Você está na página 1de 25

General_Presentation.

ppt

R\200060\Commercial\Typing\_GeneralPresentation\doris_pres\PresentationDORISDiapo\PresentationComplte

Slide 1

June 2007

58A rue du Dessous des Berges - 75013 PARIS - FRANCE


Phone : +33 1 44 06 10 00
Fax : +33 1 45 70 87 38
www.doris-engineering.com

PIONEER IN OFFSHORE TECHNOLOGY SINCE 1965

INTRODUCTION TO FLOW ASSURANCE

General_Presentation.ppt

FLOW ASSURANCE ISSUES

CONCLUSION

Slide 2

INTRODUCTION

CONTENTS

June 2007

INTRODUCTION TO FLOW ASSURANCE

General_Presentation.ppt

E-F

G
2,000 m

W LOBE
D

3752

3463

3120 (DHI)

3125 (N) 3140 (S)

Reservoir system
(nb of complexes,
stacked sand channel,
lobes)

Slide 3

CL (*)

ODT

Top
E

3384 (ODT) 3463 (DHI-MDT)

B+C
A

2000 m

OUT

RESERVOIR CHARACTERISTICS
E

June 2007

General_Presentation.ppt

Slide 4

PVT modelling :
Composition set up,
Heavy cut characteristic definition
Thermodynamic package

Laboratory analyses to determine


Crude physical properties

CRUDE OIL PROPERTIES - PVT

June 2007

General_Presentation.ppt

Reservoir
Burial depth
(Metres)

- 4000

- 250
0
300 - 500
600
900 - 1000
1200
1500 - 1500
1800
2100 - 2000
2400
- 2500
2700
3000
- 3000
3300
3600
- 3500
3900
4200

TLP

FPSO
SPAR

Slide 5

June 2007

- 4000

- 3500

- 3000

- 2500

- 2000

- 1500

- 1000

- 500

- 250

SEMI SUB

DEEP WATER FIELD


ULTRA DEEP WATER FIELD
(WEST AFRICA, BRASIL, G. O. M. )

Reservoir burial depth down to 10 000 m

Jacket Platform

TYPICAL
SHALLOW WATER
FIELD

RESERVOIR LOCATION

Flow rate [blpd]

General_Presentation.ppt

5,000

10,000

15,000

Difficulty to interpret well


profiles at late life

11

10

Slide 6

17

16

15

14

13

12

20,000

A45_P1
A45_P1
A45_P1
A45_P1

18

A45_P1

Oil
W ater
Liquid
Gas

19

25,000

08

07

06

05

04

03

02

01

00

RESERVOIR MODEL
PRODUCTION PROFILES PER WELL

June 2007

10

20

30

40

50

60

70

80

90

100

Flow rate [Mscfd]

09

General_Presentation.ppt

Slide 7

June 2007

FLOW ASSURANCE TO GUARANTEE THE FLOW

Environment Characteristic (Cold water, high water depth)

Reservoir properties (Pressure, Temperature)

Fluid Properties (Wax, Emulsion, Low GOR)

FLUID MORE AND MORE DIFFICULT TO PRODUCE

FLOW ASSURANCE ISSUES

General_Presentation.ppt

HY
D

VISC

?
O ST Y

Slide 8

CO3--

ASPHALTENES

SO4--

RESERVOIR

CP

FLOW ASSURANCE: TO FIND THE BEST WAY

WAX

R
A
TE

June 2007

General_Presentation.ppt

Slide 9

PROD

PROD

WATER

June 2007

Field Architecture :
Well drilling centers
Well target
Subsea Pipeline Network
Topsides facilities location

FOR DIFFERENT FIELD LAYOUTS

General_Presentation.ppt

Topsides

Process Deck

2,000,000 bbls storage

WAX

Slide 10

FLOW
ACTIVATION

EMULSION

EROSION
CORROSION

SCALES

ASPHALTENES

FLOW
ASSURANCE
STRATEGIES

OPERABILITY

TOPSIDES
PROCESS

SLUGS

NAPHTENATE

HYDRATE

June 2007

BY MANAGING FLOW ASSURANCE ISSUES

105 m

General_Presentation.ppt

GAS LIFT

HYDRATE
INHIBITORS
Separation

Slide 11

Multiphase Pump

June 2007

GAS LIFT

Topsides

AMONG SEVERAL WAYS

General_Presentation.ppt

- Topsides Requirements

- Flow Stability issues

- Production boosting

- Chemical Requirements

- Pipe thermal insulation

Slide 12

(m/s)

VLiquid

1.7e7

1.75e7

1.5e7

1.55e7

1.6e7

1.65e7

Trend data

5000

20 000 blpd

25 000 blpd

15 000 blpd

10 000 blpd

PRESSURE BRAN_M42_M41, PI PE_1, 1 [ Pa]


PRESSURE BRAN_M42_M41, PI PE_1, 1 [ Pa]
PRESSURE BRAN_M42_M41, PI PE_1, 1 [ Pa]
PRESSURE BRAN_M42_M41, PI PE_1, 1 [ Pa]

10000
Time [s]

June 2007

15000

Time (s)

