Escolar Documentos
Profissional Documentos
Cultura Documentos
1/B-C
1/C-D
1/D-E
5/B-C
5/C-D
: 2.5 kN/m2 x 4 m
Brick Wall
Total dead load
=
3.6 kN/m2
2
= 0.25 kN/m
= 0.5 kN/m 2
= 0.5 kN/m 2
---------------4.85 kN/m 2
= 10 kN/m
: ( 4.85 x 1.875 ) + 10
= 19.09 kN/m
= 4.6875kN/m
= 1.4DL + 1.6LL
= 1.4 (19.09) + 1.6 (4.6875)
= 34.226 kN/m
327.55 x 10 3
Sx =
275
= 1191.09
mm
cm3
cm 3 , Ix =
cm 4 , Zx = cm 3 , r = 10.2 mm
New design load = 1.4 (19.09 + 0.671) + 1.6 (4.6875) = 35.17 kN/m
Maximun moment and shear (Final)
Mmax = wL2/8 = 35.17 (8.75)2/ 8 = 336.59 kNm
Fmax = wL/2 = 35.17 (8.75) / 2 = 153.87 kN
275
275
mm2
= 1.00
5wiL / 348EI =
limit =
5( 4.687)(8950)4
384 ( 205 1000 ) 24300 10 4
= 7.18mm
8750
=24.31
360
Px =
a+0.7 d
1.4 d
25 t
Pbw
( b 1+nk ) d
10.63+286.58
1.4 x 409.4
25 x 1 x 8.8
170.03
( 21.26+ 2 24.5 ) 409.4
= 114.455 kn
Fv = 153.87 < Pbw, ok bearing stiffener is required
Beam
2/B-C
2/C-D
2/D-E
=
3.6 kN/m2
= 0.25 kN/m 2
= 0.5 kN/m 2
= 0.5 kN/m 2
---------------4.85 kN/m 2
: ( 4.85 x 3.75 )
= 18.19 kN/m
= 9.375 kN/m
= 1.4DL + 1.6LL
= 1.4 (18.19) + 1.6 (9.375)
= 40.47 kN/m
387.31 x 103
Sx =
275
= 1408.4
cm3
mm
cm 3 , Ix = 27300 x 104
cm 4 , , r = 10.2 mm
New design load = 1.4 (18.19 + 0.742) + 1.6 (9.38) = 41.51 kN/m
Maximun moment and shear (Final)
Mmax = wL2/8 = 41.51 (8.75)2/ 8 = 397.26 kNm
Fmax = wL/2 = 41.51 (8.75) / 2 = 181.61 kN
275
275
= 1.00
5wiL4 / 348EI =
limit =
5 (49.375)(8950)4
384 ( 205 1000 ) 27 300 10 4
8750
=24.31
360
= 12.79mm
Beam
3/B-C
3/C-D
3/D-E
=
3.6 kN/m2
2
= 0.25 kN/m
= 0.5 kN/m 2
= 0.5 kN/m 2
---------------4.85 kN/m 2
= 4 kN/m
Partition : 1 X 4
Total dead load
: ( 4.85 x 3.75 ) + 4
= 22.19 kN/m
= 9.375 kN/m
= 1.4DL + 1.6LL
= 1.4 (22.19) + 1.6 (9.375)
= 46.066 kN/m
440.87 x 103
Sx =
275
= 1603.16
mm2
cm3
cm 3 , Ix = 31700 x 104
cm 4 , , r = 10.2 mm
New design load = 1.4 (22.19 + 0.853) + 1.6 (9.375) = 47.26 kN/m
Maximun moment and shear (Final)
Mmax = wL2/8 = 47.26 (8.75)2/ 8 = 452.3 kNm
Fmax = wL/2 = 47.26 (8.75) / 2 = 206.76 kN
275
265
= 1.02
= 5wiL4 / 348EI =
limit =
5 (9.375)(8950)
384 ( 205 1000 ) 31700 10 4
= 11.01mm
8750
=24.31
360
Px =
a+0.7 d
1.4 d
