SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008)

REV 3

SAUDI ARAMCO TEST REPORT

SATR NUMBER

Galvanic CP Testing

SATR-X-3101

PROJECT TITLE

WBS / BI / JO NUMBER

EQUIPMENT ID NUMBER(S)

EQUIPMENT DESCRIPTION

LAYOUT DRAWING NUMBER

REV. NO.

SCHEDULED TEST DATE & TIME

ACTUAL TEST DATE & TIME

CPCONTRACTOR / SUBCONTRACTOR

EQPT CODE

SYSTEM ID.

PURCHASE ORDER NUMBER

PLANT NO.

EC / PMCC / MCC NO.


QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY

SAUDI ARAMCO TIP NUMBER

SAUDI ARAMCO ACTIVITY NUMBER

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

ITEM
No.

30-Jun-08
DATE APPROVED
QR NUMBER

TEST PROCEDURE ACCEPTANCE CRITERIA

WORK PERMIT REQUIRED?

REFERENCE

A.

PROCEDURE

A1

Ensure that the proper voltmeters and ammeters and suitable reference
electrodes was used for CP testing.

SAES-X-400
Sec. 3.1

A2

Check the meter batteries periodically to ensure they still function


properly. Generally, they should be replaced every year.

SAES-X-400
Sec. 3.1

A3

Ensure that all meters was calibrated.

SAES-X-400
Sec. 3.1

A4

Ensure that high input impedance meters for structure-to-electrolyte


potential measurements, especially in areas of high resistivity was used.
Input impedance should be 20 megohms or greater.

SAES-X-400
Sec. 3.1

A5

Use a clamp-on-ammeter for the direct measurements of DC currents.


Meters having current measuring capacity up to 200 amps and a variety
of clamp sizes are preferred.

SAES-X-400
Sec. 3.1

A6

Ensure that the copper-copper sulfate and silver-silver chloride


reference electrodes was properly maintained.

SAES-X-400
Sec. 3.1

A7

Check test leads of voltmeters used for structure-to-electrolyte


measurements periodically, for continuity and integrity. Repair or replace
faulty leads or connections before making measurements.

SAES-X-400
Sec. 3.1

A8

The minimum design life for galvanic or impressed current anode


systems shall be either 7 years, or the testing and inspection (T&I)
period, whichever is greater.

SAES-X-500
Sec. 4.3.1

PASS

FAIL

N/A

RE-TEST DATE

B. TEST EQUIPMENT AND MATERIALS CRITERIA

B1. Multimeter

C. TEST RESULTS
EQUIPMENT IDENTIFICATION

TEST POINTS

LOCATION

GALVANIC ANODE
TYPE

Volt Meter
Brand: ______________
S/N:

______________

Calib. Date:___________
Ammeter
Brand: ______________
S/N:

______________

Calib. Date:___________

Page 1 of 3

STRUCTURE TO
ELECTROLYTE
POTENTIAL (mV)

POLARIZATION
CURRENT
(Amp)

REMARKS

Ammeter
Brand: ______________
S/N:

______________

Calib. Date:___________

Page 2 of 3

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008)

REV 3

SAUDI ARAMCO TEST REPORT

SATR NUMBER

Galvanic CP Testing

SATR-X-3101

PROJECT TITLE

WBS / BI / JO NUMBER

ITEM
No.

30-Jun-08
DATE APPROVED
QR NUMBER

CPCONTRACTOR / SUBCONTRACTOR

TEST RESULTS ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A

RE-TEST DATE

TEST RESULTS ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A

RE-TEST DATE

D. CONCLUSIONS

ITEM
No.

D1

Safety
Cathodic protection personnel are responsible for obtaining appropriate
work permits and associated gas test results from the operations
foreman in all classified areas before starting any job.

D2

Test results are acceptable and in accordance with Saudi Aramco


Engineering Standards and contractual requirements.

SAES-P-332
Sec. 3

N/A

REMARKS:

REFERENCE DOCUMENTS:
1. SAEP-332 Cathodic Protection Commissioning, 31 May 2005
2. SAES-X-400 Cathodic Protection of Buried Pipelines, 22 October 2007
3. SAES-X-500 Cathodic Protection of Vessel and Tank Internals, 31 March 2008

Contractor / Third-Party

Saudi Aramco

Technician Performing Test*


Name, Title, Department,
Company, Initials and
Date:

PMT Representative

Test Performed Successfully and Results are Acceptable:

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

Name, Initials and Date:

QC Inspector

PID Representative
Witnessed Test

Work / Rework May Proceed

Name, Initials and Date:

Name, Initials and Date:

QC Supervisor

Proponent and Others


Quality Record Approved:

Name, Sign and Date:

Name, Organization,
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results

Y = YES

Page 3 of 3