Você está na página 1de 2

Federal Register / Vol. 72, No.

239 / Thursday, December 13, 2007 / Notices 70927

With the approval of the chairmen, when the cars were moved to New York available for examination during regular
members of the public may present oral State for use on the Niagara and Western business hours (9 a.m.–5 p.m.) at the
statements at the meeting. Persons New York Railroad excursion train. above facility. All documents in the
wishing to present statements or obtain The cars have been stored on FGLK in public docket are also available for
information should contact the person Geneva, New York, since October 2004. inspection and copying on the Internet
listed in the FOR FURTHER INFORMATION The current windows are sealed 3/8’’ at the docket facility’s Web site at
CONTACT section. Members of the public thick safety glass in Adlake Company http://www.regulations.gov.
may present a written statement to the Frames. There is no damage to the Anyone is able to search the
committee at any time. windows at this time. In all aspects, electronic form of any written
Issued in Washington, DC, on January 7, these two cars will be utilized in the communications and comments
2007. same manner and in the same locations received into any of our dockets by the
Editoral Note: This document was received as the four cars currently operating name of the individual submitting the
at the Office of the Federal Register December under Docket Number FRA–2001– comment (or signing the comment, if
7, 2007. 10215. submitted on behalf of an association,
Robert L. Bostiga, FGLK has requested updated business, labor union, etc.). You may
RTCA Advisory Committee (Acting). quotations for FRA-compliant review DOT’s complete Privacy Act
[FR Doc. 07–6037 Filed 12–12–07; 8:45 am] replacement window glass. These costs Statement in the Federal Register
BILLING CODE 4910–13–M reflect the application of 49 CFR Part published on April 11, 2000 (Volume
223, glass into all passenger coaches 65, Number 70; Pages 19477–19478).
currently operating under Docket
Issued in Washington, DC on December 10,
DEPARTMENT OF TRANSPORTATION Number FRA–2001–10215, and the two 2007.
additional coaches that are being
Grady C. Cothen, Jr.
Federal Railroad Administration requested in this petition. FGLK stated
Deputy Associate Administrator for Safety
that glass replacement continues to be
Petition for Waiver of Compliance Standards and Program Development.
an extremely high cost for an excursion
[FR Doc. E7–24189 Filed 12–12–07; 8:45 am]
In accordance with Part 211 of Title operation and would jeopardize any
BILLING CODE 4910–06–P
49 Code of Federal Regulations (CFR), chance of profitability for such
notice is hereby given that the Federal operation for quite some time.
Railroad Administration (FRA) received Interested parties are invited to
DEPARTMENT OF TRANSPORTATION
a request for a waiver of compliance participate in these proceedings by
with certain requirements of its safety submitting written views, data, or Federal Railroad Administration
standards. The individual petition is comments. FRA does not anticipate
described below, including the party scheduling a public hearing in Petition for Waiver of Compliance
seeking relief, the regulatory provisions connection with these proceedings since
involved, the nature of the relief being the facts do not appear to warrant a In accordance with Part 211 of Title
requested, and the petitioner’s hearing. If any interested party desires 49 Code of Federal Regulations (CFR),
arguments in favor of relief. an opportunity for oral comment, they notice is hereby given that the Federal
should notify FRA, in writing, before Railroad Administration (FRA) received
The Finger Lakes Railway Corporation the end of the comment period and a request for a waiver of compliance
(Waiver Petition Docket Number FRA– specify the basis for their request. with certain requirements of its safety
2001–10215) All communications concerning these standards. The individual petition is
The Finger Lakes Railway Corporation proceedings should identify the described below, including the party
(FGLK), seeks an extension of a waiver appropriate docket number (e.g., Waiver seeking relief, the regulatory provisions
of compliance from certain provisions of Petition Docket Number FRA–2001– involved, the nature of the relief being
Safety Glazing Standards, 49 CFR Part 10215) and may be submitted by any of requested, and the petitioner’s
223 that requires certified glazing for the following methods: arguments in favor of relief.
four passenger coaches, Car Numbers: Web site: http://www.regulations.gov. The Oregon Pacific Railroad (Waiver
FGLK 7201, FGLK 7202, FGLK 7601, Follow the online instructions for Petition Docket Number FRA–2007–
and FGLK7602. In addition, FGLK submitting comments. 28096)
petitions to add two more coaches in the Fax: 202–493–2251.
waiver: FGLK 1642, and FGLK 1643. Mail: Docket Operations Facility, U.S. The Oregon Pacific Railroad (OPR),
The FGLK petition states that the cars Department of Transportation, 1200 seeks a waiver of compliance from
are still operating in the same service New Jersey Avenue, SE., W12–140, certain provisions of Safety Glazing
environment with no changes to speed, Washington, DC 20590. Standards, 49 CFR part 223 that requires
or line segments and are following the Hand Delivery: 1200 New Jersey certified glazing for four self-propelled
conditions stipulated in the existing Avenue, SE., Room W12–140, switcher locomotives.
waiver. For the added two coaches, Washington, DC 20590, between 9 a.m. OPR operates on two disconnected
FGLK provided the following and 5 p.m., Monday through Friday, rail lines in the Portland area consisting
information in support of its petition. except Federal Holidays. of the former East Portland Traction
The cars were built in 1916, by the Communications received within 45 Company and Molalla Western Railway,
Harlen and Harrington Company for days of the date of this notice will be which were merged in 1997, to become
what used to be Norfolk & Western considered by FRA before final action is the OPR. Over the years, a waiver was
mstockstill on PROD1PC66 with NOTICES

