Marathon Electric
A Subsidiary of Regal-Beloit Corp.
100 East Randolph Street
P.O. Box 8003
W ausau, W I 54402-8003
Phone: (715) 675 3311
Fax:
(715) 675 6361
TABLE OF CONTENTS
SAFETY ..............................................................................................................................................................................................4
4
RECEIVING AND STORAGE .........................................................................................................................................................4
4
UNPACKING AND HANDLING ...................................................................................................................................................4
4
STORAGE........................................................................................................................................................................................4
4
PRINCIPLES OF OPERATION ......................................................................................................................................................5
5
5
FIGURE 1 -- MAGNAPLUS CIRCUIT DIAGRAM ...............................................................................................................................5
5
FIGURE 2 -- TYPICAL MAGNAPLUS LAYOUT DIAGRAM.................................................................................................................5
6
VOLTAGE REGULATION .....................................................................................................................................................................6
MOTOR STARTING .......................................................................................................................................................................6
6
PARALLEL OPERATION ..............................................................................................................................................................6
6
NONLINEAR LOADING ................................................................................................................................................................6
6
INSTALLATION................................................................................................................................................................................6
6
PREPARATION FOR USE .............................................................................................................................................................6
6
GENERATOR MOUNTING ...........................................................................................................................................................7
7
Single Bearing Units. ...................................................................................................................................................................7
7
Two Bearing Generators -- Direct Drive .....................................................................................................................................7
7
Two Bearing Units -- Belt Driven.................................................................................................................................................7
7
END PLAY TESTING .....................................................................................................................................................................7
7
TORSIONAL VIBRATION.............................................................................................................................................................7
7
ENVIRONMENTAL CONSIDERATIONS .....................................................................................................................................8
8
WIRING CONNECTIONS................................................................................................................................................................8
8
OPERATION ....................................................................................................................................................................................1
11
PRE-START INSPECTION ..........................................................................................................................................................1
11
START-UP .....................................................................................................................................................................................1
11
SHUTDOWN PROCEDURE.........................................................................................................................................................1
12
MAINTENANCE .............................................................................................................................................................................1
12
DRYING WINDINGS ...................................................................................................................................................................1
13
Space Heaters .............................................................................................................................................................................1
13
Forced Air ..................................................................................................................................................................................1
13
TESTING ..........................................................................................................................................................................................1
13
13
VISUAL INSPECTION ........................................................................................................................................................................1
13
CONSTANT EXCITATION TEST .........................................................................................................................................................1
13
CONTINUITY / RESISTANCE TEST.....................................................................................................................................................1
14
INSULATION TEST ............................................................................................................................................................................1
DIODE TESTING ..........................................................................................................................................................................1
14
SERVICE ..........................................................................................................................................................................................1
14
GENERAL .....................................................................................................................................................................................1
14
FIELD FLASHING ........................................................................................................................................................................1
14
15
BEARING REMOVAL ........................................................................................................................................................................1
Opposite Drive End Bearing Bracket Removal. .........................................................................................................................1
15
Drive End Bearing Bracket Removal, ........................................................................................................................................1
15
Two Bearing Units......................................................................................................................................................................1
15
BEARING REPLACEMENT ........................................................................................................................................................1
15
15
RECTIFIER ASSEMBLY REMOVAL ....................................................................................................................................................1
15
DIODE REPLACEMENT .....................................................................................................................................................................1
2
SAFETY
PLEASE REMEMBER SAFETY FIRST. If you are not sure
o f t h e i n s t ru c t i o n s o r p ro c e d u re s c o n t a i n e d h e re i n , s e e k
q u a l i f i e d h e l p b e f o re c o n t i n u i n g .
WARNING
THE LIFTING LUG (S) ON THE GENERATOR ARE
DESIGNED TO SUPPORT THE GENERATOR ONLY.
DO NOT LIFT A COMPLETE GENERATOR AND
DRIVER ASSEMBLY BY MEANS OF LIFTING LUG (S)
ON THE GENERATOR. PERSONAL INJURY OR
EQUIPMENT DAMAGE MAY RESULT.
