Escolar Documentos
Profissional Documentos
Cultura Documentos
3 X 6 X 5.50
GENERAL DATA
0.70
5.5
0.800
0.85
6.00
6.85
0.15
0.15
TOP HAUNCH DETAILS
0.15
0.15
BOTTOM HAUNCH DETAILS
6.00
5.50
3
0.7
0.8
0.85
0.00
0.00
7.5
0.075
21.4
7.00
6.85
6.25
Concrete Density
Surcharge live load
SBC
=
=
=
m
m
No
m
m
m
m
m
m
m
m
m
m
m
30 Degrees
0.333
1.8 t/m3
2.4 t/m3
1.20 m
20.000 T/m2
Earth Pressure
0
0.00
0.7
0.0 T/M2
5.50
0.8
0.85
0.85
0.72 T/M2
3.75 T/M2
6.00
7.49 T/M2
Base Earth Pressure
6.850
6.25
=
=
=
=
=
=
0
0.90
1.263
0.85
0.758
2000
=
=
=
=
900.00
2162.50
2525.00
1800.00
M
m
m
m
m
t/m3
Ref:pg:408,Foundation Analysis and Design by joseph E.Bowles (Fs=40*s.f*qa) and s.f = 2.5
=2000(0.9/2)
=2000(1.263+0.9)/2
=2000(1.263+1.263)/2
=2000(0.9+0.9)/2
t/m
t/m
t/m
t/m
=2000(1.263+0.9)/2
2162.50 t/m
Load Calculation
1)
SIDE B
EARTH CUSHION
=0
0.000M
0.850M
5.400
6.250M
3)
0.719 T/M2
DEAD LOADS
SELF WEIGHT OF TOP SLAB
= 0.7x1x2.4
=
SELF WT. OF BOTTOM SLAB
= 0.8x1x2.4
=
SELF WEIGHT OF SIDE WALLS
= 0.85x1x2.4
=
LOAD DUE TO W/C
= 0.075x1x2.2
=
LOAD DUE TO FILL
= 0x1x1.8
=
WEIGHT OF FINISHES
=
WEIGHT OF HAUNCH
=12x 0.15x0.5x0.15x2.4
=
WEIGHT OF CRASH BARRIER (@ 0.67t/m)
= 0.67x1
=
TOTAL
=
TOTAL BASE AREA
TOTAL AVERAGE BOTTOM PRESSURE
= (143.173+2.513x6.85x1)/21.4
1.68
1.92
2.04
0.17
0.00
0.00
0.32
0.67
6.80
=
=
T/m
T/m
T/m
T/m
T/m
T/m
T
T/m
T/m
35
39
51
4
0
0
0.32
14
143
21.40 M2
7.49 T/M2
T
T
T
T
T
T
T
T
T
LIVE LOADS
Water Live load inside the Box cell
5.5 kN/m2
b.
Wheel Load
CASE 1:
1.095
70T
0.84
4.57
35T
35T
6.85
2.05
X
bw
=
=
6.85 / 2
0.84+2X(0.075+0.000)
=
=
3.425
0.99
M
M
=
=
2.24
4.826
As per IRC-21-2000
=
=
=
=
=
6.583
5.420
5.420
5.420
4.995
M
M
M
M
M
=70/(6.583*5.42)
=70/(6.583*5.42)
=70/(6.583*5)
=
=
=
1.962
1.962
2.129
T/M2
T/M2
T/M2
18.06 %
18.06 %
2.316
2.316
2.513
=1.962x1.183
=1.962x1.183
=2.129x1.183
=
=
=
=
=
As per IRC-6-2000
k
B eff
0.990+2.24X3.425(1-(3.425/6.85))
4.826/2>2.05/2
THEREFORE OVERLAPING DUE TO LOAD DISPERSION OCCURS
EFFECTIVE WIDTH
=0.5+1.2+0.84/2+2.05+4.826/2
Total Dispersion width along Span dir =4.57+2(0.075+0.7/2+0.00)
=4.57+2(0.075+0.00+0.7/2)
WIDTH ALONG SPAN VEHICLE PLACED AT MIDDLE OF TOTAL BOX
WIDTH ALONG SPAN VEHICLE PLACED AT MIDDLE OF END SPAN
=4.57+2(0.075+0.00+0.7/2)
=4.57+0.075+0.000+0.7/2
T/M2
T/M2
T/M2
CASE 2 :
CLASS A LOAD 2 WEELS OF 11.4T (Max Loads) considered
MAXIMUM BENDING MOMENT AT MID SPAN
TOTAL LOAD 22.8T