25 t
Pbw
( b 1+nk ) d
13.63+292.04
1.4 x 417.2
25 x 1.02 x 10.9
170.03
( 27.26+2 29.1 ) 417.2
= 190.039 kn
Fv = 206.76 < Pbw, ok bearing stiffener is required
Beam
3/A-B
4/B-C
4/C-D
=
3.6 kN/m2
2
= 0.25 kN/m
= 0.5 kN/m 2
= 0.5 kN/m 2
---------------4.85 kN/m 2
: ( 4.85 x 3.75 )
= 18.19 kN/m
= 9.375 kN/m
= 1.4DL + 1.6LL
= 1.4 (18.19) + 1.6 (9.375)
= 40.474 kN/m
mm
387.35 x 10 3
Sx =
275
= 1408.55
cm3
cm 3 , Ix = 27300 x 104
cm 4 , , r = 10.2 mm
New design load = 1.4 (18.19 + 0.742) + 1.6 (9.375) = 41.51 kN/m
Maximun moment and shear (Final)
Mmax = wL2/8 = 41.51 (8.75)2/ 8 = 397.26 kNm
Fmax = wL/2 = 41.51 (8.75) / 2 = 181.61 kN
275
27 5
=1
5wiL / 348EI =
5 (9.375)(8950)4
384 ( 205 1000 ) 27300 10 4
= 12.79mm
limit =
8750
=24.31
360
a+0.7 d
1.4 d
25 t
Pbw
( b 1+nk ) d
11.83 +288.96
1.4 x 412.8
25 x 1 x 9.5
195.05
( 23.6+2 22.5 ) 412.8
= 143.15 kn
Fv = 181.61 > Pbw, bearing stiffener is required
Beam
5/D-E
=
3.6 kN/m2
2
= 0.25 kN/m
= 0.5 kN/m 2
= 0.5 kN/m 2
---------------4.85 kN/m 2
= 10 kN/m
: ( 4.85 x 1.875 ) + 10
= 19.09 kN/m
: 3 x 1.875
= 5.625 kN/m
= 1.4DL + 1.6LL
= 1.4 (19.09) + 1.6 (5.625)
= 35.726 kN/m
341.91 x 103
Sx =
275
= 1243.31
mm2
cm 3
cm 3 , Ix = 24300 x 104
cm 4 , , r = 10.2 mm
New design load = 1.4 (19.09 + 0.671) + 1.6 (5.625) = 36.68 kN/m
Maximun moment and shear (Final)
Mmax = wL2/8 = 36.68 (8.75)2/ 8 = 351.04 kNm
Fmax = wL/2 = 36.68 (8.75) / 2 = 160.48 kN
275
275
=1
10
) = 371.25 kNm
5wiL4 / 348EI =
limit =
5(5.625)(8950)4
384 ( 205 1000 ) 24 300 104
= 8.62mm
8750
=24.31
360
a+0.7 d
1.4 d
25 t
Pbw
( b 1+nk ) d
10.63+286.58
=
1.4 x 409.4
25 x 1 x 8.8
195.05
( 21.26+ 2 24.2 ) 409.4
= 104.94 kn
Fv = 160.48 > Pbw, bearing stiffener is required
Beam
4/D-E
=
3.6 kN/m2
2
= 0.25 kN/m
= 0.5 kN/m 2
= 0.5 kN/m 2
---------------4.85 kN/m 2
= 4 kN/m
partition : 1 x 4
Total dead load
: ( 4.85 x 3.75 ) + 4
= 22.19 kN/m
: 3 x 3.75
= 10.31 kN/m
= 1.4DL + 1.6LL
= 1.4 (22.19) + 1.6 (10.31)
= 47.562 kN/m
455.18 1 x 10
Sx =
275
= 1655.2
mm
cm3
cm
, Ix = 31700 x 104
cm
, , r = 10.2 mm
New design load = 1.4 (22.19 + 0.853) + 1.6 (10.31) = 48.76 kN/m
Maximun moment and shear (Final)