STORAGE
In the event that the generator is not immediately installed
on its prime mover, it is recommended that the unit be stored
indoors in a clean, dry area, which is not subject to rapid
changes in temperature and humidity. If the generator is
s t o re d f o r a l o n g p e ri o d o f t i m e , t h e g e n e ra t o r s h o u l d b e
t e s t e d , c l e a n e d a n d d ri e d a s re q u i re d b e f o re b e i n g p u t i n t o
service. See the maintenance section of this manual for
f u rt h e r i n f o rm a t i o n . I f t h e u n i t h a s b e e n s t o re d i n a n a re a
where it has been subject to vibration, it is recommended
that the bearing(s) be inspected and replaced as necessary.
PRINCIPLES OF OPERATION
PMG (optional)
PMG Field
(rotor)
Rotating Assembly
Exciter Field
(stator)
Main Field
(rotor)
Exciter Armature
(rotor)
Main Armature
(stator)
L1
(+)
(+)
DC
(in)
DC
(in)
(-)
L2
(-)
3 Phase AC (out)
3 Phase AC (out)
PMG
Armature
(stator)
L3
PRINCIPLE OF OPERATION
MagnaPLUS generators are a brushless, self excited, and
externally voltage regulated, synchronous AC generator.
The generator is made up of six major components: main
stator (armature), main rotor (field), exciter stator (field),
exciter rotor (armature), rectifier assembly, and voltage
regulator. In understanding the above terminology, note the
following: stators are stationary, rotors rotate, a field is an
e l e c t ri c a l i n p u t , a n d a n a rm a t u re i s a n e l e c t ri c a l o u t p u t .
These system components are electrically interconnected as
shown in figure 1 and physically located as shown in
f i g u re 2 .
PARALLEL OPERATION
All MagnaPlus generators are built with 2/3 pitch main stator
windings and full amortisseur (damper) windings. These
features make the MagnaPlus generators suitable for parallel
operation when equipped with the proper voltage regulators
and voltage regulator accessories. Consult with the factory
for further information relative to parallel operations.
NONLINEAR LOADING
Solid state electronic control devices (variable frequency
drives, precision motor controls, battery chargers, etc.) utilize
electronic switching circuits (thyristors, SCRs, Diodes, etc.).
These switching circuits introduce high frequency harmonics,
which distort the normal waveform of the generator. This
creates additional heat in the generator windings and may
cause the generator to over-heat. Problems that can occur
are not limited to the generator. Poor wave shape may
adversely effect various loads connected to the generator.
Consult Marathon Electric for further information relative to
nonlinear loads .
INSTALLATION
Voltage Regulation
MOTOR STARTING
W hen a motor is started, the motor draws a large surge of
current. This starting current is equivalent to the motors
l o c k e d ro t o r o r s t a l l c u rre n t a n d i s 5 t o 1 0 t i m e s ' n o rm a l f u l l
l o a d c u rre n t . W h e n t h e g e n e ra t o r s u p p l i e s t h i s i n -ru s h o f
starting current, the generator voltage dips temporarily. If
t h e m o t o r i s t o o l a rg e f o r t h e g e n e ra t o r, t h e g e n e ra t o r s
voltage dips greater than 30 percent. This may result in the
motor starter de-energizing or the motor stalling. MagnaPlus
WARNING
DISABLE AND LOCKOUT ANY ENGINE CRANKING
DEVICES BEFORE ATTEMPTING TO INSTALL OR
SERVICE THE GENERATOR.
FOR ELECTRIC
START SETS, DISCONNECT THE CRANKING
BATTERY. FOR AIR START, DISCONNECT THE AIR
SUPPLY. FOR MOTOR GENERATOR SETS, OPEN
THE POWER SUPPLY TO THE DRIVE MOTOR.
FAILURE TO COMPLY WITH THESE SAFETY
PROCEDURES COULD RESULT IN SEVERE
PERSONAL INJURY OR EQUIPMENT DAMAGE.
GENERATOR MOUNTING
Two Bearing Units -- Belt Driven
Two bearing MagnaPLUS generators can be belt driven
provided belts are sized and applied correctly. Please refer
to your supplier of belts and sheaves for correct sizing and
t e n s i o n i n g s p e c i f i c a t i o n s . A b e a ri n g l i f e c a l c u l a t i o n s h o u l d
be performed. Marathon Electric recommends a minimum
B-10 life of 40,000 hours. If cog type belts are used, a
vibration may be introduced which could lead to premature
f a i l u re o f t h e b e a ri n g s .
