Escolar Documentos
Profissional Documentos
Cultura Documentos
1B..
Contents
Introduction
1. General information
Illustration of engine
Technical data
Type plate information
Engine oil circuit
Sealants and adhesives
Special tools
2. Additional equipment
A 01.00
A 01.10
A 01.11
A 01.12
A 02:00
A 02.11
A 02.13
A 03.00
A 03.11.1
A 03.11.2
A 03.11.3
A 03.11.4
A 03.11.5
A 05.00
A 05.20
A 05.40
A 05.60
A 05.80
Fuel
Fuel tank 1B20.10
up to January 1997
Fuel tank 1B20.10
from January 1997 on
Fuel tank 1B20.13,
1B27, 1B30, 1B 40, 1B 50
Combustion air
Dry-type air cleaner
Maintenance indicator
Exhaust system
Silencer 1B20,
sand-cast version
Silencer 1B20,
pressure-cast version
Silencer 1B30,
sand-cast version
Silencer 1B30/40, two-parts
sheet metal version
Silencer 1B 20/27/30/40/50
welded sheet metal version
Electric starting
Starter
Generator
Fittings
Gear ring
Contents
3. Basic engine equipment
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
Dismantling cross-references
01.00 Crankcase
01.10 Mass balance (1B40/50)
02.00 Crankshaft
Wear and regrinding
dimensions
04.00 Camshaft and automatic decompressor
05.00 Piston with conrod
06.00 Cylinder
07.00 Cylinder head
08.00 Cylinder head cover
10.00 Oil pump, governor
10.10 Oil pump
10.20 Governor, speed control
1B20 up to Series 14,
1B30.10
10.30 Standard governor, speed
control from 1B20.15,
1B30.11, 1B20V
10.31 Adjusting lower idle speed
10.40 Generator governor, speed
control from 1B20.15,
1B30.11, 1B20V on
10.50 Governor, speed control
with internal stop from
1B20.24, 1B27, 1B30.19,
1B20V.14, 1B30V.11,
1B40.10, 1B50.10
10.51 Static setting for coil
spring governor
10.52 Static pre-settings with the
leaf spring governor
11.00 Timing case cover
14.00 Fuel injection system
14.10 Injector
14.11 Injector with RSN nozzles
and pre-injection
14.20 Injection pump
14.30 Start of delivery and power
adjustment
14.31 Start of delivery and
power adjustment using
capillary tube
M 14.40
M
M
M
M
15.00
17.00
26.00
31.00
4. Tables
Governor components
Screw tightening torques
Tappet clearance
Bumping clearance
Troubleshooting electrical system
Code designations in circuit diagrams
HATZ wiring designations
Circuit diagram for current and voltage
measurements
Generator characteristics, 12 V
Circuit diagrams
Injection pump settings
Introduction
This workshop manual represents the products technical status as indicated on each
page (month / year). The workshop manual clearly indicates that only a skilled mechanic (annual briefing) is able to carry out all repairs in a proper manner. No reference is
made to such work as cleaning parts etc., as it is assumed that this will always be carried out by a competent workshop when needed.
The work is to be carried out in all cases only with the specified tools or absolutely
equivalent ones.
It is assumed that the mechanic has access to a full range of regular hand tools.
For maintenance work, operating fluids and other materials, troubleshooting etc., please
refer to the operating manual.
Use only Original HATZ Spare Parts.
Only these guarantee the correct dimensions, ratings and quality standards.
In all relevant areas, statutory requirements and the regulations issued by authorised
trade associations and industrial accident insurers are applicable.
The details supplied here may vary if special equipment is incorporated; such
deviations cannot be taken into account in the workshop manual or in the spare parts
list.
If any difficulties arise, please contact the nearest HATZ Service point.
1. General information
1B . . / 12.2011
Illustration of engine
1
2
3
4
5
6
7
8
9
10
11
Tank cover
Tightening strap (concealed by the
noise insulating hood)
Noise insulating hood
Type plate
Silencer (exhaust)
Exhaust screen
Oil pressure switch
Electric starter
Voltage regulator
Crankshaft - power take-off
Oil drain plugs
1B . . / 12.2011
12
13
14
15
16
17
18
19
20
21
Illustration of engine
1
2
3
4
5
6
7
8
Tank cover
Recoil starter
Dry-type air cleaner
Intake opening for cooling and
combustion air
Voltage regulator
Electric starter
Noise insulating hood
Tightening strap (concealed by
noise insulating hood)
9
10
11
12
13
14
15
16
Shutdown pin
Speed control lever
Oil filter
Oil drain plug
Oil filler and dipstick
Exhaust screen
Silencer (exhaust)
Type plate
1B . . / 12.2011
Technical data
Type
1 B 20
Description
1 B 27
1 B 30
direct injection
Number of cylinders
Bore / stroke
74 / 65
80 / 69
232
280
347
1:22.0
1:21.5
1:21.5
mm 69 / 62(65*)
Displacement
cc
Compression ratio
Max. lubricating oil content
app. l
0.9**
0.9**
1.1**
app. l
0.5**
0.5**
0.5**
max.
1 % of full-load fuel
consumption
counter-clockwise
app. kg
33
34
38
m3 / min
4.2
4.2
6.0
0.35
0.42
0.52
25
35
Starter
12 V - 1.0 kW 24 V - 1.6 kW
12 V - 14 A / 7 A 24 V - 10 A / 5 A
Battery
12 V - 36 / 60 Ah 24 V - 24 / 44 Ah
min/max
* 1 B 20 from Serial 31 on
1 B 20V from Serial 21 on
** These values are to be understood as approximate.
Always refer to the max. mark on the dipstick.
1B . . / 12.2011
Technical data
Type
1 B 40
Description
1 B 50
direct injection
Number of cylinders
Bore / stroke
mm
88 / 76
93 / 76
Displacement
cc
462
517
1:21.0
1:20.5
Compression ratio
Max. lubricating oil content
app. l
1.5**
1.5**
app. l
0.8**
0.8**
max.
1 % of full-load fuel
consumption
counter-clockwise
app. kg
55
55
m3 / min
7.3
7.6
0.69
0.78
25
35
Starter
12 V - 1.0 kW 24 V - 1.6 kW
12 V - 14 A / 7 A 24 V - 10 A / 5 A
Battery
12 V - 36 / 60 Ah 24 V - 24 / 44 Ah
min/max
1B . . / 12.2011
100 10 96 000814
1 B 20
-6
KENNZ.
ABE /AUSF.
MIN -1
PV
NH
MADE IN GERMANY
CM 3
1) If required
2) In special cases only; e.g. engines acc. to Federal Authority for Automobilism
1B . . / 12.2011
Engine family
4 HZX L.232 V 20
Static timing
(begin of fuel
delivery)
Customer specification
(only for special
equipment)
Variation
Engine type
Engine number
100 28 04 063750
Fabrication No.
Year of production
Engine serial No.:
The serial No. beginns
with 10 and changes
continously if any major
changes are carried out
Type No.
Engine speed
2650
310
SERIAL NO.
MIN -1
NH / kW
BUILD DATE
Made in Germany
VARIABLE SPEED
This engine conforms to MY
U.S. EPA regulations large
nonroad compression-ignition engines and MY
California
regulation for off-road compression-ignition engines.
Refer to owner's manual
for maintenance specifications and adjustments.
6.2
2.8
Rated power in kW
Injection pump delivery lift
in mm to obtain the required
power output
0232
245
Special adjustment
instruction
Displacement in cm3
Manuf. year
0504
Year
Month
1B . . / 12.2011
2
3
4
5
6
7
1
2
3
4
1B . . / 12.2011
5
6
7
8
A = 502 230 01
Loctite Activator
500 ml
B = 502 231 00
Loctite 573
50 ml
C = 502 232 00
Loctite 601
50 ml
D = 502 233 00
Loctite 221
50 ml
E = 502 234 00
Loctite 648
10 ml
F = 502 238 00
Technicoll 8058
750 g
+ 502 239 00
Technicoll 8367
750 g
G = 502 565 01
Loctite IS 407
20 g
H = 502 825 01
Silicon
30 ml
J = 502 830 02
High-temperature paste
K = 503 426 00
High-temperature grease
100 g
L = 502 566 00
Silicon
100 g
M = 504 851 00
1000 g
80 ml
1B . . / 12.2011
Special tools
Mounting / demounting cylinderhead + equipment
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
19
20
21
22
23
24
Ident-No.
61209001
62638300
63887100
63887200
64398200
64397900
64398000
64398100
62675391
------63344100
63344200
63344300
63343900
64430000
05173900
------64434590
63538990
------50050800
64803500
63081500
1B . . / 12.2011
Name
Piston ring pliers
Piston ring clamping tool 70 - 100mm
Disassembly tools for cable plug 2,5mm
Disassembly tools for cable plug 1,5mm
Guide pin for pump element
Socket for PTO shaft - 30mm
Socket for PTO shaft - 27mm
Socket for PTO shaft - 24mm
Impact extractor with accessories
No single order, please order group
Adapter for impact extractor M4
Adapter for impact extractor M5
Adapter for impact extractor M6
Adapter for dismantling of cam follow spindle
Adapter M 16 x 1,5 for idle gear pin W35
Adapter extra long M 5 for impact extractor
No single order, please order group
Disassembly tools for cable plug kit
Holder to prevent flywheel movement
No single order, please order group
Allen screw M 6 x 18
Pinch-off pliers
Allen socket 6 mm lg 1/2
Special tools
1
2
8
7
6
5
3
11
12
-4
9(3
16
24
13
14
7
0-1
15
9(
17
10
23
21
22
20
1B1B
. . ./ .12.2011
/ 10.04
Special tools
Mounting / demounting driving mechanism
No.
1
2
3
4
Ident-No.
62486302
62568201
63130000
62575190
1B . . / 12.2011
Name
Elevating table, mobile
Revolvable fixing; basic part
Revolvable fixing - adaptor engine side
Console for revolvable fixing
Special tools
2
4
3
1
1B1B
. . ./ .12.2011
/ 10.04
Special tools
Repair of components
No.
1
2
3
4
5
6
Ident-No.
62922301
63139200
63414200
64270700
62188402
63414300
1B . . / 12.2011
Name
Valve lifting tool
Assembly pin for valve stem seal
Honing tool 50-175
Capillary tube for pump adjustment
Alternator testing bench
Replace segments for honing tool
Special tools
4
2
1B1B
. . ./ .12.2011
/ 10.04
Special tools
Testing equipment
No.
1
2
3
4
5
Ident-No.
62924190
63651190
61417690
61549200
63337600
1B . . / 12.2011
Name
Protection tube
Spacer plate
Axial heigh compensator for E71/79/B20
Base frame small
Rubber element replace
Special tools
1B1B
. . ./ .12.2011
/ 10.04
Special tools
Testing equipment
No.
1
2
3
4
5
6
7
8
9
10
11
12
Ident-No.
61899700
63009500
63009600
63009700
63115300
64409290
63630990
63115090
63115290
63152590
63307990
63630890
1B . . / 12.2011
Name
Drive shaft 6-hole
Drive shaft head 6-hole new
Drive shaft head 6-hole rebuilt
Flexible insert for drive shaft head 6-hole
Puller for PTO.flange
Special PTO-drive shaft No.6 and additional shim
PTO.flange for shaft # 1
PTO.flange for shaft # 2
PTO.flange for shaft # 4
PTO.flange for shaft # 6
PTO.flange for shaft # 7
PTO.flange for shaft # 8
Special tools
4
3
1
5
6
10
11
12
1B1B
. . ./ .12.2011
/ 10.04
Special tools
Testing equipment
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Ident-No.
62483900
63196400
62486200
62486101
62485101
63585200
64397100
64736900
64736800
64736700
62485201
62485900
64826800
64804000
1B . . / 12.2011
Name
Fuel supply meter
Fuel flow meter
Multi connector switch box
Extension cable for temperature probe
Temperature measuring instrument
Oil temperature probe 1B20/30
Oil temperature probe 1B40
Exhaust temperature probe 1B20/27
Exhaust temperature probe 1B30
Exhaust temperature probe 1B40/50
Temperature probe universal solid
Temperature probe universal flexible
Oil temperature probe 1B..V
Tachometer
Special tools
2
R
E
T
E
M
W 00
LO 39
F 8
L 4
E 62
U
F
6
4
7
14
11
12
10
13
1B1B
. . ./ .12.2011
/ 10.04
Special tools
Adjustment and diagnosis tools
No.
1
2
3
4
5
6
7
8
9
10
11
12
Ident-No.
62483892
------63834200
------63834000
63196500
63834100
64123600
63912300
63834300
63577600
63426800
1B . . / 12.2011
Name
Rev. meter for fuel pressure pipe
No single order, please order group
Charging cable 12V
No single order, please order group
Lead for piezo sensor
Piezo-sensor 6mm
Photo sensor with lead
RPM differential adapter
Support for photo-sensor 1B
Ignition sensor
Optical speed sensor with cable
Cable for piezo-sensor
Special tools
2
1 (2-7)
6
7
10
11
12
1B1B
. . ./ .12.2011
/ 10.04
Special tools
Adjustment and diagnosis tools
No.
3
5
6
7
8
9
10
11
Ident-No.
63576000
63291300
64161090
62092692
63338500
63338600
-------------
1B . . / 12.2011
Name
Fuel pressure pipe 300 bar / 4350 psi
High-pressure pump complete
Testbox for instrument box
Oil pressure gauge 0 - 6 bar with flexible tube
Connector M8x1
Connector M6
No single order, please order group
No single order, please order group
Special tools
3
5
1)
1
(8-
4
5
8 9 10
6
11
1B1B
. . ./ .12.2011
/ 10.04
2. Additional equipment
1B . . / 12.2011
A 01.00 Fuel
A 01.10
Preliminary work
Take off the air cleaner cover.
Take off the noise insulating hood.
Dismantling
Detach fuel feed line 1.
Pull line 1 off the engine-end connection.
Pull off oil leak-off line 2.
Pull vent hose 3 off connecting pipe 4 at
the insulating flange.
Unscrew nuts 5 and take off washers 6.
Unscrew nuts 7 and take off spring
washer 8.
Carefully take off fuel tank 9 with air
guide housing 10 ; note bushings 11
and washers 12.
Loosen screws 13 and take off washers
14 and 16 and retaining angle 15.
Loosen and remove machine screws
17 with spring washers 18 and washers
19 ; note bushings 20 between fuel tank
and air guide housing.
Testing / repair:
Visual inspection.
Look for cracks and signs of leakage.
Check that retaining components are in
good condition.
1B . . / 12.2011
Assembly
Follow the dismantling procedure in the
reverse order.
Make sure that the tank is held without
trapped stresses at all retaining points.
Make sure that all bushings and washers are in their correct positions.
Tighten nuts 5 very carefully to the
specified torque (the stud bolts 21 are
made of plastic, and must not be
replaced by metal bolts for thermal
reasons).
Renewing fuel filter
Open filler cap 22.
Pull line 23 with filter 24 carefully out of
the tank.
Pull fuel filter 24 with grommet 25 away
from connecting nipple 26.
Assemble in the reverse order of work.
A 01.00
A 01.10
22
3 Nm (0,3 mkg !)
2.2 lb ft
24
25
26
23
5
6
9
13
14
15
16
2
3
4
21
20
1
17 18 19
12
11
10 8
1B . . / 12.2011
A 01.00 Fuel
A 01.11
General information:
The fuel return system and the upper
tank mounting have been modified. The
previous plastic stud bolts 24 have been
replaced by steel stud bolts. In connection
with this change, the following parts were
also modified:
7, 8, 9, 25, 26, 15, 16, 17, 18.
Preliminary work:
Take off the air cleaner cover.
Take off the noise insulating hood.
Dismantling:
Disconnect fuel line 1 and pull it off
T-piece 2.
Pull vent hose 3 off connecting pipe 4 at
the insulating flange.
Pull return line 5 off vent valve 6.
Unscrew nuts 7 and take off washers 8
and 9.
Unscrew nuts 10 and take off spring
washers 11.
Carefully take off fuel tank 12 with air
guide housing 13; note bushings 14 .
Loosen and remove screws 15 and
take off washers 16 and 17 and retaining angle 18.
Loosen and remove machine screws 19
with spring washers 20 and washers 21;
note bushings 22 between the fuel tank
and the air guide housing.
Testing / repair:
Visual check.
Look for cracks and signs of leakage.
Check that retaining components are in
good condition.
1B . . / 12.2011
Assembly:
Follow the dismantling procedure in the
reverse order.
Make sure that the tank is held without
trapped stresses at all retaining points.
Make sure that all bushings and washers are in their correct positions.
Install return pipe 23 so montieren,
so that the end of the pipe in the tank
faces the outlet nipple.
Note:
It is possible to convert the tank mounting
from the old to the new version if all the
parts stated above are replaced.
A 01.00
A 01.11
1B . . / 12.2011
A 01.00 Fuel
A 01.12
General information:
On 1B 20 engines from Series 13 and
1B 30 / 40 / 50 engines from the start
of series production, an injector with oil
leak-off return line to the tank was introduced.
Dismantling / assembly:
See A 01.11
Retrofitting (see also M 14.40):
Remove the edge at the angle for fuel
tank 1 as illustrated.
Drill an 8.3 - 8.5 mm diameter hole in
the tank at the point shown, and deburr
it.
Insert the rubber grommet and hose
nipple.
Note:
Only the new injector is available as a
spare part.
All the parts needed for retrofitting are
supplied with it.
1B . . / 12.2011
A 01.00
A 01.12
1B . . / 12.2011
Preliminary work:
Dismantling:
Take off the parts in the order 1 ... 4 .
Pull tank vent hose 8 off insulating
flange 14 .
Loosen and remove machine screws 9
with spring washers 10 and shim washer
11.
Extract air guide sleeve 15 out of air
cleaner housing 12.
Take off air cleaner housing 12 with
seals 13 and insulating flange 14.
Testing / repair:
Check filter element 4 and sealing strips
5 / 6 on the housing and also rubber
grommet 7 in the cover and plug 16 .
Renew damaged parts.
Assembly:
Install the parrs by following the dismantling procedure in the reverse order.
Note the correct installed position of
plug 16 :
without maintenance indicator:
Axial bore 17 faces the cylinder head
with maintenance indicator:
Axial bore 17 faces the air cleaner
Renew the seals.
Note correct tightening value.
Make sure that no lines are trapped
between the air cleaner housing and the
cylinder head.
1B . . / 12.2011
A 02.00
A 02.11
8
13
13
5
23 Nm
17 lb ft
11
14
16
12
2
10
9
7
15
16
17
1B . . / 12.2011
Maintenance indicator
Preliminary work:
Take off air cleaner housing 1.
See A 02.11
Dismantling:
Pull plug 9 out of air cleaner housing 1.
Pull hose 3 off maintenance indicator 8.
Remove the parts in the order 4...8.
Testing / repair:
Visual check.
Check the maintenance indicator by
applying suction to the connecting hose
or connecting stub pipe:
Vacuum = maintenance indicator is
CLOSED (green signal ring not
visible)
Atmospheric pressure = maintenance
indicator is OPEN (green signal ring is
visible).
Check that rubber parts have not aged,
and renew if necessary.
Check that all relevant parts are correctly seated.
Assembly:
Install parts by following the dismantling
instructions in the reverse order.
Secure connecting hose 2 in plug 9 with
adhesive G.
Insert plug 2 in air cleaner housing 1.
Axial bore 12 must face towards the air
cleaner housing.
1B . . / 12.2011
Checking operation:
Press the cap / bellows:
At least 3 seconds must be allowed for
full opening.
Raise valve plates 10 and 11:
The cap / bellows must return to the
OPEN position, with the green signal
ring visible. If necessary, check the seat
of the seal in the housing or renew the
valve plates.
Install parts on engine.
A 02.00
A 02.13
1B . . / 12.2011
Dismantling:
Unscrew nut 1 with washer 2, pull off
exhaust manifold 3 and detach threaded pin 4 .
Take out screws 5 and take off guard 6.
Take off clamp 7 and plate 8.
Unscrew nuts 9 with washers 10
(to unscrew the lower nut, hold screw
11 to prevent it from turning); take off
silencer cover 13.
Remove washers 14 and spacing tubes
15 and 16.
Unscrew and remove nuts 17 and 18
and take off washers 19.
Take off rear panel of silencer 20 and
gaskets 21.
Exhaust pipe 22 is secured with
countersunk screw 23, washer 24 and
nut 25 to the rear panel of the silencer
and does not need to be take off unless
damage has occurred.
Testing / repair:
Examine parts for damage.
Clean the silencer halves, exhaust pipe
and exhaust manifold.
Renew gaskets 21 (5 items) and cord
seal 26.
Assembly:
Follow the dismantling instructions in
the reverse order.
1B . . / 12.2011
A 03.00
A 03.11.1
6
1
2
10
13
8
7 9
23
14 15
18
22
17
5
7
19
5
14
8
24 25
21
16 14
8
20
12
11
26
1B . . / 12.2011
Dismantling:
Unscrew nut 1 with washer 2, pull off
exhaust manifold 3 and disconnect
threaded pin 4.
Take out screws 5 and remove guard 6.
Take off clamp 7 and plate 8.
Unscrew nuts 9 and screw 10 with
washer 11 and take off silencer cover
12.
Unscrew nuts 13 and take off washers
14.
Take off rear silencer panel 15 and gaskets 16.
Exhaust pipe 17 with washers 18 is
secured with countersunk screw 19,
washer 20 and nut 21 to the rear
silencer panel and does not have to be
removed unless damage has occurred.
Testing / repair:
Examine parts for damage.
Clean the silencer halves, exhaust pipe
and exhaust manifold.
Renew gaskets 16 (5 items).
Assembly:
Follow the dismantling instructions in
the reverse order.
1B . . / 12.2011
A 03.00
A 03.11.2
1B . . / 12.2011
Dismantling:
Unscrew nut 1 with washer 2, pull off
exhaust manifold 3 and disconnect
threaded pin 4.
Take out screws 5 and remove guard 6.
Take off clamp 7 and plate 8.
Unscrew nuts 9 and 10 with washers 11
and 12.
Take off silencer cover 13 and inserts
14 and 15.
Take off washers 16 and spacing tubes
17 and 18.
Unscrew nuts 19 and 20 and take off
washers 21.
Take off rear silencer panel 22 and gaskets 23.
Exhaust pipe 24 with washers 25 is
secured with countersunk screw 26,
washer 27 and nut 28 to the rear
silencer panel and does not need to be
removed unless damage has occurred.
Testing / repair:
Check parts for damage.
Clean the silencer halves, exhaust pipe
and exhaust manifold.
Renew gaskets 23 (5 items).
Assembly:
Follow the dismantling instructions in
the reverse order.
Make sure that inserts 14 and 15 are
correctly seated.
Note that the lengths of spacing tubes
17 (65 mm) and 18 (51.6 mm) are
different.
1B . . / 12.2011
A 03.00
A 03.11.3
1B . . / 12.2011
Dismantling:
Remove in numerical sequence 1 ... 17.
Testing / repair:
Check parts for damage.
Clean exhaust pipe and exhaust manifold.
Renew gaskets 17 (5 items).
Assembly:
Follow the dismantling instructions in
the reverse order.
Make sure that gasket 11 is correctly
seated.
1B . . / 12.2011
A 03.00
A 03.11.4
1B . . / 12.2011
1B . . / 12.2011
A 03.00
A 03.11.05
5
9
630 815 00
12
13
14
5
8
7
6
3
1
2
10
11
14
Silencer
Cylinderhead
1B . . / 12.2011
Starter
Preliminary work:
Disconnect the battery: negative pole
first, positive pole second.
Disconnect cables as far as necessary.
Dismantling:
Take out screw 1 with washer 2 and nut
3.
Unscrew nut 4 with spring washer 5 and
washer 6.
Take off regulator switch 7 and bushing
8.
Remove machine screw 9 with spring
washer 10 and washer 11; take off stirrup 12.
Take out machine screws 13 with spring
washers 14 and washers 15; take off
starter 16.
Testing / repair:
Examine bearings and pinion for signs
of wear or damage.
Check that pinion turns freely.
Note:
Repairs to the starter motor should only
be performed by an authorised HATZ
Service point.
Assembly:
Follow the dismantling instructions in
the reverse order.
Restore the electrical connections.
Reconnect the battery: first the positive
pole and then the negative pole.
1B . . / 12.2011
A 05.00
A 05.20
4
10
12
11
15
16
14
13
22
24
2
G
1B . . / 12.2011
Generator
1B . . / 12.2011
Assembly:
Follow the dismantling procedure in the
reverse order.
Before tightening coil 6, align it so that it
is concentric with the crankshaft (scriber
mark).
A 05.00
A 05.40
644 345 90
1B . . / 12.2011
Fittings
Preliminary work:
Disconnect the battery: first the negative
pole, then the positive pole.
Dismantling:
Take out machine screws 1 with washer
2.
Detach cables and take off the electrical
fitting.
Testing / repair:
Examine parts for damage and renew if
necessary.
Assembly:
Following the dismantling procedure in
the reverse order.
Make sure that the cables are reconnected correctly (see also Section 4).
1B . . / 12.2011
A 05.00
A 05.60
1
0
2
4
5
17
6
24
7
50
30
15
24
1B . . / 12.2011
Gear ring
Preliminary work:
Take off the flywheel (M 17.00)
Testing / repair:
Inspect the gear ring for broken teeth or
other damage.
If necessary, file the gear ring to shape
or renew it.
Dismantling:
Heat the gear ring carefully until it can
be removed from the flywheel,
or:
Drill into the gear ring and chisel it
open.
Assembly:
Heat the gear ring to approx. 150C and
pull it on to the flywheel.
Note:
The chamfered side of the teeth must be
towards the starter.
1B . . / 12.2011
A 05.00
A 05.80
C
150
F
300
1B . . / 12.2011
1B . . / 12.2011
1B . . / 12.2011
Preperations to be made X
Dismantling cross-references
When dismantling . . .
