Você está na página 1de 2

Federal Register / Vol. 72, No.

210 / Wednesday, October 31, 2007 / Notices 61691

likely to significantly frustrate Advance notice of any special needs or Activity for Which Permit Is
implementation of proposed agency accommodations is appreciated. Requested: Enter Antarctic Specially
action. I have made this determination Protected Areas. The applicant plans to
Heather C. Gottry,
under the authority granted me by the enter Cape Crozier (ASPA #124),
Chairman’s Delegation of Authority Acting Advisory Committee, Management Backdoor Bay, Cape Royds (ASPA
Officer.
dated July 19, 1993. #157), and Cape Royds (ASPA #121) for
[FR Doc. E7–21441 Filed 10–30–07; 8:45 am] the purpose of videotaping scientific
The agenda for the sessions on
BILLING CODE 7537–01–P research with penguins as part of an
November 15, 2007 will be as follows:
International Polar Year (IPY) education
Committee Meetings and outreach project, ‘‘Live from the
Open to the Public NATIONAL SCIENCE FOUNDATION Poles’’. Live from the Poles will help
heighten public awareness during IPY
Policy Discussion Notice of Permit Applications Received by bringing cutting-edge science to
2–3 p.m. Under the Antarctic Conservation Act diverse, worldwide audiences of
Challenge Grants/Public Programs— of 1978 (Pub. L. 95–541) students, teachers, and the public.
Room 420 Location: Cape Crozier (ASPA #124),
AGENCY: National Science Foundation.
Education Programs—Room M–07 Backdoor Bay, Cape Royds (ASPA
Federal/State Partnership—Room ACTION: Notice of Permit Applications #157), and Cape Royds (ASPA #121).
510A Received Under the Antarctic Dates: November 24, 2007 to January
Conservation Act of 1978, Public Law 13, 2008.
Preservation and Access—Room 415 95–541.
Research Programs—Room 315. Nadene G. Kennedy,
SUMMARY: The National Science Permit Officer, Office of Polar Programs.
Closed to the Public
Foundation (NSF) is required to publish [FR Doc. E7–21362 Filed 10–30–07; 8:45 am]
Discussion of specific grant applications notice of permit applications received to BILLING CODE 7555–01–P
and programs before the Council. conduct activities regulated under the
3 p.m. until Adjourned Antarctic Conservation Act of 1978.
Challenge Grants/Public Programs— NSF has published regulations under
the Antarctic Conservation Act at Title NUCLEAR REGULATORY
Room 420 COMMISSION
Education Programs—Room M–07 45 Part 670 of the Code of Federal
Regulations. This is the required notice [Docket Nos. 50–498 and 50–499; License
Federal/State Partnership—Room
of permit applications received. Nos. NPF–76 and NPF–80]
510A
DATES: Interested parties are invited to
Preservation and Access—Room 415 In the Matter of NRG South Texas LP,
submit written data, comments, or
Research Programs—Room 315 STP Nuclear Operating Company,
views with respect to this permit
The morning session of the meeting application by November 30, 2007. This (South Texas Project, Units 1 and 2);
on November 16, 2007 will convene at application may be inspected by Order Approving Indirect Transfer of
9 a.m., in the first floor Council Room interested parties at the Permit Office, Facility Operating Licenses
M–09, and will be open to the public, address below.
as set out below. The agenda for the I
ADDRESSES: Comments should be
morning session will be as follows: NRG South Texas LP (NRG South
addressed to Permit Office, Room 755,
A. Minutes of the Previous Meeting Texas) is a co-holder of the Facility
Office of Polar Programs, National
B. Reports Operating Licenses numbered NPF–76
Science Foundation, 4201 Wilson
and NPF–80, which authorize the
1. Introductory Remarks Boulevard, Arlington, Virginia 22230.
possession, use, and operation of South
2. Staff Report FOR FURTHER INFORMATION CONTACT: Texas Project (STP), Units 1 and 2,
3. Congressional Report Nadene G. Kennedy at the above respectively. The facilities are located in
4. Reports on Policy and General address or (703) 292–7405. southwest Matagorda County, Texas,
Matters SUPPLEMENTARY INFORMATION: The which is approximately 12 miles south-
a. Challenge Grants National Science Foundation, as southwest of Bay City and 10 miles
b. Public Programs directed by the Antarctic Conservation north of Matagorda Bay. STP is jointly
c. Education Programs Act of 1978 (Pub. L. 95–541), as owned by three entities: NRG South
d. Federal/State Partnership amended by the Antarctic Science, Texas, 44 percent; City of Public Service
Tourism and Conservation Act of 1996, Board of San Antonio, 40 percent; and
e. Preservation and Access
has developed regulations for the City of Austin, Texas, 16 percent. In
f. Research Programs establishment of a permit system for addition, these entities each hold a
The remainder of the proposed various activities in Antarctica and corresponding percentage interest in
meeting will be given to the designation of certain animals and STP Nuclear Operating Company
consideration of specific applications certain geographic areas as requiring (STPNOC), which operates STP.
and will be closed to the public for the special protection. The regulations
reasons stated above. establish such a permit system to II
Further information about this designate Antarctic Specially Protected By application dated May 3, 2007, as
meeting can be obtained from Heather Areas. supplemented by electronic mail dated
Gottry, Acting Advisory Committee The applications received are as June 28, 2007, and letters dated July 23
rwilkins on PROD1PC63 with NOTICES