GENERATOR MOUNTING
TORSIONAL VIBRATION
GENERATOR MOUNTING
Two Bearing Generators -- Direct Drive
Two bearing generators are provided with a keyed shaft
extension.
For direct drive generators, the assembler
furnishes a flexible coupling, which is installed between the
ENVIRONMENTAL
CONSIDERATIONS
WIRING CONNECTIONS
Wiring of the generator and accessories should be
done in accordance with good electrical practices.
Follow government, industry and association
standards.
The generator conduit box construction allows cable entry
f ro m m u l t i p l e s i d e s . A h o l e s a w o r o t h e r a p p ro p ri a t e t o o l
may be used to provide for conduit entrance. Protect the
interior of the generator from shavings when drilling or
sawing. An approved connector must be used in conjunction
T4
T7
T12
T6
T3
L3
T9
L-L
T10
T11
T8
T5
L-N
T2
L2
T1
T10
T4
T12
L-L
T5
T9
T2
T6 T11
L3
T3
L2
T8
L-N
L1
T1
T6
L-L
T7
T3
L3
T4
T9
T10
T11
T8
T5
L2
T2
L-N
T1
T9
T3
L3
T4
T10
T11
L-L
T6 T7
T8
T5
T2
L2
L-L
T5
T6
L2
T11
T9
T2
T1
T8
T12
T4
T7
T10
L1
L-N
L-N
L-L
T2
T12 T8
T3
T9
T5
T11
L2
L-N
T4
T1
T10
T7
L1
Note: Single-phase KW /KVA ratings are approximately
e q u a l t o 5 0 % o f t h e g e n e ra t o r s t h re e p h a s e ra t i n g s .
L-N
L-L
T1
T4
T9
T6
T7
T3
T10
T11
T8
T5
L2
T2
L1
L-N
L-N
L-L
10
L1
T1
T2
T3
T4
VOLTAGE (DEDICATED)
Hz
L-L
L-N
60
240
120
220
110
50
220
110
200
100
L2
L-N
L-N
L-L
8.
9.
OPERATION
PRE-START INSPECTION
Before starting the generator for the first time, the following
i n s p e c t i o n c h e c k s a re re c o m m e n d e d :
1.
2.
3.
START-UP
WARNING
4.
5.
6.
7.
11
1.
2.
3.
4.
5.
6.
3.
MAINTENANCE
The following maintenance procedures should be followed to
e n s u re l o n g e q u i p m e n t l i f e a n d s a t i s f a c t o ry p e rf o rm a n c e .
Maintenance intervals will depend upon operating conditions.
1.
2.
3.
WARNING
QUALIFIED ELECTRICAL PERSONNEL MUST
CONDUCT THE FOLLOWING TEST.
LETHAL
VOLTAGE MAY BE PRESENT AT BOTH THE
GENERATOR
AND
VOLTAGE
REGULATOR
TERMINALS DURING THIS PROCEDURE. CAUTION
MUST BE EXERCISED NOT TO COME INTO
PERSONAL CONTACT WITH LIVE TERMINALS,
LINKS, OR STUDS. SERIOUS INJURY OR DEATH
COULD RESULT.
7.
8.
9.
WARNING
QUALIFIED ELECTRICAL PERSONNEL MUST
CONDUCT THE FOLLOWING TEST.
LETHAL
VOLTAGE MAY BE PRESENT AT BOTH THE
GENERATOR
AND
VOLTAGE
REGULATOR
TERMINALS DURING THIS PROCEDURE. CAUTION
MUST BE EXERCISED NOT TO COME INTO
PERSONAL CONTACT WITH LIVE TERMINALS,
LINKS, OR STUDS. SERIOUS INJURY OR DEATH
COULD RESULT.
SHUTDOWN PROCEDURE
4.
5.
2.
12
DRYING WINDINGS
Generators in service may inadvertently have their windings
exposed to splashing or sprayed water. Units that have
b e e n i n t ra n s i t o r s t o ra g e f o r l o n g p e ri o d s o f t i m e m a y b e
subjected to extreme temperature and moisture changes
causing excessive condensation. Regardless of the source
of moisture, wet windings should be thoroughly dried out
b e f o re o p e ra t i n g t h e u n i t . I f t h i s p re c a u t i o n i s n o t t a k e n ,
serious damage to the generator can result. The following
procedures may be utilized in drying the generators
windings. W inding wetness and situation limitations will
i n fl u e n c e th e m e th o d s e l e c te d .