Air filter cover
Noise reduction cover
Air filter housing
Exhaust silencer
Air duct
Fuel tank
Flywheel
Cover to cylinder head
Injector
Injection pump
Rockers
Pushrods
Cylinder head
Timing cover
Conrod
Piston
Cylinder bug
Crankshaft
Governor / Oil pump
Speed control
Camshaft
Crankcase
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X
X
X
X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X X
X
X
X X X X
1B . . / 12.2011
M 01.00 Crankcase
Preliminary work:
For dismantling, see M cross-reference list.
Testing / repair:
Inspect for damage and broken cooling
fins.
If stud bolts 1 are renewed, screw them
in and tighten them with 10 Nm.
1B27 / 50:
If the cylinder head screws are loosened
for whatever reasons, the stud screws
(tension screws) 1 must be replaced for
new.
Tightening torque:
1B27: 10 Nm
1B50: with new crank case 10 Nm
with used crank case 5 Nm
Check firm seating of oil deflector plate
2.
Clean oilways and oil filter 3 and 4
thoroughly; to do this, remove wire hose
clips 5 from suction head 6, turn the
suction head forwards and remove the
intake mesh screen.
Check the distance by which connecting
nipple 7 projects.
Press the new shaft sealing ring 8 in
until it is flush with the crankcase.
Renew sealing strip 9 if necessary.
Oil filter:
1 B 20 from engine number 700 on
1 B 20 V and 1 B 30 all:
The oil filter was modified and is now
retained in position in the crankcase by
the two tensioning springs 10 and
cylinder screw 11.
This oil filter cannot be used on 1 B 20
engines with engine numbers below 700.
1B . . / 12.2011
M 01.00
7.5 mm
12
3
1 B . .V
E
1 B . .V
4
10
11
1B . . / 12.2011
M 01.00 Crankcase
M 01.10 Mass balance (1B40 / 1B50)
Preliminary work:
Remove the timing case cover.
See M dismantling cross-reference list.
Dismantling:
Turn the crankshaft until the markings
on the gearwheels are opposite each
other as illustrated.
Remove balancer shaft 1 from the
crankcase.
Testing / repair:
Inspect parts for damage or wear;
renew if necessary.
Assembly:
Apply grease K to the mounting points
of the balancer shaft.
Place balancer shaft 1 in the crankcase,
making sure that the markings are
opposite each other as illustrated.
Assemble the engine.
Note:
The oilway between the oil pump and the
bearings of the balancer shaft in the timing case cover is fitted with various plugs
according to the equipment.
Here the following applies:
Engine with mass balance:
Plug 2 is inserted = oilway open
Engine without mass balance:
Plugs 3 and 5 and O-ring 4 are
fitted = oilway closed.
This should be especially noted in conversions, as otherwise sufficient engine lubrication is not guaranteed!
1B . . / 12.2011
M 01.00
M 01.10
1B . . / 12.2011
M 02.00 Crankshaft
1B . . / 12.2011
M 02.00
E7
D1
D1
1B . . / 12.2011
M 02.00
Wear and regrinding dimensions 1B 20 / 1B 27
h
0.3
0.3
0.5
0.4
3.2
R 3+ 0 . 2
R2
Nom. value
(mm)
R 1.2+0.3
Wear tolerance
-0.5 (mm)
a*
30.01 - 30.04
30.10
29.51 - 29.54
29.60
29.987 - 30.000
29.95
29.487 - 29.500
29.45
a-b
0.01 - 0.06
0.15
0.01 - 0.06
0.15
33.975 - 33.991
33.94
33.475 - 33.491
33.44
d*
34.004 - 34.026
34.07
33.504 - 33.526
33.57
c-d
0.02 - 0.05
0.13
0.02 - 0.05
0.13
40.002 - 40.013
40.000 - 40.160
39.85
38.00 - 38.20
18.016 - 18.027
18.04
37.000 - 37.016
37.03
1B . . / 12.2011
M 02.00
Wear and regrinding dimensions 1B 30
h
0.3
0.3
a
0.5 3.2
0.4
g
R2
R2
R 1.2-0.4
+ 0 .2
R 3.5
Nom. value
(mm)
Wear tolerance
-0.5 (mm)
a*
30.01 - 30.04
30.10
29.51 - 29.54
29.60
29.987 - 30.000
29.95
29.487 - 29.500
29.45
a-b
0.01 - 0.06
0.15
0.01 - 0.06
0.15
35.975 - 35.991
35.94
35.475 - 35.491
35.44
d*
36.010 - 36.050
36.09
35.510 - 35.550
35.59
c-d
0.02 - 0.075
0.15
0.02 - 0.075
0.15
45.009 - 45.020
44.80 - 45.00
41.840 - 42.000
41.70
20.020 - 20.033
20.045
39.000 - 39.016
39.03
1B . . / 12.2011
M 02.00
Wear and regrinding dimensions 1B 40 / 1B 50
h
0.3
0.3
0.5 3.2
0.4
g
R2
R2
R 2-0.2
R 4-0 . 2
Nom. value
(mm)
Wear tolerance
-0.5 (mm)
a*
36.035 - 36.081
36.10
35.535 - 35.581
35.60
35.984 - 36.000
35.95
35.484 - 35.500
35.45
a-b
0.035 - 0.097
0.15
0.035 - 0.097
0.15
47.975 - 47.991
47.94
47.475 - 47.491
47.44
d*
48.010 - 48.053
48.09
47.510 - 47.553
47.59
c-d
0.019 - 0.078
0.15
0.019 - 0.078
0.15
50.009 - 50.020
49.80 - 50.00
44.975 - 45.000
44.80
22.020 - 22.033
22.045
51.000 - 51.016
51.03
1B . . / 12.2011
1B . . / 12.2011
M 04.00 Camshaft
M 04.00 Camshaft and automatic decompressor
- 620 753 91 Preliminary work:
See M dismantling cross-reference list.
Dismantling:
Camshaft:
Swing cam follower 1 away from camshaft.
Press the rocker arm for injection pump
2 away from the camshaft with a suitable lever and pull camshaft 3 out of the
timing case cover.
Cam follower and injection pump
rocker arm:
Detach injection pump rocker arm 2
from ther pump piston and disconnect it
from the return spring.
Take out screws 4 and 5 and remove
shafts 6 and 7 using driving-out tool
- 3 -.
Automatic decompressor:
Take off circlips 8.
Take off bob-weights 9 and 10 and
stirrup 11. Note shims 12).
Testing / repair:
Examine parts for damage or wear and
renew if necessary.
Assembly:
Follow the dismantling instructions in
the reverse order.
Note the shims 12; without them, friction
between the bobweights and the camshaft gearwheel would be too high, so
that the automatic decompressor would
be unable to operate.
Check that all parts move freely.
Grease the sliding contact face on shaft
7 with lubricant K.
Apply sealant D to screws 4 and 5 when
inserting and tightening them.
1B . . / 12.2011
Note:
1B20
from Series 12
1B20V from Series 10
1B30
from Series 10
Shafts 6 were lengthened to 25 mm and
cylinder screws 4 were increased to
strength rating 10.9.
Shaft 7 was lengthened to 28 mm and
secured with M 6 x 30 cylinder screw 5.
Var. II:
1B20
from Series 21
1B20V from Series 13
1B27
from Series 10
1B30
from Series 17
1B40
from Series 10
1B50
from Series 10
The position of the rocker arm 2 in relation to injection pump was modified. It is
secured by washer 15 and countersunk
screw 16. Shaft 14 is fixed in the timing
case cover.
Camshaft endplay:
Endplay is adjusted to 0.2 mm with
washer 13.
Determining washer thickness:
Using a ruler and a feeler gauge, determine the amount by which thrust face A
is set back in relation to sealing face B,
and the amount by which thrust face C
is set back in relation to sealing face D.
Add the two values together and deduct
the correct endplay of 0.1 mm.
The value obtained in this way is the
thickness of washer 13 that must be
inserted.
M 04.00
1B . . / 12.2011
1B . . / 12.2011
Assembly:
Use pliers to fit the piston rings to the
piston.
Place the piston on the conrod and
insert the piston pin, which should first
be oiled.
Fit circlips 4.
Clean the conrod and big end bearing
cap and place bearing shells 8 in
position.
Turn the piston rings so that their end
gaps are offset by approximately 120.
Oil the piston and cylinder and compress
the piston rings with clamping tool.
Insert the conrod and piston into the cylinder from the top with the combustion
chamber bowl towards the timing case
cover (to correspond with tthe position
of the injector nozzle).
Attach the big end bearing cap and
tighten its screws uniformly to the specified torque.
Check that the components move freely.
Note:
1B20 from Series 31
1B20V from Series 21:
The stroke increased from 62 mm to
65 mm and thus the piston is changed.
The pistons of the old and new versions
are not interchangeable with each other!
M 05.00
P
TO
max. 0.20 mm
II
max. 0.15 mm
III
max. 0.10 mm
TO
TO
P
6
4
8
2
1
lb ft
Nm
1B 20 20 - 22 15.0 - 16.2
1B 27
1B 30 29 - 31 21.4 - 22.9
1B 40
40 - 42 29.5 - 31.0
1B 50
[ mm ]
1B 20
1B 27
1B 30
1B 40
1B 50
nom.
max.
nom.
max.
nom.
max.
a*
37.03
18.04
39.03
20.045
51.03
22.045
* M 02.00
1B . . / 12.2011
M 06.00 Cylinder
634 142 00
Preliminary work:
For dismantling, see M cross-reference list.
Testing / repair:
Check for seizure marks and cracks.
Checking for wear:
Piston rings:
Measure below bottom dead centre
(BDC), since the cylinder is not subject
to any wear at this point.
Insert the used piston ring into the cylinder and use the piston to align it at a
right angle to the cylinder axis.
Measure ring gap a with a feeler gauge,
and renew the piston ring if the limit
value is exceeded.
Cylinder:
Measure just under top dead centre
(TDC), since this is where maximum
wear takes place.
Insert a new piston ring and align it at a
right angle.
Determine ring gap b and renew the cylinder liner if the limit value is
exceeded (1B 20/30/40).
1B27 / 1B50:
The cylinder liner is cast into the crankcase and can not be changed.
Dismantling:
Working from below with a plastic drift,
force the cylinder liner out of the crankcase and pull it off upwards.
Assembly:
1 B 20
Insert the cylinder liner into the crankcase from above, and press down fully.
1B . . / 12.2011
Assembly:
1 B 30
Apply sealant B to the cylinder liner.
Max. sealant coating 1 mm on the inner
face of the crankcase, or else it will not
be possible to drive the cylinder liner in
fully.
Insert the cylinder liner into the crankcase from above, and press down fully.
1 B 40
Place the O-ring in the groove in the
crankcase and smear with mounting
lubricant.
- Insert the cylinder liner into the crankcase from above and press down fully,
making sure that the O-ring is not
pushed out of the groove.
Note:
If a cylinder liner is re-used (with either
used or new piston rings), it must be rehoned.
Perform the honing work with honing tool
-13-.
After honing, check measurements a and
b again.
M 06.00
D [mm]
1B 20 / 1B 20V
1B 27 / 1B 27V
1B 30 / 1B 30V
1B 40 / 1B 40V
1B 50 / 1B 50V
nom.
69.00 - 69.01
74.00 - 74.01
80.00 - 80.01
88.00 - 88.01
93.00 - 93.01
Max.
69.11
74.11
80.11
88.13
93.11
bmax = 0.85 mm
b
P
TO
I
1 B 40
1 B 30
B max 1 mm
a max [mm]
P
TO
= 0.8
TO
II = 1.4
TO
III = 1.2
1B . . / 12.2011
1B . . / 12.2011
Assembly:
Follow the dismantling instructions in
the reverse order.
1B 20 / 27:
Insert sealing rings 18 into crankcase
(1B20: apply silicone H). Install the cylinder head.
1B 30 / 40 / 50:
Insert centering bush 19 into the
crankcase at the tierods at the timing
end. Install the cylinder head and new
O-rings 16 and new disks 15 at the
tierods at the timing end.
Tighten the cylinder head down with
washers 14 and nuts 13 as follows:
1 B 20:
10 Nm => 30 Nm => release -50
=> 30 Nm => release -50 => 25 Nm
1 B 27:
10 Nm => 90 => 120 (total 210)
1 B 30 / 40:
20 Nm => 55 Nm => release -68
=> 58 Nm => release -68 => 58 Nm
=> release -68 => 45 Nm
1 B 50:
10 Nm => 150 => release -50
=> 150 (total 250)
Adjust valve clearance at adjusting nut
9 and lock this nut with grub screw 8.
Important:
The engine must be precisely at TDC
on the ignition stroke, or else the automatic decompressor will take effect and
falsify the valve clearance adjustment.
Tighten locknuts 1 to secure the retaining strap until the tie bolt extends by 1.5
mm beyond the nut.
M 07.00
10
11
4
5
8
9
12
631 392 00
13
14
15
16
13
20
14
17
S
19
H18
21
629 223 01
1B . . / 12.2011
1B20 only:
From serial number:
1B20.16
The oilway in the cylinder head was
sealed and a new cylinder head cover
introduced.
The new cover must never be used on
earlier cylinder heads, or else engine oil
will be drawn into the inlet port and the
engine could then overspeed and destroy
itself.
1B . . / 12.2011
M 08.00
Up to 1B20.15:
From 1B20.16:
1B . . / 12.2011
Preliminary work:
For dismantling, see M cross-reference list.
Dismantling:
Remove circlip 1 and pull out shaft 2.
Take off reverse-motion lever 3 and
governor sleeve 4.
Take off bobweights 5 (8 and 4
weights).
Remove cylinder screws 6 with stop
plate 7 and pressure relief valve spring
8, noting the presence of ball 9.
Take off oil pump cover 10.
Parts 11 ... 14 need not be removed
unless damaged.
Testing / repair:
Examine parts for wear or damage and
renew if necessary..
Assembly:
Follow the dismantling procedure in the
reverse order.
Apply sealant H to oil pump cover 10.
Insert screws 6 with sealant D.
After assembly, set the gap between
spring 8 and stop 7 to 0.4 mm (bend the
stop as necessary).
1 B40 / 50:
Make sure that the correct plugs 15
or 16 ... 18 are fitted
(see M 01.10)
1B . . / 12.2011
Note:
From Series No. 1B 20.17
1B 30.12
A new oil pump was introduced, with two
covers (see picture). The installation procedure is the same as for the previous oil
pump.
The two oil pumps are interchangeable.
From Series No. 1B 20.18
1B 20 V.10
1B 30.13
The timing case cover, camshaft and oil
pump cover were modified.
These parts are not interchangeable
separately with the old versions.
M 10.00
M 10.10
1B40 / 50
15
16
17
18
10 H
6 D
11
12
2
13
1
6 D
abSeries
Serien-Nr.:1B20.17
from
No.
1B30.12
14
10 H
3
1B . . / 12.2011
Preliminary work:
For dismantling, see M cross-reference list.
Dismantling:
Remove circlip 1 and pull out shaft 2.
Take off reverse-motion lever 3.
Take off speed control lever 4.
Remove nut 5, washer 6, cup springs 7
and friction disc 8.
Mark the position of stop plate 9 in relation to speed control shaft 18.
Take off stop plate 9.
Mark the position of retaining plate 12 in
relation to the timing case cover, using
a scriber.
Take out cylinder screw 10 with washer
11 and take off retaining plate 12 and
O-ring 13.
Remove cylinder screws 14, governor
springs 15 and intermediate plates 16.
Take off circlips 17 (4 circlips) and pull
speed control shaft 18 out of the timing
case cover (note washers 19).
Take off governor lever 20.
Testing / repair:
Examine the parts for wear or damage.
Check the position of the bimetallic strip
at the governor lever as shown in the
drawing.
1B . . / 12.2011
Assembly:
Follow the dismantling procedure in the
reverse order.
Make sure that washers 19 are correctly
positioned.
Note the marks made to indicate the
positions of the parts when dismantling.
For position of governor spring cluster,
see Section 4.
After assembling, run the engine until it
is warm, check the speed setting with
revolution counter - 11 - and correct if
necessary.
Note:
The speed control does not have to be
removed to renew the governor springs.
If only O-ring 13 or governor lever 20 are
to be removed, proceed as follows:
Remove reverse-motion lever (1, 2, 3),
governor spring cluster (14, 15, 16) and
speed control lever 4
Take off circlips 17.
Mark the position of retaining plate 12 in
relation to the timing case cover.
Slacken off cylinder screw 10 through
the opening in stop plate 9 and pull out
the complete unit.
Assembly takes place in the reverse
order of work.
Check the speed setting.
M 10.00
M 10.20
19
13
18 17
8
5 6
10
11
8.5 mm
bei 20 C
12 16
15
D 14
20
1B . . / 12.2011
Preliminary work:
For dismantling, see M cross-reference list.
Dismantling:
Remove parts in the order 1...14.
Mark the position of retaining plate 15 in
relation to the timing case cover with a
scriber.
Remove parts in the order 15...22.
Testing / repair:
Examine parts for wear or damage.
Check the position of the bimetallic strip
at the governor lever as shown in the
drawing (M 10.20).
Assembly:
Follow the dismantling instructions in
the reverse order.
Make sure that washers 21 (1.0 mm)
and 20 (0.5 mm) are in their correct
positions.
Note the correct position of retaining
plate 15 (scriber mark).
Make sure that governor spring 9 is
connected correctly.
When assembling, bend the ends of idle
spring 4 inwards to prevent them from
escaping accidentally.
Apply sealant D to screws 6 when
installing them, and set stop 8 to value
S (see M 10.51)
Not the correct way in which cup
springs 11 (14 springs) must be
installed (the cup springs were later
replaced by a coil spring).
Tighten screw 10, loosen again and
retighten to a torque of 20 Nm; after
this, set the correct friction value.
1B . . / 12.2011
Note:
To prevent it from being reset accidentally, stop plate 23 has pressed-in ball 24
in the head of screw 25 to secure it.
When dismantling, the screw head must
therefore be ground away.
When installing the stop plate, apply
grinding paste M to shaft 19.
M 10.00
M 10.30
1B . . / 12.2011
1B . . / 12.2011
M 10.00
M 10.31
1B . . / 12.2011
Preliminary work:
For dismantling, see M cross-reference list.
Dismantling:
Remove parts in the order 1...10.
Mark the position of retaining plate 13 in
relation to the timing case cover with a
scriber.
Remove parts in the order 11...18.
Testing / repair:
Check parts for wear and damage.
Check the position of the bimetallic strip
at the governor lever as shown in the
drawing (M 10.20).
Assembly:
Follow the dismantling instructions in
the reverse order.
Check that the positions of washers 17
(1.0 mm) and 16 (0.5 mm) are correct.
Note correct position of retaining plate
13 (scriber mark).
Apply sealant D to screws 4 when
installing.
For correct governor springs, see Section 4.
Note correct assembly arrangement of
cup springs 8 (14 springs). These were
later replaced by a coil spring.
Tighten screw 7, loosen again and
retighten to 20 Nm, then adjust to the
necessary friction value.
1B . . / 12.2011
Note:
To prevent it from being moved accidentally, stop plate 20 is secured by ball 21
pressed into the head of screw 22.
To remove, the screw head must be
ground away.
When installing the stop plate, apply
grinding paste M to shaft 15.
M 10.00
M 10.40
1B . . / 12.2011
General:
In connection with EPA certification, the
engine speed adjustment screws together
with stop were located inside the timing
case cover.
The rest of the governor is the same as
the previous version (M 10.30 or M 10.40)
The adjustment screws 1 are protected by
screw 2 and plate 3 against unauthorised
adjustment.
Dismantling / assembly:
- Takes place as in the previous version.
- Make sure that washers 4 and 5 are in
the right position.
- Circlip 6 is only installed on 1B40 / 50
engines.
1B . . / 12.2011
M 10.00
M 10.50
1
2
3
4(0.5mm)
5(1.0mm)
6(1B40/50)
6(1B40/50)
5(1.0mm)
1B . . / 12.2011
1B
1B .. .. // 12.2011
12.2011
Attention:
Wire diameter (d) of spring depends on
execution of flyweight carrier
Notes:
Individual speed values refer to rated full
load speed.
Final (dynamic) speed tuning at test
bench being done by slightly turning
eccentric screw A accordingly.
M 10.00
M 10.51
D
C
Version I
Version II
5 mm
4x2
2.5 mm
4x1
1B20
1B27/30
S = 18.5 mm S = 18.5 mm
S = 23 mm
S = 23 mm
1B40 / 50
S = 23 mm
1B . . / 12.2011
1B
1B .. .. // 12.2011
12.2011
Additional notes:
- The indicated speeds refer to nominal
(= full load) speed.
- Final setting of speed (full load and high
idle respectively) is only possible by
means of a test run whereby eccentric
gets slightly turned.
- Earlier series of engines also for none
gen-set applications such as compactors, pumps, etc. have got the leaf
spring governor instead of the spiral
type as introduced later. In such cases
the indicated equipment (springs, flyweights, etc.) and pre-setting procedure
is applicable also for these engines.
M 10.00
M 10.52
B
C
Start
A
Version I
Version II
5 mm
2x2
13
2.5 mm
4x1
!
1B . . / 12.2011
Preliminary work:
For dismantling, see M cross-reference list.
Remove the recoil starter so that the
engine can be turned over by hand.
Dismantling:
Detach the fuel feed from the tank.
Pull the oil leak-off line and oil trap off
their connections at the timing case
cover.
Take out cylinder screws 1...6 with
washers and sealing rings.
Take off the timing case cover.
Testing / repair:
Check parts for wear or damage.
Renew sealing rings 7 and O-ring 8.
Press on a new shaft sealing ring 9 until
recessed by 5.5 mm.
Press the new main bearing 10 in until
flush (note the oilways).
Assembly:
Turn the crankshaft to TDC.
Version I:
(First-series engines without marking on
camshaft)
Remove adjusting washer 11 from the
camshaft. Two holes to accept the stirrup for the automatic decompressor will
then be visible. Make a chalk mark on
the camshaft gearwheel tooth that is
centrally above an imaginary line
between these two holes (equivalent to
maximum cam lift).
Install adjusting disc 11 again.
Turn the camshaft to TDC on the valveoverlap stroke, so that the tooth marked
with chalk is again at the very top.
1B . . / 12.2011
Version II:
(camshaft with marking)
Turn the camshaft to TDC on the
overlap stroke, so that the tooth with a
punch mark is pointing vertically down.
Apply sealant H to the sealing face on
the timing case cover.
Place the timing case cover against the
crankcase and knock it into position
until it makes complete contact with the
crankcase.
Insert the pushrods and check that the
crankshaft is precisely at TDC when the
valves are in the overlap position. This
ensures the correct position of the camshaft in relation to the crankshaft.
Cylinder screws 5 (M 8 x 120) are
installed with copper sealing rings 6.
All other timing case cover screws 1...3
are installed with spring washers 4.
Cylinder screw 3 is 60 mm long, since
the air guide support hoop is attached to
it.
Apply sealant H to the threads of
cylinder screws 1.
Important!
The tapped holes for the cylinder screws
in item 1 extend through to the cylinder liner. For this reason, only M8 x 45
screws are to be inserted here, or else
the cylinder liner will be damaged.
Continue assembly work by following
the dismantling instructions in the
reverse order.
Note:
Setscrew 12 must not be inserted too far;
it must project from the timing case cover
by at least 2.5 mm, or else the fuel supply
hole will be blocked.
M 11.00
1 (M8 x 45)
H
4
H
3
11
9
12
Version I
Version II
10
E
1B . . / 12.2011
Preliminary work:
For dismantling, see M cross-reference list.
Dismantling:
Remove cylinder screw 1, washer 2 and
fork 3.
Unscrew collar nut 4 and pull the complete injector 5 out of the cylinder head.
Checking:
Look for blue discoloration or impurities
at the injector nozzle.
Check the spray pattern, spray pressure
and leakage in a suitable injector tester.
If the spray pattern is poor or the spray
pressure incorrect, repair the injector.
DANGER:
Keep the hands clear of the injector
spray. The fuel spray from an injector
nozzle can cause severe injuries.
Repair:
Dismantle parts 6 ... 11 of the injector.
Examine the injector body/injector needle for damage caused by overheating,
score marks, micro-wear (visible as a
matt grey, compacted surface) and carbonised nozzle holes.
Checking sliding action:
If injector needle 7/1 is clean and has
been coated with fuel, it should slide in
the seat in injector body 7 under its own
weight.
Renew worn or defective parts.
The nozzle body and needle have
been lapped together and must only be
exchanged or renewed as a pair.
Assembly by following the dismantling
instructions in the reverse order.
Tighten the nozzle clamp nut to the
specified torque.
1B . . / 12.2011
M 14.00
M 14.10
1
14
3
5
4
12
11
10
9
8
7/1
7
Y
180
180
13
+5
30 Nm
+4
22 lb ft
1B . . / 12.2011
1B . . / 12.2011
M 14.00
M 14.11
1B . . / 12.2011
Preliminary work:
For dismantling, see M cross-reference list.
Dismantling:
Disconnect the pump piston at the
rocker arm.
Unscrew pressure valve holder 1 with
O-ring 2.
Take off spacer 3, spring 4, sealing ring
5 and pressure valve 6.
Pull pump element 7 and washer 8 out
upwards.
Remove screw plug respectively
cover 9.
Governor sleeve 13 is located by hoop
14 and does not need to be removed.
Testing / repair:
Check that the pump piston can move
freely over its entire stroke.
Renew worn or damaged parts.
Assembly:
Place throttle in the stop position.
Insert shim washer 8.
Insert pump element 7, making sure
that the suction hole on the barrel
(larger hole with taper) and the plunger
are in the correct position. When viewed
from the throttle side of the timing cover,
inlet hole of barrel should face you and
when looking straight down on top of
the barrel and plunger, the stop grove
(vertically cut grove on plunger) should
face the 5 oclock position, with the inlet
hole on barrel being the 6 oclock position.