Mmax = wL2/8 = 48.76 (8.75)2/ 8 = 466.65 kNm
Fmax = wL/2 = 48.76 (8.75) / 2 = 213.33 kN
275
26 5
=1
= 5wiL4 / 348EI =
limit =
5(11.25)( 8950)
384 ( 205 1000 ) 317 00 104
8750
=24.31
360
= 13.21mm
Beam
1/A-B
=
3.6 kN/m2
2
= 0.25 kN/m
= 0.5 kN/m 2
= 0.5 kN/m 2
= 1.0 kN/m 2
---------------4.85 kN/m 2
= 10 kN/m
: ( 5.85 x 1.875 )
= 10.97 kN/m
: 2 x 1.875
= 3.75 kN/m
= 1.4DL + 1.6LL
= 1.4 (10 + 10.97) + 1.6 (3.75)
= 35.36 kN/m
338.1 x 103
Sx =
275
= 1230.58
cm
mm2
cm 3 , Ix = 24300 x 104
cm 4 , , r = 10.2 mm
New design load = 1.4 (10 + 10.97 + 0.671) + 1.6 (3.75) = 36.63 kN/m
Maximun moment and shear (Final)
Mmax = wL2/8 = 36.3 (8.75)2/ 8 = 347.40 kNm
Fmax = wL/2 = 36.3 (8.75) / 2 = 158.81 kN
275
275
=1
10
) = 371.25 kNm
= 5wiL4 / 348EI =
limit =
5 (4.6875)(8950)4
384 ( 205 1000 ) 24300 10 4
8750
=24.31
360
= 1.53mm
a+0.7 d
1.4 d
25 t
Pbw
( b 1+nk ) d
10.63+248.5
1.4 x 355
25 x 1 x 7.4
170.03
( 21.2 6+2 24.5 ) 355
= 97.55 kn
Fv = 160.48 > Pbw, bearing stiffener is required
Beam
2/A-B
: ( 5.55 x 1.875 )
: 2.5 x 3.75
= 1.4DL + 1.6LL
=
3.6 kN/m2
= 0.25 kN/m 2
= 0.5 kN/m 2
= 0.5 kN/m 2
= 1.0 kN/m 2
---------------4.85 kN/m 2
= 10 kN/m
= 10.41 kN/m
= 8.44 kN/m
402.72 x 103
Sx =
275
= 1464.44
cm
mm2
cm 3 , Ix = 32700 x 104
cm 4 , , r = 10.2 mm
New design load = 1.4 (10 + 1.41 + 0.7) + 1.6 (8.44) = 43.17 kN/m
Maximun moment and shear (Final)
Mmax = wL2/8 = 43.17 (8.75)2/ 8 = 413.15 kNm
Fmax = wL/2 = 43.17 (8.75) / 2 = 188.887 kN
275
26 5
= 1.02
= 5wiL4 / 348EI =
limit =
5 (9.375)(8950)
384 ( 205 1000 ) 327 00 104
= 11.244mm
8750
=24.31
360
Beam
4/A-B
=
3.6 kN/m2
= 0.25 kN/m 2
= 0.5 kN/m 2
= 0.5 kN/m 2
----------------
Partition
4.85 kN/m 2
= 4 kN/m
:1x4
: ( 4.85 x 3.75 ) + 4
: 3 x 3.75
= 22.19 kN/m
= 11.25 kN/m
= 1.4DL + 1.6LL
= 1.4 (22.19) + 1.6 (11.25)
= 49.01 kN/m
469.04 x 103
Sx =
275
= 1705.6
mm2
cm3
cm 3 , Ix = 2=37100 x 104
cm 4 , , r = 10.2 mm
New design load = 1.4 (22.19 x 0.82) + 1.6 (11.25) = 50.214 kN/m
Maximun moment and shear (Final)
Mmax = wL2/8 = 50.214 (8.75)2/ 8 = 480.56 kNm
Fmax = wL/2 = 50.214(8.75) / 2 = 219.69 kN
275
275
=1
d/t =41.2 < 70, there is no need check need for shear buckling.