WARNING
QUALIFIED ELECTRICAL PERSONNEL MUST
CONDUCT THE FOLLOWING TEST.
LETHAL
VOLTAGE MAY BE PRESENT AT BOTH THE
GENERATOR
AND
VOLTAGE
REGULATOR
TERMINALS DURING THIS PROCEDURE. CAUTION
MUST BE EXERCISED NOT TO COME INTO
PERSONAL CONTACT WITH LIVE TERMINALS,
LINKS, OR STUDS. SERIOUS INJURY OR DEATH
COULD RESULT.
Space Heaters
An electric heater may have been supplied with the
generator. W hen energized from a power source other than
the generator, the heater will gradually dry the generator.
Enclosing the unit with covering and inserting additional
h e a t i n g u n i t s c a n a c c e l e ra t e t h i s p ro c e s s . A h o l e s h o u l d b e
left at the top of the covering to permit the escape of
moisture. Care should be taken not to overheat various
accessory equipment mounted with the generator.
Forced Air
Another method to dry the generator is to run the set with no
excitation (see startup procedure item #2). The natural flow
of ambient air through the generator will tend to dry the
windings. This method can be accelerated by adding a
source of heat at the air intake to the generator. Heat at
point of entry should not exceed 80 C (180 F).
TESTING
Visual Inspection
1.
2.
3.
W i t h n o l o a d o n t h e g e n e ra t o r (m a i n b re a k e r o p e n ) ru n
the generator at rated speed. Measure the generators
terminal voltage and compare this value with values
re c o rd e d d u ri n g i n s t a l l a t i o n .
13
Insulation Test
I n s u l a t i o n re s i s t a n c e i s a m e a s u re o f t h e i n t e g ri t y o f t h e
insulating materials that separate the electrical windings
from the generators steel core. This resistance can degrade
over time or be degraded by contaminants: dust, dirt, oil,
grease, and especially moisture. Most winding failures are
due to a breakdown in the insulation system. In many cases,
l o w i n s u l a t i o n re s i s t a n c e i s c a u s e d b y m o i s t u re c o l l e c t e d
when the generator is shutdown
Insulation resistance is measured with a megger (mega-ohm
m e t e r). A m e g g e r m e a s u re s i n s u l a t i o n re s i s t a n c e b y p l a c i n g
500 volts between the winding and the frame of the
generator. Caution must be taken to remove all electronic
devices (regulators, diodes, surge protectors, capacitors,
protective relays, etc.) from the winding circuit before
c h e c k i n g th e i n s u l a ti o n . W i n d i n g i n s u l a ti o n c a n b e c h e c k e d
on the main stator, main rotor, exciter stator, and exciter
rotor. Minimum resistance is 2 mega-ohms. If the winding
re s i s t a n c e i s l o w i t m u s t b e d ri e d (s e e m a i n t e n a n c e s e c t i o n )
o r re p a i re d .
1.
2.
3.
DIODE TESTING
I f t h e g e n e ra t o r i s c l o s e c o u p l e d t o a n e n g i n e , i t m a y b e
necessary to "bar over" the engine in order to gain access to
a given area of the rectifier assembly. NEVER use the
generator's fan as a fulcrum to accomplish this. Use the
engine manufacturer's recommended practice to manually
turn over the engine.
To prevent possible injury to
p e rs o n n e l , a n d d a m a g e t o t h e e q u i p m e n t , e n s u re t h a t t h e
e n g i n e c a n n o t s t a rt d u ri n g t h i s p ro c e d u re .
SERVICE
Remove the two main rotor leads and the three exciter rotor
leads from the rectifier assembly (figure 4). The rectifier
a s s e m b l y i s n o w e l e c t ri c a l l y i s o l a t e d f ro m t h e g e n e ra t o r.
The diodes remain mounted and the diode leads remain
connected to the terminal posts. Using an ohmmeter or a
b a t t e ry l i g h t c o n t i n u i t y t e s t e r, p l a c e o n e t e s t p ro b e o n t h e
d i o d e l e a d t e rm i n a l p o s t . I n s u c c e s s i o n , t o u c h t h e o t h e r t e s t
probe to the lead screw hole in each heat sink. Reverse the
probes and repeat the procedure. You have now tested the
t h re e d i o d e s c o n n e c t e d t o t h i s t e rm i n a l p o s t i n b o t h t h e
forward and reverse direction. Repeat the procedure using
t h e o t h e r d i o d e t e rm i n a l p o s t .