0.5
0.25
5.7
5.7
5.7
5.7
1.45
1.2
6.85
2.3
X
bw
=
=
6.85 / 2-1.2/2
0.5+2 X(0.075+0.000)
=
=
2.825
0.65
M
M
=
=
2.24
4.368
As per IRC-21-2000
M
4.368/2>2.3/2
THEREFORE OVERLAPING DUE TO LOAD DISPERSION OCCURS
EFFECTIVE WIDTH
=0.5+1.2+0.5/2+2.3+4.368/2
Total Dispersion width of load in long direction
=1.45+2(0.075+0.00+0.7/2)
WIDTH ALONG SPAN VEHICLE PLACED AT MIDDLE OF TOTAL BOX
=1.45+2(0.075+0.00+0.7/2)
WIDTH ALONG SPAN VEHICLE PLACED AT MIDDLE OF END SPAN
#NAME?
WIDTH ALONG SPAN VEHICLE PLACED AT START OF END SPAN
=
=
=
=
=
6.434
2.3
2.3
2.3
1.875
M
M
M
M
M
=
=
=
1.5407279 T/M2
1.5407279 T/M2
1.8899596 T/M2
As per IRC-6-2000
k
B eff
0.650+2.24X2.825(1-(2.825/6.85))
Impact factor
= 10 + ((25-10)/(9-5)) x (9-6.85)
Actual Impact factor
=(3-0) x 18.063/3
INCREASING DUE TO IMPACT FOR VEHILE IN MIDDLE OF BOX
INCREASING DUE TO IMPACT FOR VEHILE IN MIDDLE OF END SPAN
INCREASING DUE TO IMPACT WHEN VEHICLE PLACED AT START OF END SPAN
=22.8/(6.434*2.3)
=22.8/(6.434*2.3)
=22.8/(6.434*1.88)
=1.541x1.183
=1.541x1.183
=1.89x1.183
=
=
=
=
=
18.06 %
18.06 %
1.819
1.819
2.231
OK
OK
T/M2
T/M2
T/M2
STRUCTURAL DESIGN
SUMMARY OF MOMENTS (FROM STAAD Pro)
MAXIMUM MOMENT(T-m)
LOAD
COMBINATIONS
TOP SLAB
L/C
MAXIMUM SHEAR(T)
BOTTOM SLAB
Sagging
Hogging
Sagging
Hogging
SIDE
WALLS
INT
WALLS
TOP
SLAB
BOTTOM
SLAB
10
DL+EP+SUR+70R in
middle of end span
50.9
97.0
52.1
89.7
29.2
0.3
61.4
61.0
11
DL+EP+SUR+70R in
mid span
50.3
97.2
51.6
89.1
29.2
0.0
61.0
60.6
12
DL+EP+SUR+70R at
start of end span
51.3
97.2
52.4
89.0
29.3
0.5
61.6
61.1
13
DL+EP+SUR+BOG
in middle of end span
DL+EP+SUR+BOG
in mid span
50.3
96.1
51.5
88.5
29.0
0.3
60.7
60.3
49.9
96.1
51.0
88.0
28.8
0.0
60.5
60.1
15
DL+EP+SUR+BOG
at start of end span
51.0
96.7
51.9
88.2
29.0
0.7
61.0
60.2
16
DL+EP+SURCHARG
E
49.0
94.8
50.4
87.0
28.7
0.0
59.5
59.2
14
=
=
=
=
=
=
11.300
22.200
24.900
12.500
15.600
24.900
T-M
T-M
T-M
T-M
T-M
T-M
=
=
=
=
700
850
800
800
MM
MM
MM
MM
GRADE OF CONCRETE
GRADE OF STEEL
MODULAR RATIO
k
j
Q
M30
1000 T/M2
Fe415
=
=
=
=
=
20000 T/M2
10
0.333
0.889
151.02
= 1/(1+st/m*cbc)
= 1-k/3
= 0.5*k*j*cbc
TOP SLAB
DEPTH CHECK
Considering clear cover of 75 mm for the base slab and 40 mm for all the othert faces
= 700 mm x MM
=
650 MM
=
22.2 TM
=
383 MM
DEPTH PROVIDED IS SUFFICIENT
700-40-10
SQRT(22.2/(151.02))*1000
150 mm x 150 mm
650
650 mm
OK
16.000 T
=
0T
SF (t)
carried
tc
by
(N/mm2) concrete
, tc*b*d
30
Sl.
