40
16
36
3750
Demand
3500
4000
2500
1500
4000
OR
(b) Solve above method by Least cost cell method
(a) Consider the assignment problem shown in table below. In the problem 5
different jobs are to be assigned to 5 different operators such that the toal
processing time is minimized. The matrix entries represent processing times in
hours.
Develop a zero-one programming model.

07

07

07
07

Q.3

1
2
3
4
5
1
20
24
30
24
16
2
14
32
28
28
22
3
26
28
14
18
18
4
24
20
22
26
20
5
16
26
30
22
30
(b) Solve above problem with Hungerian method
OR
(a) Solve the below game theory problem with the concept of dominance method
PLAYER B
PLAYER
I
II
III
A
I
3
5
4
II
5
6
2
III
2
1
4
IV
3
3
5
(b) Determine the solution of game for the pay-off matrix given below
PLAYER B
PLAYER A
I
II
I
-3
-1
II
4
1

Q.4

07

IV
2
4
0
2
07
III
7
-2

(a) The initial cost of a machine is Rs 71000 and scrape value is Rs 1000. The
maintenance costs found from experience are as below.
Find when should the machine be replaced?

(b)

07

Year
1
2
3
4
5
6
7
8
Maintenance 2000 3500 5000 7000 10000 13000 17000 21000
Customers arrive at a one window drive according to the poisons distribution
with the mean of 10 minutes and service time per customer is exponential
with mean of 6 minutes. The space in front of the window can accommodate
only three vehicles including the serviced one. Other vehicles have to wait
outside the space. Calculate
- Probability that an arriving customer can drive directly to the space in
front of the window
- Probability that an arriving customer will have to wait outside the directed
space
- How long an arriving customer is expected to wait before getting the
service?

07

07

OR

Q.4

(a) Inventory control manager of a firm has collected the following data on one
item
- Minimum total cost per annum = Rs. 16000
- Inventory holding cost per unit per year = Rs. 4
- No of order per year = 10
- Price per unit = Rs. 25

07

Calculate annual demand of the item, procurement cost per order, inventory
carrying cost as a percentage of average inventory investment and economic
order quantity (EOQ)
(b) In a firm, the demand for a certain item is random. It has been established that
the monthly demand of an item has a normal distribution with a mean of 1000
and a standard deviation of 150 units. The unit price of an item is Rs 20/-. The
ordering cost is Rs 40/-, the inventory carrying cost is estimated to be 15% per

07

annum respectively. The procurement lead time is constant and is two months.
Find the most economic ordering policy and the expected cost of controlling
inventory given that the service level is 95%.
Q.5

(a) A small project is compsed of 7 activities whose time estimates are listed in the
table below. Activities are identified by their beginning (i) and ending (j) node
numbers
Activity
Estimated duration (weeks)
(i-j)
Optimistic
Most likely
pessimistic
1-2
1
1
7
1-3
1
4
7
1-4
2
2
8
2-5
1
1
1
3-5
2
5
14
4-6
2
5
8
5-6
3
6
15
-

Q.5

07

Draw the network diagram of activities in the project


Find the expected duration and variance of each activity. What is the
expected project length?
Calculate the variance and standard deviation of the project length.

(b) What do you mean by linear programming?


Define following terms : linear function, objective function, decision variable,
constraints, feasible solution, optimal solution.
OR
(a) What is CPM and PERT. Discuss significance of using CPM and PERT.

07

(b) Define following terms with respect to CPM/PERT : event, merge event, burst
event, activity, processor activity, successor activity, dummy activity

07

07

*************

Seat No.: ________

Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY


BE - SEMESTERVII EXAMINATION SUMMER 2014

Subject Code: 171901


Subject Name: Operation Research
Time: 02:30 pm - 05:00 pm

Date: 22-05-2014
Total Marks: 70

Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.

