LOGISTIC REQUIREMENTS
CHAPTER
FACILITIES AND LOGISTIC REQUIREMENT
VI
In order to carry out the Study as presented in this Proposal in an efficient, timely and cost effective
manner, the Consultant will require the followings facilities, equipment and services.
6.1
OFFICE ACCOMMODATION
The Consultant Team will undertake the work in a Project Office to be established in Kathmandu.
Approximately 500 square feet of suitability furnished and partitioned office accommodation will be
required. All Study works will be co-ordinated and conducted from this office.
Survey and investigation works during the site investigation/survey will be conducted in the field making
temporary lodging arrangements.
6.2
6.3
OFFICE SUPPLIES
The cost for stationeries and consumables, report reproduction, other office supplies etc. has also been
included in the Financial Proposal submitted herewith in separately sealed envelop.
6.4
Different types of field equipment will be required for survey works and investigation. These, among
others, will include:
6.5
TRANSPORTATION
The Consultant will need the following transport facilities with driver, fuel and lubricant during the Study.
VI-1
TECHNICAL PROPOSAL
1 No. of 4WD vehicle (truck) for use of drilling during soil investigation
6.6
LOGISTIC REQUIREMENTS
The Consultant has fully provided for all necessary technical and administrative staff required. The
resource inputs included are:
CAD Engineer
Assistants
Data Processor
Secretary/Computer Operator
Lab Technician
Administrative Staff
6.7
Client shall provide to the Consultant copies of all available data, documents and reports required for
carrying out the proposed Study.
The Consultant may need from other authorities, departments and institutions other information, reports or
even the use of facilities. In such case, the Client shall assist the Consultant in the co-ordination of Study
related works with such authorities, departments and institutions.
VI-2