Railroad. The cars are all of steel taken. Comments received after that granted in 1993, for several of the units.
construction. They were refurbished in date will be considered as far as An upturn in business has required
1989–1990, and used on the Maine practicable. All written communications placing several units not in compliance
Coast Railroad for excursion until 2002, concerning these proceedings are into service, as follows:

VerDate Aug<31>2005 17:10 Dec 12, 2007 Jkt 214001 PO 00000 Frm 00112 Fmt 4703 Sfmt 4703 E:\FR\FM\13DEN1.SGM 13DEN1
70928 Federal Register / Vol. 72, No. 239 / Thursday, December 13, 2007 / Notices

OPR 100 ........................... SW–1 built 1952 ............................................................... 600 h.p.


OPR 801 ........................... SW–8 built 1953 ............................................................... 800 h.p.
OPR 802 ........................... SW–8 built 1954 ............................................................... 800 h.p.
OPR 803 ........................... SW–8 built 1954 ............................................................... 800 h.p.

Interested parties are invited to Issued in Washington, DC, on December splitting and deformation of the
participate in these proceedings by 10, 2007. reservoir tank along the longitudinal
submitting written views, data, or Grady C. Cothen, Jr., seam. Catastrophic failure of the main
comments. FRA does not anticipate Deputy Associate Administrator for Safety reservoir tank can result in serious
scheduling a public hearing in Standards and Program Development. injury or worse to anyone in the vicinity
connection with these proceedings since [FR Doc. E7–24190 Filed 12–12–07; 8:45 am] of the tank at the time of failure.
the facts do not appear to warrant a BILLING CODE 4910–06–P In 2005, GETS produced a list of
hearing. If any interested party desires approximately twenty-seven hundred
an opportunity for oral comment, they (2,700) locomotives that have likely
DEPARTMENT OF TRANSPORTATION been equipped with the suspect
should notify FRA, in writing, before
the end of the comment period and reservoirs. GETS noted that additional
Federal Railroad Administration
specify the basis for their request. suspect reservoirs may have been
Safety Advisory 2007–04 mounted onto GETS locomotives
All communications concerning these through maintenance and repair. No
proceedings should identify the AGENCY: Federal Railroad other locomotive manufacturer has
appropriate docket number (e.g., Waiver Administration (FRA), DOT. produced any locomotives equipped
Petition Docket Number FRA–2007– ACTION: Notice of safety advisory; with the suspect main reservoir tanks,
28096) and may be submitted by any of potential catastrophic failure of and any attempt to do so would require
the following methods: locomotive reservoir tanks. major modifications to the mounting
Web site: http://www.regulations.gov. system. All suspect reservoir tanks can
SUMMARY: In April 2005, FRA issued
Follow the online instructions for be identified by a name plate which
Safety Advisory 2005–02 in order to
submitting comments. shows R&R attached to the skin of the
provide information to interested parties
tank.
Fax: 202–493–2251. on the potential catastrophic failure of
locomotive main reservoir tanks On September 12, 2007, GETS
Mail: Docket Operations Facility, U.S. notified FRA that its earlier instructions
manufactured by R&R Metal Fabricators,
Department of Transportation, 1200 to inspect and measure the reservoir
Incorporated, and installed on General
New Jersey Avenue, SE., W12–140, tanks and replace only those that fail to
Electric Transportation System (GETS)
