Você está na página 1de 3

71832 Federal Register / Vol. 72, No.

243 / Wednesday, December 19, 2007 / Proposed Rules

for this AD, follow the procedures in 14 CFR • Federal eRulemaking Portal: Go to Airworthiness Directive 2007–0173,
39.19. Before using any approved AMOC on http://www.regulations.gov. Follow the dated June 18, 2007 (referred to after
any airplane to which the AMOC applies, instructions for submitting comments. this as ‘‘the MCAI’’), to correct an unsafe
notify your appropriate principal inspector • Fax: (202) 493–2251.
(PI) in the FAA Flight Standards District
condition for the specified products.
• Mail: U.S. Department of The MCAI states:
Office (FSDO), or lacking a PI, your local
FSDO. Transportation, Docket Operations, M–
Due to the recalculation of loads for the
30, West Building Ground Floor, Room Multi Role Transporter and Tanker (MRTT)
Issued in Renton, Washington, on W12–140, 1200 New Jersey Avenue, SE.,
December 10, 2007. aircraft, it has been found that a structural
Washington, DC 20590. reinforcement at the aft section of the
Ali Bahrami, • Hand Delivery: U.S. Department of fuselage (FR (frame) 87–FR91) is required for
Manager, Transport Airplane Directorate, Transportation, Docket Operations, M– A300–600 aircraft and A310 aircraft with a
Aircraft Certification Service. 30, West Building Ground Floor, Room Trim Tank installed. * * *
[FR Doc. E7–24521 Filed 12–18–07; 8:45 am] W12–40, 1200 New Jersey Avenue, SE., The unsafe condition is the potential
BILLING CODE 4910–13–P Washington, DC, between 9 a.m. and 5 loss of structural integrity in the aft
p.m., Monday through Friday, except section of the fuselage between FR87
Federal holidays. through FR91, inclusive, during extreme
DEPARTMENT OF TRANSPORTATION
Examining the AD Docket rolling and vertical maneuver
Federal Aviation Administration You may examine the AD docket on combinations. The corrective action is
the Internet at http:// reinforcing the structure at FR91.
14 CFR Part 39 www.regulations.gov; or in person at the Related investigative and corrective
Docket Operations office between 9 a.m. actions (reinforcement) include:
[Docket No. FAA–2007–0345; Directorate • Doing a rotating probe inspection
Identifier 2007–NM–194–AD] and 5 p.m., Monday through Friday,
for cracking of the fastener holes;
except Federal holidays. The AD docket • Reaming the fastener holes; and
RIN 2120–AA64
contains this proposed AD, the • Contacting Airbus for repair
Airworthiness Directives; Airbus Model regulatory evaluation, any comments instructions and repairing any crack
A310–304, –322, –324, and –325 received, and other information. The found in any reamed fastener hole.
Airplanes; and A300 Model B4–601, street address for the Docket Operations You may obtain further information
B4–603, B4–605R, B4–620, B4–622, office (telephone (800) 647–5527) is in by examining the MCAI in the AD
B4–622R, F4–605R, F4–622R, and C4– the ADDRESSES section. Comments will docket.
605R Variant F Airplanes (Commonly be available in the AD docket shortly
after receipt. Relevant Service Information
Called Model A300–600 Series
Airplanes) FOR FURTHER INFORMATION CONTACT: Tom Airbus has issued Service Bulletins
Stafford, Aerospace Engineer, A310–53–2126 and A300–53–6156, both
AGENCY: Federal Aviation International Branch, ANM–116, dated November 28, 2006. The actions
Administration (FAA), DOT. Transport Airplane Directorate, FAA, described in this service information are
ACTION: Notice of proposed rulemaking 1601 Lind Avenue, SW., Renton, intended to correct the unsafe condition
(NPRM). Washington 98057–3356; telephone identified in the MCAI.
(425) 227–1622; fax (425) 227–1149.
SUMMARY: We propose to adopt a new FAA’s Determination and Requirements
airworthiness directive (AD) for the SUPPLEMENTARY INFORMATION: of This Proposed AD
products listed above. This proposed Comments Invited This product has been approved by
AD results from mandatory continuing the aviation authority of another
We invite you to send any written
airworthiness information (MCAI) country, and is approved for operation
relevant data, views, or arguments about
originated by an aviation authority of in the United States. Pursuant to our
this proposed AD. Send your comments
another country to identify and correct bilateral agreement with the State of
to an address listed under the
an unsafe condition on an aviation Design Authority, we have been notified
ADDRESSES section. Include ‘‘Docket No.
product. The MCAI describes the unsafe of the unsafe condition described in the
FAA–2007–0345; Directorate Identifier
condition as: MCAI and service information
2007–NM–194–AD’’ at the beginning of
Due to the recalculation of loads for the your comments. We specifically invite referenced above. We are proposing this
Multi Role Transporter and Tanker (MRTT) comments on the overall regulatory, AD because we evaluated all pertinent
aircraft, it has been found that a structural economic, environmental, and energy information and determined an unsafe
reinforcement at the aft section of the condition exists and is likely to exist or
fuselage (FR (frame) 87–FR91) is required for aspects of this proposed AD. We will
A300–600 aircraft and A310 aircraft with a consider all comments received by the develop on other products of the same
Trim Tank installed. * * * closing date and may amend this type design.
proposed AD based on those comments. Differences Between This AD and the
The unsafe condition is the potential We will post all comments we
loss of structural integrity in the aft MCAI or Service Information
receive, without change, to http://
section of the fuselage between FR87 www.regulations.gov, including any We have reviewed the MCAI and
through FR91, inclusive, during extreme personal information you provide. We related service information and, in
rolling and vertical maneuver will also post a report summarizing each general, agree with their substance. But
combinations. The proposed AD would substantive verbal contact we receive we might have found it necessary to use
require actions that are intended to about this proposed AD. different words from those in the MCAI
rwilkins on PROD1PC63 with PROPOSALS