When inserting the element assembly,
make sure that the plunger tab enters
the governor sleeve (this can be more
easily achieved if the governor sleeve is
turned to and fro slightly), and that the
eccentric pin engages in the slot on the
element cylinder.
1B . . / 12.2011
M 14.00
M 14.20
1
2
3
4
5
6
9
10
13
12
11
14
1B . . / 12.2011
1B . . / 12.2011
M 14.00
M 14.30
9
5
10
H 2
1B . . / 12.2011
1B . . / 12.2011
Measurement:
Slowly turn the engine in direction of
rotation at the same time watch the capillary tube.
I: The plunger moves upwards and
forces the air out of the barrel of the
injection pump, the fuel column in the
capillary tube is moving.
II: As the plunger moves further upwards,
the inlet bore is closed off, compressing the air inside the pump element C.
The fuel column in the capillary tube
stops.
III: The plunger moves further upwards,
the helix of the plunger opens the inlet
bore releasing the air causing the fuel
column in the capillary tube to move
rapidly. This is the exact point of end
of delivery. Take reading of degrees at
flywheel.
Now slowly turn the engine in reverse
direction of rotation, the helix of the
plunger closes the inlet bore and
vacuum is generated in the pump element C. The fuel column in the capillary tube stops.
IV: The plunger opens the inlet bore and
the released vacuum causes the fuel
column in the capillary to move rapidly.
This is the exact point of start of
delivery. Take reading of degrees at
flywheel.
The power adjustment is determined by
the delivery lift in degrees (difference
between start and end of delivery).
Adjustment description M 14.30.
M 14.00
M 14.31
C
II
B
C
III
IV
1B . . / 12.2011
1B . . / 12.2011
M 14.00
M 14.40
1B . . / 12.2011
Preliminary work:
Dismantling:
Take out retaining screws 1 and pull
housing 2 off horizontally by hand.
Pull starting cable 3 out of handgrip 4
and unfasten the knot.
Turn cable pulley 5 back slowly until
return spring 6 is relieved of load.
Loosen screw 7 and take off spring
washer 8 and brake disc 9.
With return spring 6 entirely relieved of
load, turn cable pulley 5 to and fro and
lift it carefully out of housing 2.
Turning to and fro is essential, or else
return spring 6 will be pulled out of its
seat in housing 2. However, it need not
be removed unless damaged.
Warning: risk of injury!
Take pawl 11 and torsion spring 12 off
cable pulley 5.
Testing / repair:
Perform a visual check.
Check parts for wear or damage and
renew if necessary.
1B . . / 12.2011
Assembly:
Apply a light coating of high-temperature grease K to all moving metal parts.
Wind return spring 6 back into housing
2 if it had to be removed, or insert a
new wrapped spiral spring and remove
its wrapping. The outer eye of the spring
must engage in the milled cutout in
housing 2. The inner spring eye must be
about 4 mm from the shaft.
Wind on starting cable 3 and place
cable pulley 5 on the shaft in housing 2.
Turn the cable pulley to and fro slightly
until the projection on the cable pulley
engages in the return spring eye.
Insert the longer arm of torsion spring
12 into the hole on the cable pulley.
Install pawl 11 and engage the shorter
arm of the torsion spring in the cutout.
Insert brake spring 10 as illustrated, and
install brake disc 9.
Install spring washer 8 and screw 7.
Use sealant D.
Note correct tightening torque (10 Nm).
Preload the cable pulley by giving it
4 1/2 turns in the engines direction of
rotation, and lock it in this position.
Thread the cable thrrough handgrip 4
and secure it with a knot.
Check that the recoil starter operates
correctly.
Install remaining parts on engine.
M 15.00
10 Nm
7.4 lb ft
K
11
12
5
1
D 7
9
3
10
m
m
1B . . / 12.2011
M 17.00 Flywheel
1B . . / 12.2011
= Start of delivery
= End of delivery
= End of delivery
M 17.00
1B 40 / 50:
1B . . / 12.2011
Preliminary work:
Take off the fuel tank and air guide
housing 1 (A 01.10).
Take off the flywheel (M 17.00).
Dismantling:
Unscrew support bracket 2 from dividing
plate 3.
Take out cylinder screw 4, noting the
presence of washer 5.
Take off dividing sheet 3.
Air guide sheets 6 and 7 can remain in
position.
Testing / repair:
Check the sealing strips for damage.
Remove any foreign bodies.
Assembly:
Follow the dismantling instructions in
reverse.
It is essential for all air guides to be
installed completely and correctly so
that the engines thermal operating condition is not affected.
1B . . / 12.2011
M 26.00
4
3
1B . . / 12.2011
M 31.00 Breather
Preliminary work:
Take off the air cleaner cover, the noise
insulating hood and the air cleaner
housing.
Dismantling:
Pull oil trap 1 out of suction pipe 2 in the
timing case cover, and take out of the
crankcase complete with seal 3.
Pull off hose 4, lever cover 5 out of the
crankcase with a suitable drift and take
out diaphragm 6.
Testing / repair:
Check parts for damage.
If necessary, renew diaphragm 6 and
filter insert 7.
Assembly:
Follow the dismantling instructions in
the reverse order .
Drive cover 5 fully into the crankcase
with a suitable drift.
Re-attach parts removed from engine.
1B . . / 12.2011
M 31.00
1B . . / 12.2011
4. Tables
1B . . / 12.2011
Governor components
1B 20
13
1B 20 / 1B 20V
13
1B . . / 12.2011
Governor components
1B 20
13
1B 20
13
Governor lever
without bi-metal !
1B . . / 12.2011
Governor components
1B 27 / 1B 27V / 1B 30 / 1B 30 V
13
1B 27 / 1B 30
13
1B . . / 12.2011
Governor components
1B 40 / 1B 50
13
1B 40 / 1B 50
13
1B . . / 12.2011
Governor components
1B 40 / 1B 50
13
1B 40 / 1B 50
13
1B . . / 12.2011
Governor components
1B 40 / 1B 50
13
1B . . / 12.2011
23 - 0 - 23 - 0 - 25
Tighten - release - tighten . . .
9.8
30 + 5
1B 20 / 27 / 30
350 + 20
1B 40 / 50
40 + 2
1B . . / 12.2011
9.6
1B 20 / 27:
1B 30:
1B 40 / 50:
21.4 1
29 + 2
40 + 2
1B 20:
16
50
1B . . / 12.2011
10
1B50 with used crankcase: 5
Tappet clearance
Bumping clearance
0.1 + 0.05
1B 20 from serial 30 on,
1B 20V from serial 20 on
without automatic valve adjustment
device:
0.2 + 0.05
1B . . / 12.2011
1 B 20 before EPA:
0,55 - 0,65 mm
1 B 20 / 27:
0,45 - 0,55 mm
1 B 30:
0,50 - 0,55 mm
1 B 40 / 50:
0,55 - 0,60 mm
8.8
10.9
12.9
1.7
2.8
3.9
4.7
3.4
5.5
7.8
9.3
6.0
9.5
13
16
14
23
33
39
M 10
29
46
65
78
M 12
50
80
110
140
M 14
80
130
180
220
M 16
120
190
270
330
M 18
170
270
380
450
M 20
240
380
530
640
M 22
320
510
720
860
1B . . / 12.2011
Malfunction
Battery is
not being
charged
sufficiently
or at all, or
is being discharged too
rapidly.
Indication
Even shortly after
charging, the terminal voltage drops
rapidly to 7 V on
systems with 12 V
nominal voltage.
Possible cause
Poor connections, open
circuit or contact resistance in charging circuit,
short-circuit in line.
Remedial action
Eliminate open circuit,
clean posts and clips,
tighten loose terminals.
Recharge battery at
low current (app. 1/40
of nominal capacity
in Amps) for about 50
hours. (Only possible if
suplhatising not yet too
far advanced.) Otherwise: renew battery.
Recharge the battery.
1B . . / 12.2011
Malfunction
Post
terminals
corroded.
Indication
Possible cause
Insufficient current Sulphuric acid attacks
transfer, bloom
metals (except lead).
(white salt deposit).
Remedial action
Wash the posts and
terminals down with hot
soda solution (but this
must not enter the
battery!), rinse with cold
water and apply acidresistant grease.
Acid level
too low.
Overloading, natural
water loss caused by
evaporation (esp. in
summer).
Battery was discharged
too far or too frequently.
Add distilled or
demineralised water.
Battery life
too low.
1B . . / 12.2011
Malfunction
Battery output is too
low.
Indication
Voltage drops
severely when a
load is applied.
Possible cause
Battery is flat (discharged).
Remedial action
Recharge battery.
Clean connecting
terminals, apply acidresistant grease, tighten
terminal clips.
Battery capacity too low Install a larger battery.
(too many consumers).
Long-term
charging
rate is
insufficient.
Terminal voltage
Fault at generator,
Repair or renew the
drops to 7 V nom- voltage regulator or
generator and voltage
inal voltage (12 V
cable connections.
regulator, make sure
circuit) even shortly
that all line connections
after recharging.
are tight.
Too many consumers
Choose more suitable
connected to the circuit, battery - generator
or generator is too small. ratings.
1B . . / 12.2011
Malfunction Indication
Starter does Generator indicator
lamp is not on.
not rotate
when
preheat
- starting
switch is
operated.
Indicator lamp darkens slowly when
preheat-starter
switch is operated.
Indicator light remains on brightly.
Bridge terminals 30
and 50 briefly at the
starter. The starter
then runs.
Possible cause
Poor connection (loose
or oxidised), break in
cable or short to earth
(ground).
Remedial action
Check battery cables
and connections, clean
battery posts and terminals, make sure that
connections are tight.
Battery flat or defective. Recharge or renew the
battery.
Battery is flat
(discharged).
1B . . / 12.2011
Malfunction
Starter turns
too slowly or
is unable to
turn the engine over.
Drive pinion
does not
engage or
disengage.
Indication
Possible cause
Lengthy period of
Carbon brushes sticking.
use without maintenance or in severe
conditions.
Carbon brushes worn.
Remedial action
Renew carbon brushes
and brush holder guides.
Renew carbon brushes.
Lengthy period of
use without maintenance, neglect of
electrical system.
Commutator scored or
burned.
Recondition or renew
starter.
Recondition or renew
starter.
1B . . / 12.2011
Commutator dirty.
Clean commutator.
Commutator scored or
burned.
Recondition or renew
starter.
Recondition or renew
starter.
Malfunction Indication
Starter con- Noise of starter
tinues to turn turning.
after switch
has been
released.
Possible cause
Preheat/starting switch
does not return automatically from position 2
to position 1.
Remedial action
Reset the preheat/starting switch to 0 by force
if necessary and renew
it. If this is not possible,
disconnect the battery
immediately.
Warning!
If this action is not
taken within 2 - 3
minutes, the starter
will overheat and burn
out.
Engine starts
reluctantly or
not at all
although
starter turns
quickly.
Defective preheat
system (this is only
of significance at
temperatures below
-10C).
1B . . / 12.2011
A
A
A
A
1
2
3
4
Equipment box
Equipment panel
Automatic start-stop
Starter protection module
B
B
B
B
1
2
3
4
Temperature sensor
Speed pulse sensor
Oil pressure sensor
Horn
C1
Capacitor
E1
F1
Fuse
G1
G2
G3
Battery
Generator (alternator)
Flywheel generator
H
H
H
H
H
H
H
H
1
2
3
4
5
6
7
8
K
K
K
K
K
K
K
K
1
2
3
4
5
6
7
8
M1
MG
Starter motor
Starter-generator
N
N
N
N
Regulator for
Regulator for
Regulator for
Pulse sensor
1
2
3
4
1B . . / 12.2011
starter-generator
flywheel generator
alternator (unless integrated)
(additional for syncro-regulator)
P1
P2
P3
R
R
R
R
R
1
2
3
4
5
Preheat glowplug
Heating flange
Line resistor for preheat system
Resistor
Line resistor with thermal time switch
S
S
S
S
S
S
S
S
S
S
S
S
1
2
3
4
5
6
7
8
9
10
11
12
T1
V
V
V
V
Decoupling diode
Freewheeling diode
Zener diode
Suppressor diode
1
2
3
4
W1
W2
X
X
X
X
X
1
2
3
4
5
Y
Y
Y
Y
Y
1
2
3
4
5
Z1
Z2
Suppressor choke
Suppressor capacitor
1B . . / 12.2011
Designation
Earth (ground)
Generator B+
With alternator: D+
With flywheel generator: Terminal L at regulator
Starter terminal 50
Preheat glowplug I
Preheat glowplug II
Start-stop input
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
* * * reserved * * *
28
29
* * * reserved * * *
1B . . / 12.2011
30
0
P
50
Displaypanel
III
II
50a
A
_
L C W
G G
22
2
24
30
0
P
50
Displaypanel
III
II
50a
L C W
G G
22
2
V
~
24
1B . . / 12.2011
Generator characteristics, 12 V
Charge current:
Battery voltage 12.5 V, normal operating temperature
I [A]
16
14
12
10
8
6
4
2
1000
1500
2000
2500
3000
3500
n [min-1]
Off-load AC voltage:
measured between a yellow and a red wire at the coil (without regulating switch)
U [V~]
50
40
30
20
10
0
1000
1500
1B . . / 12.2011
2000
2500
3000
3500
n [min-1]
Circuit diagrams
1B . . / 12.2011
1B . . / 12.2011
2,512
11
2,5'i'
2,5'i'
Starteinrichtung
Starting device
Dispos. de demarr.
Stromversorgung / Ladeeinrichtung
Power supply / Charging device
Alimentation electr. / Chargeur
ffi
A5
7
'
- '1
-I
Motorabste 11 ung
Motor shut-down
Arret du moteur
- ,
Y41
i
i
'-'l
HL
HL
Name
51 011 00.
Stromlaufplan
Schematic diagram
Schema de cablage
1004
von
BI.
Blatt 1-
-.-.-.-._._._._._._.-----l
_.-
Hinweis: Jede nderung der Verdrahtung erfordert eine Rcksprache mit dem Werk
Instruct.: Any changes in the wiring require a consultation of the factory !
Remarque: Avant de modifier le cablage, contacter l'usine !
berwachung + Anzeige
Monitoring + display
Surveillance + temoin
[f}~b2JS6
Motor
Engine
Moteur
'-+-i-+'-'-'-'-'-'-'-
[}-
SB
05092100
._._._._._._._._.j
Anzeigeplatine
'-'-'-'-'-'-'-'-'-'-'-'-'-'-'1
L._._._._._._._._._._._._._._._._.~
._._._._.---1'
'l"._._._._.~ ...L
L._._._.
'I
i'~';;-'-'tl~"f;'-'-'ll
,u",-j:;---~--1 vii
S1
Armaturenkasten
Instrument box
Boi tier de bord
r-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-.-.-.-.-.-.-.-.-.-.-.-.-.
1B . . / 12.2011
Ih
~
111
2.5'i'
012
\. ~' -
I r - -V- -
II
2.5'i'
Hinweis: Jede nderung der Verdrahtung erfordert eine Rcksprache mit dem Werk!
Instruct.: Any changes in the wiring reQuire a consultation of the factory I
RemarQue: Avant de modifier le cablage. contacter l'usine !
Starteinrichtung
Starting device
Dispos. de demarr.
. _ _ . _ _ . _ _ . _ _ .-----l
2.5'i'
._._._._.~
---
Stromversorgung / Ladeeinrichtung
Power supply / Charging device
Alimentation electr. / Chargeur
._._._._.
L._._._.
.'''1'
,'-'-'-'Q1'5Q;'ffi'-'-'l
S1
Armaturenkasten
Instrument box
Boi tier de bord
1'-'-'-'-'-'-'-'-'-'-'-'-'-
12 V- Anlage
12 VequilJllent
EquipllEnt 12 V
H..
H..
Nane
Stromlaufplan
Schematic diagram
Schema de cablage
von
BI.
Blatt 1-
1B . . / 12.2011
15
2,5'i'
2,5'i'
_ __
.~
L.
I, I'
I'
15
A5
[}-
SB
~~Efr
Motor
Engine
Moteur
Y4 '
'-+-i-+'-'-'-'-'-'-'-
05101400
Starteinrichtung
Starting device
Dispos. de demarr.
Motorabste 11 ung
Motor shut-down
Arret du moteur
!
----..
IHL
NarnE!
HL
Stromlaufplan
Schematic diagram
Schema de cablage
von
BI.
Blatt 1-
51 013 00.
1004
r~=--~"~----'---'-----T-----~~--------------------~-----
I I
~~
Hinweis: Jede nderung der Verdrahtung erfordert eine Rcksprache mit dem Werk
Instruct.: Any changes in the wiring require a consultation of the factory !
Remarque: Avant de modifier le cablage, contacter l'usine !
berwachung + Anzeige
Monitoring + display
Surveillance + temoin
._._
R1
._~.-l~l------------.J
._1
'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'
..L L._._._._._._._._._._._._._._._._.
Stromversorgung / Ladeeinrichtung
Power supply / Charging device
Alimentation electr. / Chargeur
l'. _ . _ . _ . _ .~
l._._._.
i C>-lT--y-
I j~
~'~';;-'-'n'~' '-'-'l i
2,5,2
Armaturenkasten am Motor
Instrument box at engine
Boitier de bord le moteur
r-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'l
S1
2,52
'I
1 5 ' - ' 1 , 15
2,5'
35'
1
'
G1"~
tT- !
._._._._._.
H2
S6
Motor
Engine
Moteur
Y4
-=1
i
i
'1
Anderung
~+:"":":"":::":"":":=..:..t-:...=...-r-=
..-...::..'--------_..~~
Schutzvermerk
nach DIN 34 beachten
Form- u, Lagetolerierung
DIN ISO 1101
MOTORENF ABRIK
HA TZ
RUHSTORF-ROTT
HATZ]
berwachung + Anzeige
Monitoring + display
Surveillance + temoin
Oberflchenbeschaffenheit
DIN ISO 1302 Reihe,.?"
Starteinrichtung
Starting device
Dispos , de demarr,
sr.
ISO E
e$
1: 1
ICAD I Datum
1 B 20 ... 1 B 30
Armaturenk. m. Anzeige
Mastab/sCALE
HL
HL
Name
12 V
RAW-PART ND,
Typ
, ZF
0151112131910101.11101014
1 1 1 1 1 1 1 I. 1 1 1 1
Rohteil-Nr.: /
Werkstoff/ MATERIAL
Kabelstrang
wiring harness
\uOrtlJ~"IiI-~""5~"'4~""3-~-~"'6"~ faisceau electrique
Stromlaufplan
Motorabstellung
Motor shut-down
Arret du moteur
IQ,;,. .
~~
.0
~o
60
0
._._._._._.J
'I
L._._._._._._._._._._._._.---.J
'I
11_lil
!~
2,5'
- - -
'
'-'-'-'-'-'-'-'-'-'-'-'11
._._._J i ~._._.
~I
Stromversorgung / Ladeeinrichtung
Power supply / Charging device
Alimentation electr, / Chargeur
~.
1,
I L._._.
'
'I r'-o';;-'-f,
Armaturenkasten
Instrument box
Boitier de bord
I'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'~
1---+---+---+-------11
1B . . / 12.2011
35'
Anderung
'li
Schutzvermerk
nach DIN 34 beachten
Form- u. Lagetolerierung
DIN Ig) 1101
Allgemeintoleranzen
DIN 7168. !'l.i.t.t.e.l.
berwachung + Anzeige
Monitoring + display
Surveillance + temoin
[f}~b2JS6
7
- '1
-I
j
'
Motorabste 11 ung
Motor shut-down
Arret du moteur
_.~
Y41
'-'l
MOTORENF ABRIK
HA TZ
RUHSTORF-ROTT
ISO E
e$
Mastab/sCALE 1: 1
) ICAD I Datum
1 B 20
mit Signalgeber
Stromlaufplan
HL
HL
Name
_.Motor
Engine
Moteur
Hinweis: Jede nderung der Verdrahtung erfordert eine Rcksprache mit dem Werk
Instruct.: Any changes in the wiring require a consultation of the factory !
Remarque: Avant de modifier le cablage, contacter l'usine !
[}-
SB
'-+-i-+'-'-'-'-'-'-'-
H2 H17 H4 H5
Piezo-Signalgeber
buzzer
alarme sonore
I.
RAW-PART No.
1
Typ
ZF
0151113121110101.11101014
Rohteil-Nr.: /
Werkstoff/ MATERIAL
-.-.-.-._._._._._._.-----l
j5-28 V
;j
H10
Starteinrichtung
Starting device
Dispos. de demarr.
I-=---+='----+=---r=-..-----1
A5
' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' 1 !'
Anzeigeplatine
15
LED-display
05092100
,cont.
tableau ' LED''
j
L._._._._._
jl
'+'=1"1
Stromversorgung / Ladeeinrichtung
Power supply / Charging device
Alimentation electr. / Chargeur
Ij
ir-
2,5'
III
._._._._.~
50a
-y- - - - - -
l._._._.
j~
IC)- Ir -
2,5'
Q1'_' 15'-675'l
2,512
i'~';;-'-'I iI
Si
Armaturenkasten
Instrument box
Boi tier de bord
r-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-.-.-.-.-.-.-.-.-.-.-.-.-.
1B . . / 12.2011
- - -
"
Stromversorgung / Ladeeinrichtung
Power supply / Charging device
Alimentation electr, / Chargeur
K!4 HO 30
K!2
l. . . .
K!
R 47
r--
H7
Motor
Engine
Moteur
Form- u, Lagetolerierung
DIN Ig) 1101
Schutzvermerk
nach DIN 34 beachten
LJ
MOTORENF ABRIK
HA TZ
RUHSTORF-ROTT
1'1
'l
.J
H13'
eo
Vorglhen
Preheating
Prechauffage
~O
~e
000
ISO E
1: 1
: )I CAD I Datum
e$
Mastab/sCALE
1 B 40
Name
RAW-PART ND,
Typ
ZF
0151215121610101.11101014
1 1 1 1 1 1 1 I. 1 1 1 1
Rohteil-Nr.: /
Werkstoff/ MATERIAL
Kabe 1strang
wiring harness
~rL1:r;~1'F~6""5~-4-~-~-1~ fa i sceau el ectri que
AK Abschaltaut. berdrehz.
1 B 20
~O
Stromlaufplan
Motorabstellung
Motor shut-down
Arret du moteur
._.j
AI
"
I
T II
Y~~
Kabelstrang
wiring harness
Faisceau electrique 17
berwachung + Anzeige
Monitoring + display
Surveillance + temoin
Starteinrichtung
Starting device
Dispos , de demarr,
~+---+:"'="'-t-=.. -----1
--l
[hl52J-l
H4 H5
r
1
L._._-._._._._._-._._-._._._-.
Anderung
'
1t._._._._._.!
!JI
._._._._._.. ._._._._._ ._.
' 15 50
iFrfl
rM)
-I ~f-J M1Y
-'-'-'-'-'-'-'-'-'-'-'-'-'1,I1 f30
QO
-+-:1--+-'-'-'-'-'-'
---2-;-_J
L. ._._.
'L
50a
, 1 5
I r'~'-'"l
I,
Off
f'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'l
.
Armaturenkasten
.
Instrument box
2 52
2,5'
Boitier de bord
A5
'
1---+---+---+------11
1B . . / 12.2011
2,5'i'
j~
1 1
[}-
SB
~~Efr
Starteinrichtung
Starting device
Dispos. de demarr.
Motor
Engine
Moteur
Y4 '
7
Motorabste 11 ung
Motor shut-down
Arret du moteur
8-$
1 B 20 - 1 B 40
._._
Ri
Stromlaufplan
1: 1
01745700.100~
RAW-PART No.
No.
Typ
'ZF
0151215171710101.11101014
1 1 1 1 1 1 1 I. 1 1 1 1
Rohteil-Nr.: /
Werkstoff/ MATERIAL
._~.-l~l----------
6.
13._1
Hinweis: Jede nderung der Verdrahtung erfordert eine Rcksprache mit dem Werk
Instruct.: Any changes in the wiring require a consultation of the factory !
Remarque: Avant de modifier le cablage, contacter l'usine !
berwachung + Anzeige
Monitoring + display
Surveillance + temoin
Mastab/sc ALE
1---=+----+--+----1 Form- u. Lagetolerierung
nderung
DIN 19) 1101
MOTOAENF ABAIK ISO E
Schutzvermerk nach
HATZ
NICHT MANUELL ANDERN
DIN 19:1 16016 beachten
AUHSTOAF-AOTT
'-+-i-+'-'-'-'-'-'-'-
15 17 4
._.J L
11
15 50
A5
'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'--'
..L L._._._._._._._._._._._._._._._._.
Stromversorgung / Ladeeinrichtung
Power supply / Charging device
Alimentation electr. / Chargeur
l'. _ . _ . _ . _ .~
2,5'i'
L._._._. ._._.
I~}--r--'-k
'I
2,5,2
Armaturenkasten am Motor
Instrument box at engine
Boitier de bord le moteur
~, r - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' l ,~
1B . . / 12.2011
\.
'-
Ir---V
L_._._.
'''1'
nderung
2,5'
Moleur
Mot~r
Englne
S7
Inl
S6
~
_._
Ri
Y2
7
-.-
._.j
i
i
'-'-'-'-'-'-'-'-'-'-'-'-'-'-'1
I1
Schutzvermerk nach
DIN 19:1 16016 beachten
Lagetolerierung
Starteinrichtung
Starting device
Dispos. de demarr.
MOTOAENF ABAIK
HATZ
AUHSTOAF-AOTT
ISO E
1: 1
8-$
Mastab/sc ALE
ICAD
Datum
1 b 20 - 1 B 40
1
Name
Armaturenk. m Anz. + DV
Stromlaufplan
I. 1
:!F1N1SH-PART No.
Typ
ZF
0151215181110101.11101014
Fertigteil Nr.
RAW-PART No.