GENERAL
The service procedures given in this section are those which
can reasonably be conducted on-site with a minimum
n u m b e r o f s p e c i a l to o l s a n d e q u i p m e n t.
Qualified
maintenance personnel should conduct all service
procedures. Replacement parts may be ordered through an
authorized service center or directly from the factory.
FIELD FLASHING
Forward
Terminal End
Anode Cathode
(+)
(-)
Reverse
Stud End
Cathode
Anode
(-)
(+)
14
CAUTION:
Failure to remove the exciter field leads from the
automatic voltage regulator during flashing
procedures may destroy the regulator.
BEARING REPLACEMENT
Using a bearing puller, remove the existing bearing. It is
s t ro n g l y re c o m m e n d e d t h a t t h e b e a ri n g b e re p l a c e d a n y t i m e
it is removed from the shaft. ALWAYS install the same type
and size bearing that was supplied as original equipment.
Order by part number from the parts list, and include the unit
serial number and part number when ordering. Heat the
bearing to a maximum of 100oC (212oF) in an oven. Apply
a t h i n c o a t o f c l e a n l u b ri c a t i n g o i l t o t h e p re s s -f i t a re a o f t h e
rotor shaft. Using suitable heat resistant gloves, install the
bearing over the end of the shaft until it seats against the
shaft shoulder. The bearing should slide on the shaft and be
seated without excessive force. Should the bearing bind on
t h e s h a f t p ri o r t o b e i n g s e a t e d a g a i n s t t h e s h o u l d e r, a p i e c e
o f t u b i n g s l i g h t l y l a rg e r t h a n t h e p re s s f i t a re a c a n b e u s e d t o
drive the bearing to its final position. Using light taps with a
soft mallet, apply pressure to the inner race only.
Bearing Removal
Prior to performing this operation, it is suggested that the
alternator's shaft be rotated until two of the main rotor poles
are in a vertical position. Once the bearing bracket is
backed out, the rotor will drop on the main stator core.
Having the rotor in this position will limit the amount of rotor
drop to that of the air gap. Visually inspect the bearing bore
for damage or wear. If worn or damaged, replace prior to
re a s s e m b l e .
Diode Replacement
15
430 FRAME
A - Exciter Rotor Lead, B - Main Rotor Lead, C - Red (+) Suppressor Lead, D - Black (-) Suppressor Lead
RETURNED GOODS
dam age
when
TROUBLESHOOTING
16
WARNING
HIGH VOLTAGES MAY BE PRESENT AT THE GENERATORS TERMINALS WHEN THE UNIT IS RUNNING.
SOME ACCESSORY EQUIPMENT SUCH AS SPACE HEATERS MAY BE ENERGIZED FROM AN OUTSIDE
POWER SOURCE WHEN THE UNIT IS AT REST. TOOLS, EQUIPMENT, CLOTHING AND YOUR BODY MUST
BE KEPT CLEAR OF ROTATING PARTS AND ELECTRICAL CONNECTIONS. SPECIAL PRECAUTIONS MUST
BE TAKEN DURING TROUBLESHOOTING SINCE PROTECTIVE COVERS AND SAFETY DEVICES MAY BE
REMOVED OR DISABLED TO GAIN ACCESS AND PERFORM TESTS. BE CAREFUL. SERIOUS PERSONAL
INJURY OR DEATH CAN RESULT FROM THESE HAZARDS. CONSULT QUALIFIED PERSONNEL WITH ANY
QUESTIONS.
Verify generator connections. See drawings supplied with the generator or lead
connection diagrams in this manual. Inspect all wiring for loose connections, open
c i rc u i t s , g ro u n d s , a n d s h o rt c i rc u i t s .
L o s s o f re s i d u a l
Flash the field. Refer to field flashing in the service section. If the generator is equipped
with a PMG, field flashing is not necessary -- check regulator fuse and input power from
the PMG.
Test the generator using the 12 volt battery test as specified in the testing section. If the
results indicate generator problems, perform insulation, continuity, and diode tests as
s p e c i fi e d i n th e te s ti n g s e c ti o n .
Regulator inoperative
Underspeed operation
Verify generator connections. See drawings supplied with the generator or lead
connection diagrams in this manual. Inspect all wiring for grounds, open circuits and short
c i rc u i t s .
