Escolar Documentos
Profissional Documentos
Cultura Documentos
S.No
01
02
03
Chapters
1, 2 and 3
4,5,6,7 and 8
Lab
Training
Training
9 to 18
Training
Sub Total
Chapters
1 to 7
School Lab
Training
Sub Total
Weeks
2
2
1
2
1
4
4
16
Weeks
4
1
3
8
S.No
Chapters
Weeks
01
Safety
Technical
Training
Exams &
Project Report
Sub Total
02
Total
Duration of the
Course in months
Theory
Hours
96
96
SECTION - I
Practical Exams
Hours
Hour
48
96
48
192
384
Theory
Hours
192
192
Theory
Hours
96
48
240
432
48
SECTION - II
Practical Exams
Hours Hours
Remarks
Remarks
48
Practical Training at School.
144
Practical Training at Rig Site for CBM
192
SECTION - III
Practical Exams
Remarks
Hours
Hours
96
96
28
672
96
624
144
COURSE SYLLABUS
CORE DRILLING,
Course Duration: 7 Months
Theory Classes Chapters 1 to 3:
2 Weeks.
COURSE SYLLABUS
Theory Classes - Chapters 4 to 8:
2 Weeks.
Chapter 4: Core Drilling Bits.
1. Impregnated Diamond Bits.
a. Impregnated Bit Drilling guidelines.
b. Soft Rock & Hard Rock Formations.
c. Rotational Speeds.
d. Bit Revolutions per Inch (RPI).
e. Bit Weight.
f. Fluid Flow.
2. Surface Set Diamond Bits.
a. Operating Parameters.
b. Rotational Speeds.
c. RPI.
d. Bit Weight.
e. Fluid Flow.
3. TSD Bits.
a. Thermally Stable Bits (TSD).
b. Bit Description.
i. Size, Bit Type.
ii. Gauge, Waterway & No Natural Diamond.
iii. Rod/Box Thread.
4. PCD Bits.
a. Polycrystalline Compact Diamond Bits (PCD).
b. Bit Description
5. Carbide Bits Bit Description.
6. TSD/PCD Bits:
a. Cutter Size, Shape & no. of cutters.
b. Load bearing Capacities Vs Formation to be drilled.
c. Optimum Penetration Rates.
Chapter 5: Core Barrels, Coring Rods, Casing & Casing Shoes.
1. Core Barrel Series: AQ, BQ, NQ, HQ, PQ & SQ.
a. Hole diameters and Core Diameters.
2. Core Barrel System:
a. Core Barrel Assembly.
b. Inner Tube.
3. Drill Rods:
a. Drill Rod Series. & OD, ID and Weight.
b. Drill Rod Thread Series: Q, RQ, HD & WJ Threads.
c. Drill Rod joint maximum Torque Rating.
d. Drill Rod Joint Depth Capacity.
e. V-Wall Overview & Pullback Advantages.
f. Rods with Chrome Plating/Induction Hardening.
COURSE SYLLABUS
4. Casings:
a. Casing Series, ID, OD & Weight.
b. W - Thread.
c. W.T Thread.
5. Casing Shoes & Bits:
a. Casing Shoe Description.
b. Carbide Chip Casing Shoes and Bits.
c. Casing Drive Shoes.
d. Stagger Tooth Bits and Casing Shoes.
6. Diamond Grades and Sizes: SPC ranges and Diamond Size.
Chapter 6: Coring Accessories.
1. Water Swivels.
a. Universal Water Swivels.
b. Compact Water Swivels & Components.
2. Core Boxes:
a. Waxed Cardboard Core Boxes.
b. Wooden Core Boxes.
c. Plastic Core Boxes.
3. Wire Line Packers:
a. NWL, HWL & PWL Wire Line Packers.
b. Seal Tees, Composite Cable Assembly.
c. Regulator.
d. Spare parts/Consumables.
4. Plugs and Deflector Wedges:
a. Plugs:
i. Cementing/Displacement Plugs.
ii. Safety Bridge Plugs.
b. Deflector Wedges:
i. BWL, NWL & HWL Deflector Wedges.