MATERIAL
Rohteil-Nr.: /
Werkstoff/
Hinweis: Jede nderung der Verdrahtung erfordert eine Rcksprache mit dem Werk
Instruct.: Any changes in the wiring require a consultation of the factory !
Remarque: Avant de modifier le cablage, contacter l'usine !
berwachung + Anzeige
Monitoring + display
Surveillance + temoin
_._._._.-----l
01560802
. - ' - .. - . - . - . - . - .
L._._._._._._._ ._._._._._._._._._._._._._.~i
1--=+---+--+----1 Form- u.
'
11
15
Stromversorgung / Ladeeinrichtung
Power supply / Charging device
Alimentation electr. / Chargeur
l._._._._.
1~
-,- I' I'
,1'f'=ll
I i :J i
63
2,5'i'
_I
2,5'i'
._._._._.J I
---
i,
N2~ Uj-Y(B+~
i _
2,5 12
i'~';;-'-'tl~"f;'-'-'ll
S1
Armaturenkasten
Instrument box
Boi tier de bord
~ r-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'l ~
1B . . / 12.2011
j~
=1 1
'+_.
-,
'
25'
1 1
~~1~~~
Mot~r
15 17 4
Ipl
S7
13
S6
Ri
_._._._._.
LI
Y2
._._._.
Lagetolerierung
OIN ISO 1101
Schutzvermerk nach
OIN ISO 16016 beachten
Starteinrichtung
Starting device
Dispos. de demarr.
MOTOAENF ABAIK
HATZ
AUHSTOAF-AOTT
ISO E
1: 1
8-$
Mastab/sc ALE
+ DV
ICAD I Datum I Name
1 b 20 - 1 B 40
Armaturenk. Aut.
Stromlaufplan
RAW-PART No.
No.
Typ
'ZF
0151215181210101.11101014
1 1 1 1 1 1 1 I. 1 1 1 1
Rohteil-Nr.: /
Werkstoff/ MATERIAL
Hinweis: Jede nderung der Verdrahtung erfordert eine Rcksprache mit dem Werk
Instruct.: Any changes in the wiring require a consultation of the factory !
Remarque: Avant de modifier le cablage, contacter l'usine !
berwachung + Anzeige
Monitoring + display
Surveillance + temoin
01745700.1003
._._._._._._._._._.---.J
i
i
._'-.
__._._1
L ._._._._._._._._._._._._._._._._._._._._.~I
1--=+---+--+----1 Form- u.
nderung
A5
'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'-'--'
Stromversorgung / Ladeeinrichtung
Power supply / Charging device
Alimentation electr. / Chargeur
Gi
':..J.
I'
11
15 50
._.J L
i
i 1,~II'
l._._._._.
Ir-
____
N2~-U j--Yi-'---+---I
2,5'i'
L._._._. ._._.
I~}--r--'-k
'I
I I'
(B+~------I ,GI- GI- w
2,5'i'
2,5,2
Armaturenkasten am Motor
Instrument box at engine
Boitier de bord le moteur
~, r - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' l ,~
1B . . / 12.2011
j~
15
15
50
[}-
SB
Starteinrichtung
Starting device
Dispos. de demarr.
Motor
Engine
Moteur
7
'
- '1
-I
Motorabste 11 ung
Motor shut-down
Arret du moteur
- ,
Y41
i
i
'-'l
8-$
1: 1
1B
) ICAD I Datum
AK angeb. 12 V Aut.
Stromlaufplan
RAW-PART No.
No.
Typ
ZF
0151217181310101.11101014
1 1 1 1 1 1 1 I. 1 1 1 1
Rohteil-Nr.: /
Werkstoff/ MATERIAL
-.-.-.-._._._._._._.-----l
Armaturenkasten 01796500
instrument box
01796500
boi tier de board 01796500
I Name
_.-
Hinweis: Jede nderung der Verdrahtung erfordert eine Rcksprache mit dem Werk
Instruct.: Any changes in the wiring require a consultation of the factory !
Remarque: Avant de modifier le cablage, contacter l'usine !
berwachung + Anzeige
Monitoring + display
Surveillance + temoin
[f}~b2JS6
Mastab/sc ALE
1---=+---+--+----1 Form- u. Lagetolerierung
nderung
DIN 19) 1101
MOTOAENF ABAIK ISO E
Schutzvermerk nach
HATZ
NICHT MANUELL ANDERN
DIN 19:1 16016 beachten
AUHSTOAF-AOTT
._._._._._._._._.J
'-+-i-+'-'-'-'-'-'-'-
2 17 4
Anzeigeplatine
'-'-'-'-'-'-'-'-'-'-'-'-'-'1
A5
L._._._._._._._._._._._._._._._._.~
._.---1 i...-.
1 '
, 1
1 '
, 1
'-'l i
2,5Y'
Stromversorgung / Ladeeinrichtung
Power supply / Charging device
Alimentation electr. / Chargeur
'l'._._._._.~ ...L
2,5Y'
L._._._. ._._.
I~}--r--'-k
5O
Q1'_'a
2,512
i'~';;-'-'I' I
Si
Armaturenkasten
Instrument box
Boi tier de bord
~, r - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - ' - . - . - . - . - . - . - . - . - . - . - . - . - .
1B . . / 12.2011
~
,
1B . . / 12.2011
1B . . / 12.2011
1B . . / 12.2011
kW
-1
NF
NB
(IFN)
1500
1.5
1800
1.9
min
NS
(ICFN)
min-1
>3000 - 3600
3000
2000
2.1
1.9
2300
2.5
2.2
2.8
2.5
2600
2.9
2600 - <3000
2800
3.1
2.9
2.7
3000
3.2
3.1
2.8
3300
3.4
3.3
3600
3.6
3.4
2000 - <2600
1500 - <2000
fb (KW v.OT)
14 +1
lh (mm)
3.4 0.1
IFN = ICXN
j (KW)
7.5
6.2
12.0
11.0
q (mm /H)
ICFN
fb (KW v.OT)
14 +1
j (KW)
7.5
6.2
4.6
lh (mm)
3.4 0.1
q (mm /H)
12.5
11.0
10.0
fb (KW v.OT)
10 +1
j (KW)
7.5
6.2
4.6
lh (mm)
3.7 0.1
q (mm /H)
12.5
11.0
10.0
fb (KW v.OT)
10 +1
j (KW)
6.2
4.6
lh (mm)
3.7 0.1
q (mm /H)
11.0
10.0
fb (KW v.OT)
lh (mm)
3.9 0.1
+1
j (KW)
6.2
11.0
q (mm /H)
fb = Frderbeginn
start of delivery
dbut dalimentation
comienzo de la alimentacin
q = max. Einspitzmenge
max. quantity of injected fuel
max. dbit d'injection
mx. cantidad de inyeccin
lh = Leerhub
pre lift
prcourse
medida carrera avance
j = dazugehriger Einstellwinkel
appropriate angle for adjustment
angle d'ajustage appropri
angulo de ajuste aproriado
kW
4.0
NF
NB (IFN)
NS (ICXN / ICFN)
3.0
Gilt nur fr . . .
Only valid for . . .
Valable seulment pour . . .
Valido solamente para . . .
Einspritzpumpe
Injection pump
Pompe d'injection
Bomba de injeccion
2.0
1.0
1500
1800 2000
2300
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes
d'injection
Valores de adjuste de la bomba de
inyeccion
B.11/512 CST 10.05.2011
Type / Tipo
1B20
3300
3600
min-1
41
23-29
gepr.:
1B . . / 12.2011
1B . . / 12.2011
kW
NF
NB
(IFN)
NS
(ICFN)
1500
1.6
1.5
1.4
1800
1.9
1.9
1.7
-1
min
Min-1
>3000 - 3600
2000
2.2
2.1
1.9
2300
2.6
2.5
2.2
2600
2.9
2.8
2.5
2800
3.1
2.9
2.7
3000
3.2
3.1
2.8
3300
3.4
3.3
3.0
3600
3.6
3.4
3.1
3000
2600 - <3000
2000 - <2600
1500 - <2000
fb (KW v.OT)
14 +1
lh (mm)
3.4 0.1
IFN = ICXN
ICFN
j (KW)
7.5
6.2
4.6
12.0
11.0
10.0
q (mm /H)
fb (KW v.OT)
14 +1
j (KW)
7.5
6.2
4.6
lh (mm)
3.4 0.1
q (mm /H)
12.5
11.0
10.0
fb (KW v.OT)
10 +1
j (KW)
7.5
6.2
4.6
lh (mm)
3.7 0.1
q (mm /H)
12.5
11.0
10.0
fb (KW v.OT)
10 +1
j (KW)
7.5
6.2
4.6
lh (mm)
3.7 0.1
q (mm /H)
12.5
11.0
10.0
fb (KW v.OT)
lh (mm)
3.9 0.1
+1
j (KW)
7.5
6.2
4.6
12.0
11.0
10.0
q (mm /H)
fb = Frderbeginn
start of delivery
dbut dalimentation
comienzo de la alimentacin
q = max. Einspitzmenge
max. quantity of injected fuel
max. dbit d'injection
mx. cantidad de inyeccin
lh = Leerhub
pre lift
prcourse
medida carrera avance
j = dazugehriger Einstellwinkel
appropriate angle for adjustment
angle d'ajustage appropri
angulo de ajuste aproriado
kW
4.0
NF
NB (IFN)
NS (ICXN / ICFN)
3.0
Gilt nur fr . . .
Only valid for . . .
Valable seulment pour . . .
Valido solamente para . . .
Einspritzpumpe
Injection pump
Pompe d'injection
Bomba de injeccion
2.0
1.0
1500
1800 2000
2300
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes
d'injection
Valores de adjuste de la bomba de
inyeccion
B.11/512 CST 10.05.2011
Type / Tipo
1B20
100
300
3300
3600
min-1
41
23-27
28-29
gepr.:
1B . . / 12.2011
Einspritzpumpen-Einstellwerte
100
30
HATZ
HATZ
HATZ
Lw = 1,6mm
-1
min
NF(kW)
(ISO 1585)
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
NBSI(kW)
IFNSI
NB(kW)
IFN
NS(kW)
ICFN
(ISO 1585)
(ISO 3046)
(ISO 3046)
3,6
3,6
3,5
3,5
3,5
3,5
3,5
3,5
3,4
3,4
3,4
3,4
3,4
3,3
3,3
3,3
3,2
3,2
3,2
3,1
3,1
fb
(KW v.OT)
3,4
3,4
3,4
3,4
3,3
3,3
3,3
3,2
3,2
3,2
3,2
3,2
3,1
3,1
3
2,9
2,9
2,9
2,9
2,8
2,8
2,8
2,7
2,7
2,7
2,6
2,5
2,5
2,4
2,3
2,2
2,1
2,1
12
12
12
12
12
12
11
11
11
11
11
11
10
10
10
10
10
10
9
9
9
9
9
9
8
8
8
8
8
8
8
7
7
q (mm3 / H)
ab 2006 HATZ
ab 2006 HATZ
ab 2006 HATZ
505 734 01
013 987 01
505 765 00 / 200+10 bar
(KW)
oberer Leerlauf
NBSI
NB
NS
NF
NBSI
NB
NS
(ISO 1585)
(ISO 3046)
(ISO 3046)
(ISO 3046)
(ISO 1585)
(ISO 3046)
(ISO 3046)
(ISO 3046)
12
12
12
12
12
12
12
12
12
12
12
12
12,5
12,5
12,5
12,5
12,5
12,5
12,5
12,5
12,5
11
11
11
11
11
11
11
11
11
11
11
11
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
5,25
5,25
5,25
5,25
5,25
5,25
5,25
5,25
5,25
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
EPA II
NF
01
gelenktes Formular T002/FB/004 Rev. A
1B20
4,5
4,5
4,5
4,5
4,5
4,5
4,6
4,6
4,6
4,6
4,6
4,6
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
4,6
4,6
4,6
min-1
All-drehzahl
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
PV
220
220
230
230
240
240
250
250
260
260
270
270
280
280
290
290
300
300
310
310
320
320
330
330
340
340
350
350
360
360
380
380
400
180
150
95192603.1004 41
B.11/512
CST
03.05.11
1B . . / 12.2011
Einspritzpumpen-Einstellwerte
100
31
min
NF(kW)
(ISO 1585)
NBSI(kW)
IFNSI
NB(kW)
IFN
NS(kW)
ICFN
(ISO 1585)
(ISO 3046)
(ISO 3046)
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
fb
(KW v.OT)
3,4
3,4
3,4
3,4
3,3
3,3
3,3
3,2
3,2
3,2
3,2
3,2
3,1
3,1
3
2,9
2,9
2,9
2,9
2,8
2,8
2,8
2,7
2,7
2,7
2,6
2,5
2,5
2,4
2,3
2,2
2,1
2,1
15
15
15
15
15
15
14
14
14
14
14
14
13
13
13
13
13
13
12
12
12
12
12
12
11
11
11
11
11
11
10
10
10
q (mm3 / H)
(KW) / RW (mm)
oberer Leerlauf
NF
NBSI
NB
NS
NF
NBSI
NB
NS
(ISO 1585)
(ISO 3046)
(ISO 3046)
(ISO 3046)
(ISO 1585)
(ISO 3046)
(ISO 3046)
(ISO 3046)
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
5
5
5
5
5
5
5
5
5
5
5
5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
19.10.2005 nderung durch VQ/Systembetreuung
EPA II
505 734 10
013 987 01
-1
1B20
01
min-1
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
95192604.1004
B.11/512
CST
PV
All-drehzahl
220
220
230
230
240
240
250
250
260
260
270
270
280
280
290
290
300
300
310
310
320
320
330
330
340
340
350
350
360
360
380
380
400
180
150
41
03.05.2011
1B . . / 12.2011
100
32
Einspritzpumpen-Einstellwerte
1B20
EPA IV
oberer Leerlauf
FB
KWvOT
Alldrehzahl (*)
7,0
15 0,5
220
"
"
220
11
"
"
230
11
"
"
230
3,3
11
"
"
240
3350
3,3
11
"
3300
3,3
11
6,3
"
14 0,5
250
3250
3,2
11
"
"
250
3200
3,2
11
"
"
260
3150
3,2
11
"
"
260
3100
3,2
11
"
"
270
3050
3,2
11
"
3000
3,1
11,5
6,8
"
13 0,5
280
2950
3,1
11,5
"
"
280
min-1
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
3,4
11
3550
3,4
11
3500
3,4
3450
3,4
3400
PV
180
240
270
2900
11,5
"
"
290
2850
2,9
11,5
"
"
290
2800
2,9
11,5
"
"
300
2750
2,9
11,5
"
"
300
2700
2,9
11,5
"
"
310
2650
2,8
11,5
"
"
310
2600
2,8
11,5
"
"
320
2550
2,8
11,5
"
320
2500
2,7
11,5
6,5
"
11 0,5
2450
2,7
11,5
"
"
330
2400
2,7
11,5
"
"
340
2350
2,6
11,5
"
"
340
2300
2,5
11,5
"
"
350
2250
2,5
11,5
"
2200
2,4
11,5
7,3
"
9 0,5
360
2150
2,3
11,5
"
"
360
2100
2,2
11,5
"
"
380
2050
2,1
11,5
"
"
380
2000
2,1
11,5
"
"
400
150
330
350
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
TEV / Baumgartner
Version 09.03.2009
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
95192605.1004 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
Einspritzpumpen-Einstellwerte
300
30
HATZ
HATZ
505 734 01
013 938 01
HATZ
505 724 00
Lw = 1,6mm
min
NF(kW)
(ISO 1585)
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
NBSI(kW)
IFNSI
NB(kW)
IFN
NS(kW)
ICFN
(ISO 1585)
(ISO 3046)
(ISO 3046)
3,5
3,5
3,5
3,5
3,4
3,4
3,3
3,3
3,3
3,2
3,2
3,2
3,1
3,1
3,1
3,0
3,0
3,0
2,9
2,9
2,8
2,8
2,7
2,7
2,7
2,6
2,5
2,5
2,5
2,4
2,3
2,2
2,2
2,1
2,1
2,0
1,9
1,8
1,8
1,7
1,7
1,7
1,6
3,4
3,4
3,4
3,4
3,3
3,3
3,3
3,2
3,2
3,2
3,2
3,1
3,1
3,0
3,0
2,9
2,9
2,9
2,9
2,8
2,8
2,7
2,7
2,7
2,6
2,6
2,5
2,4
2,4
2,3
2,2
2,1
2,1
2,0
2,0
1,9
1,9
1,8
1,8
1,7
1,6
1,6
1,5
3,1
3,1
3,1
3,1
3,0
3,0
3,0
3,0
3,0
2,9
2,9
2,9
2,8
2,8
2,8
2,8
2,7
2,7
2,6
2,6
2,5
2,5
2,5
2,4
2,4
2,3
2,2
2,2
2,1
2,1
2,0
1,9
1,9
1,9
1,8
1,8
1,7
1,6
1,6
1,5
1,5
1,4
1,4
FB
(KW v.OT)
14
14
14
14
14
14
13
13
13
13
13
13
12
12
12
12
12
12
11
11
11
11
11
11
10
10
10
10
10
10
9
9
9
9
9
9
9
9
9
9
9
9
9
q (mm3 / H)
Basis EPA II
Stanadyne 37869
/ 200+10 bar
(KW)
oberer Leerlauf
NF
NBSI
NB
NS
NF
NBSI
NB
NS
(ISO 1585)
(ISO 3046)
(ISO 3046)
(ISO 3046)
(ISO 1585)
(ISO 3046)
(ISO 3046)
(ISO 3046)
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
5,0
5,0
5,0
5,0
5,0
5,0
5,0
5,0
5,0
5,0
5,0
5,0
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,3
5,3
5,3
5,3
5,3
5,3
5,3
5,3
5,3
5,3
5,3
5,3
5,3
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
02
gelenktes Formular T002/FB/003 Rev. A 19.10.2005 nderung durch VQ/Systembetreuung
NON EPA
-1
1B20
4,7
4,7
4,7
4,7
4,7
4,7
4,8
4,8
4,8
4,8
4,8
4,8
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
4,8
4,8
4,8
4,8
4,8
4,8
4,8
4,8
4,8
4,8
4,8
4,8
4,8
4,2
4,2
4,2
4,2
4,2
4,2
4,3
4,3
4,3
4,3
4,3
4,3
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,3
4,3
4,3
4,3
4,3
4,3
4,3
4,3
4,3
4,3
4,3
4,3
4,3
min-1
All-drehzahl
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
220
220
230
230
240
240
250
250
260
260
270
270
280
280
290
290
300
300
310
310
320
320
330
330
340
340
350
350
360
360
380
380
400
420
420
440
440
460
460
480
480
210
210
PV
180
150
95196501.3004 41
B.11/512
CST 03.05.2011
1B . . / 12.2011
300
31
Einspritzpumpen-Einstellwerte
NON EPA
Basis EPA II
505 734 10
013 938 01
1B20
oberer Leerlauf
FB
KWvOT
Alldrehzahl (*)
PV
4,50
150,5
220
180
"
"
220
"
"
"
230
"
"
"
230
3,0
"
"
"
240
"
3,0
"
"
"
240
"
"
3,0
"
"
140,5
250
3,0
"
"
3,0
"
"
"
250
3,0
"
"
3,0
"
"
"
260
"
2,9
"
"
2,9
"
"
"
260
"
"
2,9
"
"
2,9
"
"
"
270
3,1
"
5,25
2,9
"
5,25
2,9
"
4,75
"
270
"
3,1
"
"
2,8
"
"
2,8
"
"
130,5
280
"
"
3,0
"
"
2,8
"
"
2,8
"
"
"
280
3,1
"
"
3,0
"
"
2,8
"
"
2,8
"
"
"
290
2850
3,0
"
"
2,9
"
"
2,8
"
"
2,8
"
"
"
290
2800
3,0
"
"
2,9
"
"
2,7
"
"
2,7
"
"
"
300
2750
3,0
"
"
2,9
"
"
2,7
"
"
2,7
"
"
"
300
2700
2,9
"
"
2,9
"
"
2,6
"
"
2,6
"
"
120,5
310
2650
2,9
"
"
2,8
"
"
2,6
"
"
2,6
"
"
"
310
2600
2,8
"
"
2,8
"
"
2,5
"
"
2,5
"
"
"
320
2550
2,8
"
"
2,7
"
"
2,5
"
"
2,5
"
"
"
320
2500
2,7
"
"
2,7
"
"
2,5
"
"
2,5
"
"
"
330
2450
2,7
"
"
2,7
"
"
2,4
"
"
2,4
"
"
"
330
2400
2,7
"
"
2,6
"
"
2,4
"
"
2,4
"
"
110,5
340
2350
2,6
"
"
2,6
"
"
2,3
"
"
2,3
"
"
"
340
2300
2,5
"
"
2,5
"
"
2,2
"
"
2,2
"
"
"
350
2250
2,5
"
"
2,4
"
"
2,2
"
"
2,2
"
"
"
350
2200
2,5
"
"
2,4
"
"
2,1
"
"
2,1
"
"
"
360
2150
2,4
"
"
2,3
"
"
2,1
"
"
2,1
"
"
"
360
2100
2,3
"
5,5
2,2
"
5,00
2,0
"
5,00
2,0
"
4,50
100,5
380
2050
2,2
"
"
2,1
"
"
1,9
"
"
1,9
"
"
"
380
2000
2,2
"
"
2,1
"
"
1,9
"
"
1,9
"
"
"
400
1950
2,1
"
"
2,0
"
"
1,9
"
"
1,9
"
"
"
420
1900
2,1
"
"
2,0
"
"
1,8
"
"
1,8
"
"
"
420
1850
2,0
"
"
1,9
"
"
1,8
"
"
1,8
"
"
"
440
1800
1,9
"
"
1,9
"
"
1,7
"
"
1,7
"
"
90,5
440
1750
1,8
"
"
1,8
"
"
1,6
"
"
1,6
"
"
"
460
1700
1,8
"
"
1,8
"
"
1,6
"
"
1,6
"
"
"
460
1650
1,7
"
"
1,7
"
"
1,5
"
"
1,5
"
"
"
480
1600
1,7
"
"
1,6
"
"
1,5
"
"
1,5
"
"
"
480
1550
1,7
"
"
1,6
"
"
1,4
"
"
1,4
"
"
"
210
1500
1,6
"
"
1,5
"
"
1,4
"
"
1,4
"
"
"
210
min-1
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
3,5
11,5
5,5
3,4
11,0
5,00
3,1
11,0
5,00
3,1
10,0
3550
3,5
"
"
3,4
"
"
3,1
"
"
3,1
"
3500
3,5
"
"
3,4
"
"
3,1
"
"
3,1
3450
3,5
"
"
3,4
"
"
3,1
"
"
3,1
3400
3,4
"
"
3,3
"
"
3,0
"
"
3350
3,4
"
"
3,3
"
"
3,0
"
3300
3,3
"
"
3,3
"
"
3,0
3250
3,3
"
"
3,2
"
"
3200
3,3
"
"
3,2
"
"
3150
3,2
"
"
3,2
"
3100
3,2
"
"
3,2
3050
3,2
"
5,75
3000
3,1
"
2950
3,1
2900
TEV / Baumgartner
Version 20.10.2008
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
02
150
95196503.3004 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
100
32
Einspritzpumpen-Einstellwerte
1B20
NON EPA
Basis EPA IV
All-drehzahl
(*)
6,25
"
"
"
"
"
5,75
"
"
"
"
"
5,25
"
"
"
"
"
"
"
5,00
"
"
"
"
"
"
"
170,5
"
"
"
"
"
150,5
"
"
"
"
"
"
"
"
"
"
"
"
"
130,5
"
"
"
"
"
"
"
220
220
230
230
240
240
250
250
260
260
270
270
280
280
290
290
300
300
310
310
320
320
330
330
340
340
350
350
"
"
"
"
5,50
"
"
"
"
"
"
"
"
"
"
"
"
"
"
110,5
"
"
"
"
"
"
"
"
"
"
360
360
380
380
400
420
420
440
440
460
460
480
480
210
210
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
3,5
3,5
3,5
3,5
3,4
3,4
3,3
3,3
3,3
3,2
3,2
3,2
3,1
3,1
3,1
3,0
3,0
3,0
2,9
2,9
2,8
2,8
2,7
2,7
2,7
2,6
2,5
2,5
11,5
7,5
"
"
"
"
"
"
"
"
"
"
"
6,75
"
"
"
"
"
"
"
"
"
"
"
6,50
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
6,25
"
"
"
"
"
"
"
"
"
"
"
"
"
"
3,4
3,4
3,4
3,4
3,3
3,3
3,3
3,2
3,2
3,2
3,2
3,1
3,1
3,0
3,0
2,9
2,9
2,9
2,9
2,8
2,8
2,7
2,7
2,7
2,6
2,6
2,5
2,4
11,0
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
7,25
"
"
"
"
"
6,25
"
"
"
"
"
6,00
"
"
"
"
"
"
"
6,00
"
"
"
"
"
"
"
3,1
3,1
3,1
3,1
3,0
3,0
3,0
3,0
3,0
2,9
2,9
2,9
2,8
2,8
2,8
2,8
2,7
2,7
2,6
2,6
2,5
2,5
2,5
2,4
2,4
2,3
2,2
2,2
11,0
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
7,25
"
"
"
"
"
6,25
"
"
"
"
"
6,00
"
"
"
"
"
"
"
6,00
"
"
"
"
"
"
"
3,1
3,1
3,1
3,1
3,0
3,0
3,0
3,0
3,0
2,9
2,9
2,9
2,8
2,8
2,8
2,8
2,7
2,7
2,6
2,6
2,5
2,5
2,5
2,4
2,4
2,3
2,2
2,2
10,0
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
2,5
2,4
2,3
2,2
2,2
2,1
2,1
2,0
1,9
1,8
1,8
1,7
1,7
1,7
1,6
2,4
2,3
2,2
2,1
2,1
2,0
2,0
1,9
1,9
1,8
1,8
1,7
1,6
1,6
1,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
6,00
"
"
"
6,25
"
"
"
"
"
"
2,1
2,1
2,0
1,9
1,9
1,9
1,8
1,8
1,7
1,6
1,6
1,5
1,5
1,4
1,4
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
6,00
"
"
"
6,25
"
"
"
"
"
"
2,1
2,1
2,0
1,9
1,9
1,9
1,8
1,8
1,7
1,6
1,6
1,5
1,5
1,4
1,4
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TEV / Baumgartner
Version 28.04.2009
"
"
"
"
6,5
"
"
"
6,75
"
"
"
"
"
"
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
oberer Leerlauf
FB
KWvOT
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
/ 200+10 bar
PV
180
150
95196504.3004 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
1B . . / 12.2011
kW
NF
NB
(IFN)
NS
(ICFN)
1500
1.6
1.5
1.4
1800
1.9
1.9
1.7
-1
min
min-1
>3000 - 3600
2000
2.2
2.1
1.9
2300
2.6
2.5
2.2
2600
2.9
2.8
2.5
2800
3.1
2.9
2.7
3000
3.2
3.1
2.8
3300
3.4
3.3
3.0
3600
3.6
3.4
3.1
3000
2600 - <3000
2000 - <2600
1500 - <2000
fb (KW v.OT)
14 +1
lh (mm)
3.4 0.1
j (KW)
3
q (mm /H)
fb (KW v.OT)
14 +1
j (KW)
lh (mm)
3.4 0.1
q (mm /H)
fb (KW v.OT)
10 +1
j (KW)
lh (mm)
3.7 0.1
q (mm /H)
fb (KW v.OT)
10 +1
j (KW)
lh (mm)
3.7 0.1
q (mm /H)
fb (KW v.OT)
lh (mm)
3.9 0.1
+1
j (KW)
3
q (mm /H)
IFN = ICXN
ICFN
7.5
6.2
4.6
12.0
11.0
10.0
7.5
6.2
4.6
12.5
11.0
10.0
7.5
6.2
4.6
12.5
11.0
10.0
7.5
6.2
4.6
12.5
11.0
10.0
7.5
6.2
4.6
12.0
11.0
10.0
fb = Frderbeginn
start of delivery
dbut dalimentation
comienzo de la alimentacin
q = max. Einspitzmenge
max. quantity of injected fuel
max. dbit d'injection
mx. cantidad de inyeccin
lh = Leerhub
pre lift
prcourse
medida carrera avance
j = dazugehriger Einstellwinkel
appropriate angle for adjustment
angle d'ajustage appropri
angulo de ajuste aproriado
kW
4.0
NF
NB (IFN)
NS (ICXN / ICFN)
3.0
Gilt nur fr . . .