Q.1

Q.2

(a)

State the phases of Operation Research. Discuss in brief the areas of application
of Operation Research
(b) Solve the following LPP by simple method :
Maximize Z = 3x1 + 2x2 subject to 2x1 + x2 < 5, x1 + x2 < 3 and x1and x2 > 0

07

(a)

Company wants to find out the minimum time require to complete four tasks by
available four workers with him so that he can take another from the order
party. Following table gives the time in hours for each workers for each job
A
B
C
D
1
24
10
21
11
2
14
22
10
15
3
15
17
20
19
4
11
19
14
13

07

Explain Monte Carlo simulation procedure. Also discuss its applications with
suitable example
OR
(b) A school wants to pick up students from five different areas. Cost in rupees of
going from one area to another is shown in table. Find the optimal route to the
bus drive such that no repetition of the area comes before picking up students
from all areas.
I
II
III
IV
V
I
0
30
60
80
20
II
70
0
40
90
30
III
90
80
0
50
80
IV
130
50
70
0
60
V
20
40
30
90
0

07

(a)

07

(b)

Q.3

Reduce following matrix by rule of dominance

Player
B1
B2
B3
B4
A1
6
4
8
0
Player
A2
6
8
4
8
A3
8
4
8
0
A4
0
8
0
16
(b) Two companies are thinking on selecting the advertising media. There are three
medias available along with the pay of as shown in the pay of matrix

07

07

07

TV
Radio
Internet
TV
150
200
-400
Player A
Radio
0
75
-100
Internet
450
100
250
Value is in gain sales in (1000 rupees) suggest optimal strategy for the
marketing and find out the value of the game
1

Q.3

Q.4

OR
(a) A person is planning to purchase a car. A new car is costing rupees 3 lacs. The
resale value of the car at the end of the year is 85 % of the previous year.
Maintenance and repair cost during the first year are rupees 10000 and they
increase by 15 % every year. The minimum resale value of the car can be
rupees 75000. (a) When should the car be replaced to minimize average annual
cost? (b) If interest rate of 12 % is assumed, calculate the average cost at the
end of 10 years
(b) A copy maker has one copy making machine and he operates as the order
comes. The order arrival is poison distribution having interval time of 0.5 min.
The average time to serve a copy is distributed with mean of 0.3 min.
Determine the following: (1) Utilization factor of the machine (2) Idle time for
machine in a day having working hours of 10 hours (3) No of persons waiting
in the system (4) No of persons waiting in the queue (5) Average waiting time
in the queue
(a)

From the following given data find out shortage cost for the item. C1 = Rs.900/and critical probability = 0.70
Units Stocked
50
58
65
70
75
Probability
0.2
0.25
0.14
0.34
0.07
(b) Consider the following given data and based on that find out critical path for the
given project.
Activity
1-2
1-3
2-4
3-4
3-5
3-6
4-6
5-6
Time in
6
9
3
4
8
12
7
1
days

07

07

07

07

OR

Q.4

Q.5

Q.5

(a)

A utensil manufacturing company manufactures around 140 units of utensils.


Depending upon the availability of row material and other conditions the daily
production has been varying from 136 units of utensils to 144 units of utensils
whose probability is as given below.
Production 136
137
138
139
140
141
142 143 144
per day
Probability 0.03 0.06 0.14 0.13 0.22 0.16 0.12 0.08 0.06
The finished units of utensils are transported in a specially designed rickshaw
that can accommodate only 140 units of utensils. Using the following given
random numbers simulate the process to find out (1) What will be the average
number of utensils waiting in the factory (2) What will be the number of
empty spaces in rickshaw
Random Numbers: 84, 72, 28, 52, 38, 65, 13, 79, 27, 54, 01
(b) Solve the cargo loading problem with following data and maximum weight
capacity is five.
Item (n)
Weight
Return
(Wn)
(Rn)
1
1
3
2
2
7
3
3
10

07

(a)