P40_riserbase_10Mblpd_lat e_1wA_M42_M41_WC50:
P40_riserbase_15Mblpd_lat e_1wA_M42_M41_WC50:
P40_riserbase_20Mblpd_lat e_1wA_M42_M41_WC50:
P40_riserbase_25Mblpd_lat e_1wA_M42_M41_WC50:

(m/s)

VGas

UPWARD SLOPE

DOWNWARD SLOPE

FLOW MAP - HORIZONTAL PIPE

STRATIFIED

SLUGS

BUBBLE

Pa

- Pipe Diameters

USE OF THERMO-HYDRAULIC CODES TO DETERMINE:

FLOW ASSURANCE MAIN TASKS

Pressure (Pa)

20000

General_Presentation.ppt

WELLS
&
DRILLING

RESERVOIR

SEABED

MEAN SEA LEVEL

TREE

SPS
UFR

FLOWLINE

Slide 13

CHOKE

RISER

TOPSIDES

FLOW ASSURANCE IS NOT ALONE

June 2007

General_Presentation.ppt

Slide 14

FA ITERATION STEPS WITH


RESERVOIR & WELL ENGINEERS

June 2007

General_Presentation.ppt

THERMAL
SPECIFICATIONS
(FA)

PIPE
SIZES
(FA)

CONSTRUCTION
METHODS

Slide 15

GAS LIFT
INJECTION
(FA)

DEEPWATER
RISER
DESIGN

ENVIRONMENTAL DATA

June 2007

RISER
COMPONENENTS
SPEC.

INSTALLATION
METHODS

FLOATER
EXCURSION

SUBSEA SYSTEM DESIGN IS BASED ON


OTHER REQUIREMENTS AS WELL

General_Presentation.ppt

Spools (jumper)

Core pipe
(tether)

Slide 16

June 2007

Flexjoint
(taper joint)

Riser bundle
(integral/non integral)

Taper joint (or hinge


connection)

Buoyancy tank
(air cans)

Flexibles jumpers
(dynamic bundles)

RISER INSULATED SYSTEM : HYBRID RISER TOWER

General_Presentation.ppt

WHFT (C)

30

35

40

45

50

55

60

65

70

75

80

10

15
20

20
26

25
32

15

20

16
25

32
20

39
26

Bundle
Insulation

30

35
Tie Back distance (km)

25

23
12

15
29

19
36

PIP
Insulation

40

45

20

Electrical
26
Heating

31

50

Slide 17

55

June 2007

Pipe insulation selection based on available technology

23
25

30
33

36
40

Wet
Insulation

Influence of WellHead Flowing Temperature and Tie-back distance on insulation selection


1500 m Water Depth

FLOW ASSURANCE REQUIREMENTS

60

General_Presentation.ppt

PRODUCTION LINE

TO LOOP THE

REQUIRES

GAS

Slide 18

LIQUID (OIL + WATER)

METHANOL

DRY OIL

June 2007

HYDRATE MANAGEMENT BASED ON FLUID DISPLACEMENT

FLOW ASSURANCE REQUIRES SPECIFIC


OPERATIONAL PROCEDURES

General_Presentation.ppt

Slide 19

June 2007

RISER BASE

SENSORS AT

TEMPERATURE

DEDICATED

FLOW ASSURANCE REQUIRES MONITORING


TO VALIDATE OPERATIONAL PROCEDURES

General_Presentation.ppt

Time (hours)

0.00

10.00

20.00

30.00

40.00

50.00

60.00

P30 test

10

P50 shutdown during warmup

Temperature (C)

P50 test

12

P10 test

16

P10 after 8 days production

14

18

T initial

T initial

0.0

0.5

1.0

1.5

2.0

2.5

Slide 20

INSULATION PERFORMANCES

t (h)

3.0

3.5

4.0

4.5

5.0

Temperature drop measured at manifold header during thermal tests on site

ON SITE MEASUREMENT OF THE THERMAL

P30 shutdown during warm-up

19

21

23

25

27

29

31

33

35

37

39

41

43

45

47

49

51

53

55

5.5

6.0

l302

l301

r302

r301

June 2007

FLOW ASSURANCE REQUIRES CALIBRATION


OF THE MONITORING (1/2)

T (C)

General_Presentation.ppt

Slide 21

TEMPERATURE PROBE

June 2007

FLOW ASSURANCE REQUIRES CALIBRATION


OF THE MONITORING (2/2)

General_Presentation.ppt

Slide 22

TEMPERATURE PROBE

TO UPDATE PROCEDURES

FIELD PRODUCTION

ARE STILL REQUIRED DURING

FLOW ASSURANCE STUDIES

June 2007

FLOW ASSURANCE REQUIRES TO BE UPDATED


DURING THE PRODUCTION

General_Presentation.ppt

Slide 23

Involvement in operational issues

June 2007

Involvement in conceptual studies to support


field architecture development

To Study the Fluid transfer from reservoir to


subsea and subsea to topsides

Flow Assurance discipline has to be considered as a


transverse discipline

FLOW ASSURANCE - CONCLUSION

General_Presentation.ppt

Slide 24

OFFSHORE IS
STILL
INNOVATIVE

DONT BE
WRONG

June 2007

FLOW ASSURANCE HUMAN RESSOURCES

General_Presentation.ppt

Slide 25

June 2007

So, Ready to join


the Engineering
Team ?

FLOW ASSURANCE HUMAN RESSOURCES

Você também pode gostar