Washington, DC 20590. locomotives. FRA is issuing this meet the criteria proved to be only
Hand Delivery: 1200 New Jersey document, Safety Advisory 2007–04, in partially effective in identifying the at
Avenue, SE., Room W12–140, order to provide updated information risk tanks. To minimize the possibility
Washington, DC 20590, between 9 a.m. related to this issue. of any additional reservoir tank failures,
and 5 p.m., Monday through Friday, FOR FURTHER INFORMATION CONTACT: GETS has advised all known owners
except Federal Holidays. George Scerbo, Railroad Safety and users of the affected locomotives
Specialist, Motive Power and equipped with the involved R&R Metal
Communications received within 45 Fabricators, Incorporated reservoir tanks
days of the date of this notice will be Equipment Division (RRS–14), FRA
Office of Safety Assurance and to replace them by September 30, 2008,
considered by FRA before final action is or sooner. Any owner or user of these
Compliance, 1120 Vermont Avenue,
taken. Comments received after that reservoir tanks should contact GETS for
NW., Washington, DC 20590, telephone:
date will be considered as far as replacement of the reservoir tanks at no
(202) 493–6249 or Michael Masci, Staff
practicable. All written communications Attorney, FRA Office of Chief Counsel, cost.
concerning these proceedings are 1120 Vermont Avenue, NW., Recommended Action: In recognition
available for examination during regular Washington, DC 20590, telephone: (202) of the need to assure safety, FRA
business hours (9 a.m.–5 p.m.) at the 493–6037. recommends that railroads operating
above facility. All documents in the SUPPLEMENTARY INFORMATION: In early and owning GETS locomotives inspect
public docket are also available for 2005, GETS provided FRA information the main reservoir tanks of such
inspection and copying on the Internet on the potential catastrophic failure of locomotives in service and any main
at the docket facility’s Web site at locomotive main reservoir tanks, reservoir tanks in inventory to
http://www.regulations.gov. manufactured by R&R Metal Fabricators, determine if they were manufactured by
Anyone is able to search the Incorporated, and installed on GETS R&R Metal Fabricators, Incorporated,
electronic form of any written locomotives. At that time, GETS between 1988 and 1995. If any such
communications and comments reported that 5,826 suspect main locomotive reservoir tanks are found,
reservoir tanks were manufactured the owner or operator of the locomotive
received into any of our dockets by the
between 1988 and 1995. Prior to the should contact Mr. Len Baran, GETS
name of the individual submitting the
issuance of Safety Advisory 2005–02, Product Manager, at General Electric
comment (or signing the comment, if
four main reservoir tanks had failed Transportation Systems, 2901 East Lake
submitted on behalf of an association, Road, Building 14–410, Erie,
catastrophically (ruptured) while in
business, labor union, etc.). You may
mstockstill on PROD1PC66 with NOTICES

service. Since the issuance of Safety Pennsylvania 16531, or by e-mail at


review DOT’s complete Privacy Act Len.Baran@trans.ge.com, or by
Advisory 2005–02, two additional
Statement in the Federal Register reservoir tanks have failed and several telephone at (814) 875–2769.
published on April 11, 2000 (Volume others have been removed from service FRA may modify this Safety Advisory
65, Number 70; Pages 19477–19478). for various other reasons. GETS 2007–04, issue additional safety
describes the ruptures as a rapid advisories, or take other appropriate

VerDate Aug<31>2005 17:10 Dec 12, 2007 Jkt 214001 PO 00000 Frm 00113 Fmt 4703 Sfmt 4703 E:\FR\FM\13DEN1.SGM 13DEN1

Você também pode gostar