Você está na página 1de 2

13894 Federal Register / Vol. 73, No.

51 / Friday, March 14, 2008 / Notices

the Agency may lengthen the process Dolores and Montezuma Counties, need to mitigate these impacts. Rating:
and include a second comment period, CO. EC2.
as needed. Summary: EPA does not object to the EIS No. 20080018, ERP No. D–FHW–
All comments should be submitted preferred alternative. Rating: LO. K40267–CA, Phase I—CA 11 Corridor
using the methods in ADDRESSES, and EIS No. 20070497, ERP No. D–FAA– Location and Route Adoption and
must be received by EPA on or before K51043–CA, Horizon Air Service to Location Identification of the Otay
the closing date. Comments will become Mammoth Yosemite Airport Project, Mesa East Port of Entry (POE) on Otay
part of the Agency Docket for sumithrin. Proposed Operations Specifications Mesa, Presidential Permit for the POE
Comments received after the close of the Amendment to Provide Scheduled Air and Acquisition of Right-Of-Way
comment period will be marked ‘‘late.’’ Service, Town of Mammoth Lakes, Permit, San Diego County, CA.
EPA is not required to consider these Mono County, CA. Summary: EPA expressed
late comments.
Summary: EPA does not object to the environmental concerns about air
B. What is the Agency’s Authority for proposed action. Rating: LO. quality impacts associated with idling
Taking this Action? trucks and mobile source air toxics and
EIS No. 20070523, ERP No. D–NRC–
Section 4(g)(2) of FIFRA, as amended, cumulative impacts to multiple
E06025–NC, Generic—License
directs that, after submission of all data resources, and recommended
Renewal of Nuclear Plants (GEIS)
concerning a pesticide active ingredient, completing a full cumulative impact
Regarding Shearon Harris Nuclear
‘‘the Administrator shall determine analysis, addressing mobile source air
Power Plant, Unit 1, Plant-Specific
whether pesticides containing such toxics and committing to anti-idling
Supplement 33 to NUREG–1437,
active ingredient are eligible for methods. Rating: EC2.
Wake County, NC.
reregistration,’’ before calling in Summary: EPA expressed EIS No. 20070541, ERP No. DS–NOA–
product-specific data on individual end- environmental concerns about water L91011–AK, Cook Inlet Beluga Whale
use products and either reregistering withdrawal impacts to surface water Subsistence Harvest Project, Proposes
products or taking other ‘‘appropriate under exceptional drought conditions, to Implement a Long-Term Harvest
regulatory action.’’ and requested radiological monitoring Plan and Fulfill the Federal
of all plant effluents, and appropriate Government’s Trust Responsibility,
List of Subjects
storage and disposition of radioactive Cook Inlet, AK.
Environmental protection, Pesticides waste. Rating: EC1. Summary: EPA does not object to the
and pests. proposed project. Rating: LO.
EIS No. 20080006, ERP No. D–FHW–
Dated: March 7, 2008.
H40192–NE, Nebraska Highway 35 Final EISs
Steven Bradbury,
(N–35) Corridor, To Improve 66-mile EIS No. 20070415, ERP No. F–AFS–
Director, Special Review and Reregistration from Norfolk to South Sioux City,
Division, Office of Pesticide Programs. J65435–UT, Ogden Ranger District
Funding, Madison, Stanton, Wayne, Travel Plan Revision, To Present
[FR Doc. E8–5044 Filed 3–13–08; 8:45 am] Dixon, and Dakota Counties, NE. Additional Analysis for Six
BILLING CODE 6560–50–S Summary: EPA expressed Alternatives, Wasatch-Cache National
environmental concern about impacts Forest, Ogden Ranger District, Box
on two impaired steams, and the Elder, Cache, Morgan, Weber and
ENVIRONMENTAL PROTECTION cumulative impacts of induced Rich Counties, UT.
AGENCY residential development, and Summary: EPA continues to have
recommended that noise attenuation environmental concerns about impacts
[ER–FRL–6696–9] measures other than structural be from trails needing maintenance and
examined. Rating: EC2. that new trails may not receive
Environmental Impact Statements and
Regulations; Availability of EPA EIS No. 20080013, ERP No. D–AFS– sufficient upkeep.
Comments G65107–NM, Santa Fe National Forest EIS No. 20070539, ERP No. F–SFW–
Project, Settlement Land Transfers: K39015–CA, PROGRAMMATIC—
Availability of EPA comments Pueblo de San Ildefonso, Pueblo of South Bay Salt Pond Restoration
prepared pursuant to the Environmental Santa Clara and Los Alamos County, Project, Restored Tidal Marsh,
Review Process (ERP), under section Implementation, Santa Fe National Managed Ponds, Flood Control
309 of the Clean Air Act and Section Forest, Los Alamos, Rio Arriba and Measures and Public Access Features,
102(2)(c) of the National Environmental Santa Fe Counties, NM. Don Edward San Francisco Bay
Policy Act as amended. Requests for Summary: EPA does not object to the National Wildlife Refuge, Alameda,
copies of EPA comments can be directed proposed action. Rating: LO. Santa Clara and San Mateo Counties,
to the Office of Federal Activities at CA.
202–564–7167. An explanation of the EIS No. 20080016, ERP No. D–FHW–
L40233–ID, Three Cities River Summary: The Final PEIS addressed
ratings assigned to draft environmental
Crossing Project, New Roadway EPA’s previous concerns; therefore, EPA
impact statements (EISs) was published
Crossing of the Boise River at the does not object to the proposed action.
in Federal Register dated April 6, 2007
(72 FR 17156). Juncture of the Cities of Boise, Eagle EIS No. 20080009, ERP No. F–AFS–
and Garden, Ada County Highway J65465–WY, Lower Valley Energy
Draft EISs District (ACHD), Ada County, ID. (LVE) Natural Gas Pipeline Project,
EIS No. 20070452, ERP No. D–BLM– Summary: EPA expressed Construction and Operation of a
rwilkins on PROD1PC63 with NOTICES