Only valid for . . .
Valable seulment pour . . .
Valido solamente para . . .
Einspritzpumpe
Injection pump
Pompe d'injection
Bomba de injeccion
2.0
1.0
1500
1800 2000
2300
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes
d'injection
Valores de adjuste de la bomba de
inyeccion
B.11/512 CST 11.05.2011
3300
Type / Tipo
1B20V
111
3600
min-1
41
13-19
gepr.:
1B . . / 12.2011
Einspritzpumpen-Einstellwerte
301
20
min
NF(kW)
(ISO 1585)
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
NBSI(kW)
IFNSI
NB(kW)
IFN
NS(kW)
ICFN
(ISO 1585)
(ISO 3046)
(ISO 3046)
3,5
3,5
3,5
3,5
3,4
3,4
3,3
3,3
3,3
3,2
3,2
3,2
3,1
3,1
3,1
3,0
3,0
3,0
2,9
2,9
2,8
2,8
2,7
2,7
2,7
2,6
2,5
2,5
2,5
2,4
2,3
2,2
2,2
2,1
2,1
2,0
1,9
1,8
1,8
1,7
1,7
1,7
1,6
3,4
3,4
3,4
3,4
3,3
3,3
3,3
3,2
3,2
3,2
3,2
3,1
3,1
3,0
3,0
2,9
2,9
2,9
2,9
2,8
2,8
2,7
2,7
2,7
2,6
2,6
2,5
2,4
2,4
2,3
2,2
2,1
2,1
2,0
2,0
1,9
1,9
1,8
1,8
1,7
1,6
1,6
1,5
3,1
3,1
3,1
3,1
3,0
3,0
3,0
3,0
3,0
2,9
2,9
2,9
2,8
2,8
2,8
2,8
2,7
2,7
2,6
2,6
2,5
2,5
2,5
2,4
2,4
2,3
2,2
2,2
2,1
2,1
2,0
1,9
1,9
1,9
1,8
1,8
1,7
1,6
1,6
1,5
1,5
1,4
1,4
HATZ
HATZ
HATZ
FB
(KW v.OT)
14
14
14
14
14
14
13
13
13
13
13
13
12
12
12
12
12
12
11
11
11
11
11
11
10
10
10
10
10
10
9
9
9
9
9
9
9
9
9
9
9
9
9
505 734 01
013 938 00
505 724 00
Basis EPA II
Lw = 1,6mm
q (mm3 / H)
(KW)
oberer Leerlauf
NF
NBSI
NB
NS
NF
NBSI
NB
NS
(ISO 1585)
(ISO 3046)
(ISO 3046)
(ISO 3046)
(ISO 1585)
(ISO 3046)
(ISO 3046)
(ISO 3046)
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
10,5
5,0
5,0
5,0
5,0
5,0
5,0
5,0
5,0
5,0
5,0
5,0
5,0
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,5
5,3
5,3
5,3
5,3
5,3
5,3
5,3
5,3
5,3
5,3
5,3
5,3
5,3
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
02
gelenktes Formular T002/FB/003 Rev. A 19.10.2005 nderung durch VQ/Systembetreuung
NON EPA
-1
1B20V
4,7
4,7
4,7
4,7
4,7
4,7
4,8
4,8
4,8
4,8
4,8
4,8
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
4,8
4,8
4,8
4,8
4,8
4,8
4,8
4,8
4,8
4,8
4,8
4,8
4,8
4,2
4,2
4,2
4,2
4,2
4,2
4,3
4,3
4,3
4,3
4,3
4,3
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,5
4,3
4,3
4,3
4,3
4,3
4,3
4,3
4,3
4,3
4,3
4,3
4,3
4,3
min-1
All-drehzahl
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
220
220
230
230
240
240
250
250
260
260
270
270
280
280
290
290
300
300
310
310
320
320
330
330
340
340
350
350
360
360
380
380
400
420
420
440
440
460
460
480
480
210
210
PV
180
150
95202000.3014 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
Einspritzpumpen-Einstellwerte
301
21
min-1
(ISO 1585)
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
NB(kW)
IFN
NS(kW)
ICFN
(ISO 1585)
(ISO 3046)
(ISO 3046)
3,5
3,5
3,5
3,5
3,4
3,4
3,3
3,3
3,3
3,2
3,2
3,2
3,1
3,1
3,1
3,0
3,0
3,0
2,9
2,9
2,8
2,8
2,7
2,7
2,7
2,6
2,5
2,5
2,5
2,4
2,3
2,2
2,2
2,1
2,1
2,0
1,9
1,8
1,8
1,7
1,7
1,7
1,6
3,4
3,4
3,4
3,4
3,3
3,3
3,3
3,2
3,2
3,2
3,2
3,1
3,1
3,0
3,0
2,9
2,9
2,9
2,9
2,8
2,8
2,7
2,7
2,7
2,6
2,6
2,5
2,4
2,4
2,3
2,2
2,1
2,1
2,0
2,0
1,9
1,9
1,8
1,8
1,7
1,6
1,6
1,5
3,1
3,1
3,1
3,1
3,0
3,0
3,0
3,0
3,0
2,9
2,9
2,9
2,8
2,8
2,8
2,8
2,7
2,7
2,6
2,6
2,5
2,5
2,5
2,4
2,4
2,3
2,2
2,2
2,1
2,1
2,0
1,9
1,9
1,9
1,8
1,8
1,7
1,6
1,6
1,5
1,5
1,4
1,4
fb
(KW v.OT)
15
15
15
15
15
15
14
14
14
14
14
14
13
13
13
13
13
13
12
12
12
12
12
12
11
11
11
11
11
11
10
10
10
10
10
10
9
9
9
9
9
9
9
q (mm3 / H)
/ 200+10 bar
(KW) / RW (mm)
oberer Leerlauf
NF
NBSI
NB
NS
NF
NBSI
NB
NS
(ISO 1585)
(ISO 3046)
(ISO 3046)
(ISO 3046)
(ISO 1585)
(ISO 3046)
(ISO 3046)
(ISO 3046)
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11,5
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
5,50
5,50
5,50
5,50
5,50
5,50
5,50
5,50
5,50
5,50
5,50
5,50
5,75
5,75
5,75
5,75
5,75
5,75
5,75
5,75
5,75
5,75
5,75
5,75
5,75
5,75
5,75
5,75
5,75
5,75
5,50
5,50
5,50
5,50
5,50
5,50
5,50
5,50
5,50
5,50
5,50
5,50
5,50
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
gelenktes Formular T002/FB/003 Rev. A 19.10.2005 nderung durch VQ/Systembetreuung
Basis EPA II
505 734 10
013 938 01
NON EPA
NF(kW)
1B20V
5,00
5,00
5,00
5,00
5,00
5,00
5,00
5,00
5,00
5,00
5,00
5,00
5,25
5,25
5,25
5,25
5,25
5,25
5,25
5,25
5,25
5,25
5,25
5,25
5,25
5,25
5,25
5,25
5,25
5,25
5,00
5,00
5,00
5,00
5,00
5,00
5,00
5,00
5,00
5,00
5,00
5,00
5,00
4,50
4,50
4,50
4,50
4,50
4,50
4,50
4,50
4,50
4,50
4,50
4,50
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,75
4,50
4,50
4,50
4,50
4,50
4,50
4,50
4,50
4,50
4,50
4,50
4,50
4,50
min-1
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
220
220
230
230
240
240
250
250
260
260
270
270
280
280
290
290
300
300
310
310
320
320
330
330
340
340
350
350
360
360
380
380
400
420
420
440
440
460
460
480
480
210
210
95202002.3014
B.11/512
PV
All-drehzahl
180
150
41
CST 03.05.2011
1B . . / 12.2011
111
22
Einspritzpumpen-Einstellwerte
1B20V
NON EPA
Basis EPA IV
oberer Leerlauf
FB
KWvOT
Alldrehzahl (*)
PV
6,25
170,5
220
180
"
"
220
"
"
"
230
"
"
"
230
3,0
"
"
"
240
"
3,0
"
"
"
240
"
6,25
3,0
"
5,75
150,5
250
3,0
"
"
3,0
"
"
"
250
"
3,0
"
"
3,0
"
"
"
260
"
2,9
"
"
2,9
"
"
"
260
"
2,9
"
"
2,9
"
"
"
270
270
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
3,5
11,5
7,5
3,4
11,0
7,25
3,1
11,0
7,25
3,1
10,0
3550
3,5
"
"
3,4
"
"
3,1
"
"
3,1
"
3500
3,5
"
"
3,4
"
"
3,1
"
"
3,1
3450
3,5
"
"
3,4
"
"
3,1
"
"
3,1
3400
3,4
"
"
3,3
"
"
3,0
"
"
3350
3,4
"
"
3,3
"
"
3,0
"
3300
3,3
"
6,75
3,3
"
6,25
3,0
3250
3,3
"
"
3,2
"
"
3200
3,3
"
"
3,2
"
3150
3,2
"
"
3,2
"
3100
3,2
"
"
3,2
"
3050
3,2
"
3000
3,1
"
2950
3,1
"
2900
3,1
2850
3,0
2800
"
/ 200+10 bar
3,1
"
"
2,9
"
"
2,9
"
"
"
3,1
"
6,00
2,8
"
6,00
2,8
"
5,25
"
280
"
3,0
"
"
2,8
"
"
2,8
"
"
"
280
"
"
3,0
"
"
2,8
"
"
2,8
"
"
"
290
"
"
2,9
"
"
2,8
"
"
2,8
"
"
"
290
3,0
"
"
2,9
"
"
2,7
"
"
2,7
"
"
"
300
2750
3,0
"
"
2,9
"
"
2,7
"
"
2,7
"
"
"
300
2700
2,9
"
"
2,9
"
"
2,6
"
"
2,6
"
"
"
310
2650
2,9
"
310
2600
2,8
"
2550
2,8
"
2500
2,7
2450
2,7
2400
6,50
"
2,8
"
"
2,6
"
"
2,6
"
"
"
2,8
"
6,00
2,5
"
6,00
2,5
"
5,00
130,5
320
"
2,7
"
"
2,5
"
"
2,5
"
"
"
320
"
"
2,7
"
"
2,5
"
"
2,5
"
"
"
330
"
"
2,7
"
"
2,4
"
"
2,4
"
"
"
330
2,7
"
"
2,6
"
"
2,4
"
"
2,4
"
"
"
340
2350
2,6
"
"
2,6
"
"
2,3
"
"
2,3
"
"
"
340
2300
2,5
"
"
2,5
"
"
2,2
"
"
2,2
"
"
"
350
2250
2,5
"
"
2,4
"
"
2,2
"
"
2,2
"
"
"
350
2200
2,5
"
"
2,4
"
"
2,1
"
"
2,1
"
"
"
360
2150
2,4
"
"
2,3
"
"
2,1
"
"
2,1
"
"
"
360
2100
2,3
"
"
2,2
"
"
2,0
"
"
2,0
"
"
"
380
2050
2,2
"
"
2,1
"
"
1,9
"
"
1,9
"
"
"
380
2000
2,2
"
6,5
2,1
"
6,00
1,9
"
6,00
1,9
"
5,50
110,5
400
1950
2,1
"
"
2,0
"
"
1,9
"
"
1,9
"
"
"
420
1900
2,1
"
"
2,0
"
"
1,8
"
"
1,8
"
"
"
420
1850
2,0
"
"
1,9
"
"
1,8
"
"
1,8
"
"
"
440
1800
1,9
"
6,75
1,9
"
6,25
1,7
"
6,25
1,7
"
"
"
440
1750
1,8
"
"
1,8
"
"
1,6
"
"
1,6
"
"
"
460
1700
1,8
"
"
1,8
"
"
1,6
"
"
1,6
"
"
"
460
1650
1,7
"
"
1,7
"
"
1,5
"
"
1,5
"
"
"
480
1600
1,7
"
"
1,6
"
"
1,5
"
"
1,5
"
"
"
480
1550
1,7
"
"
1,6
"
"
1,4
"
"
1,4
"
"
"
210
1500
1,6
"
"
1,5
"
"
1,4
"
"
1,4
"
"
"
210
6,25
TEV / Baumgartner
Version 01.09.2009
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
150
95202003.3014 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
125
10
Einspritzpumpen-Einstellwerte
505 680 01
013 987 01
-1
min
NF(kW)
(ISO 1585)
NBSI(kW)
IFNSI
NB(kW)
IFN
NS(kW)
ICFN
(ISO 1585)
(ISO 3046)
(ISO 3046)
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
TEV / Baumg.
30.05.2007
4,0
4,0
3,9
3,9
3,9
3,8
3,8
3,8
3,8
3,7
3,7
3,7
3,7
3,7
3,6
3,6
3,6
3,6
3,5
3,4
3,4
3,4
3,3
3,2
3,1
3,1
3,0
3,0
2,9
2,8
2,7
2,6
2,5
2,4
2,3
2,2
2,2
2,1
2,0
1,9
1,8
1,7
1,6
fb
(KW v.OT)
13 0,5
13 0,5
13 0,5
13 0,5
13 0,5
13 0,5
13 0,5
13 0,5
13 0,5
13 0,5
13 0,5
13 0,5
11 0,5
11 0,5
11 0,5
11 0,5
11 0,5
11 0,5
11 0,5
11 0,5
9 0,5
9 0,5
9 0,5
9 0,5
9 0,5
9 0,5
7 0,5
7 0,5
7 0,5
7 0,5
7 0,5
7 0,5
7 0,5
7 0,5
7 0,5
7 0,5
7 0,5
7 0,5
7 0,5
7 0,5
7 0,5
7 0,5
7 0,5
q (mm3 / H)
New Diesel
New Diesel
Stanadyne (38084)
/ 200+10 bar
oberer Leerlauf
NF
NBSI
NB
NS
NF
NBSI
NB
NS
(ISO 1585)
(ISO 3046)
(ISO 3046)
(ISO 3046)
(ISO 1585)
(ISO 3046)
(ISO 3046)
(ISO 3046)
13
13
13
13
13
13
13
13
13
13
13
13
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
13,3
6,0
6,0
6,0
6,0
6,0
6,0
6,0
6,0
6,0
6,0
6,0
6,0
5,5
5,5
5,5
5,5
5,0
5,0
5,0
5,0
6,0
6,0
6,0
6,0
6,0
6,0
4,5
4,5
4,5
5,0
5,0
5,0
5,0
5,0
5,5
5,5
5,5
5,5
5,5
6,0
6,0
6,0
6,0
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
EPA II
(KW)
01
gelenktes Formular T002/FB/004 Rev. A
1B27
min-1
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
All-drehzahl
PV
220
225
230
235
240
245
250
255
260
265
270
275
280
285
290
295
300
305
310
315
320
325
330
335
340
345
350
355
360
370
380
390
400
410
420
430
440
450
460
470
480
490
500
180
150
95199101.1254 41
B.11/512
CST 04.05.2011
1B . . / 12.2011
125
11
Einspritzpumpen-Einstellwerte
1B27
EPA IV
/ 200+10 bar
oberer Leerlauf
FB
KWvOT
Alldrehzahl (*)
PV
7,8
15 0,5
220
180
"
"
225
"
"
"
230
"
"
"
235
3,9
"
"
"
240
3350
3,8
"
"
3300
3,8
"
7,2
"
14 0,5
250
3250
3,8
"
"
"
255
3200
3,8
"
"
"
260
3150
3,7
"
"
3100
3,7
"
"
"
13 0,5
270
3050
3,7
"
"
"
275
3000
3,7
13,5
7,0
"
280
2950
3,7
"
"
"
285
2900
3,6
"
"
"
290
2850
3,6
"
"
2800
3,6
"
"
"
11 0,5
300
2750
3,6
"
"
"
305
2700
3,5
"
"
"
310
2650
3,4
"
"
"
315
2600
3,4
"
"
"
320
2550
3,4
"
"
"
325
2500
3,3
"
"
"
330
2450
3,2
"
"
335
2400
3,1
"
"
"
9 0,5
2350
3,1
"
"
"
345
2300
3,0
"
"
"
350
2250
3,0
"
"
"
355
2200
2,9
"
"
"
360
2150
2,8
"
"
370
2100
2,7
"
6,5
"
7 0,5
380
2050
2,6
"
"
"
390
2000
2,5
"
"
"
min-1
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
4,0
13,3
3550
4,0
"
3500
3,9
3450
3,9
3400
245
265
295
340
400
1950
410
1900
420
1850
430
1800
440
1750
450
1700
460
1650
470
1600
480
1550
490
1500
500
TEV / Baumgartner
Version 23.07.2009
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
150
95199102.1254 41
B.11/512
CST
04.05.2011
1B . . / 12.2011
125
10
Einspritzpumpen-Einstellwerte
1B27
NON EPA
Basis EPA II
/ 200+10 bar
oberer Leerlauf
FB
KWvOT
Alldrehzahl (*)
PV
3,7
13 0,5
220
180
"
"
225
"
"
"
230
"
"
"
235
3,5
"
"
"
240
4,1
3,4
"
"
"
245
"
"
3,4
"
"
"
250
3,4
"
"
3,4
"
"
"
255
"
3,4
"
"
3,4
"
"
"
260
"
"
3,3
"
"
3,3
"
"
"
265
"
"
3,3
"
"
3,3
"
"
"
270
3,7
"
4,2
3,3
"
4,2
3,3
"
"
"
275
3,7
13,3
"
3,3
13,3
"
3,3
"
"
"
280
2950
3,7
"
4,3
3,3
"
4,3
3,3
"
3,8
"
285
2900
3,6
"
"
3,2
"
"
3,2
"
"
"
290
2850
3,6
"
4,4
3,2
"
4,4
3,2
"
"
"
295
2800
3,6
"
4,5
3,2
"
4,5
3,2
"
"
"
300
2750
3,6
"
"
3,2
"
"
3,2
"
"
"
305
2700
3,5
"
"
3,2
"
"
3,2
"
"
"
310
2650
3,4
"
"
3,1
"
"
3,1
"
"
"
315
2600
3,4
"
"
3,1
"
"
3,1
"
"
"
320
2550
3,4
"
"
3,1
"
"
3,1
"
"
325
2500
3,3
"
"
3,0
"
"
3,0
"
4,0
"
11 0,5
2450
3,2
"
"
2,9
"
"
2,9
"
"
"
335
2400
3,1
"
"
2,8
"
"
2,8
"
"
"
340
2350
3,1
"
"
2,8
"
"
2,8
"
"
"
345
2300
3,0
"
"
2,7
"
"
2,7
"
"
"
350
2250
3,0
"
4,6
2,7
"
4,6
2,7
"
"
"
355
2200
2,9
"
4,7
2,6
"
4,7
2,6
"
"
"
360
2150
2,8
"
4,8
2,5
"
4,8
2,5
"
"
"
370
2100
2,7
"
4,9
2,4
"
4,9
2,4
"
"
"
380
2050
2,6
"
5,0
2,3
"
5,0
2,3
"
"
2000
2,5
"
"
2,3
"
"
2,3
"
"
"
9 0,5
400
1950
2,4
"
5,1
2,2
"
5,1
2,2
"
"
"
410
1900
2,3
"
5,2
2,1
"
5,2
2,1
"
"
"
420
1850
2,2
"
5,3
2,0
"
5,3
2,0
"
"
"
430
1800
2,2
"
5,4
2,0
"
5,4
2,0
"
"
"
440
1750
2,1
"
5,5
1,9
"
5,5
1,9
"
"
"
450
1700
2,0
"
5,6
1,8
"
5,6
1,8
"
"
"
460
1650
1,9
"
5,7
1,7
"
5,7
1,7
"
"
"
470
1600
1,8
"
5,8
1,6
"
5,8
1,6
"
5,0
"
480
1550
1,7
"
5,9
1,5
"
5,9
1,5
"
"
"
490
1500
1,6
"
"
1,4
"
"
1,4
"
"
"
500
min-1
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
4,0
13
4,0
3,6
13
4,0
3,6
12,0
3550
4,0
"
"
3,6
"
"
3,6
"
3500
3,9
"
"
3,5
"
"
3,5
3450
3,9
"
"
3,5
"
"
3,5
3400
3,9
"
"
3,5
"
"
3350
3,8
"
4,1
3,4
"
3300
3,8
"
"
3,4
3250
3,8
"
"
3200
3,8
"
3150
3,7
3100
3,7
3050
3000
TEV / Baumgartner
Version 10.11.2008
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
02
150
330
390
95225300.3084 41
B.11/512
CST
04.05.2011
1B . . / 12.2011
125
11
Einspritzpumpen-Einstellwerte
1B27
NON EPA
Basis EPA IV
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
4,0
4,0
3,9
3,9
3,9
3,8
3,8
3,8
3,8
3,7
3,7
3,7
3,7
3,7
3,6
3,6
3,6
3,6
3,5
13,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
7,3
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
3,6
3,6
3,5
3,5
3,5
3,4
3,4
3,4
3,4
3,3
3,3
3,3
3,3
3,3
3,2
3,2
3,2
3,2
3,2
13,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
7,3
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
3,6
3,6
3,5
3,5
3,5
3,4
3,4
3,4
3,4
3,3
3,3
3,3
3,3
3,3
3,2
3,2
3,2
3,2
3,2
12,0
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
6,5
"
"
"
"
"
6,3
"
"
"
"
"
"
"
"
"
6,0
"
"
2650
2600
2550
2500
2450
2400
2350
2300
2250
3,4
3,4
3,4
3,3
3,2
3,1
3,1
3,0
3,0
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
3,1
3,1
3,1
3,0
2,9
2,8
2,8
2,7
2,7
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
3,1
3,1
3,1
3,0
2,9
2,8
2,8
2,7
2,7
"
"
"
"
"
"
"
"
"
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
2,9
2,8
2,7
2,6
2,5
2,4
2,3
2,2
2,2
2,1
2,0
1,9
1,8
1,7
1,6
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
2,6
2,5
2,4
2,3
2,3
2,2
2,1
2,0
2,0
1,9
1,8
1,7
1,6
1,5
1,4
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
2,6
2,5
2,4
2,3
2,3
2,2
2,1
2,0
2,0
1,9
1,8
1,7
1,6
1,5
1,4
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TEV / Baumgartner
Version 09.03.2010
/ 200+10 bar
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
FB
KWvOT
15 0,5
oberer Leerlauf
All-drehzahl
(*)
"
"
"
"
"
"
220
225
230
235
240
245
250
255
260
265
270
275
280
285
290
295
300
305
310
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
315
320
325
330
335
340
345
350
355
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
11 0,5
360
370
380
390
400
410
420
430
440
450
460
470
480
490
500
"
"
"
"
"
"
"
"
"
"
"
13 0,5
"
"
"
"
"
"
"
"
"
"
"
"
PV
180
150
95225301.3084 41
B.11/512
CST
04.05.2011
1B . . / 12.2011
n (min-1)
F (kW)
IFN (kW)
ICFN (kW)
1500
2.7
2.3
2.1
1800
3.4
3.0
2.7
2000
3.8
3.4
3.1
2300
4.3
3.9
3.5
2600
4.7
4.2
3.8
2800
5.0
4.4
4.0
3000
5.2
4.6
4.1
3300
5.4
4.8
4.3
3600
5.6
5.0
4.5
q (mm /H)
18.0
16.5
15.0
j (KW)
7.8
6.5
5.1
q = max. Einspitzmenge
max. quantity of injected fuel
max. dbit d'injection
mx. cantidad de inyeccin
j = dazugehriger Einstellwinkel
appropriate angle for adjustment
angle d'ajustage appropri
angulo de ajuste aproriado
kW
6.0
NF
NB (IFN)
5.0
NS (ICXN)
Gilt nur fr . . .