Shear capacity
Pv = 0.6pyAv = 0.6(275)(460)(9.9)= 724.09kN
Fv = 219.69kN < Pv shear is adequate
Moment capacity
0.6Pv = 0.6 (724.09) = 434.454 kN
Fv < Pv ; low shear
Mc= pySx = 275(1830x
10
) = 484.95 kNm
5wiL4 / 348EI =
limit =
5 (4.6875)(8950)4
384 ( 205 1000 ) 24300 10 4
8750
=24.31
360
= 1.53mm
Beam
5/A-B
=
3.6 kN/m2
2
= 0.25 kN/m
= 0.5 kN/m 2
= 0.5 kN/m 2
---------------4.85 kN/m 2
= 4 kN/m
Partition : 1 x 4
Total dead load
Live Load (LL)
Toilet
Design Load, Wudl
: ( 4.85 x 1.875 ) + 4
= 13.09 kN/m
: 3 x 1.875
= 5.625 kN/m
= 1.4DL + 1.6LL
= 1.4 (13.09) + 1.6 (5.625)
= 27.326 kN/m
261.52 x 103
Sx =
275
= 950.98
mm2
cm 3
cm 3 , Ix = 16000 x 104
cm 4 , , r = 10.2 mm
New design load = 1.4 (13.09 + 0.57) + 1.6 (5.625) = 28.124 kN/m
Maximun moment and shear (Final)
Mmax = wL2/8 = 28.124 (8.75)2/ 8 = 269.16 kNm
Fmax = wL/2 = 28.124 (8.75) / 2 = 123.04 kN
275
275
=1
= 5wiL4 / 348EI =
limit =
5(5.625)( 8950)
384 ( 205 1000 ) 160 00 10 4
= 13.09mm
8750
=24.31
360
Px =
a+0.7 d
1.4 d
9.63+250.6
1.4 x 358
25 t
Pbw
( b 1+nk ) d
25 x 1 x 8.1
140.94
( 19.26+2 23.2 ) 358
= 142.781kn
Fv = 123.04 < Pbw, bearing stiffener is not required
Beam
D/1-3
C/1-3
C/3-5
= 4 kN/m
= 1.4DL
= 1.4 (4)
= 5.6 kN/m
Design load from beam 2/C-D, 2/D-E = 41.51 kN/m
Point load acting on the beam = 41.51 x 8.75 = 363.21 kN
Maximum moment (Trial)
Mmax = wL2 / 8 + PL/4 = 5.6 (7.5)2 / 8 + 363.21(7.5) / 4 = 720.4 kNm
Plastic modulus
Assume the web thickness,T<16mm, py = 275N/
720.4 x 103
Sx =
275
= 2619.64
mm
cm3
Sx =3070
cm3 , , r = 10.2 mm
275
265
= 1.02
Px =
a+0.7 d
1.4 d
25 t
Pbw
( b 1+nk ) d
919.88+336.42
1.4 x 480.6
25 x 1 .02 x 15.3
498.54
( 39.76+ 2 41.6 ) 480.6
= 425.404kn
Fv < Pbw, bearing stiffener is not required
AT MID SPAN OF BEAM
Web bearing capacity
Fv < Pbw
b 1= t + 1.6r + 2T
Pbw = (b1 + nk)tPyw
= (15.3)+ 1.6 (10.2) + 2(26.3)
K= T + r = 15.3 + 26.3 = 41.6
=84.22
N=5
Pbw = [84.22 + (5 x 41.6)](15.3)(265 x 10-3) = 1184.81 kN
Fv < Pbw , bearing stiffener is not needed.
