3714 Federal Register / Vol. 73, No.

14 / Tuesday, January 22, 2008 / Notices

Commission’s Public Reference Room, Absent a request to be heard in Your input will help us determine the
888 First Street, NE., Washington, DC opposition to such blanket approvals by issues that need to be evaluated in the
20426. The Order may also be viewed the deadline above, Snowflake is environmental assessment. The public
on the Commission’s Web site at authorized to issue securities and scoping meeting will be held at:
http://www.ferc.gov, using the eLibrary assume obligations or liabilities as a Heidelberg Multi Purpose Building, 114
link. Enter the docket number excluding guarantor, indorser, surety, or otherwise West Park Street, Heidelberg,
the last three digits in the docket in respect of any security of another Mississippi 39114, Phone: 601–787–
number filed to access the document. person; provided that such issuance or 3000.
Comments, protests, and interventions assumption is for some lawful object The Commission staff will also
may be filed electronically via the within the corporate purposes of conduct a site visit of the location of the
Internet in lieu of paper. See, 18 CFR Snowflake, compatible with the public proposed facilities on January 30, 2008.
385.2001(a)(1)(iii) and the instructions interest, and is reasonably necessary or Anyone interested in participating in
on the Commission’s Web site under the appropriate for such purposes. the site visit may attend, and they must
‘‘e-Filing’’ link. The Commission The Commission reserves the right to provide their own transportation. The
strongly encourages electronic filings. require a further showing that neither staff will start the site visit on
public nor private interests will be Wednesday, January 30 at
Kimberly D. Bose,
adversely affected by continued approximately 9 a.m. (CST). The
Secretary. approvals of Snowflake’s issuance of Commission staff, company
[FR Doc. E8–963 Filed 1–18–08; 8:45 am] securities or assumptions of liability. representatives, and interested
BILLING CODE 6717–01–P Copies of the full text of the Director’s participants will meet in the parking lot
Order are available from the at the following location: Piggly Wiggly,
Commission’s Public Reference Room, Highway 15, Bay Springs, MS 39422.
DEPARTMENT OF ENERGY 888 First Street, NE., Washington, DC
20426. The Order may also be viewed Kimberly D. Bose,
Federal Energy Regulatory Secretary.
on the Commission’s Web site at
Commission [FR Doc. E8–962 Filed 1–18–08; 8:45 am]
http://www.ferc.gov, using the eLibrary
[Docket Nos. ER08–299–000] link. Enter the docket number excluding BILLING CODE 6717–01–P
the last three digits in the docket
Snowflake White Mountain Power, number filed to access the document.
LLC; Notice of Issuance of Order Comments, protests, and interventions DEPARTMENT OF ENERGY
January 15, 2008. may be filed electronically via the
Federal Energy Regulatory
Snowflake White Mountain Power, Internet in lieu of paper. See, 18 CFR
Commission
LLC (Snowflake) filed an application for 385.2001(a)(1)(iii) and the instructions
market-based rate authority, with on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission [Docket No. CP08–5–000]
accompanying tariff. The proposed
market-based rate tariff provides for the strongly encourages electronic filings.
Southern Natural Gas Company
sale of energy, capacity and ancillary Kimberly D. Bose, Magnolia Enterprise Holdings, Inc.;
services at market-based rates. Secretary. Notice of Intent to Prepare an
Snowflake also requested waivers of [FR Doc. E8–964 Filed 1–18–08; 8:45 am] Environmental Assessment for the
various Commission regulations. In BILLING CODE 6717–01–P Proposed AGL–Brunswick Project and
particular, Snowflake requested that the Request for Comments on
Commission grant blanket approval Environmental Issues
under 18 CFR part 34 of all future DEPARTMENT OF ENERGY
issuances of securities and assumptions January 2, 2008.
of liability by Snowflake. Federal Energy Regulatory The staff of the Federal Energy
On January 11, 2008, pursuant to Commission Regulatory Commission (FERC or
delegated authority, the Director, Commission) will prepare an
[Docket No. CP08–8–000]
Division of Tariffs and Market environmental assessment (EA) that will
Development-West, granted the requests Leaf River Energy Center LLC; Notice discuss the environmental impacts of
for blanket approval under part 34 of Public Scoping Meeting and Site the AGL-Brunswick Project involving
(Director’s Order). The Director’s Order Visit for the Proposed Leaf River construction and operation of natural
also stated that the Commission would Storage Project gas pipeline facilities by Southern
publish a separate notice in the Federal Natural Gas Company (Southern) in
Register establishing a period of time for January 15, 2008. Jones, Laurens, Glynn, and Liberty
the filing of protests. Accordingly, any The staff of the Federal Energy Counties, Georgia. The EA will be used
person desiring to be heard concerning Regulatory Commission (Commission) by the Commission in its decision-
the blanket approvals of issuances of will conduct a public scoping meeting making process to determine whether
securities or assumptions of liability by and site visit for the Leaf River Storage the project is in the public convenience
Snowflake, should file a protest with the Project involving construction and and necessity.
Federal Energy Regulatory Commission, operation of natural gas storage and This notice announces the opening of
888 First Street, NE., Washington, DC pipeline header facilities by Leaf River the scoping process the Commission
20426, in accordance with Rules 211 Energy Center LLC in Smith, Jasper, and will use to gather input from the public
and 214 of the Commission’s Rules of Clarke Counties, Mississippi. and interested agencies on the project.
sroberts on PROD1PC70 with NOTICES

Practice and Procedure. 18 CFR 385.211, We invite you to attend the public Your input will help determine which
385.214 (2007). scoping meeting beginning at 7 p.m. issues need to be evaluated in the EA.
Notice is hereby given that the (CST) on Tuesday evening, January 29, Please note that the scoping period will
deadline for filing protests is February 2008, to provide environmental close on February 4, 2008. Details on
11, 2008. comments on the proposed project. how to submit comments are provided