5. Casing Cutters and Core Recovery Tools:
a. Casing Cutters:
i. Single Blade Casing Cutters.
ii. Dual Blade Casing Cutters.
b. Core Recovery Tools.
i. Releasing Spears.
ii. Coring Taper Taps.
iii. Magnets.
iv. Over-shots.
v. Junk Mill Bits.
vi. Sonic Taper Taps.
vii. Rotary Taper Taps.
COURSE SYLLABUS
6. Wireline Cable & Accessories:
a. Swaged Cable.
b. Galvanized Cable.
c. Wireline cable Oval Sleeves Aluminum and Brass.
d. Crimping Tools & wireline cable clamp.
7. Drilling Compounds, Greases and Dope Brushes.
8. Reaming Shells.
9. Diamond Wedging Tools.
10. Directional Drilling Tools.
Chapter 7: Hoisting, Pipe Handling & Capacities.
1. Hoisting Plugs AW, NW HWL, AWJ, NWJ, NWL & Murphy Fast Plug.
2. Hoist Plug.
3. Pipe Elevators.
4. Casing Lifters.
5. Pipe Tongs.
6. Self Locking Swivel Hooks.
7. KWIK Klamps.
8. NW/HW Casing Pin Hoisting Plug.
9. Coring Wrenches & Straight Pipe Wrenches.
10. Coring Wrench / Full Circle Grip Wrench.
a. Straight Pipe Wrench.
b. Chain Wrenches
Chapter 8: Core Drilling/Diamond Drilling Rigs.
1. Types of Core Drilling Rigs.
a. Skid Mounted / Truck / Crawler.
2. Components of Drilling Rig.
a. Hydraulic Leveling Jacks / out riggers.
b. Prime Mover Diesel Engine.
c. Hydraulic Motor Gears, Torque and RPM ratings.
d. Hydraulic System & Pumps.
e. Control Panel with instrumentation.
f. Rig Lighting.
g. Drill Head:
i. Rotation Motor,
ii. Mechanical Transmission and
iii. Head Opener, Chuck
iv. Drill Head Lubrication.
v. Drill Head Lubrication Oil Filtration.
COURSE SYLLABUS
h. Drill Mast and Feed System.
i. Feed Stroke.
ii. Feed Pull.
iii. Feed Thrust.
iv. Rod Pull.
v. Drilling Angle.
vi. Hydraulic Mast Dump.
vii. Hydraulic Mast Raising.
viii. Telescopic Mast Assembly.
i.
j.
Draw Works:
i. Main Line Hoist.
1. Hook Load.
2. Hoisting Cable, Speed & Breaking Strength.
ii. Wireline Hoist.
1. Line Pull.
2. Line Speed.
3. Drum Capacity and minimum breaking strength.
Fuel Tank, Hydraulic Tank, Battery, Hydraulic Foot Clamp.
One Week.
Two Weeks.
One Week.
COURSE SYLLABUS
Theory Classes - Chapters 09 to 18: 4 Weeks
Chapter 09: Circulation Fluids and Grouting.
1. The Circulation System.
2. Drilling Muds.
3. Fluids for Cleaning and Stabilizing.
4. Overcoming Lost Circulation Using Muds.
5. Additives for Drilling mud & their mixing order.
6. Testing and Treating Muds.
7. Stabilizing and Sealing Bore Holes with Cement.
8. Cementing and Sealing Casing.
9. MSDS of all mud chemicals.
Chapter 10: Drilling Operations.
1. Diamond Drilling & Drilling Methods.
2. Checklist for Rig Equipment & Components.
3. Checklist for Consumables and spares.
4. Drilling Rig Safety Inspection Checklist.
5. Rig Site Layout.
6. Logistics and Supplies.
7. Rig Camp Setup.
8. Rig Move.
9. Rig up/Rig Down.
10. Rig Stability.
11. Rig Setup and Spud the Well.
12. The connection to the bit.
13. Cutting Actions.
14. Core Recovery.
Chapter 11: Overcoming Down-Hole Problems.
