Escolar Documentos
Profissional Documentos
Cultura Documentos
Version 2.0
2012 BAKER HUGHES INCORPORATED. ALL RIGHTS RESERVED. TERMS AND CONDITIONS OF USE: BY ACCEPTING THIS DOCUMENT, THE RECIPIENT AGREES THAT THE DOCUMENT TOGETHER WITH ALL INFORMATION
INCLUDED THEREIN IS THE CONFIDENTIAL AND PROPRIETARY PROPERTY OF BAKER HUGHES INCORPORATED AND INCLUDES VALUABLE TRADE SECRETS AND/OR PROPRIETARY INFORMATION OF BAKER HUGHES
(COLLECTIVELY "INFORMATION"). BAKER HUGHES RETAINS ALL RIGHTS UNDER COPYRIGHT LAWS AND TRADE SECRET LAWS OF THE UNITED STATES OF AMERICA AND OTHER COUNTRIES. THE RECIPIENT FURTHER
AGREES THAT THE DOCUMENT MAY NOT BE DISTRIBUTED, TRANSMITTED, COPIED OR REPRODUCED IN WHOLE OR IN PART BY ANY MEANS, ELECTRONIC, MECHANICAL, OR OTHERWISE, WITHOUT THE EXPRESS PRIOR
WRITTEN CONSENT OF BAKER HUGHES, AND MAY NOT BE USED DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO BAKER HUGHES INTEREST.
Agenda
Introduction to TOGI Subsea P&A project
Scope of work
P&A operation Step by Step
Big Fishing
Scope of work
Batch P&A of 5 wells:
Pull completion
Log 9 5/8 casing
Place 1st barrier
Cut & Pull 9 5/8 Casing
Place 2nd barrier
Cut & Pull 13 3/8 casing
Surface plug
Remove wellhead, 30 and
42 casing
Contingency:
Mill seal assembly
Section mill 9 5/8 & 13 3/8
Casing mill 9 5/8
Cut & Pull 9 5/8 in one run
4
Pull Completion
Operational steps
Pull tubing with THRT
Tubing pulled down to PBR
9 5/8 X 10 section
Log 9 5/8 X 10 Casing
Place 1st Barrier Plug
Cut 10 Casing Below Hanger
Pull 10 Seal Assembly
Remove 10 X 9 5/8 Casing
Casing Mill
Mill 58 meter of 9 5/8 Casing
ROP was limited by swarf handling
Small swarf
5
5
10
Contingency
11
13 3/8 section
Log 13 3/8 Casing
Place 2nd Barrier Plug
Pull 13 3/8 Seal Assembly
Remove 13 3/8 Casing
12
18 5/8 section
Set 18 5/8 Mechanical Plug
Place Surface Cement Plug
Cut & Pull 18 5/8
Cut & Pull 30
Cut & Pull 42
13
Big Fishing
1. Remove 18 5/8 wellhead (Blue)
2. Remove 30 Conductor (Red)
3. Remove 42 Washout sleeve (Green)
14
D-spear
15
Wellhead
Cut 30
16
Pull 30 Conductor
E-spear
17
20 D-spear
Cement?
Cement above 42 hanger and inside template housing!
Cement outside of 30
18
45 Cement Mill
Cut 42
19
42 Conductor cut
Pull 42
Remove 42 Washout sleeve (green)
Catch 38,5
Modified E-Spear
42 Conductor on Deck
Stack-Up Test
20
Big Fishing
Movie
21
22