Você está na página 1de 15

E BARRIER

Sl No

Description

unit

Qty

Rate

1.00

barrier 4m

nos

6.00

169000.00

1.00

barrier 5m

nos

4.00

200000.00

1.00

barrier 7m

nos

2.00

292000.00

nos

12.00

20000.00

total
2.00

CST @ 4% OF Sl 1

3.00

total sl 1 , 2

4.00

entry tax @ 4% of sl 3

5.00

total product cost Sl 3 , 4

6.00

Commissioning cost @ 20%of Sl 5

7.00

service tae @ 10.2% of sl 6

8.00

Total installation cost

9.00

pedestal etc ( LS )

10.00

transportation etc (LS for 1 truck load)


Grand Total

Amt
1014000.00
800000.00
584000.00
2398000.00
95920.00
2493920.00
99757.00
2593677.00
518735.00
52911.00
571646.00
240000.00
50000.00
3455323.00

ANALYSIS-D1
E BARRIER ( C Way = 5m)

Description

unit

Qty

Rate

Amt

barrier 4m

nos

0.00

169000.00

0.00

barrier 5m

nos

0.00

200000.00

0.00

barrier 7m

nos

1.00

292000.00

292000.00

Total

292000.00

CST @ 4% OF Sl 1

11680.00

total sl 1 , 2

303680.00

entry tax @ 4% of sl 3

12147.00

total product cost Sl 3 , 4

315827.00

Commissioning cost @ 20%of Sl 5

63165.00

service tae @ 10.2% of sl 6

6443.00

Total installation cost

69608.00

pedestal etc ( LS )

nos

1.00

20000.00

20000.00

transportation etc (LS 59.876% of cost of


Rs 50000.00 for 1 truck load)

29938.00

Grand Total

435373.00

Executive Engineer,PWD,
Abhayapuri NH Division,
Abhayapur, Assam.

ANALYSIS-D2
E BARRIER ( C Way = 7.5 & 7.75m)
75
Description

unit

Qty

Rate

Amt

barrier 4m

nos

0.00

169000.00

0.00

barrier 5m

nos

2.00

200000.00

400000.00

barrier 7m

nos

0.00

292000.00

0.00

total

400000.00

CST @ 4% OF Sl 1

16000.00

total sl 1 , 2

416000.00

entry tax @ 4% of sl 3

16640.00

total product cost Sl 3 , 4

432640.00

Commissioning cost @ 20%of Sl 5

86528.00

service tae @ 10.2% of sl 6

8826.00

Total installation cost

95354.00

pedestal etc ( LS )

nos

2.00

20000.00

40000.00

transportation etc (LS 70% of cost of Rs


50000.00 for 1 truck load)

35000.00

Grand Total

602994.00

Executive Engineer,PWD,
Abhayapuri NH Division,
Abhayapur, Assam.

ANALYSIS-D3
E BARRIER ( C Way = 11.00m)
75
Description

unit

Qty

Rate

Amt

barrier 4m

nos

0.00

169000.00

0.00

barrier 5m

nos

0.00

200000.00

0.00

barrier 7m

nos

2.00

292000.00

584000.00

total

584000.00

CST @ 4% OF Sl 1

23360.00

total sl 1 , 2

607360.00

entry tax @ 4% of sl 3

24294.00

total product cost Sl 3 , 4

631654.00

Commissioning cost @ 20%of Sl 5

126331.00

service tae @ 10.2% of sl 6

12886.00

Total installation cost

139217.00

pedestal etc ( LS )

nos

2.00

20000.00

40000.00

transportation etc (LS 70% of cost of Rs


50000.00 for 1 truck load)

35000.00

Grand Total

845871.00

Executive Engineer,PWD,
Abhayapuri NH Division,
Abhayapur, Assam.

WEIGHBRIDGES(PIT TYPE)

Sl No

Description of item

Rate in %

Cost of each unit (Rs.)


60 MT

100MT

Total

1172000.00

1492000.00

2664000.00

187520.00

238720.00

426240.00

1359520.00

1730720.00

3090240.00

54381.00

69229.00

123610.00

1413901.00

1799949.00

3213850.00

56556.00

71998.00

128554.00

Product Cost

Excise

Total (1+2)

CST

Total (3+4)

Entry Tax

Total Product Cost (5+6)

1470457.00

1871947.00

3342404.00

Test Weight

187500.00

187500.00

375000.00

CST

7500.00

7500.00

15000.00

10

Total (8+9)

195000.00

195000.00

390000.00

11

Entry Tax

7800.00

7800.00

15600.00

12

Total of Test Weight


(10+11)

202800.00

202800.00

405600.00

13

Installation

30000.00

40000.00

70000.00

14

Service Tax

3060.00

4080.00

7140.00

15

Total of Installation
(10+11)

33060.00

44080.00

77140.00

16

Constn of Pit

400000.00

400000.00

800000.00

17

Constn of Cabin,
electricals etc.