No.
Section considered
Section
location
at deff.
16
tv
(N/mm2)
tmax
0.246
(N/mm2)
r%
2.200
0.322
1.00
Hence OK
-0.452 Mt
=
Asw = Vs x s/(s x d)
Shear Reinforcement
8 mm dia @
300mm C/C
Area of steel provided
0.253
16.45
OK
700 mm
=
700 mm
Effective depth =
650 mm
22.20 tm
Steel reqd =
1921.2 mm2
+
20 mm dia @
300mm C/C
=
2094.40 mm2
OK
Effective depth =
650
11.30 tm
+
=
Steel reqd =
12 mm dia @
200mm C/C
1130.97 mm2
OK
977.9 mm2
BOTTOM SLAB
DEPTH CHECK
DEPTH OF BOTTOM SLAB PROVIDED
EFFECTIVE DEPTH PROVIDED
800-75-10
MAXIMUM MOMENT
EFFECTIVE DEPTH REQUIRED
SQRT(24.9/(151.02))*1000
=
800 MM
=
715 MM
=
24.9000 TM
=
406 MM
DEPTH PROVIDED IS SUFFICIENT
SHEAR CHECK FOR THE BOTTOM SLAB AT THE LOCATION OF THE WALLS
TOTAL SHEAR FORCE
21.300 T
OK
Sl.
No.
Section considered
Section
location
Bottom Slab/Wall
Loc.
at deff.
21
tv
(N/mm2)
0.298
(N/mm2)
2.200
Shear Strength
Shear Reinforcement
tmax
r%
0.352
1.00
=
Asw = Vs x s/(s x d)
Reinforcement Details
Depth of slab
=
Max moment on top surface
=
Provide
16 mm dia @
200mm C/C
Area of steel provided
Depth of slab
=
Max moment on bottom surface
Provide
20 mm dia @
250mm C/C
Area of steel provided
800 mm
800
=
0.262
18.77
Provide Shear Reinforcement
2.533 Mt
10 mm dia @
300mm C/C
Area of steel provided
SF (t)
carried
tc
by
(N/mm2) concrete
, tc*b*d
Effective depth =
15.60 tm
16 mm dia @
=
2010.62
Effective depth =
24.90 tm
20 mm dia @
=
2513.27
OK
715 mm
Steel reqd =
1227.3 mm2
200mm C/C
mm2
OK
715
Steel reqd =
1958.9 mm2
250mm C/C
mm2
OK
SIDE WALL
DEPTH CHECK
DEPTH OF SIDE WALL PROVIDED
EFFECTIVE DEPTH PROVIDED
850-40-10
MAXIMUM MOMENT
EFFECTIVE DEPTH REQUIRED
SQRT(24.9/(151.02))*1000
=
850 MM
=
800 MM
=
24.900 TM
=
406 MM
DEPTH PROVIDED IS SUFFICIENT
OK
10.100 T
Sl.
No.
Section considered
Section
location
Top slab
at deff.
10.1
tv
(N/mm2)
0.126
850 mm
=
tmax
(N/mm2)
2.200
r%
0.251
1.00
SF (t)
carried
tc
by
(N/mm2) concrete
, tc*b*d
0.253
Hence OK
20.25
Effective depth =
800 mm
24.90 tm
Steel reqd =
1750.8 mm2
+
16 mm dia @
200mm C/C
=
2010.62 mm2
OK
=
+
=
960 mm2
16 mm dia @
300mm C/C
1340.41 mm2
OK
INTERMEDIATE WALL
DEPTH CHECK
DEPTH OF INTERMEDIATE WALL PROVIDED
EFFECTIVE DEPTH PROVIDED
MAXIMUM MOMENT
EFFECTIVE DEPTH REQUIRED
800-40-10
SQRT(12.5/(151.02))*1000
=
800 MM
=
750 MM
=
12.500 TM
=
288 MM
DEPTH PROVIDED IS SUFFICIENT
12.500 T
OK
Sl.