address the unsafe condition described to ensure the AD is clear for U.S.
in the MCAI. Discussion operators and is enforceable. In making
DATES: We must receive comments on The European Aviation Safety Agency these changes, we do not intend to differ
this proposed AD by January 18, 2008. (EASA), which is the Technical Agent substantively from the information
ADDRESSES: You may send comments by for the Member States of the European provided in the MCAI and related
any of the following methods: Community, has issued EASA service information.

VerDate Aug<31>2005 19:24 Dec 18, 2007 Jkt 214001 PO 00000 Frm 00005 Fmt 4702 Sfmt 4702 E:\FR\FM\19DEP1.SGM 19DEP1
Federal Register / Vol. 72, No. 243 / Wednesday, December 19, 2007 / Proposed Rules 71833

We might also have proposed 2. Is not a ‘‘significant rule’’ under the A300–600 aircraft and A310 aircraft with a
different actions in this AD from those DOT Regulatory Policies and Procedures Trim Tank installed. * * *
in the MCAI in order to follow FAA (44 FR 11034, February 26, 1979); and The unsafe condition is the potential loss
of structural integrity in the aft section of the
policies. Any such differences are 3. Will not have a significant fuselage between FR87 through FR91,
highlighted in a NOTE within the economic impact, positive or negative, inclusive, during extreme rolling and vertical
proposed AD. on a substantial number of small entities maneuver combinations. The corrective
under the criteria of the Regulatory action is reinforcing the structure at FR91.
Costs of Compliance
Flexibility Act. Related investigative and corrective actions
Based on the service information, we We prepared a regulatory evaluation (reinforcement) include: Doing a rotating
estimate that this proposed AD would of the estimated costs to comply with probe inspection for cracking of the fastener
affect about 160 products of U.S. holes; reaming the fastener holes; and
this proposed AD and placed it in the
registry. We also estimate that it would contacting Airbus for repair instructions and
AD docket. repairing any crack found in any reamed
take about 129 work-hours per product fastener hole.
to comply with the basic requirements List of Subjects in 14 CFR Part 39
of this proposed AD. The average labor Air transportation, Aircraft, Aviation Actions and Compliance
rate is $80 per work-hour. Required safety, Safety. (f) Unless already done, do the following
parts would cost about $5,840 per actions.
product. Where the service information The Proposed Amendment (1) Within 2,500 flight cycles after the
lists required parts costs that are Accordingly, under the authority effective date of this AD, reinforce the aft
section of the fuselage, in accordance with
covered under warranty, we have delegated to me by the Administrator, the Accomplishment Instructions of Airbus
assumed that there will be no charge for the FAA proposes to amend 14 CFR part Service Bulletin A310–53–2126 or Service
these costs. As we do not control 39 as follows: Bulletin A300–53–6156, as applicable, both
warranty coverage for affected parties, dated November 28, 2006. Do all related and
some parties may incur costs higher PART 39—AIRWORTHINESS investigative corrective actions, as
than estimated here. Based on these DIRECTIVES applicable, before further flight.
figures, we estimate the cost of the 1. The authority citation for part 39 FAA AD Differences
proposed AD on U.S. operators to be continues to read as follows: Note: This AD differs from the MCAI and/
$2,585,600, or $16,160 per product. or service information as follows: No