Check regulator fuse and input power. Input power is produced by the generators
residual voltage or from an optional PMG.
Regulator adjustment
Test the generator using the 12 volt battery test as specified in the testing section. If the
results indicate generator problems, perform insulation, continuity, and diode tests as
s p e c i fi e d i n th e te s ti n g s e c ti o n .
Regulator inoperative
17
Excessive load
Reduce load. The load on each leg should be evenly balanced, and rated current should
not be exceeded on any leg.
L a rg e m o t o r s t a rt i n g o r l o w l o a d
power factor
Motor starting currents are too large for the generator. W hen starting multiple motors,
sequence the motors and start the largest motors first. Reduce lagging power factor load.
Check driver. If belt driven, check belt tension. Check under frequency setting on
regulator. Under frequency voltage roll-off may be activated.
Reactive droop
If the generator is equipped for parallel operation, some droop is normal as reactive load
increases. W hen operating as a single unit, the parallel CT can be shorted to eliminate this
effect. Refer to Regulator manual.
L i n e d ro p
If voltage is proper at generator terminals but low at load terminals, increase external wire
size.
Test the generator using the 12 volt battery test as specified in the testing section. If the
results indicate generator problems, perform insulation, continuity, and diode tests as
s p e c i fi e d i n th e te s ti n g s e c ti o n .
Fl u c tu a ti n g e n g i n e s p e e d
Check engine and governor systems for malfunctions. Check load for fluctuation.
Regulator stability
Replace defective or worn rheostat. Use shielded cable to minimize electrical noise.
Check assembly for loose connections. Test the diodes as specified in the test section.
L o o s e t e rm i n a l o r l o a d c o n n e c t i o n s
Defective regulator
Replace regulator.
F a u l t y m e t e ri n g
I n c o rre c t c o n n e c t i o n s
Verify generator connections. Refer to drawings supplied with the generator or connection
d i a g ra m s i n t h i s m a n u a l .
Regulator adjustments
Check the power factor of the load. If power factor is leading, change load configuration.
Excessive leading power factor (capacitors) can cause voltage to climb out of control.
I n c o rre c t re g u l a t o r c o n n e c t i o n
Defective regulator
Replace regulator.
18
GENERATOR IS OVERHEATING
CAUSE
Generator is overloaded
Reduce load. Check with ammeter and compare with nameplate rating.
I n s u f f i c i e n t c i rc u l a t i o n o f c o o l i n g a i r
Generator location and enclosure design must provide adequate airflow and minimize
re c i rc u l a t i o n o f h o t a i r.
Unbalanced load
The load on each leg should be as evenly balanced as possible and should not exceed
ra t e d c u rre n t o n a n y o n e l e g .
Defective bearing
Replace bearing.
EQUIPMENT RUNS NORMALLY ON UTILITY POWER, BUT WILL NOT RUN ON GENERATOR
CAUSE
Analyze load. Excessive SCR (thyristor) loading will cause distortion. Some equipment
may be sensitive to distorted waveforms. Refer to Marathon Electric.
Check nameplates of devices comprising the load. Compare required voltage and
frequency with that of the generator. Adjust driver speed and/or generator voltage as
n e c e s s a ry t o m a t c h g e n e ra t o r o u t p u t t o l o a d re q u i re m e n t s .
CAUTION: Compare required voltage, frequency, and kVA with generator nameplate to ensure adequate generator
capacity. If in doubt, consult Marathon Electric for information regarding generator capacity.