J65496–CO, Canyons of the Ancients environmental concerns about air Pressurized Natural Gas Pipeline,
National Monument Resource quality, including ozone, particulate Special-Use-Authorization, Big Piney
Management Plan, To Address Future matter, air toxics, wetlands, aquatic and Jackson Ranger Districts, Bridger-
Management Options for resources, floodplains, water quality Teton National Forest, Sublette and
Approximately 165.00 Acres of Land, and stormwater management, and the Teton Counties, WY.

VerDate Aug<31>2005 19:17 Mar 13, 2008 Jkt 214001 PO 00000 Frm 00068 Fmt 4703 Sfmt 4703 E:\FR\FM\14MRN1.SGM 14MRN1
Federal Register / Vol. 73, No. 51 / Friday, March 14, 2008 / Notices 13895

Summary: No formal comment letter Forest Plan, Palouse Ranger District, Right-of-Way Grant, Imperial County,
was sent to the preparing agency. Clearwater National Forest, Latah CA, Wait Period Ends: 04/14/2008,
EIS No. 20080030, ERP No. F–BLM– County, ID, Wait Period Ends: 04/14/ Contact: Erin Dreyfuss 760–337–4436.
J65455–MT, Upper Missouri River 2008, Contact: Kara Chadwick 208–
Amended Notices
Breaks National Monument Resource 875–1131.
EIS No. 20080083, Draft Supplement, EIS No. 20070514, Draft EIS, AFS, CO,
Management Plan, Implementation, San Juan Public Lands, Draft Land
AFS, WV, Lower Williams Project
Blaine, Chouteau, Fergus and Phillips Management Plan (DLMP),
Area (LWPA), Additional Information,
Counties, MT. Implementation, San Juan National
Proposed to Perform Vegetation
Summary: EPA continues to have Management and Wildlife Habitat Forest, Archuleta, Conejos, Dolores,
environmental concerns about impacts Improvements, Implementation, Hinsdale, LaPlata, Mineral,
to water quality and aquatic resources Gauley Ranger District, Monongahela Montezuma, Montrose, Rio Grande,
from road density, cumulative effects National Forest, Webster County, WV, San Juan and San Miguel Counties,
and the adequacy of resources available Comment Period Ends: 04/28/2008, CO, Comment Period Ends: 04/11/
for monitoring and adaptive Contact: O’Dell Tucker 304–799–4334 2008, Contact: Gary Thrash 970–247–
management and for travel management Ext 19. 4874. Revision of FR Published 12/14/
enforcement. EIS No. 20080084, Draft Supplement, 2007: Extending Comment Period
Dated: March 11, 2008. AFS, UT, West Bear Vegetation from 03/12/2008 to 04/11/2008.
Robert W. Hargrove, Management Project, Additional EIS No. 20080019, Draft EIS, MMS, 00,
Information to Improve a Portion of Cape Wind Energy Project,
Director, NEPA Compliance Division, Office
of Federal Activities. the Cumulative Effects Analysis and Construction, Operation and
Correct the Soils Analysis, Timber Maintenance, and Decommissioning
[FR Doc. E8–5183 Filed 3–13–08; 8:45 am]
Harvesting, Prescribed Burning, Roads of a Electric Generation Facility,
BILLING CODE 6560–50–P
Construction, Township 1 North, Barnstable, Nantucket and Duke
Range 9 East, Salt Lake Principle County, MA and Washington County,
Meridian, Evanston Ranger District, RI, Comment Period Ends: 04/21/
ENVIRONMENTAL PROTECTION
Wasatch-Cache National Forest, 2008, Contact: Dr. Rodney E. Cluck
AGENCY
Summit County, UT, Comment Period 703–787–1087. Revision of FR
[ER–FRL–6696–8] Ends: 04/28/2008, Contact: Larry Published 01/18/2008: Extending
Johnson 307–783–3194. Comment Period from 03/20/2008 to
Environmental Impacts Statements; EIS No. 20080085, Final EIS, NPS, WA, 04/21/2008.
Notice of Availability Olympic National Park General Dated: March 11, 2008.
Responsible Agency: Office of Federal Management Plan, Implementation, Robert W. Hargrove,
Activities, General Information (202) Clallam, Grays Harbor, Jefferson and Director, NEPA Compliance Division, Office