No.
Section considered
Section
location
Top slab
at deff.
12.5
tv
(N/mm2)
0.167
850 mm
=
tmax
(N/mm2)
r%
2.200
0.168
Hence OK
1.00
Effective depth =
12.50 tm
Steel reqd =
+
16 mm dia @
300mm C/C
=
1340.41 mm2
OK
=
+
=
SF (t)
carried
tc
by
(N/mm2) concrete
, tc*b*d
0.223
800 mm
878.9 mm2
900
16 mm dia @
300mm C/C
1340.41 mm2
OK
DISTRIBUTION STEEL :
TOP SLAB
0.12% Effective Area
Case1 :
MIN STEEL
0.2DL+0.3LL
Case2 :
MAXIMUM BENDING MOMENT FOR DIST. STEEL LOAD COMBINATION
AREA OF STEEL REQUIRED
=2.4/ (20000*0.89*650)*10^9
Thus, AREA OF STEEL REQUIRED
PROVIDE
12 mm dia @
200mm C/C
Area of steel provided
BOTTOM SLAB
Case1 :
0.12% Effective Area
MIN STEEL
Case2 :
0.2DL+0.3LL
MAXIMUM BENDING MOMENT FOR DIST. STEEL LOAD COMBINATION
AREA OF STEEL REQUIRED
=2.4/(20000*0.89*715)*10^9
Thus, AREA OF STEEL REQUIRED
PROVIDE
12 mm dia @
200mm C/C
12 mm dia @
780 mm2
=
=
2.40 T-M
207.69 mm2
=
780.00 MM2
200mm C/C
=
1130.97 mm2
OK
12 mm dia @
=
858 mm2
=
=
2.40 T-M
188.81 mm2
=
200mm C/C
858.00 MM2
1130.97 mm2
OK
960 mm2
2.40 T-M
17.85
=2.4/(20000*0.89*800)*10^9
200mm C/C
12 mm dia @
200mm C/C
168.75 mm2
=
200mm C/C
960.00 MM2
1130.97 MM2
=1.8/(*0.89*800)*10^9
12 mm dia @
=
OK
900 mm2
1.800 T-M
135.00 mm2
=
200mm C/C
900.00 MM2
1130.97 MM2
OK
Angle
Angle
= 8.86
Angle
0 t/m
0 t/m
290
#N/A
DL
LL
8m
=
=
=
=
=
=
=
=
=
=
150
800.000
0.065
5.500
2.400
2.200
1.800
7.700
29.62
0.517
mm
m
m
m
t/m3
t/m3
t/m3
m
deg
radians
=
=
=
=
288.000
0.021
1.485
289.506
t/m
t/m
t/m
t/m
LL intensity
Total intensity
Design intensity of load
Load per m run of the beam
Span of the assumed beam
=
=
=
=
=
#N/A
#N/A
#N/A
#N/A
8.856
t/m
t/m
t/m
t/m
m
#N/A t-m
Grade of Concrete
M30
1000 T/M2
Grade of Steel
Q
K
=
=
=
Fe415
20000 T/M2
J
dreqd
dprovd.
Ast reqd.
Provide
No. of Bars
Ast provide
#N/A
= 1/(1+st/m*cbc)
= 1-k/3
= 0.5*k*j*cbc
=
=
=
#N/A
#N/A
Y32
At
1.481 Mpa
0.333
0.889
#N/A mm
1200 mm
#N/A mm2
3 nos.