07

Explain the following terms in connection with inventory management. (1) Reorder point (2) Safety stock (3) Lead time (4) Economic lot size (5) Carrying
cost
(b) Explain the term crashing of network. Why it is required?
OR
(a) The annual demand of a product is 15,000 units. Each unit cost Rs.50/- if the
orders are placed in quantity below 150 units. For order of 200 and above the
unit prize is Rs.44/-. Assume inventory holding cost is 12% of the value of item
and ordering cost is Rs.2/- per order find the economic lot size

07

07
07

(b)

A company is presently buying an item of worth Rs.90,000/- from a supplier at


an optimal purchasing policy at a discount of 1%. Presently the ordering cost is
Rs.100/- per order and 20% as inventory handling cost of the average inventory
level. The company receives another two offers from the other suppliers. First
supplier offers 5% discount if the order is placed twice a year and second
supplier offers 3% discount if the order is placed quarterly a year. Which offer
the company should accept?

07

*************

Seat No.: ________

Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY


BE - SEMESTERVII EXAMINATION WINTER 2014

Subject Code: 171901


Subject Name: Operation Research
Time: 10:30 am - 01:00 pm

Date: 25-11-2014
Total Marks: 70

Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.

Q:-1

(a) Write the dual of the following linear programming problem.


07
Minimize, Z = 20 X1+ 23 X2
Subjected to,
- 4X1 - X2 -8
5X1 - 3X2 = - 4
X1, X2 0
Solve the Dual problem using simplex method and predict the value of variables X1,
X2 from the solution of dual linear programming problem.
(b) Optimum simplex table of the following linear programming problem
has
been given in the table:-1.
Maximize, Z = 60 X1+ 20 X2 +80 X3
Subjected to,
6X1+3X2+5X3
3X1+4X2+5X3
X1, X2, X3 0

60
80

Basic
Variable
X1
X3

X1
1
0

750
600

X2

X3

W1

W2

-1/3
0
1/3
-1/3
50
1
1
-1/5
2/5
90
Table:-1
(i) If the RHS of the constraints changes to [750, 900]T, does it affect the
optimum solution? If yes, then find the optimum solution using sensitivity
analysis approach.
(ii)
If coefficient of X2 in the constraints change to [1, 1]T, does it affect the
optimum solution? If yes, obtain the optimum solution using sensitivity
analysis approach.
(iii) If new constraint X1+X2+X3 90 is added to the LP Problem, does it
affect the optimum solution? If yes, obtain the optimum solution using
sensitivity analysis approach.

02
02
03

Q:-2 (a) A Manufacturer wants to ship 8 loads of his product as shown in following matrix.
The matrix gives the mileage from origins, O to the destinations, D. The shipping cost
is Rs. 10 per load per mile. What will be the optimal schedule and optimal cost? Use
Vogels approximation method to find initial basis feasible solution and MODI
method to obtain optimal solution.
D1

D2

D3

Supply

O1

50

30

220

O2

90

45

170

O2

250

200

50

Demand

(b) (i) Using dynamic programming solve the following L.P.P.,


Maximize, Z = X1+ 9 X2

07

04

Subjected to,
X2 11
2X1+X2 25
X1, X2 0
(ii) In brief, explain characteristics of operation research.
OR
(b) (i) A student of engineering wants to appear in the three competitive exam and he has
three days left before examination. He wants to revise the whole syllabus of the
subjects before examination by devoting a single day, two days or not a single day to
any subject based on given estimate of expected grade points as shown in matrix. How
he should plan his study?

03
06

Subjects
I

II

III

3
3
4
3
(ii) Write the definition of operation research given by author Churchman, Ackoff and
Arnoff.
(a) The owner of a small machine shop has four machinists available. To assign jobs for
the days. Five jobs are offered with the expected profit in rupees for each machinist on
each job has been shown in matrix below. Find the assignment of machinists to jobs
that will result in a maximum profit. Which job should be declined?
Jobs

Machinist

Q:-3

Days

6.20

7.80

5.00

10.10

8.20

7.10

8.40

6.10

7.30

5.90

8.70

9.20

11.10

7.10

8.10

4.80

6.40

8.70

7.70

8.00

01

07

(b) Determine the approximate solution of following game problem (do minimum 10
iteration)
B
1
2
3
4
1
3
2
4
0
2
3
4
2
4
A
3
4
2
4
0
4
0
4
0
8

07

OR
(a) A company is facing the problem of assigning six different machines to five different
jobs. The estimated costs are given in matrix as below.
Jobs

Machine

Q:-3

2.5

1.5

6.5

3.5

4.5

10

07

Solve the problem assuming that the objective function is to minimize total cost. Is
there any alternate optimal solution exist? If yes, find the possible alternate solution.