Only valid for . . .
Valable seulment pour . . .
Valido solamente para . . .
4.0
Einspritzpumpe
Injection pump
Pompe d'injection
Bomba de injeccion
3.0
180+8 bar
2.0
1500
1800 2000
2300
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes
d'injection
Valores de adjuste de la bomba de
inyeccion
B.11/512 CST 11.05.2011
Type / Tipo
1B30
101
3300
3600
min-1
41
10-16
gepr.:
1B . . / 12.2011
kW
NF
NB
(IFN)
NS
(ICFN)
1500
2.7
2.3
2.1
1800
3.4
3.0
2.7
-1
min
min-1
fb (KW v.OT)
13 +1
j (KW)
7.8
q (mm3/H)
> 3000 - 3200
fb (KW v.OT)
13 +1
3.8
3.4
3.1
2300
4.3
3.9
3.5
j (KW)
2600
4.7
4.2
3.8
fb (KW v.OT)
13 +1
fb (KW v.OT)
13 +1
q (mm /H)
5.0
4.4
4.0
3000
5.3
4.6
4.1
3300
5.4
4.9
4.3
3600
5.6
5.0
4.5
1500 - 2400
fb (KW v.OT)
10 +1
6.5
18.0
j (KW)
6.5
18.0
1/6
j (KW)
5.1
14.5
5.1
15.0
5.1
16.5
7.8
q (mm3/H)
14.0
16.5
7.8
2800
6.5
18.0
j (KW)
5.1
16.0
7.8
q (mm /H)
> 2400 - 2600
6.5
17.5
j (KW)
ICFN
15.5
7.8
q (mm /H)
> 2600 - 3000
6.5
17.0
2000
IFN = ICXN
15.0
5.1
16.5
15.0
Basis - base
baser - base
1/6
kW
6.0
NF
NB (IFN)
5.0
NS (ICXN / ICFN)
Gilt nur fr . . .
Only valid for . . .
Valable seulment pour . . .
Valido solamente para . . .
4.0
Einspritzpumpe
Injection pump
Pompe d'injection
Bomba de injeccion
3.0
Einspritzdse / Nozzle
Injecteur / Tobera
2.0
1500
1800 2000
2300
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes
d'injection
Valores de adjuste de la bomba de
inyeccion
B.11/512 CST 11.05.2011
Type / Tipo
1B30
101
302
3300
3600
min-1
41
17 - 22
23 - 24
gepr.:
13.06.00
1B . . / 12.2011
kW
NF
NB
(IFN)
NS
(ICFN)
1500
2.3
2.1
1800
3.0
2.7
-1
min
min-1
fb (KW v.OT)
13 +1
j (KW)
7.8
q (mm3/H)
> 3000 - 3200
fb (KW v.OT)
13 +1
3.4
3.1
2300
3.9
3.5
j (KW)
2600
4.7
4.2
3.8
fb (KW v.OT)
13 +1
fb (KW v.OT)
13 +1
q (mm /H)
5.0
4.4
4.0
3000
5.3
4.6
4.1
3300
5.4
4.9
3600
5.6
5.0
1500 - 2400
fb (KW v.OT)
10 +1
6.5
j (KW)
6.5
1/6
j (KW)
5.1
15.0
5.1
16.5
q (mm3/H)
16.5
2800
6.5
18.0
j (KW)
16.0
7.8
q (mm /H)
> 2400 - 2600
6.5
17.5
j (KW)
ICFN
15.5
7.8
q (mm /H)
> 2600 - 3000
6.5
17.0
2000
IFN = ICXN
15.0
5.1
16.5
15.0
Basis - base
baser - base
1/6
kW
6.0
NF
NB (IFN)
5.0
NS (ICXN / ICFN)
Gilt nur fr . . .
Only valid for . . .
Valable seulment pour . . .
Valido solamente para . . .
4.0
Einspritzpumpe
Injection pump
Pompe d'injection
Bomba de injeccion
3.0
Einspritzdse / Nozzle
Injecteur / Tobera
2.0
1500
1800 2000
2300
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes
d'injection
Valores de adjuste de la bomba de
inyeccion
B.11/512 CST 11.05.2011
Type / Tipo
1B30
3300
3600
min-1
41
17-24
gepr.:
13.06.00
1B . . / 12.2011
1B . . / 12.2011
101
25-26
Einspritzpumpen-Einstellwerte
HATZ
HATZ
505 680 01
013 896 00
HATZ
505 667 00
Leistung (kW)
-1
min
IFNSI
IFN
ICXN
ISO 1585
ISO 3046
ISO 3046
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
5,0
5,0
5,0
4,9
4,9
4,9
4,9
4,8
4,8
4,8
4,7
4,7
4,6
4,6
4,6
4,5
4,5
4,4
4,4
4,3
4,2
4,2
4,1
4,1
4,0
3,9
3,9
3,8
3,7
3,7
3,6
3,5
3,4
TEV / Tovar
11.01.2006
ICFN
ISO 3046
FB
(KW v.OT)
F
ISO 1585
180,5
"
"
"
160,5
"
"
"
"
"
"
"
"
"
"
"
140,5
"
"
"
"
"
"
"
"
"
120,5
"
"
"
"
"
"
1B30
q (mm3 / H)
IFN
IFNSI
ICXN
ISO 3046
ISO 3046
EPA II
Stanadyne 37499
/ 200+10 bar
(KW)
ICFN
IFNSI
IFN
ICXN
ISO 3046
ISO 1585
ISO 3046
ISO 3046
16
"
"
"
"
"
"
"
"
"
"
"
16,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
7,8
"
"
"
7,6
"
"
"
"
"
"
"
7,7
"
"
"
7,2
"
"
"
"
"
"
"
"
"
6,9
"
"
"
"
"
"
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
oberer Leerlauf
ICFN
ISO 3046
-1
min
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
All-drehzahl
PV
240
240
240
250
250
250
250
260
260
260
260
270
270
270
270
280
280
280
280
290
290
290
300
300
310
310
320
330
340
350
360
370
380
180
150
95191801.1014 41
B.11/512
CST 03.05.2011
1B . . / 12.2011
101
27
Einspritzpumpen-Einstellwerte
1B30
EPA IV
Einspritzpumpe, Injection pump, Pompe dinjection, Bomba de injeccion HATZ 505 680 10
Einspritzventil, Injection valve, soupape, dinjection, valvula de inyeccion HATZ 013 896 10
Einspritzdse, Nozzle, Injecteur, Tobera HATZ 505 667 10
Kraftstoffdruckrohr, pressure pipe, tube de pression, tubo de presin Lw = 1,6mm
F ISO 1585
min-1
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
5,0
16
10,0
3550
5,0
"
"
3500
5,0
"
3450
4,9
"
3400
4,9
"
3350
4,9
"
3300
4,9
"
3250
4,8
"
3200
4,8
3150
4,8
3100
FB
KWvOT
oberer Leerlauf
Alldrehzahl (*)
PV
140,5
240
180
"
240
"
"
240
"
"
250
"
"
250
"
"
250
9,5
120,5
250
"
"
260
"
"
"
260
"
"
"
260
4,7
"
"
"
260
3050
4,7
"
"
"
270
3000
4,6
16,5
9,0
110,5
270
2950
4,6
"
"
"
270
2900
4,6
"
"
"
270
2850
4,5
"
"
"
280
2800
4,5
"
8,5
100,5
280
2750
4,4
"
"
"
280
2700
4,4
"
"
"
280
2650
4,3
"
"
"
290
2600
4,2
"
"
"
290
2550
4,2
"
"
"
290
2500
4,1
"
"
"
300
2450
4,1
"
"
"
300
2400
4,0
"
"
"
310
2350
3,9
"
"
"
310
2300
3,9
"
8,0
90,5
320
2250
3,8
"
"
"
330
2200
3,7
"
"
"
340
2150
3,7
"
"
"
350
2100
3,6
"
"
"
360
2050
3,5
"
"
"
370
2000
3,4
"
"
80,5
380
1950
390
1900
400
1850
410
1800
420
1750
430
1700
440
1650
450
1600
460
1550
470
1500
480
TEV / Baumgartner
Version 12.03.2009
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
150
95191802.1014 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
302
25-26
Einspritzpumpen-Einstellwerte
1B30
NON EPA
Basis EPA II
Einspritzpumpe, Injection pump, Pompe dinjection, Bomba de injeccion HATZ 505 680 01
Einspritzventil, Injection valve, soupape, dinjection, valvula de inyeccion HATZ 013 988 00
Einspritzdse, Nozzle, Injecteur, Tobera HATZ 505 767 00
Kraftstoffdruckrohr, pressure pipe, tube de pression, tubo de presin Lw = 1,6mm
F ISO 1585
min-1
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
Stanadyne 38098
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
5,4
5,4
5,4
5,3
5,3
5,3
5,2
5,2
5,2
5,1
5,1
5,1
5,0
5,0
4,9
4,9
4,8
4,8
4,7
4,6
4,6
4,5
4,4
4,4
4,3
4,2
4,1
4,1
4,0
3,9
3,8
3,7
3,6
3,6
3,5
3,4
3,3
3,2
3,0
2,9
2,8
2,7
2,6
18
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
8,5
"
"
"
"
"
"
"
"
"
"
"
7,9
"
"
"
"
"
"
"
"
"
"
"
"
"
8,0
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
5,0
5,0
4,9
4,9
4,9
4,9
4,9
4,8
4,8
4,8
4,7
4,7
4,6
4,6
4,6
4,5
4,5
4,4
4,4
4,3
4,2
4,2
4,1
4,1
4,0
3,9
3,9
3,8
3,7
3,6
3,6
3,5
3,4
3,3
3,2
3,1
3,0
2,9
2,8
2,7
2,6
2,4
2,3
16,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
7,3
"
"
"
"
"
"
"
"
"
"
"
7,0
"
"
"
"
"
"
"
"
"
"
"
"
"
7,4
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
4,5
4,5
4,5
4,4
4,4
4,4
4,4
4,3
4,3
4,3
4,2
4,2
4,2
4,1
4,1
4,1
4,0
4,0
3,9
3,9
3,8
3,8
3,7
3,7
3,6
3,5
3,5
3,4
3,3
3,3
3,2
3,1
3,1
3,0
2,9
2,8
2,7
2,6
2,5
2,4
2,3
2,2
2,1
16,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
7,3
"
"
"
"
"
"
"
"
"
"
"
7,0
"
"
"
"
"
"
"
"
"
"
"
"
"
7,4
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
4,5
4,5
4,5
4,4
4,4
4,4
4,4
4,3
4,3
4,3
4,2
4,2
4,2
4,1
4,1
4,1
4,0
4,0
3,9
3,9
3,8
3,8
3,7
3,7
3,6
3,5
3,5
3,4
3,3
3,3
3,2
3,1
3,1
3,0
2,9
2,8
2,7
2,6
2,5
2,4
2,3
2,2
2,1
15
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
6,2
"
"
"
"
"
"
"
"
"
"
"
6,1
"
"
"
"
"
"
"
"
"
"
"
"
"
6,6
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TEV / Baumgartner
Version 21.10.2008
/ 200+10 bar
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
02
oberer Leerlauf
FB
KWvOT
All-drehzahl
(*)
180,5
"
"
"
"
"
"
"
"
"
"
"
160,5
"
"
"
"
"
"
"
"
"
"
"
"
"
140,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
240
240
240
250
250
250
250
260
260
260
260
270
270
270
270
280
280
280
280
290
290
290
300
300
310
310
320
330
340
350
360
370
380
390
400
410
420
430
440
450
460
470
480
PV
180
150
95196601.3024 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
101
27
Einspritzpumpen-Einstellwerte
1B30
NON EPA
Basis EPA IV
Einspritzpumpe, Injection pump, Pompe dinjection, Bomba de injeccion HATZ 505 680 10
Einspritzventil, Injection valve, soupape, dinjection, valvula de inyeccion HATZ 013 896 10
Einspritzdse, Nozzle, Injecteur, Tobera HATZ 505 667 10
Kraftstoffdruckrohr, pressure pipe, tube de pression, tubo de presin Lw = 1,6mm
IFNSI ISO 3046
F ISO 1585
-1
min
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
Stanadyne 40129
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
5,4
5,4
5,4
5,3
5,3
5,3
5,2
5,2
5,2
5,1
5,1
5,1
5,0
5,0
4,9
4,9
4,8
4,8
4,7
4,6
4,6
4,5
4,4
4,4
4,3
4,2
4,1
4,1
4,0
3,9
3,8
3,7
3,6
3,6
3,5
3,4
3,3
3,2
3,0
2,9
2,8
2,7
2,6
18
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
12,5
"
"
"
"
"
12,0
"
"
"
"
"
11,5
"
"
"
11,0
"
"
"
"
"
"
"
"
"
10,0
"
"
"
"
"
9,5
"
"
"
8,5
"
"
"
"
"
"
5,0
5,0
4,9
4,9
4,9
4,9
4,9
4,8
4,8
4,8
4,7
4,7
4,6
4,6
4,6
4,5
4,5
4,4
4,4
4,3
4,2
4,2
4,1
4,1
4,0
3,9
3,9
3,8
3,7
3,6
3,6
3,5
3,4
3,3
3,2
3,1
3,0
2,9
2,8
2,7
2,6
2,4
2,3
16,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
11,5
"
"
"
"
"
11,0
"
"
"
"
"
10,5
"
"
"
10,0
"
"
"
9,5
"
"
"
"
"
9,0
"
"
"
"
"
8,5
"
"
"
7,5
"
"
"
"
"
"
4,5
4,5
4,5
4,4
4,4
4,4
4,4
4,3
4,3
4,3
4,2
4,2
4,2
4,1
4,1
4,1
4,0
4,0
3,9
3,9
3,8
3,8
3,7
3,7
3,6
3,5
3,5
3,4
3,3
3,3
3,2
3,1
3,1
3,0
2,9
2,8
2,7
2,6
2,5
2,4
2,3
2,2
2,1
16,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
11,5
"
"
"
"
"
11,0
"
"
"
"
"
10,5
"
"
"
10,0
"
"
"
9,5
"
"
"
"
"
9,0
"
"
"
"
"
8,5
"
"
"
7,5
"
"
"
"
"
"
4,5
4,5
4,5
4,4
4,4
4,4
4,4
4,3
4,3
4,3
4,2
4,2
4,2
4,1
4,1
4,1
4,0
4,0
3,9
3,9
3,8
3,8
3,7
3,7
3,6
3,5
3,5
3,4
3,3
3,3
3,2
3,1
3,1
3,0
2,9
2,8
2,7
2,6
2,5
2,4
2,3
2,2
2,1
15
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
10,0
"
"
"
"
"
"
"
"
"
"
"
9,0
"
"
"
8,5
"
"
"
8,0
"
"
"
"
"
7,5
"
"
"
"
"
7,0
"
"
"
6,5
"
"
"
"
"
"
TEV / Baumgartner
Version 26.03.2009
/ 200+10 bar
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
oberer Leerlauf
FB
KWvOT
All-drehzahl
(*)
180,5
"
"
"
"
"
"
"
"
"
"
"
160,5
"
"
"
"
"
"
"
"
"
"
"
"
"
140,5
"
"
"
"
"
"
"
"
"
120,5
"
"
"
"
"
"
240
240
240
250
250
250
250
260
260
260
260
270
270
270
270
280
280
280
280
290
290
290
300
300
310
310
320
330
340
350
360
370
380
390
400
410
420
430
440
450
460
470
480
PV
180
150
95196602.3024 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
kW
NF
NB
(IFN)
NS
(ICFN)
1500
2.3
2.1
1800
3.0
2.7
-1
min
min-1
fb (KW v.OT)
13 +1
j (KW)
7.8
q (mm3/H)
> 3000 - 3200
fb (KW v.OT)
13 +1
3.4
3.1
2300
3.9
3.5
j (KW)
2600
4.7
4.2
3.8
fb (KW v.OT)
13 +1
fb (KW v.OT)
13 +1
q (mm /H)
5.0
4.4
4.0
3000
5.3
4.6
4.1
3300
5.4
4.9
3600
5.6
5.0
1500 - 2400
fb (KW v.OT)
10 +1
6.5
j (KW)
6.5
1/6
j (KW)
5.1
15.0
5.1
16.5
q (mm3/H)
16.5
2800
6.5
18.0
j (KW)
16.0
7.8
q (mm /H)
> 2400 - 2600
6.5
17.5
j (KW)
ICFN
15.5
7.8
q (mm /H)
> 2600 - 3000
6.5
17.0
2000
IFN = ICXN
15.0
5.1
16.5
15.0
Basis - base
baser - base
1/6
kW
6.0
NF
NB (IFN)
5.0
NS (ICXN / ICFN)
Gilt nur fr . . .
Only valid for . . .
Valable seulment pour . . .
Valido solamente para . . .
4.0
Einspritzpumpe
Injection pump
Pompe d'injection
Bomba de injeccion
3.0
Einspritzdse / Nozzle
Injecteur / Tobera
2.0
1500
1800 2000
2300
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes
d'injection
Valores de adjuste de la bomba de
inyeccion
B.11/512 CST 11.05.2011
3300
Type / Tipo
1B30V
3600
min-1
41
10-15
gepr.:
13.06.00
1B . . / 12.2011
112
16-17
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes dinjection
Valores de adjuste de la bomba de inyeccion
HATZ
HATZ
505 680 01
018 568 00
HATZ
505 667 00
Leistung (kW)
-1
min
IFNSI
IFN
ICXN
ISO 1585
ISO 3046
ISO 3046
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
5,0
5,0
5,0
4,9
4,9
4,9
4,9
4,8
4,8
4,8
4,7
4,7
4,6
4,6
4,6
4,5
4,5
4,4
4,4
4,3
4,2
4,2
4,1
4,1
4,0
3,9
3,9
3,8
3,7
3,7
3,6
3,5
3,4
TEV / Tovar
11.01.2006
ICFN
ISO 3046
FB
(KW v.OT)
F
ISO 1585
180,5
"
"
"
160,5
"
"
"
"
"
"
"
"
"
"
"
140,5
"
"
"
"
"
"
"
"
"
120,5
"
"
"
"
"
"
q (mm3 / H)
IFN
IFNSI
ICXN
ISO 3046
ISO 3046
1B30V
EPA II
Stanadyne 37499
/ 200+10 bar
(KW)
ICFN
IFNSI
IFN
ICXN
ISO 3046
ISO 1585
ISO 3046
ISO 3046
16
"
"
"
"
"
"
"
"
"
"
"
16,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
oberer Leerlauf
ICFN
ISO 3046
7,8
"
"
"
7,6
"
"
"
"
"
"
"
7,7
"
"
"
7,2
"
"
"
"
"
"
"
"
"
6,9
"
"
"
"
"
"
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
-1
min
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
All-drehzahl
PV
240
240
240
250
250
250
250
260
260
260
260
270
270
270
270
280
280
280
280
290
290
290
300
300
310
310
320
330
340
350
360
370
380
180
150
95199900.1124 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
112
18
Einspritzpumpen-Einstellwerte
1B30V
EPA IV
505 680 10
018 568 10
/ 200+10 bar
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
5,0
16
10,0
3550
5,0
"
"
3500
5,0
"
3450
4,9
"
3400
4,9
"
3350
4,9
"
3300
4,9
"
3250
4,8
"
3200
4,8
3150
4,8
3100
FB
KWvOT
oberer Leerlauf
Alldrehzahl (*)
PV
140,5
240
180
"
240
"
"
240
"
"
250
"
"
250
"
"
250
9,5
120,5
250
"
"
260
"
"
"
260
"
"
"
260
4,7
"
"
"
260
3050
4,7
"
"
"
270
3000
4,6
16,5
9,0
110,5
270
2950
4,6
"
"
"
270
2900
4,6
"
"
"
270
2850
4,5
"
"
"
280
2800
4,5
"
8,5
100,5
280
2750
4,4
"
"
"
280
2700
4,4
"
"
"
280
2650
4,3
"
"
"
290
2600
4,2
"
"
"
290
2550
4,2
"
"
"
290
2500
4,1
"
"
"
300
2450
4,1
"
"
"
300
2400
4,0
"
"
"
310
2350
3,9
"
"
"
310
2300
3,9
"
8,0
90,5
320
2250
3,8
"
"
"
330
2200
3,7
"
"
"
340
2150
3,7
"
"
"
350
2100
3,6
"
"
"
360
2050
3,5
"
"
"
370
2000
3,4
"
"
80,5
380
1950
390
1900
400
1850
410
1800
420
1750
430
1700
440
1650
450
1600
460
1550
470
1500
480
TEV / Baumgartner
Version 01.09.2009
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
150
95199901.1124 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
kW
NF
NB
(IFN)
NS
(ICFN)
1500
2.7
2.3
2.1
1800
3.4
3.0
2.7
-1
min
min-1
fb (KW v.OT)
13 +1
j (KW)
7.8
q (mm3/H)
> 3000 - 3200
fb (KW v.OT)
13 +1
3.8
3.4
3.1
2300
4.3
3.9
3.5
j (KW)
2600
4.7
4.2
3.8
fb (KW v.OT)
13 +1
fb (KW v.OT)
13 +1
q (mm /H)
5.0
4.4
4.0
3000
5.3
4.6
4.1
3300
5.4
4.9
4.3
3600
5.6
5.0
4.5
1500 - 2400
fb (KW v.OT)
10 +1
6.5
18.0
j (KW)
6.5
18.0
1/6
j (KW)
5.1
14.5
5.1
15.0
5.1
16.5
7.8
q (mm3/H)
14.0
16.5
7.8
2800
6.5
18.0
j (KW)
5.1
16.0
7.8
q (mm /H)
> 2400 - 2600
6.5
17.5
j (KW)
ICFN
15.5
7.8
q (mm /H)
> 2600 - 3000
6.5
17.0
2000
IFN = ICXN
15.0
5.1
16.5
15.0
Basis - base
baser - base
1/6
kW
6.0
NF
NB (IFN)
5.0
NS (ICXN / ICFN)
Gilt nur fr . . .
Only valid for . . .
Valable seulment pour . . .
Valido solamente para . . .