150000.00

150000.00

300000.00

18

Calibration, stamping

5000.00

5000.00

10000.00

19

Transportation

45000.00

45000.00

90000.00

20

GRAND TOTAL

2306317.00

2718827.00

5025144.00

16.00

4.00

4.00

4.00

4.00

10.20

ANALYSIS-D4
WEIGHBRIDGES(PITLESS TYPE)
Sl No

Description of item

Rate in %

Cost of each unit (Rs.)


60 MT

100MT

Basic Rate of Weigh Bridge

1595000.00

1685000.00

Standard PC Software with


printer

30000.00

30000.00

Product Cost

1625000.00

1715000.00

Excise

16.00

260000.00

274400.00

Education Cess on Excise duty

2.00

5200.00

5488.00

1890200.00

1994888.00

189020.00

199489.00

2079220.00

2194377.00

83169.00

87775.00

Total (1+2)

ST

Total (3+4)

Entry Tax

Total Product Cost (5+6)

2162389.00

2282152.00

Test Weight

187500.00

187500.00

CST

7500.00

7500.00

10

Total (8+9)

195000.00

195000.00

11

Entry Tax

7800.00

7800.00

12

Total of Test Weight (10+11)

202800.00

202800.00

13

Installation & commissioning

38000.00

38000.00

14

Service Tax

3876.00

3876.00

15

Total of Installation (10+11)

41876.00

41876.00

10.00

4.00

4.00

4.00

10.20

Sl No

Description of item

16

Rate in %

Cost of each unit (Rs.)


60 MT

100MT

Constn of Foundation

150000.00

150000.00

17

Constn of Cabin, electricals etc.

150000.00

150000.00

18

Calibration, stamping

5000.00

5000.00

19

Transportation

45000.00

45000.00

20

Packing And forwarding

3.00

64872.00

68465.00

21

Insurance

1.00

21624.00

22822.00

22

GRAND TOTAL

2843561.00

2968115.00

Executive Engineer,PWD,
Abhayapuri NH Division,
Abhayapur, Assam.

Total
3280000.00

534400.00

3885088.00
388509.00
4273597.00
170944.00
4444541.00
375000.00
15000.00
390000.00
15600.00
405600.00
76000.00
7752.00
83752.00

Total
300000.00
300000.00
10000.00
90000.00

5811676.00

ANALYSIS-D5
CCTV

Sl No

Description

unit

Qty

Rate

Amt

1.00

Camera

nos

12.00

23000.00

276000.00

1.00

Lens

nos

12.00

7500.00

90000.00

1.00

Housing

nos

12.00

15000.00

180000.00

Network DVR

nos

2.00

250000.00

500000.00

Video Server

nos

2.00

125000.00

250000.00

Video Cable

Rm

450.00

100.00

45000.00

Power Cable

Rm

450.00

60.00

27000.00

total

1368000.00

2.00

CST @ 4% OF Sl 1

54720.00

3.00

total sl 1 , 2

1422720.00

4.00

entry tax @ 4% of sl 3

56909.00

5.00

total product cost Sl 3 , 4

1479629.00

6.00

Commissioning cost (LS)

7.00

service tae @ 10.2% of sl 6

2550.00

8.00

Total installation cost

27550.00

Grand Total

1507179.00

1 Job

1.00

25000.00

Executive Engineer,PWD,
Abhayapuri NH Division,
Abhayapur, Assam.

25000.00

ANALYSIS-5
Mannually Operated Barrier Gate

Sl No

Description

Cost of steel Structurals including steel


1.00 materials and fabrication charges (Total
weight = 1.00 MT approx.)

Rate

Amount (Rs)

L.S

55000.00

2.00

Cost lifting / turning mechanism consisting of


self locking worm gear drive.

L.S

25000.00

3.00

Cost of civil works for foundation to support


the steel structure

L.S

10000.00

4.00 Cost of painting of the steel srtuctue

L.S

5000.00

4.00 Cost of erection of the Barrier Gate

L.S

5000.00

Total

( Rupees One Lakh ) only

100000.00