(1/4).

07

(a) The activities A to H of a new project having relationships and timings shown in table
below.
Duration (in days)
Relationship between
activities
A < C, D
Activity
t0
tm
tp
B<E
A
2
2
8
C<F
D<F
B
2
5
8
E, F < H
C
3
6
15

07

(b) For a game shown below, if X1 : X2 = (1/2)

: (2/3) and

Y1 : Y 2 = (3/4) :
Find expected pay off. Are these strategies optimal for player I and II? Why?
II
I

Q:-4

14

14

(1) Draw the network.

(2) Find the critical path and expected time of completion of the project.
(3) What will be the standard deviation of the project completion duration?
(4) What will be the probability of completing the project in expected time of
completion?
(b) (i) Explain in brief Monte carlo simulation.
(ii) Automobile arrives at a petrol pump having one petrol unit in poisson fashion
with an average of 10 units per hour. The service time is distributed exponentially
with a mean of 3 min. Find following:a. Average number of unit in system
b. Average waiting time for customer in queue.
c. Probability that number of units in system is 2.
d. Probability that waiting time exceeds 30 min.
OR
Q:-4

(a) Following table shows jobs, normal and crash time, normal and crash cost of a
project. Indirect cost for the project is 300 Rs./day.
Normal Normal
Crash
Crash
Jobs
Time
Cost
Time
Cost
i-j
(Days)
(Rs.)
(Days)
(Rs.)
1900
1-2
6
1400
4
2800
13
8
2000
5
23

1100

1500

24

800

1400

34

---

---

---

---

25

900

1600

46

10

2500

3500

5-6

500

800

(i)
Draw the network and find the critical path.
(ii)
What is normal duration and cost of project.
(iii)
Find optimal cost and duration.
(b)(i) Explain Kendalls notation for representing Queuing model.
(ii) Generate random numbers using (1) Mixed congruence method and (2) Additive
congruence method for the data: r0 = 2, a = 14, b = 12 and m = 32.

03
04

07

03
04

Q:-5

Q:-5

(a)
(i) Explain importance of replacement in brief.
(ii) The value of the money is 10 % per year. Machine-1 is to be replaced every 3
years and Machine -2 is to be replaced for every 6 years with yearly expenditure as
given below. Which machine costs less?
Expenditure ( in rupees)
Year

Machine:-1

Machine:-2

2000

3400

400

200

800

400

---

600

---

800

---

1000

(b) Derive the expression of optimal production lot size and optimum level of shortage
for the inventory model with gradual supply and shortage is allowed.
OR
(a) (i) Explain in brief the reason for replacement.
(ii) As new automobile vehicle costs of Rs. 10000 and it can be sold at the end of any
year with the selling price as shown below. The operating and maintenance cost are
given year wise in following table. Find when the automobile vehicle needs to be
replaced because of wear and tear.
Expenditure ( in rupees)
Year

Selling
Price (Rs.)

1
2
3

7000
5000
3000

Operating and
maintenance
cost (Rs.)
1000
1600
1800

2000

2500

5
6

1000
500

3000
3500

(b) Explain ABC analysis.

02

05

07

03

04

07
*************

Seat No.: ________


No.___________

Enrolment

GUJARAT TECHNOLOGICAL UNIVERSITY


BE - SEMESTERVII EXAMINATION SUMMER 2015

Subject Code: 171901


Subject Name: Operations Research
Time: 02.30pm-05.00pm

Date: 01/05/2015
Total Marks: 70

Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.

