72702 Federal Register / Vol. 72, No.

245 / Friday, December 21, 2007 / Notices

and the number of copies provided by j. Deadline for filing comments, specified comment date for the
the Commission’s regulations to: The protests, and motions to intervene: 60 particular application (see 18 CFR 4.36).
Secretary, Federal Energy Regulatory days from the issuance date of this Submission of a timely notice of intent
Commission, 888 First Street, NE., notice. allows an interested person to file the
Washington, DC 20426. A copy of any All documents (original and eight competing preliminary permit
motion to intervene must also be served copies) should be filed with: Secretary, application no later than 30 days after
upon each representative of the Federal Energy Regulatory Commission, the specified comment date for the
Applicant specified in the particular 888 First Street, NE., Washington, DC particular application. A competing
application. 20426. Comments, protests, and preliminary permit application must
q. Agency Comments: Federal, State, interventions may be filed electronically conform with 18 CFR 4.30 and 4.36.
and local agencies are invited to file via the Internet in lieu of paper; see 18 n. Competing Development
comments on the described application. CFR 385.2001(a)(1)(iii) and the Application: Any qualified development
A copy of the application may be instructions on the Commission’s Web applicant desiring to file a competing
obtained by agencies directly from the site under the ‘‘e-Filing’’ link. The development application must submit to
Applicant. If an agency does not file Commission strongly encourages the Commission, on or before a
comments within the time specified for electronic filings. Please include the specified comment date for the
filing comments, it will be presumed to project number (P–13056–000) on any particular application, either a
have no comments. One copy of an comments or motions filed. competing development application or a
agency’s comments must also be sent to The Commission’s Rules of Practice notice of intent to file such an
the Applicant’s representatives. and Procedure require all intervenors application. Submission of a timely
filing documents with the Commission notice of intent to file a development
Kimberly D. Bose, to serve a copy of that document on application allows an interested person
Secretary. each person in the official service list to file the competing application no
[FR Doc. E7–24763 Filed 12–20–07; 8:45 am] for the project. Further, if an intervenor later than 120 days after the specified
BILLING CODE 6717–01–P files comments or documents with the comment date for the particular
Commission relating to the merits of an application. A competing license
issue that may affect the responsibilities application must conform with 18 CFR
DEPARTMENT OF ENERGY of a particular resource agency, they 4.30 and 4.36.
must also serve a copy of the document o. Notice of Intent: A notice of intent
Federal Energy Regulatory on that resource agency. must specify the exact name, business
Commission k. Description of Project: The address, and telephone number of the
[Project No. 13056–000] proposed project would use the U.S. prospective applicant, and must include
Army Corps of Engineers’ Buckhorn an unequivocal statement of intent to
BPUS Generation Development, LLC; Lake Dam and would consist of: (1) A submit, if such an application may be
Notice of Application Accepted for proposed forebay and intake structure filed, either a preliminary permit
Filing and Soliciting Motions To located upstream of the western application or a development
Intervene, Protests, and Comments abutment of the dam; (2) a proposed application (specify which type of
steel lined power tunnel; (3) a proposed application). A notice of intent must be
December 14, 2007. powerhouse, containing two turbine/ served on the applicant(s) named in this
Take notice that the following generator units with a total installed public notice.
hydroelectric application has been filed capacity of 7.8 megawatts; (4) a tailrace p. Proposed Scope of Studies Under
with the Commission and is available channel; (5) a new 2.5-mile-long 12.5 to Permit: A preliminary permit, if issued,
for public inspection: 230 kV transmission line and, (6) does not authorize construction. The
a. Type of Application: Preliminary appurtenant facilities. The proposed term of the proposed preliminary permit
Permit. project would have an average annual would be 36 months. The work
b. Project No.: 13056–000. generation of 19.2 gigawatt-hours, proposed under the preliminary permit
c. Date Filed: November 5, 2007. which would be sold to a local utility. would include economic analysis,
d. Applicant: BPUS Generation l. This filing is available for review at preparation of preliminary engineering
Development, LLC. the Commission in the Public Reference plans, and a study of environmental
e. Name of Project: Buckhorn Lake Room or may be viewed on the impacts. Based on the results of these
Dam Hydroelectric Project. Commission’s Web site at http:// studies, the Applicant would decide
f. Location: The project would be www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation
located on the Middle Fork of the Enter the docket number excluding the of a development application to
Kentucky River in Perry County, last three digits in the docket number construct and operate the project.
Kentucky. It would use the U.S. Army field to access the document. For q. Comments, Protests, or Motions To
Corps of Engineers’ Buckhorn Lake assistance, call toll-free 1–866–208– Intervene: Anyone may submit
Dam. 3676 or e-mail comments, a protest, or a motion to
g. Filed Pursuant to: Federal Power FERCONLINESUPPORT@FERC.GOV. intervene in accordance with the
Act, 16 U.S.C. 791(a)—825(r). For TTY, call (202) 502–8659. A copy is requirements of Rules of Practice and
h. Applicant Contact: Mr. Jeffrey M. also available for inspection and Procedure, 18 CFR 385.210, 385.211,
Auser, P.E., BPUS Generation reproduction at the address in item h 385.214. In determining the appropriate
Development, LLC, 225 Greenfield above. action to take, the Commission will
Parkway, Suite 201, Liverpool, NY m. Competing Preliminary Permit: consider all protests or other comments
mstockstill on PROD1PC66 with NOTICES