Authority: 49 U.S.C. 106(g), 40113, 44701.
Authority for This Rulemaking difference.
§ 39.13 [Amended]
Title 49 of the United States Code Other FAA AD Provisions
specifies the FAA’s authority to issue 2. The FAA amends § 39.13 by adding
(g) The following provisions also apply to
rules on aviation safety. Subtitle I, the following new AD: this AD:
section 106, describes the authority of Airbus: Docket No. FAA–2007–0345; (1) Alternative Methods of Compliance
the FAA Administrator. ‘‘Subtitle VII: Directorate Identifier 2007–NM–194–AD. (AMOCs): The Manager, International
Aviation Programs,’’ describes in more Branch, ANM–116, FAA, has the authority to
Comments Due Date approve AMOCs for this AD, if requested
detail the scope of the Agency’s
(a) We must receive comments by January using the procedures found in 14 CFR 39.19.
authority. 18, 2008. Send information to ATTN: Tom Stafford,
We are issuing this rulemaking under Aerospace Engineer, International Branch,
the authority described in ‘‘Subtitle VII, Affected ADs
ANM–116, Transport Airplane Directorate,
Part A, Subpart III, Section 44701: (b) None. FAA, 1601 Lind Avenue, SW., Renton,
General requirements.’’ Under that Washington 98057–3356; telephone (425)
Applicability
section, Congress charges the FAA with 227–1622; fax (425) 227–1149. Before using
promoting safe flight of civil aircraft in (c) This AD applies to Airbus Model A310– any approved AMOC on any airplane to
304, –322, –324, and –325 airplanes, which the AMOC applies, notify your
air commerce by prescribing regulations
certificated in any category, all serial appropriate principal inspector (PI) in the
for practices, methods, and procedures numbers, except those which have received FAA Flight Standards District Office (FSDO),
the Administrator finds necessary for in service application of Airbus Service or lacking a PI, your local FSDO.
safety in air commerce. This regulation Bulletin A310–53–2126 (Airbus modification (2) Airworthy Product: For any requirement
is within the scope of that authority No. 13011). This AD also applies to Airbus in this AD to obtain corrective actions from
because it addresses an unsafe condition A300 Model B4–601, B4–603, B4–605R, B4– a manufacturer or other source, use these
that is likely to exist or develop on 620, B4–622, B4–622R, F4–605R, F4–622R, actions if they are FAA-approved. Corrective
products identified in this rulemaking and C4–605R Variant F airplanes (commonly actions are considered FAA-approved if they
action. called Model A300–600 series airplanes), are approved by the State of Design Authority
certificated in any category, all serial (or their delegated agent). You are required
Regulatory Findings numbers, except those which have received to assure the product is airworthy before it
application of Airbus modification No. 13273 is returned to service.
We determined that this proposed AD in production or application of Airbus (3) Reporting Requirements: For any
would not have federalism implications Service Bulletin A300–53–6156 in service. reporting requirement in this AD, under the
under Executive Order 13132. This provisions of the Paperwork Reduction Act,
proposed AD would not have a Subject
the Office of Management and Budget (OMB)
substantial direct effect on the States, on (d) Air Transport Association (ATA) of has approved the information collection
the relationship between the national America Code 53: Fuselage. requirements and has assigned OMB Control
Government and the States, or on the Number 2120–0056.
Reason
distribution of power and Related Information
rwilkins on PROD1PC63 with PROPOSALS