Web buckling check
Fv < Pbw
Px =
25 t
Pbw
( b 1+nk ) d
25 x 1.02 x 15.3
1184.81
( 84.22+5 41.6 ) 480.6
= 1233kn
Fv < Pbw, bearing stiffener is not required
Beam
E/1-3
= 10 kN/m
= 1.4DL
= 1.4 (10)
= 14 kN/m
Design load from beam 2/D-E = 41.51 kN/m
Point load acting on the beam = 41.51 x 4.375 = 181.61 kN
438.96 x 103
Sx =
275
= 1596.22
mm2
cm 3
cm3 , , r = 10.2 mm
275
265
= 1.02
Fv < Pbw
b 1= t + T + 0.8r g
* g = 10
Pbw = (b1 + nk)tPyw
= (10.9)+ (18.2) + 0.8(10.2) - 10
K= T + r = 18.2 + 10.9 = 29.1
=27.26
N = 2 + 0.6be / k = 2
Pbw = [27.2 + (2 x 29.1)](10.9)(265 x 10-3) = 246.68 kN
Fv = 209.59 < Pbw , bearing stiffener is not needed.
Web buckling check
Fv < Pbw
ae = 27.26/2 = 13.63
0.7d = 0.7 x 417.2 = 292.04 mm > ae
a+0.7 d
1.4 d
Px =
25 t
Pbw
( b 1+nk ) d
13.63+292.04
1.4 x 417.2
25 x 1.02 x 10.9
246.68
( 27.26+2 29.1 ) 417.2
= 189.91kn
Fv < Pbw, bearing stiffener is not required
AT MID SPAN OF BEAM
Web bearing capacity
Fv < Pbw
b 1= t + 1.6r + 2T
Pbw = (b1 + nk)tPyw
= (10.5)+ 1.6 (10.2) + 2(18.9)
K= T + r = 18.2 + 10.9 = 29.1
=84.22
N=5
Pbw = [63.62 + (5 x 29.1)](10.9)(265 x 10-3) = 604.04 kN
Fv < Pbw , bearing stiffener is not needed.
Web buckling check
Fv < Pbw
Px =
25 t
Pbw
( b 1+nk ) d
25 x 1.02 x 10.9
604.04
( 63.62+5 29.1 ) 417.2
= 585.13kn
Fv < Pbw, bearing stiffener is not required
Beam
B/1-3
= 10 kN/m
= 1.4DL
= 1.4 (10)
= 14 kN/m
Design load from beam 2/A-B = 43.17, 2/B-C = 41.51 kN/m
Point load acting on the beam = (41.51 x 4.375) + (43.17 x 4.375) = 370.48 kN
Maximum moment (Trial)
Mmax = wL2 / 8 + PL/4 = 14 (7.5)2 / 8 + 370.48(7.5) / 4 = 793 kNm
Plastic modulus
Assume the web thickness,T<16mm, py = 275N/
793.09 x 10 3
Sx =
275
= 2883.96
mm
cm3
cm3 , , r = 10.2 mm
275
265
= 1.02
Shear capacity
Pv = 0.6pyAv = 0.6(265)(480.6)(15.3)= 1169.2kN
Fv < Pv shear is adequate
Moment capacity
0.6Pv = 0.6 (1169.2) = 701.52 kN
Fv < Pv ; low shear
Mc= pySx = 265(3070x
a+0.7 d
1.4 d
25 t
Pbw
( b 1+nk ) d
919.88+336.42
1.4 x 480.6
25 x 1.02 x 15.3
498.54
( 39.76+ 2 41.6 ) 480.6
= 425.404kn
Fv < Pbw, bearing stiffener is not required
AT MID SPAN OF BEAM
Web bearing capacity
Fv < Pbw
b 1= t + 1.6r + 2T
Pbw = (b1 + nk)tPyw
= (15.3)+ 1.6 (10.2) + 2(26.3)
K= T + r = 15.3 + 26.3 = 41.6
=84.22
N=5
Pbw = [84.22 + (5 x 41.6)](15.3)(265 x 10-3) = 1184.81 kN
Fv < Pbw , bearing stiffener is not needed.