4.0
Einspritzpumpe
Injection pump
Pompe d'injection
Bomba de injeccion
3.0
Einspritzdse / Nozzle
Injecteur / Tobera
2.0
1500
1800 2000
2300
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes
d'injection
Valores de adjuste de la bomba de
inyeccion
B.11/512 CST 11.05.2011
3300
Type / Tipo
1B30 V
112
3600
min-1
41
10-15
gepr.:
13.06.00
1B . . / 12.2011
303
16-17
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes dinjection
HATZ
HATZ
505 680 01
018 881 00
HATZ
505 767 00
Leistung (kW)
min-1
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
IFNSI
IFN
ICXN
ISO 1585
ISO 3046
ISO 3046
ISO 3046
5,0
5,0
4,9
4,9
4,9
4,9
4,9
4,8
4,8
4,8
4,7
4,7
4,6
4,6
4,6
4,5
4,5
4,4
4,4
4,3
4,2
4,2
4,1
4,1
4,0
3,9
3,9
3,8
3,7
3,6
3,6
3,5
3,4
3,3
3,2
3,1
3,0
2,9
2,8
2,7
2,6
2,4
2,3
4,5
4,5
4,5
4,4
4,4
4,4
4,4
4,3
4,3
4,3
4,2
4,2
4,2
4,1
4,1
4,1
4,0
4,0
3,9
3,9
3,8
3,8
3,7
3,7
3,6
3,5
3,5
3,4
3,3
3,3
3,2
3,1
3,1
3,0
2,9
2,8
2,7
2,6
2,5
2,4
2,3
2,2
2,1
5,4
5,4
5,4
5,3
5,3
5,3
5,2
5,2
5,2
5,1
5,1
5,1
5,0
5,0
4,9
4,9
4,8
4,8
4,7
4,6
4,6
4,5
4,4
4,4
4,3
4,2
4,1
4,1
4,0
3,9
3,8
3,7
3,6
3,6
3,5
3,4
3,3
3,2
3,0
2,9
2,8
2,7
2,6
TEV / Tovar
11.01.2006
ICFN
F
ISO 1585
180,5
"
"
"
"
"
"
"
"
"
"
"
160,5
"
"
"
"
"
"
"
"
"
"
"
"
"
140,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
NON EPA
FB
(KW v.OT)
1B30V
18
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
q (mm3 / H)
IFN
IFNSI
ICXN
ISO 3046
Basis EPA II
Stanadyne 38098
/ 200+10 bar
(KW)
oberer Leerlauf
ICFN
IFNSI
IFN
ICXN
ISO 3046
ISO 3046
ISO 1585
ISO 3046
ISO 3046
ISO 3046
16,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
15
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
8,5
"
"
"
"
"
"
"
"
"
"
"
7,9
"
"
"
"
"
"
"
"
"
"
"
"
"
8,0
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
7,3
"
"
"
"
"
"
"
"
"
"
"
7,0
"
"
"
"
"
"
"
"
"
"
"
"
"
7,4
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
6,2
"
"
"
"
"
"
"
"
"
"
"
6,1
"
"
"
"
"
"
"
"
"
"
"
"
"
6,6
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
ICFN
min-1
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
All-drehzahl
PV
240
240
240
250
250
250
250
260
260
260
260
270
270
270
270
280
280
280
280
290
290
290
300
300
310
310
320
330
340
350
360
370
380
390
400
410
420
430
440
450
460
470
480
180
150
95199800.3034 41
B.11/512
CST 03.05.2011
1B . . / 12.2011
112
18
Einspritzpumpen-Einstellwerte
F ISO 1585
NON EPA
1B30V
Basis EPA IV
Lw = 1,6mm
oberer Leerlauf
FB
KWvOT
Alldrehzahl (*)
PV
10,0
180,5
240
180
"
"
240
"
"
"
240
"
"
"
250
"
"
"
250
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
5,4
18
12,5
5,0
16,5
11,5
4,5
16,5
11,5
4,5
15
3550
5,4
"
"
5,0
"
"
4,5
"
"
4,5
"
3500
5,4
"
"
4,9
"
"
4,5
"
"
4,5
3450
5,3
"
"
4,9
"
"
4,4
"
"
4,4
3400
5,3
"
"
4,9
"
"
4,4
"
"
4,4
3350
5,3
"
"
4,9
"
"
4,4
"
"
4,4
"
"
"
250
3300
5,2
"
12,0
4,9
"
11,0
4,4
"
11,0
4,4
"
"
"
250
3250
5,2
"
"
4,8
"
"
4,3
"
"
4,3
"
"
"
260
3200
5,2
"
"
4,8
"
"
4,3
"
"
4,3
"
"
"
260
3150
5,1
"
"
4,8
"
"
4,3
"
"
4,3
"
"
"
260
3100
5,1
"
"
4,7
"
"
4,2
"
"
4,2
"
"
"
260
3050
5,1
"
"
4,7
"
"
4,2
"
"
4,2
"
"
"
270
3000
5,0
"
11,5
4,6
"
10,5
4,2
"
10,5
4,2
"
9,0
160,5
270
2950
5,0
"
"
4,6
"
"
4,1
"
"
4,1
"
"
"
270
2900
4,9
"
"
4,6
"
"
4,1
"
"
4,1
"
"
"
270
2850
4,9
"
"
4,5
"
"
4,1
"
"
4,1
"
"
"
280
2800
4,8
"
11,0
4,5
"
10,0
4,0
"
10,0
4,0
"
8,5
"
280
2750
4,8
"
"
4,4
"
"
4,0
"
"
4,0
"
"
"
280
2700
4,7
"
"
4,4
"
"
3,9
"
"
3,9
"
"
"
280
2650
4,6
"
"
4,3
"
"
3,9
"
"
3,9
"
"
"
290
2600
4,6
"
"
4,2
"
9,5
3,8
"
9,5
3,8
"
8,0
"
290
2550
4,5
"
"
4,2
"
"
3,8
"
"
3,8
"
"
"
290
2500
4,4
"
"
4,1
"
"
3,7
"
"
3,7
"
"
"
300
2450
4,4
"
"
4,1
"
"
3,7
"
"
3,7
"
"
"
300
2400
4,3
"
"
4,0
"
"
3,6
"
"
3,6
"
"
"
310
2350
4,2
"
"
3,9
"
"
3,5
"
"
3,5
"
"
"
310
2300
4,1
"
10,0
3,9
"
9,0
3,5
"
9,0
3,5
"
7,5
140,5
320
2250
4,1
"
"
3,8
"
"
3,4
"
"
3,4
"
"
"
330
2200
4,0
"
"
3,7
"
"
3,3
"
"
3,3
"
"
"
340
2150
3,9
"
"
3,6
"
"
3,3
"
"
3,3
"
"
"
350
2100
3,8
"
"
3,6
"
"
3,2
"
"
3,2
"
"
"
360
2050
3,7
"
"
3,5
"
"
3,1
"
"
3,1
"
"
"
370
2000
3,6
"
9,5
3,4
"
8,5
3,1
"
8,5
3,1
"
7,0
"
380
1950
3,6
"
"
3,3
"
"
3,0
"
"
3,0
"
"
"
390
1900
3,5
"
"
3,2
"
"
2,9
"
"
2,9
"
"
"
400
1850
3,4
"
"
3,1
"
"
2,8
"
"
2,8
"
"
"
410
1800
3,3
"
8,5
3,0
"
7,5
2,7
"
7,5
2,7
"
6,5
120,5
420
1750
3,2
"
"
2,9
"
"
2,6
"
"
2,6
"
"
"
430
1700
3,0
"
"
2,8
"
"
2,5
"
"
2,5
"
"
"
440
1650
2,9
"
"
2,7
"
"
2,4
"
"
2,4
"
"
"
450
1600
2,8
"
"
2,6
"
"
2,3
"
"
2,3
"
"
"
460
1550
2,7
"
"
2,4
"
"
2,2
"
"
2,2
"
"
"
470
1500
2,6
"
"
2,3
"
"
2,1
"
"
2,1
"
"
"
480
TEV / Baumgartner
Version 01.09.2009
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
150
95199801.3034 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
kW
NF
min-1
NB
(IFN)
NS
(ICFN)
min-1
> 3050 - 3600 fb (KW v.OT) 18+1
1500
3.6
1800
4.4
LH (mm)
2.8
j (KW)
7.5
6.4
q(mm /H)
25.0
23.5
LH (mm)
3.1
4.9
4.5
2300
5.7
5.2
6.3
5.8
2600
6.6
LH (mm)
3.4
j (KW)
7.5
6.4
4.8
26.0
24.0
21.0
j (KW)
7.5
6.4
4.8
q (mm /H)
26.0
24.0
21.0
LH (mm)
3.6
j (KW)
6.4
q (mm /H)
24.0
2800
6.9
6.6
6.0
3000
7.1
6.8
6.2
3300
7.4
7.1
3600
7.7
7.3
ICFN
q (mm /H)
3
2000
IFN
kW
8.0
NF
7.0
NB (IFN)
NS (ICXN / ICFN)
6.0
Gilt nur fr . . .
Only valid for . . .
Valable seulment pour . . .
Valido solamente para . . .
Einspritzpumpe
Injection pump
Pompe d'injection
Bomba de injeccion
5.0
1800 2000
2300
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes
d'injection
Valores de adjuste de la bomba de
inyeccion
B.11/512 CST 11.05.2011
Type / Tipo
1B40
3300
3600
min-1
41
10-13
gepr.:
16.07.01
1B . . / 12.2011
110
14
Einspritzpumpen-Einstellwerte
HATZ
HATZ
505 681 01
013 897 00
HATZ
505 666 00
Leistung (kW)
-1
min
IFNSI
IFN
ICXN
ISO 1585
ISO 3046
ISO 3046
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
7,3
7,3
7,2
7,2
7,2
7,1
7,1
7,1
7,0
7,0
6,9
6,9
6,8
6,7
6,7
6,6
6,6
6,5
6,4
6,3
6,3
6,2
6,1
6,0
5,9
5,8
5,7
5,6
5,5
5,3
5,2
5,0
4,9
TEV / Tovar
11.01.2006
ICFN
ISO 3046
FB
(KW v.OT)
F
ISO 1585
180,5
"
"
"
"
"
160,5
"
"
"
"
"
"
"
"
"
140,5
"
"
"
"
"
"
"
"
120,5
"
"
"
"
"
"
1B40
q (mm3 / H)
IFN
IFNSI
ICXN
ISO 3046
ISO 3046
EPA II
Stanadyne 37501
/ 200+10 bar
(KW)
ICFN
IFNSI
IFN
ICXN
ISO 3046
ISO 1585
ISO 3046
ISO 3046
23,5
"
"
"
"
"
24,0
"
"
"
"
"
"
"
"
"
25,0
"
"
"
"
"
"
"
"
"
24,0
"
"
"
"
"
"
oberer Leerlauf
ICFN
ISO 3046
6,3
"
"
"
"
"
6,5
"
"
"
"
"
"
"
"
"
6,7
"
"
"
"
"
"
"
"
"
6,4
"
"
"
"
"
"
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
-1
min
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
All-drehzahl
PV
240
240
240
250
250
250
250
260
260
260
260
270
270
270
270
280
280
280
280
290
290
290
300
300
310
310
320
330
340
350
360
370
380
180
150
95191901.1104 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
110
15
Einspritzpumpen-Einstellwerte
1B40
EPA IV
505 681 01
013 995 10
/ 200+10 bar
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
7,3
23,5
7,0
3550
7,2
"
"
3500
7,2
"
3450
7,2
"
3400
7,2
3350
3300
FB
KWvOT
oberer Leerlauf
Alldrehzahl (*)
PV
140,5
240
180
"
240
"
"
240
"
"
250
"
"
"
250
7,1
"
"
"
250
7,1
"
"
130,5
250
3250
7,0
"
"
"
260
3200
7,0
"
"
"
260
3150
7,0
"
"
"
260
3100
6,9
"
"
"
260
3050
6,9
"
"
"
270
3000
6,8
24,0
7,2
"
270
2950
6,7
"
"
"
270
2900
6,7
"
"
"
270
2850
6,6
"
"
"
280
2800
6,6
"
"
120,5
280
2750
6,5
"
"
"
280
2700
6,4
"
"
"
280
2650
6,3
"
"
"
290
2600
6,3
"
"
"
290
2550
6,2
"
"
"
290
2500
6,1
"
"
"
300
2450
6,0
"
"
"
300
2400
5,9
"
"
"
310
2350
5,8
"
"
"
310
2300
5,7
"
6,0
110,5
320
2250
5,6
"
"
"
330
2200
5,4
"
"
"
340
2150
5,3
"
"
"
350
2100
5,2
"
"
100,5
360
2050
5,0
"
"
"
370
2000
4,9
"
"
"
380
150
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
TMVT / Tovar
Version 14.07.2009
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
95191902.1104 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
kW
NF
NB
(IFN)
NS
(ICFN)
1500
3.8
3.6
3.2
1800
4.7
4.4
4.0
min-1
min-1
> 3050 - 3600 fb (KW v.OT) 18+1
LH (mm)
2.8
j (KW)
7.5
6.4
4.8
25.0
23.5
21.0
LH (mm)
3.1
5.2
4.9
4.5
2300
6.0
5.7
5.2
2600
6.6
6.3
5.8
LH (mm)
3.4
j (KW)
7.5
6.4
4.8
q (mm /H)
26.0
24.0
21.0
j (KW)
7.5
6.4
4.8
q (mm /H)
26.0
24.0
21.0
j (KW)
7.5
6.4
4.8
q (mm /H)
26.0
24.0
21.0
LH (mm)
3.6
2800
6.9
6.6
6.0
3000
7.1
6.8
6.2
3300
7.4
7.1
6.5
3600
7.7
7.3
6.6
ICFN
q(mm /H)
3
2000
IFN
kW
8.0
NF
7.0
NB (IFN)
NS (ICXN / ICFN)
6.0
Gilt nur fr . . .
Only valid for . . .
Valable seulment pour . . .
Valido solamente para . . .
Einspritzpumpe
Injection pump
Pompe d'injection
Bomba de injeccion
5.0
1800 2000
2300
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes
d'injection
Valores de adjuste de la bomba de
inyeccion
B.11/512 CST 11.05.2011
Type / Tipo
1B40
110
304
3300
3600
min-1
41
10-11
12-13
gepr.:
16.07.01
1B . . / 12.2011
304
14
Einspritzpumpen-Einstellwerte
HATZ
HATZ
505 681 01
013 989 00
HATZ
505 769 00
Lw = 1,6mm
Leistung (kW)
min
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
IFNSI
IFN
ICXN
ISO 1585
ISO 3046
ISO 3046
ISO 3046
7,3
7,2
7,2
7,2
7,2
7,1
7,1
7,0
7,0
7,0
6,9
6,9
6,8
6,7
6,7
6,6
6,6
6,5
6,4
6,3
6,3
6,2
6,1
6,0
5,9
5,8
5,7
5,6
5,4
5,3
5,2
5,0
4,9
4,8
4,6
4,5
4,4
4,2
4,1
4,0
3,8
3,7
3,5
6,5
6,5
6,5
6,5
6,4
6,4
6,4
6,3
6,3
6,3
6,2
6,2
6,1
6,1
6,0
6,0
5,9
5,9
5,8
5,7
5,6
5,6
5,5
5,4
5,3
5,2
5,1
5,0
4,9
4,8
4,7
4,5
4,4
4,3
4,2
4,1
3,9
3,8
3,7
3,6
3,4
3,3
3,2
7,5
7,5
7,5
7,5
7,4
7,4
7,4
7,4
7,3
7,3
7,2
7,2
7,1
7,0
7,0
6,9
6,9
6,8
6,7
6,7
6,6
6,5
6,4
6,3
6,2
6,1
6,0
5,8
5,7
5,6
5,5
5,3
5,2
5,1
4,9
4,8
4,6
4,5
4,4
4,2
4,1
3,9
3,8
TEV / Tovar
11.01.2006
ICFN
FB
(KW v.OT)
F
ISO 1585
180,5
"
"
"
"
"
"
"
"
"
"
"
160,5
"
"
"
"
"
"
"
"
"
"
"
"
"
140,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
NON EPA
-1
1B40
25
"
"
"
"
"
"
"
"
"
"
"
26
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
q (mm3 / H)
IFN
IFNSI
ICXN
ISO 3046
Basis EPA II
Stanadyne 38100
/ 200+10 bar
(KW)
oberer Leerlauf
ICFN
IFNSI
IFN
ICXN
ISO 3046
ISO 3046
ISO 1585
ISO 3046
ISO 3046
ISO 3046
23,5
"
"
"
"
"
"
"
"
"
"
"
24
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
21
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
7,2
"
"
"
"
"
"
"
"
"
"
"
7,4
"
"
"
"
"
"
"
"
"
"
"
"
"
7,3
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
6,5
"
"
"
"
"
"
"
"
"
"
"
6,6
"
"
"
"
"
"
"
"
"
"
"
"
"
6,7
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
5,6
"
"
"
"
"
"
"
"
"
"
"
5,5
"
"
"
"
"
"
"
"
"
"
"
"
"
5,8
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
ICFN
min
-1
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
All-drehzahl
PV
240
240
240
250
250
250
250
260
260
260
260
270
270
270
270
280
280
280
280
290
290
290
300
300
310
310
320
330
340
350
360
370
380
390
400
410
420
430
440
450
460
470
480
180
150
95196701.3044 41
B.11/512
CST 03.05.2011
1B . . / 12.2011
110
15
Einspritzpumpen-Einstellwerte
1B40
NON EPA
Basis EPA IV
505 681 01
013 995 10
/ 200+10 bar
oberer Leerlauf
FB
KWvOT
Alldrehzahl (*)
PV
5,2
140,5
240
180
"
"
240
"
"
"
240
"
"
"
250
6,4
"
"
"
250
"
6,4
"
"
"
250
"
"
6,4
"
"
"
250
6,3
"
"
6,3
"
"
"
260
"
6,3
"
"
6,3
"
"
"
260
"
"
6,3
"
"
6,3
"
"
"
260
"
"
6,2
"
"
6,2
"
"
"
260
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
7,5
25,0
8,1
7,3
23,5
7,0
6,5
23,5
7,0
6,5
21,0
3550
7,5
"
"
7,2
"
"
6,5
"
"
6,5
"
3500
7,5
"
"
7,2
"
"
6,5
"
"
6,5
3450
7,5
"
"
7,2
"
"
6,5
"
"
6,5
3400
7,4
"
"
7,2
"
"
6,4
"
"
3350
7,4
"
"
7,1
"
"
6,4
"
3300
7,4
"
"
7,1
"
"
6,4
3250
7,4
"
"
7,0
"
"
3200
7,3
"
"
7,0
"
3150
7,3
"
"
7,0
3100
7,2
"
"
6,9
3050
7,2
"
"
6,9
"
"
6,2
"
"
6,2
"
"
"
270
3000
7,1
26,0
8,2
6,8
24,0
7,2
6,1
24,0
7,2
6,1
"
5,4
130,5
270
2950
7,0
"
"
6,7
"
"
6,1
"
"
6,1
"
"
"
270
2900
7,0
"
"
6,7
"
"
6,0
"
"
6,0
"
"
"
270
2850
6,9
"
"
6,6
"
"
6,0
"
"
6,0
"
"
"
280
2800
6,9
"
"
6,6
"
"
5,9
"
"
5,9
"
"
"
280
2750
6,8
"
"
6,5
"
"
5,9
"
"
5,9
"
"
"
280
2700
6,7
"
"
6,4
"
"
5,8
"
"
5,8
"
"
"
280
2650
6,7
"
"
6,3
"
"
5,7
"
"
5,7
"
"
"
290
2600
6,6
"
"
6,3
"
"
5,6
"
"
5,6
"
"
"
290
2550
6,5
"
"
6,2
"
"
5,6
"
"
5,6
"
"
"
290
2500
6,4
"
"
6,1
"
"
5,5
"
"
5,5
"
"
"
300
2450
6,3
"
"
6,0
"
"
5,4
"
"
5,4
"
"
"
300
2400
6,2
"
"
5,9
"
"
5,3
"
"
5,3
"
"
"
310
2350
6,1
"
"
5,8
"
"
5,2
"
"
5,2
"
"
"
310
2300
6,0
"
7,6
5,7
"
6,6
5,1
"
6,6
5,1
"
5,1
120,5
320
2250
5,8
"
"
5,6
"
"
5,0
"
"
5,0
"
"
"
330
2200
5,7
"
"
5,4
"
"
4,9
"
"
4,9
"
"
"
340
2150
5,6
"
"
5,3
"
"
4,8
"
"
4,8
"
"
"
350
2100
5,5
"
"
5,2
"
"
4,7
"
"
4,7
"
"
"
360
2050
5,3
"
"
5,0
"
"
4,5
"
"
4,5
"
"
"
370
2000
5,2
"
"
4,9
"
"
4,4
"
"
4,4
"
"
"
380
1950
5,1
"
"
4,8
"
"
4,3
"
"
4,3
"
"
"
390
1900
4,9
"
"
4,6
"
"
4,2
"
"
4,2
"
"
"
400
1850
4,8
"
"
4,5
"
"
4,1
"
"
4,1
"
"
"
410
1800
4,6
"
"
4,4
"
"
3,9
"
"
3,9
"
"
"
420
1750
4,5
"
"
4,2
"
"
3,8
"
"
3,8
"
"
"
430
1700
4,4
"
"
4,1
"
"
3,7
"
"
3,7
"
"
"
440
1650
4,2
"
"
4,0
"
"
3,6
"
"
3,6
"
"
"
450
1600
4,1
"
"
3,8
"
"
3,4
"
"
3,4
"
"
"
460
1550
3,9
"
"
3,7
"
"
3,3
"
"
3,3
"
"
"
470
1500
3,8
"
"
3,5
"
"
3,2
"
"
3,2
"
"
"
480
TMVT / Tovar
Version 14.07.2009
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
150
95196702.3044 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
kW
NF
NB
(IFN)
NS
(ICFN)
1500
3.6
1800
4.4
min-1
min-1
> 3050 - 3600 fb (KW v.OT) 18+1
LH (mm)
2.8
j (KW)
7.5
6.4
25.0
23.5
LH (mm)
3.1
4.9
4.5
2300
5.7
5.2
2600
6.6
6.3
5.8
LH (mm)
3.4
j (KW)
7.5
6.4
4.8
q (mm /H)
26.0
24.0
21.0
j (KW)
7.5
6.4
4.8
q (mm /H)
26.0
24.0
21.0
j (KW)
6.4
q (mm /H)
24.0
LH (mm)
3.6
2800
6.9
6.6
6.0
3000
7.1
6.8
6.2
3300
7.4
7.1
3600
7.7
7.3
ICFN
q(mm /H)
3
2000
IFN
kW
8.0
NF
7.0
NB (IFN)
NS (ICXN / ICFN)
6.0
Gilt nur fr . . .
Only valid for . . .
Valable seulment pour . . .
Valido solamente para . . .
Einspritzpumpe
Injection pump
Pompe d'injection
Bomba de injeccion
5.0
1800 2000
2300
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes
d'injection
Valores de adjuste de la bomba de
inyeccion
B.11/512 CST 13.05.2011
3300
3600
min-1
1B40 V/W
117
10-13
Type / Tipo
41
gepr.:
16.07.01
1B . . / 12.2011
117
14
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes dinjection
Valores de adjuste de la bomba de inyeccion
HATZ
HATZ
505 681 01
018 579 00
HATZ
505 666 00
Leistung (kW)
-1
min
IFNSI
IFN
ICXN
ISO 1585
ISO 3046
ISO 3046
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
7,3
7,3
7,2
7,2
7,2
7,1
7,1
7,1
7,0
7,0
6,9
6,9
6,8
6,7
6,7
6,6
6,6
6,5
6,4
6,3
6,3
6,2
6,1
6,0
5,9
5,8
5,7
5,6
5,5
5,3
5,2
5,0
4,9
TEV / Tovar
11.01.2006
ICFN
ISO 3046
FB
(KW v.OT)
F
ISO 1585
180,5
"
"
"
"
"
160,5
"
"
"
"
"
"
"
"
"
140,5
"
"
"
"
"
"
"
"
120,5
"
"
"
"
"
"
q (mm / H)
IFN
IFNSI
ICXN
ISO 3046
ISO 3046
1B40V
EPA II
Stanadyne 37501
/ 200+10 bar
(KW)
ICFN
IFNSI
IFN
ICXN
ISO 3046
ISO 1585
ISO 3046
ISO 3046
23,5
"
"
"
"
"
24,0
"
"
"
"
"
"
"
"
"
25,0
"
"
"
"
"
"
"
"
"
24,0
"
"
"
"
"
"
6,3
"
"
"
"
"
6,5
"
"
"
"
"
"
"
"
"
6,7
"
"
"
"
"
"
"
"
"
6,4
"
"
"
"
"
"
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
oberer Leerlauf
ICFN
ISO 3046
-1
min
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
All-drehzahl
PV
240
240
240
250
250
250
250
260
260
260
260
270
270
270
270
280
280
280
280
290
290
290
300
300
310
310
320
330
340
350
360
370
380
180
150
95201200.1174 41
B.11/512
CST 03.05.2011
1B . . / 12.2011
117
15
Einspritzpumpen-Einstellwerte
1B40V
EPA IV
505 681 01
019 528 10
/ 200+10 bar
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
7,3
23,5
7,0
3550
7,2
"
"
3500
7,2
"
3450
7,2
"
3400
7,2
3350
3300
FB
KWvOT
oberer Leerlauf
Alldrehzahl (*)
PV
140,5
240
180
"
240
"
"
240
"
"
250
"
"
"
250
7,1
"
"
"
250
7,1
"
"
130,5
250
3250
7,0
"
"
"
260
3200
7,0
"
"
"
260
3150
7,0
"
"
"
260
3100
6,9
"
"
"
260
3050
6,9
"
"
"
270
3000
6,8
24,0
7,2
"
270
2950
6,7
"
"
"
270
2900
6,7
"
"
"
270
2850
6,6
"
"
"
280
2800
6,6
"
"
120,5
280
2750
6,5
"
"
"
280
2700
6,4
"
"
"
280
2650
6,3
"
"
"
290
2600
6,3
"
"
"
290
2550
6,2
"
"
"
290
2500
6,1
"
"
"
300
2450
6,0
"
"
"
300
2400
5,9
"
"
"
310
2350
5,8
"
"
"
310
2300
5,7
"
6,0
110,5
320
2250
5,6
"
"
"
330
2200
5,4
"
"
"
340
2150
5,3
"
"
"
350
2100
5,2
"
"
100,5
360
2050
5,0
"
"
"
370
2000
4,9
"
"
"
380
150
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
TMVT / Tovar
Version 14.07.2009
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
95201201.1174 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
kW
NF
NB
(IFN)
NS
(ICFN)
1500
3.8
3.6
3.2
1800
4.7
4.4
4.0
min-1
min-1
> 3050 - 3600 fb (KW v.OT) 18+1
LH (mm)
2.8
j (KW)
7.5
6.4
4.8
25.0
23.5
21.0
LH (mm)
3.1
5.2
4.9
4.5
2300
6.0
5.7
5.2
2600
6.6
6.3
5.8
LH (mm)
3.4
j (KW)
7.5
6.4
4.8
q (mm /H)
26.0
24.0
21.0
j (KW)
7.5
6.4
4.8
q (mm /H)
26.0
24.0
21.0
j (KW)
7.5
6.4
4.8
q (mm /H)
26.0
24.0
21.0
LH (mm)
3.6
2800
6.9
6.6
6.0
3000
7.1
6.8
6.2
3300
7.4
7.1
6.5
3600
7.7
7.3
6.6
ICFN
q(mm /H)
3
2000
IFN
kW
8.0
NF
7.0
NB (IFN)
NS (ICXN / ICFN)
6.0
Gilt nur fr . . .
Only valid for . . .
Valable seulment pour . . .
Valido solamente para . . .