13088, (315) 413–2700, and Mr. John A. Anyone desiring to file a competing filed, but only those who file a motion
Whittaker, IV, Winston & Strawn, LLP, application for preliminary permit for a to intervene in accordance with the
1700 K Street, NW., Washington, DC proposed project must submit the Commission’s Rules may become a
20006–3817, (202) 282–5766. competing application itself, or a notice party to the proceeding. Any comments,
i. FERC Contact: Kelly Houff, (202) of intent to file such an application, to protests, or motions to intervene must
502–6393. the Commission on or before the be received on or before the specified

VerDate Aug<31>2005 18:37 Dec 20, 2007 Jkt 214001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\21DEN1.SGM 21DEN1
Federal Register / Vol. 72, No. 245 / Friday, December 21, 2007 / Notices 72703

comment date for the particular f. Location: The project would be Enter the docket number excluding the
application. located on the Salt River in Spencer last three digits in the docket number
r. Filing and Service of Responsive County, Kentucky. It would use the U.S. field to access the document. For
Documents: Any filings must bear in all Army Corps of Engineers’ Taylorsville assistance, call toll-free 1–866–208–
capital letters the title ‘‘COMMENTS’’, Lake Dam. 3676 or e-mail
‘‘NOTICE OF INTENT TO FILE g. Filed Pursuant to: Federal Power FERCONLINESUPPORT@FERC.GOV.
COMPETING APPLICATION’’, Act, 16 U.S.C. 791(a)—825(r). For TTY, call (202) 502–8659. A copy is
‘‘COMPETING APPLICATION’’, h. Applicant Contact: Mr. Jeffrey M. also available for inspection and
‘‘PROTEST’’, and ‘‘MOTION TO Auser, P.E., BPUS Generation reproduction at the address in item h
INTERVENE’’, as applicable, and the Development LLC, 225 Greenfield above.
Project Number of the particular Parkway, Suite 201, Liverpool, NY m. Competing Preliminary Permit:
application to which the filing refers. 13088, (315) 413–2700, and Mr. John A. Anyone desiring to file a competing
Any of the above-named documents Whittaker, IV, Winston & Strawn, LLP, application for preliminary permit for a
must be filed by providing the original 1700 K Street, NW., Washington, DC proposed project must submit the
and the number of copies provided by 20006–3817, (202) 282–5766. competing application itself, or a notice
the Commission’s regulations to: The i. FERC Contact: Kelly Houff, (202) of intent to file such an application, to
Secretary, Federal Energy Regulatory 502–6393. the Commission on or before the
Commission, 888 First Street, NE., j. Deadline for filing comments, specified comment date for the
Washington, DC 20426. An additional protests, and motions to intervene: 60 particular application (see 18 CFR 4.36).
copy must be sent to Director, Division days from the issuance date of this Submission of a timely notice of intent
of Hydropower Administration and notice. allows an interested person to file the
Compliance, Federal Energy Regulatory All documents (original and eight competing preliminary permit
Commission, at the above-mentioned copies) should be filed with: Secretary, application no later than 30 days after
address. A copy of any notice of intent, Federal Energy Regulatory Commission, the specified comment date for the
competing application or motion to 888 First Street, NE., Washington, DC particular application. A competing
intervene must also be served upon each 20426. Comments, protests, and preliminary permit application must
representative of the Applicant interventions may be filed electronically conform with 18 CFR 4.30 and 4.36.
specified in the particular application. via the Internet in lieu of paper; see 18 n. Competing Development
s. Agency Comments: Federal, State, CFR 385.2001(a)(1)(iii) and the Application: Any qualified development
and local agencies are invited to file instructions on the Commission’s Web applicant desiring to file a competing
