Installation/Facility
Location
Associated Work Permit Type
Associated Work Permit Number
Electrical Isolation Certificate Number
Physical Isolation Certificate Number
WORK ACTIVITY
Job
Step
1
Description of
Job Step
Preparation before task
duty
Potential
Hazards
- Miss in communication
- Uncompetent person
- Tools and equipment
without inspection
- Working without PTW
- Working without full
PPE compliance
Potential
Impact
- Wrong information
- Head injury
- Electrocution
- Equipment damage
Control
Measures
- PTW shall be applied before
start work.
- Safety briefing during toolbox
meeting and before starts works.
- Proper planning & follow work
method before work.
- All workers must be attend
safety induction.
- Tool and equipment must be
valid inspection.
- Only competent person
authorised (i.e. chargeman B4,
B0, fire watcher, first aider, etc.)
- Strict access control to be
implemented, limit number of
people within MV room. Just
authorized people can entering
MV room. Just maximum 8
person only allowed to go within
MV room.
- All activity inside cable cellar
(cable room) area not permitted
during the work. Ensure to
clearance cable cellar area from
worker and lock entrance to the
cable cellar area.
- Chargeman to ensure energy
isolation for other switchgear not
related to the activity already
maintain safely as per LOTO
procedure.
Recovery
Measures
- Fire watcher to
standby when work
on going.
- First aider to
standby during work.
- ERT team to be alert
for this work.
Utility
EDG & SS100
Result
Acceptable
Secondary Test
(Using multi meter)
- Electrocution
(i.e: wrong in
connecting the probe)
- Fail to follow work
procedure
- Physical injury
- Follow JMS.
- Ensure barricade & signage
covered barrier of work.
- Ensure good communication
with work team and others (HT
radio)
- Authorised person only can
enter MV room.
- Full supervision by work leader
and Receiving Authority.
- Mandatory PPE to be used
within MV room.
- Chargeman shall used arc flash
protection and probe phase tools.
- Fire watcher to
standby when work
on going.
- First aider to
standby during work.
- ERT team to be alert
for this work.
Acceptable
Primary Test
- 11Kv Testing Work
- Breaker Take Out
- 11Kv Bus Bar check
- Pinch point
- Electrocution
(i.e: wrong in
connecting the probe)
- Explosion/Fire (Arc
flash)
- Ergonomic
- Heat stress
- Follow JMS.
- Ensure barricade & signage
covered barrier of work.
- Ensure good communication
with work team and others (HT
radio)
- Authorised person only can
enter MV room.
- Full supervision by work leader
and Receiving Authority.
- Mandatory PPE to be used
within MV room.
- Chargeman shall used arc flash
protection and probe phase tools.
- Aware pinch point area.
- Ensure work area barricade &
sigange.
- Ensure good communication
with work team and others by
using HT radio. Clear
communication between team at
EDG with team at MV room.
- Ensure equipment and circuit
ready discharge.
- Only competent person
(chargeman B4) to handling work
and testing.
- Practice buddy system and
correct technic for manual
handling.
- Strict access control to be
implemented, limit number of
- Fire watcher to
standby when work
on going.
- First aider to
standby during work.
- ERT team to be alert
for this work.
Acceptable
Housekeeping
- Obstruct access
- Ergonomic
- Sharp object
L - LIKELIHOOD
EGORY
CATEGORY
Remote
LOW
UM
Possible
MEDIU
M
Probable
HIGH
DEFINITIONS
No Injury
No Damage
No Pollution
First Aid
Injury
Lost Time
Injury
Minor
Damage
Major
Damage
Minor
Pollution
Major
Pollution
- Fire watcher to
standby when work
on going.
- First aider to
standby during work.
- ERT team to be alert
for this work.
Acceptable
RESULT
R - RATING
S - SEVERITY
DEFINITION
6-9
UNACCEPTABLE
3-4
TOLERABLE
1-2
ACCEPTABLE
LIKELIHOOD