Management Officer, National follows: 1. Applicant: Permit and October 3, 2007, STPNOC, on
Endowment for the Humanities, 1100 Application No.: 2008–030. Christopher behalf of NRG Energy, Inc. (NRG
Pennsylvania Avenue, NW., Linder, Woods Hole Oceanographic Energy), and NRG South Texas LP,
Washington, DC 20506, or by calling Institute, 7328 24th Avenue, NE., requested that the U.S. Nuclear
(202) 606–8322, TDD (202) 606–8282. Seattle, WA 98115. Regulatory Commission (NRC,

VerDate Aug<31>2005 17:45 Oct 30, 2007 Jkt 214001 PO 00000 Frm 00086 Fmt 4703 Sfmt 4703 E:\FR\FM\31OCN1.SGM 31OCN1
61692 Federal Register / Vol. 72, No. 210 / Wednesday, October 31, 2007 / Notices

Commission), pursuant to Section 50.80 applicable provisions of law, NUCLEAR REGULATORY


of Title 10 of the Code of Federal regulations, and orders issued by the COMMISSION
Regulations (10 CFR), consent to the Commission pursuant thereto.
proposed indirect transfer of control of [Docket No. 40–9027]
The findings set forth above are
the STP licenses to the extent held by
supported by a safety evaluation dated Notice of Issuance of
NRG South Texas with respect to its
October 22, 2007. Decommissioning Amendment for
ownership interest in STP. Currently,
NRG Energy is the indirect owner of 100 Cabot Corporation
III
percent of NRG South Texas. Under a The U.S. Nuclear Regulatory
proposed corporate restructuring, a new Accordingly, pursuant to Sections Commission (NRC) has approved the
holding company, NRG Holdings, Inc., 161b, 161i, and 184 of the Atomic Cabot Corporation (Cabot)
will be created. NRG Energy will Energy Act of 1954, as amended, 42 decommissioning plan (DP) for the
become a direct wholly-owned U.S.C. 2201(b), 2201(i), and 2234; and Reading site by amendment to their
subsidiary of NRG Holdings, Inc. 10 CFR 50.80, it is hereby ordered that Source Material License, SMC–1562.
Accordingly, NRG Holdings, Inc. will the application regarding the indirect The Reading site is located in
acquire indirect control of the licenses license transfers related to the proposed Reading, PA, near the Buttonwood
for STP to the extent currently held by establishment of NRG Holdings, Inc. is Street bridge. The site operated
NRG South Texas. In addition, NRG approved, subject to the following intermittently between April 1967 and
Holdings, Inc. will become an indirect condition: May 1969 for the production of niobium
co-owner of STPNOC, with respect to by extraction from tin slag feedstock.
the interest in STPNOC currently held Should the indirect transfer of control of
NRG South Texas to NRG Holdings, Inc. not The main processing building was
by NRG South Texas. To the extent the removed from the license in August
proposed corporate restructuring would be completed within one year from the date
of this Order, this Order shall become null 1995 by license amendment.
thus result in the indirect transfer of The licensee first submitted a DP for
control of the STP licenses as held by and void, provided, however, upon written
application and good cause shown, such date the Reading site on August 28, 1998
STPNOC, prior NRC consent was also (Accession No. 9809140068). The
requested. may be extended by order.
submittal was revised in March 2000 to
Notice of the requests for approval
This Order is effective upon issuance. reflect revised dose modeling scenarios
and an opportunity for a hearing was
published in the Federal Register on For further details with respect to this and in June 2005 (ML051330369,
July 10, 2007 (72 FR 37546). No Order, see the application dated May 3, ML051330364) to incorporate a rip-rap
comments or hearing requests were 2007, and supplemental electronic mail erosion barrier. Revision 3 to the DP was