comments on the described application. site under the ‘‘e-Filing’’ link. The development application must submit to
A copy of the application may be Commission strongly encourages the Commission, on or before a
obtained by agencies directly from the electronic filings. Please include the specified comment date for the
Applicant. If an agency does not file project number (P–13057–000) on any particular application, either a
comments within the time specified for comments or motions filed. competing development application or a
filing comments, it will be presumed to The Commission’s Rules of Practice notice of intent to file such an
have no comments. One copy of an and Procedure require all intervenors application. Submission of a timely
agency’s comments must also be sent to filing documents with the Commission notice of intent to file a development
the Applicant’s representatives. to serve a copy of that document on application allows an interested person
each person in the official service list to file the competing application no
Kimberly D. Bose, for the project. Further, if an intervenor later than 120 days after the specified
Secretary. files comments or documents with the comment date for the particular
[FR Doc. E7–24764 Filed 12–20–07; 8:45 am] Commission relating to the merits of an application. A competing license
BILLING CODE 6717–01–P issue that may affect the responsibilities application must conform with 18 CFR
of a particular resource agency, they 4.30 and 4.36.
must also serve a copy of the document o. Notice of Intent: A notice of intent
DEPARTMENT OF ENERGY on that resource agency. must specify the exact name, business
k. Description of Project: The address, and telephone number of the
Federal Energy Regulatory
proposed project would use the U.S. prospective applicant, and must include
Commission
Army Corps of Engineers’ Taylorsville an unequivocal statement of intent to
[Project No. 13057–000] Lake Dam and would consist of: (1) A submit, if such an application may be
proposed forebay and intake structure filed, either a preliminary permit
BPUS Generation Development, LLC; located upstream of the eastern application or a development
Notice of Application Accepted for abutment of the dam; (2) a proposed application (specify which type of
Filing and Soliciting Motions To steel lined power tunnel; (3) a proposed application). A notice of intent must be
Intervene, Protests, and Comments powerhouse, containing two turbine/ served on the applicant(s) named in this
December 14, 2007. generator units with a total installed public notice.
Take notice that the following capacity of 16.9 megawatts; (4) a tailrace p. Proposed Scope of Studies Under
hydroelectric application has been filed channel; (5) a new 2.26-mile-long 12.5 Permit: A preliminary permit, if issued,
with the Commission and is available to 230 kV transmission line and, (6) does not authorize construction. The
for public inspection: appurtenant facilities. The proposed term of the proposed preliminary permit
a. Type of Application: Preliminary project would have an average annual would be 36 months. The work
Permit. generation of 23.3 gigawatt-hours, proposed under the preliminary permit
mstockstill on PROD1PC66 with NOTICES

b. Project No.: 13057–000. which would be sold to a local utility. would include economic analysis,
c. Date Filed: November 5, 2007. l. This filing is available for review at preparation of preliminary engineering
d. Applicant: BPUS Generation the Commission in the Public Reference plans, and a study of environmental
Development, LLC. Room or may be viewed on the impacts. Based on the results of these
e. Name of Project: Taylorsville Lake Commission’s Web site at http:// studies, the Applicant would decide
Dam Hydroelectric Project. www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation

VerDate Aug<31>2005 18:37 Dec 20, 2007 Jkt 214001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\21DEN1.SGM 21DEN1