(e) The mandatory continuing


responsibilities among the various airworthiness information (MCAI) states: (h) Refer to MCAI EASA Airworthiness
levels of government. Due to the recalculation of loads for the Directive 2007–0173, dated June 18, 2007;
For the reasons discussed above, I Multi Role Transporter and Tanker (MRTT) Airbus Service Bulletin A310–53–2126,
certify this proposed regulation: aircraft, it has been found that a structural dated November 28, 2006; and Airbus
1. Is not a ‘‘significant regulatory reinforcement at the aft section of the Service Bulletin A300–53–6156, dated
action’’ under Executive Order 12866; fuselage (FR (frame) 87–FR91) is required for November 28, 2006; for related information.

VerDate Aug<31>2005 19:24 Dec 18, 2007 Jkt 214001 PO 00000 Frm 00006 Fmt 4702 Sfmt 4702 E:\FR\FM\19DEP1.SGM 19DEP1
71834 Federal Register / Vol. 72, No. 243 / Wednesday, December 19, 2007 / Proposed Rules

Issued in Renton, Washington, on W12–140, 1200 New Jersey Avenue, SE., strike. The corrosion reduces system
December 10, 2007. Washington, DC 20590, between 9 a.m. protection against a lightning strike.
Ali Bahrami, and 5 p.m., Monday through Friday, This condition, if not corrected, could
Manager, Transport Airplane Directorate, except Federal holidays. result in loss of the electrical grounding
Aircraft Certification Service. For service information identified in between the lightning shield and the
[FR Doc. E7–24523 Filed 12–18–07; 8:45 am] this AD, contact Boeing Commercial airplane structure. Loss of the electrical
BILLING CODE 4910–13–P Airplanes, P.O. Box 3707, Seattle, grounding between the lightning shield
Washington 98124–2207. and the airplane structure, in
Examining the AD Docket combination with flammable fuel
DEPARTMENT OF TRANSPORTATION vapors, could result in fuel tank
You may examine the AD docket on explosions and consequent loss of the
Federal Aviation Administration the Internet at http:// airplane.
www.regulations.gov; or in person at the
14 CFR Part 39 Docket Management Facility between 9 Relevant Service Information
a.m. and 5 p.m., Monday through We have reviewed Boeing Alert
[Docket No. FAA–2007–0344; Directorate
Friday, except Federal holidays. The AD Service Bulletin 767–28A0064, Revision
Identifier 2007–NM–149–AD]
docket contains this proposed AD, the 2, dated October 27, 2005. The service
RIN 2120–AA64 regulatory evaluation, any comments bulletin describes procedures for
received, and other information. The replacing the wire segments of the four
Airworthiness Directives; Boeing street address for the Docket Office FQIS wire bundles with new, improved
Model 767–200 and –300 Series (telephone 800–647–5527) is in the wire segments. The service bulletin also
Airplanes ADDRESSES section. Comments will be describes procedures for an operational
AGENCY: Federal Aviation available in the AD docket shortly after test of the FQIS following the
Administration (FAA), Department of receipt. replacement. Accomplishing the actions
Transportation (DOT). FOR FURTHER INFORMATION CONTACT: specified in the service bulletin is
Philip Sheridan, Aerospace Engineer, intended to adequately address the
ACTION: Notice of proposed rulemaking
Systems and Equipment Branch, ANM– unsafe condition.
(NPRM).
130S, FAA, Seattle Aircraft Certification
FAA’s Determination and Requirements
SUMMARY: The FAA proposes to adopt a Office, 1601 Lind Avenue, SW., Renton,
of the Proposed AD
new airworthiness directive (AD) for Washington 98057–3356; telephone
certain Boeing Model 767–200 and –300 (425) 917–6441; fax (425) 917–6590. We have evaluated all pertinent
series airplanes. This proposed AD SUPPLEMENTARY INFORMATION: information and identified an unsafe
would require replacing the wire condition that is likely to exist or