Web buckling check
Fv < Pbw
Px =
25 t
Pbw
( b 1+nk ) d
25 x 1.02 x 15.3
1184.81
( 84.22+5 41.6 ) 480.6
= 1233kn
Fv < Pbw, bearing stiffener is not required
Beam
A/3-5
= 10 kN/m
= 1.4DL
= 1.4 (10)
= 14 kN/m
Design load from beam 4/A-B = 50.214 kN/m
Point load acting on the beam = 50.214 x 4.375 = 219.69 kN
Maximum moment (Trial)
Mmax = wL2 / 8 + PL/4 = 14 (7.5)2 / 8 + 219.69 (7.5) / 4 = 510.36 kNm
Plastic modulus
Assume the web thickness,T<16mm, py = 275N/
3
510.36 x 10
Sx =
275
= 1855.85
mm
cm3
cm3 , r = 10.2 mm
Since T = 18.3mm
=
275
265
= 1.02
a+0.7 d
1.4 d
25 t
Pbw
( b 1+nk ) d
13.8+ 324.38
= 1.4 x 463.4
25 x 1.02 x 10.5
228.61
(27 6.36 +2 27.9 ) 463.4
= 163.41kn
Fv > Pbw, bearing stiffener is required
AT MID SPAN OF BEAM
Web bearing capacity
Fv < Pbw
Pbw = (b1 + nk)tPyw
b 1= t + 1.6r + 2T
= (10.5)+ 1.6 (10.2) + 2(17.7)
Px =
25 t
Pbw
( b 1+nk ) d
25 x 1.02 x 10.5
561.29
( 62.62+5 27.9 ) 463.4
= 49.55kn
Fv < Pbw, bearing stiffener is not required
Beam
E/3-5
= 10 kN/m
= 1.4DL
= 1.4 (10)
= 14 kN/m
Design load from beam 4/D-E = 48.76 kN/m
Point load acting on the beam = 48.76 x 4.375 = 213.33 kN
Maximum moment (Trial)
Mmax = wL2 / 8 + PL/4 = 14 (7.5)2 / 8 + 213.33 (7.5) / 4 = 498.43 kNm
Plastic modulus
Assume the web thickness,T<16mm, py = 275N/
3
498.43 x 10
Sx =
275
= 1812.47
cm 3
mm
cm3 , r = 10.2 mm
275
265
= 1.02
Px =
a+0.7 d
1.4 d
25 t
Pbw
( b 1+nk ) d
13.8+ 324.38
1.4 x 463.4
25 x 1.02 x 10.5
228.61
(276.36+ 2 27.9 ) 463.4
= 163.41kn
Fv > Pbw, bearing stiffener is required
AT MID SPAN OF BEAM
Web bearing capacity
Fv < Pbw
b 1= t + 1.6r + 2T
Pbw = (b1 + nk)tPyw
= (10.5)+ 1.6 (10.2) + 2(17.7)
K= T + r = 17.7 + 10.2 = 29.7
=62.22
N=5
Pbw = [62.22 + (5 x 27.9)](10.5)(265 x 10-3) = 561.29 kN
Fv < Pbw , bearing stiffener is not needed.
Web buckling check
Fv < Pbw
Px =
25 t
Pbw
( b 1+nk ) d
25 x 1.02 x 10.5
561.29
( 62.62+5 27.9 ) 463.4
= 49.55kn
Fv < Pbw, bearing stiffener is not required
BEAM
D/3-5
= 4 kN/m
= 1.4DL
= 1.4 (4)
= 5.6 kN/m
Design load from beam 4/D-E = 48.76, 4/C-D = 41.51 kN/m
Point load acting on the beam = (41.51 x 4.375) + (48.76 x 4.375) = 394.93 kN
Maximum moment (Trial)
779.87 x 103
Sx =
275
= 2942.96
mm2
cm3
cm3 , , r = 10.2 mm
275
265
= 1.02
10
) = 813.55 kNm
b 1= t + T + 0.8r g
* g = 10
a+0.7 d
1.4 d
Px =
25 t
Pbw
( b 1+nk ) d
919.88+336.42
=
1.4 x 480.6
25 x 1.02 x 15.3
498.54
( 39.76+ 2 41.6 ) 480.6
= 425.404kn
Fv < Pbw, bearing stiffener is not required
AT MID SPAN OF BEAM
Web bearing capacity
Fv < Pbw
b 1= t + 1.6r + 2T
Pbw = (b1 + nk)tPyw
= (15.3)+ 1.6 (10.2) + 2(26.3)
K= T + r = 15.3 + 26.3 = 41.6
=84.22
N=5
Pbw = [84.22 + (5 x 41.6)](15.3)(265 x 10-3) = 1184.81 kN
Fv < Pbw , bearing stiffener is not needed.