19
SPECIFICATIONS
MODEL / FRAME SIZE
281, 282, 283, 284
3 6 1 , 3 6 2 , 3 6 3 -- t h re e p h a s e
3 6 1 , 3 6 2 , 3 6 3 -- d e d i c a t e d s i n g l e p h a s e
4 3 1 , 4 3 2 , 4 3 3 -- t h re e p h a s e
4 3 1 , 4 3 2 -- d e d i c a t e d s i n g l e p h a s e
EXCITER RESISTANCE
STATOR
ROTOR
2 3 .0
.1 2 0
2 3 .5
.1 2 0
2 3 .0
.1 3 5
2 0 .3 3
.0 7 6
1 8 .0
.1 0 5
EXCITER FIELD
GENERATOR RESISTANCE
NO LOAD VOLTS
STATOR*
ROTOR
480 V / 60 HZ
281PSL1500
4 .2 0
.4 0 0
1 1 .0
281PSL1501
4 .1 5
.4 0 0
1 1 .0
281PSL1502
3 .2 0
.4 3 9
9 .0
282PSL1503
2 .0 0
.4 7 0
1 0 .4
282PSL1504
1 .5 1
.5 1 2
1 1 .3
282PSL1505
1 .0 0
.5 7 5
1 0 .1
283PSL1506
.6 8 1
.6 5 4
1 1 .0
283PSL1507
.4 8 0
.7 5 8
1 2 .0
284PSL1508
.3 4 6
.8 7 5
1 2 .0
361PSL1600
.3 8 1
.7 5 0
1 1 .8
361PSL1601
.2 6 4
.8 1 0
1 2 .5
361PSL1602
.1 8 1
.9 9 0
1 4 .1
362PSL1604
.1 3 8
1 .0 5
1 2 .2
362PSL1606
.0 9 8 0
1 .2 0
1 0 .8
363PSL1607
.0 6 9 2
1 .3 7
1 2 .2
431PSL6202
.0 2 1 4
.8 1 1 4
1 5 .1
431PSL6204
.0 4 7 7
.6 3 7 3
1 3 .6
431PSL6206
.0 3 7 1
.6 7 9 3
1 3 .8 2
431PSL6208
.0 1 3 3
.7 1 5
1 2 .2 0
432PSL6210
.0 2 1 4
.8 1 1 4
1 5 .1
432PSL6212
.0 2 2 6
.8 6 5 6
1 4 .1
433PSL6216
.0 1 2 1 5
1 .0 6 7 2
1 6 .2
433PSL6220
.0 1 2 1 4
.9 7 4 3
1 5 .6
* Stator resistance measured line to line in a high wye connection.
MODEL
DEDICATED
SINGLE PHASE
281PSL1511
281PSL1512
281PSL1513
282PSL1514
282PSL1515
283PSL1516
284PSL1517
284PSL1518
361PSL1611
361PSL1612
361PSL1613
362PSL1615
363PSL1617
431PSL1811
431PSL1813
432PSL1814
432PSL1815
GENERATOR RESISTANCE
STATOR
ROTOR
1 .4 2 0
.3 8 1
1 .1 0 6
.3 9 5
.6 3 2
.4 3 0
.4 3 6
.4 5 0
.2 4 0
.5 2 0
.1 6 0
.6 2 0
.0 9 1 8
.7 6 0
.0 6 1 0
.8 5 7
.0 6 9 5
.7 5 0
.0 4 3 4
.8 5 7
.0 3 6 9
.9 2 6
.0 1 9 1
1 .2 0
.0 1 1 9
1 .3 5
.0 2 4 8
.5 1 6
.0 1 2 9
.6 1 5
.0 0 9 3 1
.6 4 3
.0 0 7 2 3
.8 5 2
20
EXCITER FIELD
NO LOAD VOLTS / 60 HZ
8 .3
8 .1
8 .7
9 .2
9 .7
1 3 .3
1 2 .2
1 6 .6
1 7 .5
1 6 .1
1 3 .6
1 7 .0
2 3 .0
9 .9
1 3 .8
1 5 .1
1 1 .2
Reference
Number
1
2
3
4
5
6
7
8
9
10
Note:
Part Name
Reference
Number
11
12
13
14
15
16
17
18
19
20
Part Name
Main Stator
Main Rotor
Rotor Integral Keyway
Fa n
Mounting Adapter (SAE)
Shaft
Drive Hub
Drive Disk (SAE)
Exhaust Screen (drip cover not shown)
Mounting Base
Illustration above is a 280 frame MagnaPlus. Other Frame sizes are typical. Optional PMG not shown.
The generator model and serial numbers are required when ordering parts.
21
Reference
Number
1
2
3
4
5
6
7
8
9
10
Note:
Part Name
Reference
Number
11
12
13
14
15
16
17
18
19
20
Part Name
Main Stator
Main Rotor
Rotor Integral Keyway
Fa n
End Bracket (drive end)
Bearing (drive end)
Shaft
Key
Exhaust Screen (drip cover not shown)
Mounting Base
Illustration above is a 280 frame MagnaPlus. Other Frame sizes are typical. Optional PMG not shown.
The generator model and serial numbers are required when ordering parts.