Einspritzpumpe
Injection pump
Pompe d'injection
Bomba de injeccion
5.0
1800 2000
2300
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes
d'injection
Valores de adjuste de la bomba de
inyeccion
B.11/512 CST 13.05.2011
Type / Tipo
1B40 V/W
117
3300
3600
min-1
41
10-13
gepr.:
16.07.01
1B . . / 12.2011
305
14
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes dinjection
Leistung (kW)
-1
min
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
IFNSI
IFN
ICXN
ISO 1585
ISO 3046
ISO 3046
ISO 3046
7,3
7,2
7,2
7,2
7,2
7,1
7,1
7,0
7,0
7,0
6,9
6,9
6,8
6,7
6,7
6,6
6,6
6,5
6,4
6,3
6,3
6,2
6,1
6,0
5,9
5,8
5,7
5,6
5,4
5,3
5,2
5,0
4,9
4,8
4,6
4,5
4,4
4,2
4,1
4,0
3,8
3,7
3,5
6,5
6,5
6,5
6,5
6,4
6,4
6,4
6,3
6,3
6,3
6,2
6,2
6,1
6,1
6,0
6,0
5,9
5,9
5,8
5,7
5,6
5,6
5,5
5,4
5,3
5,2
5,1
5,0
4,9
4,8
4,7
4,5
4,4
4,3
4,2
4,1
3,9
3,8
3,7
3,6
3,4
3,3
3,2
7,5
7,5
7,5
7,5
7,4
7,4
7,4
7,4
7,3
7,3
7,2
7,2
7,1
7,0
7,0
6,9
6,9
6,8
6,7
6,7
6,6
6,5
6,4
6,3
6,2
6,1
6,0
5,8
5,7
5,6
5,5
5,3
5,2
5,1
4,9
4,8
4,6
4,5
4,4
4,2
4,1
3,9
3,8
TEV / Tovar
11.01.2006
ICFN
F
ISO 1585
180,5
"
"
"
"
"
"
"
"
"
"
"
160,5
"
"
"
"
"
"
"
"
"
"
"
"
"
140,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
NON EPA
1B40V
25
"
"
"
"
"
"
"
"
"
"
"
26
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
HATZ
HATZ
HATZ
Lw = 1,6mm
q (mm3 / H)
IFN
IFNSI
ICXN
ISO 3046
505 681 01
018 882 00
505 769 00
Basis EPA II
(KW)
oberer Leerlauf
ICFN
IFNSI
IFN
ICXN
ISO 3046
ISO 3046
ISO 1585
ISO 3046
ISO 3046
ISO 3046
23,5
"
"
"
"
"
"
"
"
"
"
"
24
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
21
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
7,2
"
"
"
"
"
"
"
"
"
"
"
7,4
"
"
"
"
"
"
"
"
"
"
"
"
"
7,3
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
6,5
"
"
"
"
"
"
"
"
"
"
"
6,6
"
"
"
"
"
"
"
"
"
"
"
"
"
6,7
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
5,6
"
"
"
"
"
"
"
"
"
"
"
5,5
"
"
"
"
"
"
"
"
"
"
"
"
"
5,8
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
ICFN
min
-1
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
All-drehzahl
PV
240
240
240
250
250
250
250
260
260
260
260
270
270
270
270
280
280
280
280
290
290
290
300
300
310
310
320
330
340
350
360
370
380
390
400
410
420
430
440
450
460
470
480
180
150
95201300.3054 41
B.11/512
CST 03.05.2011
1B . . / 12.2011
117
15
Einspritzpumpen-Einstellwerte
NON EPA
1B40V
Basis EPA IV
oberer Leerlauf
FB
KWvOT
Alldrehzahl (*)
PV
5,2
140,5
240
180
"
"
240
"
"
"
240
"
"
"
250
6,4
"
"
"
250
"
6,4
"
"
"
250
"
6,4
"
"
"
250
"
"
6,3
"
"
"
260
6,3
"
"
6,3
"
"
"
260
"
6,3
"
"
6,3
"
"
"
260
"
"
6,2
"
"
6,2
"
"
"
260
6,9
"
"
6,2
"
"
6,2
"
"
"
270
8,2
6,8
24,0
7,2
6,1
24,0
7,2
6,1
"
5,4
130,5
270
"
"
6,7
"
"
6,1
"
"
6,1
"
"
"
270
7,0
"
"
6,7
"
"
6,0
"
"
6,0
"
"
"
270
6,9
"
"
6,6
"
"
6,0
"
"
6,0
"
"
"
280
2800
6,9
"
"
6,6
"
"
5,9
"
"
5,9
"
"
"
280
2750
6,8
"
"
6,5
"
"
5,9
"
"
5,9
"
"
"
280
2700
6,7
"
"
6,4
"
"
5,8
"
"
5,8
"
"
"
280
2650
6,7
"
"
6,3
"
"
5,7
"
"
5,7
"
"
"
290
2600
6,6
"
"
6,3
"
"
5,6
"
"
5,6
"
"
"
290
2550
6,5
"
"
6,2
"
"
5,6
"
"
5,6
"
"
"
290
2500
6,4
"
"
6,1
"
"
5,5
"
"
5,5
"
"
"
300
2450
6,3
"
"
6,0
"
"
5,4
"
"
5,4
"
"
"
300
2400
6,2
"
"
5,9
"
"
5,3
"
"
5,3
"
"
"
310
2350
6,1
"
"
5,8
"
"
5,2
"
"
5,2
"
"
"
310
2300
6,0
"
7,6
5,7
"
6,6
5,1
"
6,6
5,1
"
5,1
120,5
320
2250
5,8
"
"
5,6
"
"
5,0
"
"
5,0
"
"
"
330
2200
5,7
"
"
5,4
"
"
4,9
"
"
4,9
"
"
"
340
2150
5,6
"
"
5,3
"
"
4,8
"
"
4,8
"
"
"
350
2100
5,5
"
"
5,2
"
"
4,7
"
"
4,7
"
"
"
360
2050
5,3
"
"
5,0
"
"
4,5
"
"
4,5
"
"
"
370
2000
5,2
"
"
4,9
"
"
4,4
"
"
4,4
"
"
"
380
1950
5,1
"
"
4,8
"
"
4,3
"
"
4,3
"
"
"
390
1900
4,9
"
"
4,6
"
"
4,2
"
"
4,2
"
"
"
400
1850
4,8
"
"
4,5
"
"
4,1
"
"
4,1
"
"
"
410
1800
4,6
"
"
4,4
"
"
3,9
"
"
3,9
"
"
"
420
1750
4,5
"
"
4,2
"
"
3,8
"
"
3,8
"
"
"
430
1700
4,4
"
"
4,1
"
"
3,7
"
"
3,7
"
"
"
440
1650
4,2
"
"
4,0
"
"
3,6
"
"
3,6
"
"
"
450
1600
4,1
"
"
3,8
"
"
3,4
"
"
3,4
"
"
"
460
1550
3,9
"
"
3,7
"
"
3,3
"
"
3,3
"
"
"
470
1500
3,8
"
"
3,5
"
"
3,2
"
"
3,2
"
"
"
480
min-1
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
7,5
25,0
8,1
7,3
23,5
7,0
6,5
23,5
7,0
6,5
21,0
3550
7,5
"
"
7,2
"
"
6,5
"
"
6,5
"
3500
7,5
"
"
7,2
"
"
6,5
"
"
6,5
3450
7,5
"
"
7,2
"
"
6,5
"
"
6,5
3400
7,4
"
"
7,2
"
"
6,4
"
"
3350
7,4
"
"
7,1
"
"
6,4
"
3300
7,4
"
"
7,1
"
"
6,4
"
3250
7,4
"
"
7,0
"
"
6,3
3200
7,3
"
"
7,0
"
"
3150
7,3
"
"
7,0
"
3100
7,2
"
"
6,9
3050
7,2
"
"
3000
7,1
26,0
2950
7,0
2900
2850
TMVT / Tovar
Version 14.07.2009
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
150
95201301.3054 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
124
10-11
Einspritzpumpen-Einstellwerte
HATZ
HATZ
HATZ
Lw = 1,6mm
Leistung (kW)
-1
min
IFNSI
IFN
ICXN
ISO 1585
ISO 3046
ISO 3046
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
7,6
7,5
7,5
7,4
7,3
7,2
7,1
7,0
6,9
6,8
6,7
6,6
6,4
6,3
6,2
6,0
5,9
5,7
5,6
5,5
5,3
TEV / Tovar
10.03.2006
ICFN
ISO 3046
FB
(KW v.OT)
F
ISO 1585
150,5
"
"
"
"
"
"
"
140,5
"
"
"
"
"
120,5
"
"
"
"
"
"
1B50
q (mm3 / H)
IFN
IFNSI
ICXN
ISO 3046
ISO 3046
EPA II
Stanadyne 38102
/ 200+10 bar
(KW)
ICFN
IFNSI
IFN
ICXN
ISO 3046
ISO 1585
ISO 3046
ISO 3046
27,0
"
"
"
"
"
"
"
"
"
"
"
"
"
26,0
"
"
"
"
"
"
oberer Leerlauf
ICFN
ISO 3046
6,5
"
"
"
"
"
"
"
"
"
"
"
"
"
5,3
"
"
"
"
"
"
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
02
-1
min
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
All-drehzahl
PV
270
270
270
280
280
280
280
290
290
290
300
300
310
310
320
330
340
350
360
370
380
150
95205301.1244 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
124
12-13
Einspritzpumpen-Einstellwerte
1B50
EPA IV
oberer Leerlauf
FB
KWvOT
Alldrehzahl (*)
PV
8,7
140,5
260
180
"
"
"
260
"
"
"
260
7,9
"
"
"
270
3400
7,9
"
"
"
270
3350
7,9
"
"
"
270
3300
7,8
26,0
9,0
130,5
270
3250
7,8
"
"
"
280
3200
7,8
"
"
"
280
3150
7,7
"
"
"
280
3100
7,7
"
"
"
280
3050
7,6
"
"
"
290
7,6
27,0
8,6
"
290
2950
7,5
"
"
"
290
2900
7,5
"
"
"
290
2850
7,4
"
"
"
300
2800
7,3
"
"
120,5
300
2750
7,2
"
"
"
300
300
min-1
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
7,9
25,5
3550
7,9
3500
7,9
3450
3000
7,8
28,0
9,2
2700
7,1
"
"
"
2650
7,0
"
"
"
310
2600
6,9
"
"
"
310
2550
6,8
"
"
"
310
2500
6,7
"
"
"
320
2450
6,6
"
"
"
320
2400
6,4
"
"
"
330
2350
6,3
"
"
"
330
2300
6,2
26,0
6,9
110,5
340
2250
6,0
"
"
"
350
2200
5,9
"
"
"
360
2150
5,7
"
"
"
370
2100
5,6
"
"
100,5
380
2050
5,5
"
"
"
390
2000
5,3
"
"
"
400
150
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
TMVT / Tovar
Version 09.07.2009
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
02
95205302.1244 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
10=124
11=306
Einspritzpumpen-Einstellwerte
HATZ
HATZ
HATZ
Lw = 1,6mm
Leistung (kW)
min
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
IFNSI
IFN
ICXN
ISO 1585
ISO 3046
ISO 3046
ISO 3046
7,6
7,5
7,5
7,4
7,3
7,2
7,1
7,0
6,9
6,8
6,7
6,6
6,4
6,3
6,2
6,0
5,9
5,7
5,6
5,5
5,3
5,1
5,0
4,8
4,7
4,6
4,4
4,3
4,1
4,0
3,9
6,8
6,8
6,7
6,6
6,6
6,5
6,4
6,3
6,2
6,1
6,0
5,9
5,8
5,7
5,5
5,4
5,3
5,2
5,0
4,9
4,8
4,6
4,5
4,4
4,2
4,1
4,0
3,8
3,7
3,6
3,5
8,0
8,0
7,9
7,8
7,8
7,7
7,6
7,5
7,4
7,3
7,2
7,0
6,9
6,8
6,6
6,5
6,3
6,2
6,0
5,9
5,7
5,6
5,4
5,3
5,1
4,9
4,8
4,6
4,5
4,4
4,2
TEV / Tovar
10.03.2006
ICFN
FB
(KW v.OT)
F
ISO 1585
150,5
"
"
"
"
"
"
"
140,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
NON EPA
Basis EPA II
-1
1B50
29
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
q (mm3 / H)
IFN
IFNSI
ICXN
ISO 3046
Stanadyne 38102
/ 200+10 bar
(KW)
oberer Leerlauf
ICFN
IFNSI
IFN
ICXN
ISO 3046
ISO 3046
ISO 1585
ISO 3046
ISO 3046
ISO 3046
27
"
"
"
"
"
"
"
"
"
"
"
"
"
26
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
24
"
"
"
"
"
"
"
"
"
"
"
"
"
23
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
7,9
"
"
"
"
"
"
"
"
"
"
"
"
"
6,6
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
6,5
"
"
"
"
"
"
"
"
"
"
"
"
"
5,3
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
4,4
"
"
"
"
"
"
"
"
"
"
"
"
"
3,9
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
02
ICFN
min
-1
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
All-drehzahl
PV
270
270
270
280
280
280
280
290
290
290
300
300
310
310
320
330
340
350
360
370
380
390
400
410
420
430
440
450
460
470
480
150
95205201.3064 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
124
12-13
Einspritzpumpen-Einstellwerte
F ISO 1585
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
NON EPA
Basis EPA IV
1B50
HATZ
HATZ
HATZ
505 681 01
013 995 10
505 774 10 Stanadyne 40137 / 200+10 bar
Lw = 1,6mm
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
8,5
8,5
8,4
8,4
8,4
8,3
8,3
8,3
8,2
8,2
8,1
8,1
8,0
8,0
7,9
7,8
7,8
7,7
7,6
7,5
7,4
7,3
7,2
7,0
6,9
6,8
6,6
6,5
6,3
6,2
6,0
5,9
5,7
5,6
5,4
5,3
5,1
4,9
4,8
4,6
4,5
4,4
4,2
28,0
"
"
"
"
"
28,5
"
"
"
"
"
29,0
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
10,3
"
"
"
"
"
10,4
"
"
"
"
"
9,7
"
"
"
"
"
"
"
"
"
"
"
"
"
8,3
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
7,9
7,9
7,9
7,9
7,9
7,9
7,8
7,8
7,8
7,7
7,7
7,6
7,6
7,5
7,5
7,4
7,3
7,2
7,1
7,0
6,9
6,8
6,7
6,6
6,4
6,3
6,2
6,0
5,9
5,7
5,6
5,5
5,3
5,1
5,0
4,8
4,7
4,6
4,4
4,3
4,1
4,0
3,9
25,5
"
"
"
"
"
26,0
"
"
"
"
"
27,0
"
"
"
"
"
"
"
"
"
"
"
"
"
26,0
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
8,7
"
"
"
"
"
9,0
"
"
"
"
"
8,6
"
"
"
"
"
"
"
"
"
"
"
"
"
6,9
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
7,1
7,1
7,1
7,1
7,1
7,1
7,1
7,0
7,0
7,0
6,9
6,9
6,8
6,8
6,7
6,6
6,6
6,5
6,4
6,3
6,2
6,1
6,0
5,9
5,8
5,7
5,5
5,4
5,3
5,2
5,0
4,9
4,8
4,6
4,5
4,4
4,2
4,1
4,0
3,8
3,7
3,6
3,5
25,5
"
"
"
"
"
26,0
"
"
"
"
"
27,0
"
"
"
"
"
"
"
"
"
"
"
"
"
26,0
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
8,7
"
"
"
"
"
9,0
"
"
"
"
"
8,6
"
"
"
"
"
"
"
"
"
"
"
"
"
6,9
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
7,1
7,1
7,1
7,1
7,1
7,1
7,1
7,0
7,0
7,0
6,9
6,9
6,8
6,8
6,7
6,6
6,6
6,5
6,4
6,3
6,2
6,1
6,0
5,9
5,8
5,7
5,5
5,4
5,3
5,2
5,0
4,9
4,8
4,6
4,5
4,4
4,2
4,1
4,0
3,8
3,7
3,6
3,5
23,0
"
"
"
"
"
"
"
"
"
"
"
24,0
"
"
"
"
"
"
"
"
"
"
"
"
"
23,0
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
6,7
"
"
"
"
"
7,0
"
"
"
"
"
6,9
"
"
"
"
"
"
"
"
"
"
"
"
"
5,2
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TMVT / Tovar
Version 09.07.2009
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
oberer Leerlauf
FB
KWvOT
All-drehzahl
(*)
140,5
"
"
"
"
"
"
"
"
"
"
"
130,5
"
"
"
"
"
"
"
"
"
"
"
"
"
120,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
260
260
260
270
270
270
270
280
280
280
280
290
290
290
290
300
300
300
300
310
310
310
320
320
330
330
340
350
360
370
380
390
400
410
420
430
440
450
460
470
480
490
500
PV
180
150
95205202.3064 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
126
10-11
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes dinjection
Valores de adjuste de la bomba de inyeccion
HATZ
HATZ
HATZ
Lw = 1,6mm
Leistung (kW)
-1
min
IFNSI
IFN
ICXN
ISO 1585
ISO 3046
ISO 3046
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
7,6
7,5
7,5
7,4
7,3
7,2
7,1
7,0
6,9
6,8
6,7
6,6
6,4
6,3
6,2
6,0
5,9
5,7
5,6
5,5
5,3
TEV / Tovar
10.03.2006
ICFN
ISO 3046
FB
(KW v.OT)
F
ISO 1585
150,5
"
"
"
"
"
"
"
140,5
"
"
"
"
"
120,5
"
"
"
"
"
"
q (mm3 / H)
IFN
IFNSI
ICXN
ISO 3046
ISO 3046
1B50V
EPA II
Stanadyne 38102
/ 200+10 bar
(KW)
ICFN
IFNSI
IFN
ICXN
ISO 3046
ISO 1585
ISO 3046
ISO 3046
27,0
"
"
"
"
"
"
"
"
"
"
"
"
"
26,0
"
"
"
"
"
"
6,5
"
"
"
"
"
"
"
"
"
"
"
"
"
5,3
"
"
"
"
"
"
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
02
oberer Leerlauf
ICFN
ISO 3046
-1
min
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
All-drehzahl
PV
270
270
270
280
280
280
280
290
290
290
300
300
310
310
320
330
340
350
360
370
380
150
95205101.1264 41
B.11/512
CST 03.05.2011
1B . . / 12.2011
126
12-13
Einspritzpumpen-Einstellwerte
1B50V
EPA IV
505 681 01
019 528 10
/ 200+10 bar
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
7,9
25,5
8,7
3550
7,9
"
"
3500
7,9
"
3450
7,9
"
3400
7,9
"
3350
7,9
"
3300
7,8
26,0
3250
7,8
"
3200
7,8
3150
7,7
3100
3050
FB
KWvOT
oberer Leerlauf
Alldrehzahl (*)
PV
140,5
260
180
"
260
"
"
260
"
"
270
"
"
270
"
"
270
9,0
130,5
270
"
"
280
"
"
"
280
"
"
"
280
7,7
"
"
"
280
7,6
"
"
"
290
7,6
27,0
8,6
"
290
2950
7,5
"
"
"
290
2900
7,5
"
"
"
290
2850
7,4
"
"
"
300
2800
7,3
"
"
120,5
300
2750
7,2
"
"
"
300
3000
7,8
28,0
9,2
2700
7,1
"
"
"
300
2650
7,0
"
"
"
310
2600
6,9
"
"
"
310
2550
6,8
"
"
"
310
2500
6,7
"
"
"
320
2450
6,6
"
"
"
320
2400
6,4
"
"
"
330
2350
6,3
"
"
"
330
2300
6,2
26,0
6,9
110,5
340
2250
6,0
"
"
"
350
2200
5,9
"
"
"
360
2150
5,7
"
"
"
370
2100
5,6
"
"
100,5
380
2050
5,5
"
"
"
390
2000
5,3
"
"
"
400
150
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
TMVT / Tovar
Version 09.07.2009
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
02
95205102.1264 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
10=126
11=307
Einspritzpumpen-Einstellwerte
Injection pump setting
Donnes de rglage des pompes dinjection
HATZ
HATZ
HATZ
Lw = 1,6mm
Leistung (kW)
min-1
3600
3550
3500
3450
3400
3350
3300
3250
3200
3150
3100
3050
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
IFNSI
ISO 1585
ISO 3046
ISO 3046
ISO 3046
7,6
7,5
7,5
7,4
7,3
7,2
7,1
7,0
6,9
6,8
6,7
6,6
6,4
6,3
6,2
6,0
5,9
5,7
5,6
5,5
5,3
5,1
5,0
4,8
4,7
4,6
4,4
4,3
4,1
4,0
3,9
6,8
6,8
6,7
6,6
6,6
6,5
6,4
6,3
6,2
6,1
6,0
5,9
5,8
5,7
5,5
5,4
5,3
5,2
5,0
4,9
4,8
4,6
4,5
4,4
4,2
4,1
4,0
3,8
3,7
3,6
3,5
8,0
8,0
7,9
7,8
7,8
7,7
7,6
7,5
7,4
7,3
7,2
7,0
6,9
6,8
6,6
6,5
6,3
6,2
6,0
5,9
5,7
5,6
5,4
5,3
5,1
4,9
4,8
4,6
4,5
4,4
4,2
TEV / Tovar
10.03.2006
ICFN
FB
(KW v.OT)
F
ISO 1585
150,5
"
"
"
"
"
"
"
140,5
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
NON EPA
IFN
ICXN
1B50V
29
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
q (mm3 / H)
IFN
IFNSI
ICXN
ISO 3046
Basis EPA II
oberer Leerlauf
ICFN
IFNSI
IFN
ICXN
ISO 3046
ISO 3046
ISO 1585
ISO 3046
ISO 3046
ISO 3046
27
"
"
"
"
"
"
"
"
"
"
"
"
"
26
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
24
"
"
"
"
"
"
"
"
"
"
"
"
"
23
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
7,9
"
"
"
"
"
"
"
"
"
"
"
"
"
6,6
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
6,5
"
"
"
"
"
"
"
"
"
"
"
"
"
5,3
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
4,4
"
"
"
"
"
"
"
"
"
"
"
"
"
3,9
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
02
ICFN
min-1
3000
2950
2900
2850
2800
2750
2700
2650
2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
All-drehzahl
PV
270
270
270
280
280
280
280
290
290
290
300
300
310
310
320
330
340
350
360
370
380
390
400
410
420
430
440
450
460
470
480
150
95205001.3074 41
B.11/512
CST
03.05.2011
1B . . / 12.2011
126
12-13
Einspritzpumpen-Einstellwerte
F ISO 1585
NON EPA
1B50V
Basis EPA IV
oberer Leerlauf
FB
KWvOT
Alldrehzahl (*)
PV
6,7
140,5
260
180
"
"
260
"
"
"
260
"
"
"
270
"
"
"
270
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
kW
mm/H
KW
3600
8,5
28,0
10,3
7,9
25,5
8,7
7,1
25,5
8,7
7,1
23,0
3550
8,5
"
"
7,9
"
"
7,1
"
"
7,1
"
3500
8,4
"
"
7,9
"
"
7,1
"
"
7,1
3450
8,4
"
"
7,9
"
"
7,1
"
"
7,1
3400
8,4
"
"
7,9
"
"
7,1
"
"
7,1
3350
8,3
"
"
7,9
"
"
7,1
"
"
7,1
"
"
"
270
3300
8,3
28,5
10,4
7,8
26,0
9,0
7,1
26,0
9,0
7,1
"
7,0
"
270
3250
8,3
"
"
7,8
"
"
7,0
"
"
7,0
"
"
"
280
3200
8,2
"
"
7,8
"
"
7,0
"
"
7,0
"
"
"
280
3150
8,2
"
"
7,7
"
"
7,0
"
"
7,0
"
"
"
280
3100
8,1
"
"
7,7
"
"
6,9
"
"
6,9
"
"
"
280
3050
8,1
"
"
7,6
"
"
6,9
"
"
6,9
"
"
"
290
3000
8,0
29,0
9,7
7,6
27,0
8,6
6,8
27,0
8,6
6,8
24,0
6,9
130,5
290
2950
8,0
"
"
7,5
"
"
6,8
"
"
6,8
"
"
"
290
2900
7,9
"
"
7,5
"
"
6,7
"
"
6,7
"
"
"
290
2850
7,8
"
"
7,4
"
"
6,6
"
"
6,6
"
"
"
300
2800
7,8
"
"
7,3
"
"
6,6
"
"
6,6
"
"
"
300
2750
7,7
"
"
7,2
"
"
6,5
"
"
6,5
"
"
"
300
2700
7,6
"
"
7,1
"
"
6,4
"
"
6,4
"
"
"
300
2650
7,5
"
"
7,0
"
"
6,3
"
"
6,3
"
"
"
310
2600
7,4
"
"
6,9
"
"
6,2
"
"
6,2
"
"
"
310
2550
7,3
"
"
6,8
"
"
6,1
"
"
6,1
"
"
"
310
2500
7,2
"
"
6,7
"
"
6,0
"
"
6,0
"
"
"
320
2450
7,0
"
"
6,6
"
"
5,9
"
"
5,9
"
"
"
320
2400
6,9
"
"
6,4
"
"
5,8
"
"
5,8
"
"
"
330
2350
6,8
"
"
6,3
"
"
5,7
"
"
5,7
"
"
"
330
2300
6,6
"
8,3
6,2
26,0
6,9
5,5
26,0
6,9
5,5
23,0
5,2
120,5
340
2250
6,5
"
"
6,0
"
"
5,4
"
"
5,4
"
"
"
350
2200
6,3
"
"
5,9
"
"
5,3
"
"
5,3
"
"
"
360
2150
6,2
"
"
5,7
"
"
5,2
"
"
5,2
"
"
"
370
2100
6,0
"
"
5,6
"
"
5,0
"
"
5,0
"
"
"
380
2050
5,9
"
"
5,5
"
"
4,9
"
"
4,9
"
"
"
390
2000
5,7
"
"
5,3
"
"
4,8
"
"
4,8
"
"
"
400
1950
5,6
"
"
5,1
"
"
4,6
"
"
4,6
"
"
"
410
1900
5,4
"
"
5,0
"
"
4,5
"
"
4,5
"
"
"
420
1850
5,3
"
"
4,8
"
"
4,4
"
"
4,4
"
"
"
430
1800
5,1
"
"
4,7
"
"
4,2
"
"
4,2
"
"
"
440
1750
4,9
"
"
4,6
"
"
4,1
"
"
4,1
"
"
"
450
1700
4,8
"
"
4,4
"
"
4,0
"
"
4,0
"
"
"
460
1650
4,6
"
"
4,3
"
"
3,8
"
"
3,8
"
"
"
470
1600
4,5
"
"
4,1
"
"
3,7
"
"
3,7
"
"
"
480
1550
4,4
"
"
4,0
"
"
3,6
"
"
3,6
"
"
"
490
1500
4,2
"
"
3,9
"
"
3,5
"
"
3,5
"
"
"
500
TMVT / Tovar
Version 09.07.2009
Technischer Hinweis
Technical advice, Remarque Technique, Indicacin tcnica
01
150
95205002.3074 41
B.11/512
CST
03.05.2011
1B . . / 12.2011