Web buckling check
Fv < Pbw
Px =
25 t
Pbw
( b 1+nk ) d
25 x 1.02 x 15.3
1184.81
( 84.22+5 41.6 ) 480.6
= 1233kn
Fv < Pbw, bearing stiffener is not required
BEAM
A/1-3
BRICK WALL
: 2.5 x 4
= 10 kN/m
= 1.4DL
= 1.4 (10)
= 14 kN/m
Design load from beam 2/A-B = 43.17
Point load acting on the beam = (43.17 x 4.375) = 188.87 kN
Maximum moment (Trial)
Mmax = wL2 / 8 + PL/4 = 14 (7.5)2 / 8 + 188.87(7.5) / 4 = 452.57 kNm
Plastic modulus
Assume the web thickness,T<16mm, py = 275N/
3
452.57 x 10
Sx =
275
= 1645.71
mm
cm3
cm3 , , r = 10.2 mm
275
265
= 1.02
a+0.7 d
1.4 d
25 t
Pbw
( b 1+nk ) d
13.78+356.06
=
1.4 x 465.8
25 x 1.02 x 10.5
238.63
( 27.56+2 29.1 ) 465.8
= 182.27kn
Fv < Pbw, bearing stiffener is not required
AT MID SPAN OF BEAM
Web bearing capacity
Fv < Pbw
b 1= t + 1.6r + 2T
Pbw = (b1 + nk)tPyw
= (10.5)+ 1.6 (10.2) + 2(18.9)
K= T + r = 18.9 + 10.2 = 29.1
=64.62
N=5
Pbw = [64.62 + (5 x 29.1)](10.5)(265 x 10-3) = 584.66 kN
Fv < Pbw , bearing stiffener is not needed.
Web buckling check
Fv < Pbw
Px =
25 t
Pbw
( b 1+nk ) d
25 x 1.02 x 10.5
584.66
( 64.62+5 29.1 ) 465.8
= 500.38kn
Fv < Pbw, bearing stiffener is not required
BEAM
B/3-5
= 10 kN/m
= 1.4DL
= 1.4 (10)
= 14 kN/m
Design load from beam 4/A-B = 50.214, 4/B-C = 41.51
Point load acting on the beam = (50.214 x 4.375) + (41.51 X 4.375) = 401.29 kN
Maximum moment (Trial)
Mmax = wL2 / 8 + PL/4 = 14 (7.5)2 / 8 + 401.29(7.5) / 4 = 850.86 kNm
Plastic modulus
Assume the web thickness,T<16mm, py = 275N/
850.86 x 103
Sx =
275
= 3092.95
cm
mm2
cm3
, r = 10.2 mm
275
265
= 1.02
10
) = 1001.7 kNm
a+0.7 d
1.4 d
25 t
Pbw
( b 1+nk ) d
24.08+ 344.4
1.4 x 492
25 x 1.02 x 18
632.31
( 48.16+5 42.2 ) 492
= 607.9 KN
Fv < Pbw, bearing stiffener is not required
AT MID SPAN OF BEAM
Web bearing capacity
Fv < Pbw
b 1= t + 1.6r + 2T
Pbw = (b1 + nk)tPyw
= (18)+ 1.6 (10.2) + 2(32)
K= T + r = 32 + 10.2 = 42.2
=90.32
N=5
Pbw = [90.32 + (5 x 42.2)](18)(265 x 10-3) = 1437.3 kN
Fv < Pbw , bearing stiffener is not needed.
Web buckling check
Fv < Pbw
Px =
25 t
Pbw
( b 1+nk ) d
25 x 1.02 x 18
492
( 90.32+5 42.2 ) 492
= 586.52kn
Fv < Pbw, bearing stiffener is not required