564–7167 or http://www.epa.gov/ Mason Counties, WA, Wait Period of Federal Activities.
compliance/nepa/ Ends: 04/14/2008, Contact: Nancy [FR Doc. E8–5184 Filed 3–13–08; 8:45 am]
Hendricks 360–565–3008.
Weekly Receipt of Environmental EIS No. 20080086, Draft Supplement,
BILLING CODE 6560–50–P
Impact Statements Filed 03/03/2008 FTA, NJ, Access to the Region’s Core
Through 03/07/2008 Project, Additional Information on the
Pursuant to 40 CFR 1506.9. Build Alternative, To Increase Trans- FEDERAL RESERVE SYSTEM
EIS No. 20080080, Second Draft Hudson Commuter Rail Capacity,
Supplement, COE, CA, Santa Ana Formations of, Acquisitions by, and
Improve System Safety and Reliability Mergers of Bank Holding Companies
River Interceptor (SARI) Protection/ between Secaucus Junction Station in
Relocation Project, Reduce the Risk of NJ and midtown Manhattan, Funding, The companies listed in this notice
Damage to the SARI to allow for the Hudson County, NJ and New York have applied to the Board for approval,
Operation of Santa Ana River Project County, NY, Comment Period Ends: pursuant to the Bank Holding Company
(SARP), and Releases from Prado Dam 04/28/2008, Contact: Donald Burns Act of 1956 (12 U.S.C. 1841 et seq.)
of up to 30,000 cubic feet per second 212–668–2182. (BHC Act), Regulation Y (12 CFR Part
(cfs), Right-of-Way Permit and U.S. EIS No. 20080087, Final EIS, FRC, 00, 225), and all other applicable statutes
COE Section 404 Permit, Orange and Fayetteville/Greenville Expansion and regulations to become a bank
Riverside Counties, CA, Comment Project, Construction and Operation holding company and/or to acquire the
Period Ends: 04/28/2008, Contact: of the Natural Gas Pipeline Facilities assets or the ownership of, control of, or
Raina Fulton 213–452–3872. in Arkansas and Mississippi, Wait the power to vote shares of a bank or
EIS No. 20080081, Final EIS, FHW, CA, Period Ends: 04/14/2008, Contact: bank holding company and all of the
Interstate 405 (San Diego Freeway) Andy Black 1–866–208–3372. banks and nonbanking companies
Sepulveda Pass Widening Project, EIS No. 20080088, Final EIS, FHW, MT, owned by the bank holding company,
Widening and High Occupancy Miller Creek Road Project, To Provide including the companies listed below.
Vehicle (HOV) Improvements from Safe and Improved Access between The applications listed below, as well
Interstate 10 to U.S.–101 in the City U.S. 93 and the Miller Creek Area, as other related filings required by the
of Los Angeles, Preferred Alternative Missoula County, MT, Wait Period Board, are available for immediate
is 2, Los Angeles County, CA, Wait Ends: 04/14/2008, Contact: Craig inspection at the Federal Reserve Bank
Period Ends: 04/14/2008, Contact: Genzlinger 406–449–5302 Ext 240. indicated. The application also will be
Cesar Perez 916–498–5065. EIS No. 20080089, Final EIS, BLM, CA, available for inspection at the offices of
rwilkins on PROD1PC63 with NOTICES

EIS No. 20080082, Final EIS, AFS, ID, United States Gypsum Expansion/ the Board of Governors. Interested
Cherry Dinner Project, Management of Modernization Project, Expand and persons may express their views in
Vegetation, Hazardous Fuels, and Upgrade Plaster City Plant to Increase writing on the standards enumerated in
Access Plus Watershed Wallboard Production Capacity with the BHC Act (12 U.S.C. 1842(c)). If the
Improvements, Amendment to the Related Increases in Water Supply, proposal also involves the acquisition of

VerDate Aug<31>2005 19:17 Mar 13, 2008 Jkt 214001 PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 E:\FR\FM\14MRN1.SGM 14MRN1

Você também pode gostar