State the general rules for formulating a dual LP problem fro its primal.
07
(b) Nachiketa corporation manufactures two products A1&A2.The profit per
unit of the two products is Rs.50& Rs.60 respectively. Both the products
require processing in three machines. Below table indicates the available
machine hours per week & time require on each machine for one unit of A1
&A2.Formulate as linear programming problem.
07

Q.1

(a)

Q.2

(a) Explain significance of any two assumptions of LPP.


(b) Use graphical method to solve the following LPP .
Maximize Z=17 X1 +15 X2
Subject to: 15X1 +25X2 375
24X1+11X2 265

07
07

All X1 , X2 0
OR
(b) Solve the following game whose payoff matrix is given below.
Player B
Player A

6
Q.3

07

8
2

(a) Distinguish between transportation & transshipment problems in detail.


(b) Company has factories A1, A2 & A3 which supply to warehouses at W1 ,W2 &
W3.Weekly factory capacities are 240,200&130 units respectively. Weekly
warehouses requirements are 190,150&110 units respectively. Unit
transportation in costs Rs. As follows:- Find I.B.S. BY VAM method & Optimum
solution BY MODI method.

A1
A2
A3
DEMAND

W1

W2

W3

SUPPLY

16
14
26
190

20
8
24
150

12
18
16
110

240
200
130
450

07
07

OR
1

Q.3

(a) Give different practical applications of transportation problem.


(b) Obtain an I.B.F.S. to the following transportation problem using N-W Corner
method.& Optimum solution BY STEPPING STONE method.
Q1
P1
1
P2
5
P3
0
DEMAND 4

Q.4

(a)

(b)

Q2
3
4
3
5

Q3
2
2
3
8

Q4
4
0
1
5

SUPPLY
8
10
12

The production department for a company requires 3500kg.of row material for
manufacturing a particular item per year. It has been estimated that the cost of
placing an order is Rs.35& the cost of carrying inventory is 25 percentage of the
investment in the inventories. The price is Rs.10 per kg.The purchase manager
wishes to determine an ordering policy for raw material. Calculate (1)The
optimal lot size(2)The minimum yearly variable inventory cost(3)The optimal
order cycle time(4)The minimum yearly total inventory cost.
Solve the following assignment problem by minimization method.
M1
M2
M3
M4
M5

I
12
13
3
18
12

II
5
7
2
9
6

III
9
6
3
12
14

IV
18
12
4
16
19

07
07

07

07

V
11
14
5
15
10

OR

Q.4

Q.5

A Project is represented by the Network shown below & has the following data.
Determine(1)Expected Time &Variance(2)Earliest & Latest times to reach each
event.(3)The critical path
Task
A
B
C
D
E
F
G
H
I
Optimistic 5
18
26
16
15
6
7
7
3
time
Pessimistic 10
22
40
20
25
12
12
9
5
time.
Most likely 8
20
33
18
20
9
10
8
4
time.
(b) On an average 95 patients per 24 hrs.day require the service of an emergency
clinic. Also on the average, a patient requires 12 minutes of an active attention.
Assume that the facility can handle only one emergency at a time.Suppoce that it
cost the clinic Rs.100 per patient treated to obtain an average servicing of 10
minutes & that minute of decreasing in this average time would cost Rs. 10 per
patient treated. How much would have to be budgeted by the clinic to decrease
the average size of the queue from one to one third patients to half a patient.

07

What is dynamic programming? Discuss the similarities between dynamic &


linear programming. How it differs from linear programming?

07

(a)

(a)

07

Q.5

(b) A firm is considering replacement of a machine whose cost price is Rs.12200&


the scrap value Rs.200.The running costs are found from experience to be as
follows. When should the machine be replaced?
Year
1
2
3
4
5
6
7
8
Running 200
600
700
1000 1200 1800 2500 4000
costRs.
OR
(a) Explain steps in Monte Carlo simulation process.
(b) Explain definition & scope of operation research.

07

07