received. dated June 28, 2007, and letters dated submitted later in June 2005, to reflect
Pursuant to 10 CFR 50.80(a), no July 23 and October 3, 2007, and the changes to the rip-rap design after
license, or any right thereunder, shall be safety evaluation dated October 22, licensee consultation with the City of
transferred, directly or indirectly, Reading Redevelopment Authority
2007, which are available for public
through transfer of control of the (ML053560277).
inspection at the Commission’s Public
license, unless the Commission shall The licensee submitted revision 4 of
Document Room (PDR), located at One the Reading site DP and related
give its consent in writing. Upon review White Flint North, Public File Area 01
of the information in the application as documents to the NRC for review and
F21, 11555 Rockville Pike (first floor), approval in August 2006, (Agencywide
supplemented and other information Rockville, Maryland and accessible
before the Commission, and relying Documents Access and Management
electronically from the Agencywide System (ADAMS) accession numbers
upon the representations and
Documents Access and Management ML062360159, ML062360164, and
agreements in the application as
supplemented, the NRC staff concludes System (ADAMS) Public Electronic ML062210261) as supplemented on
that the proposed indirect transfer of Reading Room on the Internet at the September 21, 2006 (ADAMS accession
control of NRG South Texas to NRG NRC Web site, http://www.nrc.gov/ number ML062640081). This
Holdings, Inc. as described herein will reading-rm/adams.html. amendment revised the rip-rap cover
not affect the qualifications of NRG Persons who do not have access to design and include cover design
South Texas as holder of the STP ADAMS or who encounter problems in analysis. An environmental assessment
licenses to the extent now held by it, accessing the documents located in was completed on October 16, 2007
and that the indirect transfer of control ADAMS, should contact the NRC PDR (ML072390296). The NRC approved the
of the licenses, to the extent effected by Reference staff by telephone at 1–800– DP by Amendment No. 9 to the Source
the proposed transaction described in 397–4209, 301–415–4737, or by e-mail Material License SMC–1562 on October
the application, is otherwise consistent 24, 2007.
to pdr@nrc.gov.
with applicable provisions of law, A ‘‘Notice of Consideration of
regulations, and orders issued by the Dated at Rockville, Maryland this 22nd day Amendment Request for
NRC pursuant thereto. The NRC staff of October, 2007. Decommissioning the Cabot
further concludes that, to the extent the For the Nuclear Regulatory Commission. Performance Materials, Reading,
proposed indirect transfer of control of Catherine Haney, Pennsylvania, Site, and Opportunity for
NRG South Texas would result in an Director, Division of Operating Reactor a Hearing’’ was published in the Federal
indirect transfer of control of the STP Licensing, Office of Nuclear Reactor Register on October 28, 1998 (63 FR
licenses as held by STPNOC, such Regulation. 57715). Two parties requested hearings;
proposed indirect transfer of control of Jobert Trucking and the City of Reading
rwilkins on PROD1PC63 with NOTICES

[FR Doc. E7–21433 Filed 10–30–07; 8:45 am]


NRG South Texas will not affect the Redevelopment Authority. Jobert
BILLING CODE 7590–01–P
qualifications of STPNOC to hold the Trucking was denied standing by the
STP licenses, and such indirect transfer court on May 16, 2000 (ADAMS
of control of the licenses as held by ML003715331) and the Redevelopment
STPNOC is otherwise consistent with Authority request to withdraw hearing

VerDate Aug<31>2005 17:45 Oct 30, 2007 Jkt 214001 PO 00000 Frm 00087 Fmt 4703 Sfmt 4703 E:\FR\FM\31OCN1.SGM 31OCN1

Você também pode gostar