1. Decisions and Problem Solving.
2. Problematic Formations & Differential Sticking.
3. Fishing Principles, Fishing Tools and Operations.
Chapter 12: Rig Mechanics.
1. Preventive Maintenance System.
2. Engines &Transmissions.
3. Hydraulic Systems.
4. Filters.
5. Vehicles.
6. Circulating Pumps and Swivels.
7. Compressors and Air Systems.
8. Ancillary Equipment and Drilling tools.
9. Minimizing Rig downtime.
COURSE SYLLABUS
Chapter 13: Sampling and Sampling Equipment.
1. Requirements for Sampling and Coring.
2. Handling Samples and Cores.
Chapter 14: Tests and Measurements.
1. Wire-Line Surveys.
2. Cutting Oriented Cores.
3. Down-Hole Inspections.
4. Geophysical Logging.
5. Borehole Fluid Measurements.
6. Packer Tests.
7. Measurement of Formation Pore Pressure.
8. Testing Soil Samples.
Chapter 15: Information: Logs, Records and Reports.
1. Recording Information.
2. Drillers Log & Hole Records.
3. Rig Performance Record.
4. Records of Tools.
5. Cost Records.
Chapter 16: Rig and Crew Management.
1. The Drillers Management Role.
2. Roles and Responsibilities of offsider & Assistant Driller.
3. Management and Money & People.
4. Concept of Team Building & Effective Communications.
5. Drilling Supplies and Support.
6. Moving the Rig and Equipment.
7. Defining the Program, Preparations for Drilling & Efficient Drilling.
Chapter 17: Care and Handling of Drill Rods and Casings.
1. Packing Features.
2. Lubrication and cleaning.
3. Preparation for transit.
4. Storage of Drilling Rods.
5. Thread Wear.
6. Box & Mid-Body Wear.
7. Loads and Deviated holes.
8. Trouble shooting.
9. Glossary of Technical Terms.
COURSE SYLLABUS
Chapter 18: Business Entrepreneurship.
1. Entrepreneur Skills.
2. Business Opportunities.
3. Scope of Work.
4. Selection of Rig, Equipment and Accessories.
5. Selection of Manpower.
6. HSEMS & Safe working (operating) Procedures.
7. Successful Execution of Project.
8. Client Satisfaction.
9. Cost of Consumables.
10. Lost In Hole (LIH) Equipment.
11. Mobilization & Demobilization Cost.
12. Inter hole/location Movement of Rig.
13. Cost of additional services such as survey camera & orientation sphere.
14. Non-Activity Hours.
15. PPE, HSE Equipment and Administrative expenses.
16. Cost Workings & Profits.
Four Weeks.
One Week.
COURSE SYLLABUS
AIR & MUD ROTARY DRILLING AND CBM DRILLING
DRILLING WATER WELLS, MINE DEWATERING WELLS, MONITORING WELLS, INJECTION WELLS, GEOTHERMAL
WELLS & DRILLING COAL BED METHANE GAS WELLS.
10
COURSE SYLLABUS
Chapter 6: Drilling and Casing the Well.
1. Planning the Drilling Program.
2. Collecting Information.
3. Evaluating Formations.
4. Selecting Casing Setting Depth.
5. Selecting mud parameters.
6. Understanding the Well Design.
7. Selection of drilling Rig and Drilling Equipment.
8. Using Proper BHA.
9. Using Proper Air Requirements Compressors and Boosters.
10. Casing Tally.
11. Dealing Total Loss Circulation.
12. Cement Plug Jobs.
13. Casing running Program and guidelines.
14. Cementing jobs.
Chapter 7: Operating Guidelines - Coal Bed Methane Well.
1. Safety and Operating Guidelines.
One Week.
Three Weeks.
11
COURSE SYLLABUS
HEALTH, SAFETY AND ENVIRONMENT TRAINING
Theoretical Classes - HSE:
2 Weeks
Two Weeks.
12