2412 mm2
#N/A
70 mm spacing
=+(3.1432^2/4)3
0.2m
=
=
75 mm spacing
#N/A t-m
#N/A mm2
#N/A
No. of Bars
Ast provide
=
=
2
981
#N/A
b/l0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
0.4
0.8
1.16
1.44
1.68
1.84
1.96
2.08
2.16
2.24
2.28
2.36
2.4
2.48
2.48
2.52
2.56
2.6
2.60
2.60
6.00
7.50
2.51
Bar Mark
Usage
Bar
5
Top Slab Bottom
6
Top Slab Top-Throughout
6a
Top Slab Top-Supp Xtra
2
Bottom Slab Top
1
Bottom Slab Bottom-Thr
1a
Bottom Slab Bottom-Supp Xtra
4
Side Wall Inner Face
3
Side Wall Outer Face
12
Intermediate Wall Inn
12
Intermediate Wall Out
7
Distribution (Top Slab)
9
Distribution (Bottom Slab)
8
Haunch Reinf
7
Distribution (Int.Wall)
Dia(mmBar Shape
16
16
16
16
16
16
16
16
16
16
10
10
8
10
Nos.
9
6
6
9
6
6
8
8
5
5
35
35
31
20
15
10
Edge Beam
10
0.62
3900
57
222.3
16
11
Edge Beam
10
0.62
8500
12
102.0
TOTAL
23.4
44
cum
kg/cum
17.0
49
cum
kg/cum
NOT
CONSIDERED IN
TENDER
Clear width
Clear height
Top slab thickness
Bottom slab thickness
Side wall thickness
Height of fill in left
Height of fill in Right
Width of Carriage way
Haunch Size
C/S area
Dia of Bar
Bar No.
Shear
=
=
=
=
=
=
=
=
=
Spacing
0.15
0.15
20.945 m3
Weight/m
Length Number
2.46615 12.520
6.00
5.50
0.70
0.80
0.85
0.00
0.00
7.50
m
m
m
m
m
m
m
m
Total Kg
4 123.5
20 mm dia @
250 mm c/c
16 mm dia @
200 mm c/c
1.57834
24.840
3
4
5
16 mm dia @
200 mm c/c
16 mm dia @
200 mm c/c
16 mm dia @
300 mm c/c
1.57834
1.57834
1.57834
9.220
4.200
8.620
5 72.761
5 33.145
8 108.84
6
7
8
12 mm dia @
200 mm c/c
12 mm dia @
200 mm c/c
20 mm dia @
300 mm c/c
0.88781
0.88781
2.46615
9.220
4.200
12.520
5 40.928
5 18.644
4 123.5
12 mm dia @
200 mm c/c
0.88781
1.000
140 124.29
12 mm dia @
200 mm c/c
0.88781
1.000
152 134.95
10 mm dia @
120 mm c/c
0.61654
2.350
36 52.159
8 mm dia @
300 mm c/c
Density of Steel
196
1029
49.1 Kg/m3
Clear width
Clear height
Top slab thickness
Bottom slab thickness
Side wall thickness
Height of fill in left
Height of fill in Right
Width of Carriage way
=
=
=
=
=
=
=
=
Haunch Size
0.15
0.15
C/S area
=
20.945 m3
Bar No. Dia of Bar
Spacing
Weight/m Length Number
1 10 mm dia @
12.520
200 mm c/c 0.61654
6.00
5.50
0.70
0.80
0.85
0.00
0.00
7.50
m
m
m
m
m
m
m
m
Total Kg
5 38.595
20 mm dia @
200 mm c/c
2.46615
24.840
3
4
5
12 mm dia @
200 mm c/c
16 mm dia @
200 mm c/c
12 mm dia @
175 mm c/c
0.88781
1.57834
0.88781
9.220
4.200
8.620
5 40.928
5 33.145
12 91.835
6
7
8
16 mm dia @
200 mm c/c
8 mm dia @
200 mm c/c
10 mm dia @
200 mm c/c
1.57834
0.39458
0.61654
9.220
4.200
12.520
5 72.761
5 8.2863
5 38.595
10 mm dia @
200 mm c/c
0.61654
1.000
140 86.315
10 mm dia @
200 mm c/c
0.61654
1.000
152 93.714
10 mm dia @
150 mm c/c
0.61654
2.350
28 40.568
851.04
40.6 Kg/m3
Density of Steel
306.3