Comments Invited develop on other airplanes of this same
segments of the four Fuel Quantity
Indicating System (FQIS) wire bundles We invite you to send any written type design. For this reason, we are
with new, improved wire segments. relevant data, views, or arguments about proposing this AD, which would require
This proposed AD results from operator this proposed AD. Send your comments accomplishing the actions specified in
inspections of the FQIS wire bundles to an address listed under the the service bulletin described
that revealed corrosion at the ADDRESSES section. Include ‘‘Docket No. previously, except as discussed under
connections between the ground wire FAA–2007–0344; Directorate Identifier ‘‘Difference Between the Proposed AD
and shield of each of the four FQIS wire 2007–NM–149–AD’’ at the beginning of and Service Bulletin.’’
bundles. We are proposing this AD to your comments. We specifically invite Difference Between the Proposed AD
prevent this corrosion, which could comments on the overall regulatory, and Service Bulletin
reduce system protection of the economic, environmental, and energy
aspects of this proposed AD. We will The service bulletin recommends
lightning shield and result in loss of the accomplishing the replacement of the
electrical grounding between the consider all comments received by the
closing date and may amend this wire segments of the four FQIS wire
lightning shield and the airplane bundles within 48 months after the
structure. This condition, in proposed AD because of those
comments. release date of the service bulletin, but
combination with flammable fuel we have determined that this
vapors, could result in fuel tank We will post all comments we
receive, without change, to http:// compliance time would not address the
explosions and consequent loss of the identified unsafe condition in a timely
airplane. www.regulations.gov, including any
personal information you provide. We manner. In developing an appropriate
DATES: We must receive comments on will also post a report summarizing each compliance time for this AD, we
this proposed AD by February 4, 2008. substantive verbal contact we receive considered not only the manufacturer’s
ADDRESSES: You may send comments by about this proposed AD. recommendation, but the degree of
any of the following methods: urgency associated with addressing the
• Federal eRulemaking Portal: Go to Discussion subject unsafe condition, the average
http://www.regulations.gov. Follow the Operator inspections of four Fuel utilization of the affected fleet, and the
instructions for submitting comments. Quantity Indicating System (FQIS) wire time necessary to perform the
• Fax: 202–493–2251. bundles revealed corrosion at the replacement. In light of all of these
• Mail: U.S. Department of connections between the ground wire factors, we find a compliance time of 36
Transportation, Docket Operations, M– and shield of each of the four wire months after the effective date of the AD
rwilkins on PROD1PC63 with PROPOSALS

30, West Building Ground Floor, Room bundles, on certain Boeing Model 767– for completing the required replacement
W12–140, 1200 New Jersey Avenue, SE., 200 and –300 series airplanes. Corrosion to be warranted, in that it represents an
Washington, DC 20590. occurred at the ferrules, which were appropriate interval of time for affected
• Hand Delivery: U.S. Department of used for connection of the ground wire. airplanes to continue to operate without
Transportation, Docket Operations, M– The wire bundle shielding is part of the compromising safety. This difference
30, West Building Ground Floor, Room system protection against a lightning has been coordinated with Boeing.

VerDate Aug<31>2005 19:24 Dec 18, 2007 Jkt 214001 PO 00000 Frm 00007 Fmt 4702 Sfmt 4702 E:\FR\FM\19DEP1.SGM 19DEP1

Você também pode gostar