CONFIDENTIAL
ENGINEERING
TECHNICAL REPORT
CRM REFERENCE NO
PAGE
NO.
ENGINEER
OF
REV.
NO.
1
15
00
CRM REFERENCE NO
PAGE
NO.
ENGINEER
OF
REV.
NO.
2
15
00
TABLE OF CONTENTS
YEXECUTIVE SUMMARY..
..3
DESIGN CHECKLIST..4
REVIEW AND APPROVAL .5
ELECTRONIC DISTRIBUTION..5
DESIGN CONSIDERATIONS.6
PROPOSED ACTION PLAN/RECOMMENDATIONS..... 7
COST
ESTIMATE...8
DESIGN SCOPE OF WORK.........................................................................................8
SAFETY AND GENERAL NOTES................................................................................9
DRAWINGS..............................................................................................................10
ATTACHMENT.....10
CERTIFICATE OF COMPLETION..............................................................................11
CRM REFERENCE NO
PAGE
NO.
ENGINEER
OF
REV.
NO.
3
15
00
CRM REFERENCE NO
PAGE
NO.
ENGINEER
OF
REV.
NO.
4
15
00
EXECUTIVE SUMMARY
Category: Communication Building Air Conditioning Problem
Corporate Objective: To evaluate and provide engineering technical report with
recommendation and design scope of work.
Strategy: Site survey technical gathering/ evaluation / SAES standard.
Region: Eastern region
CRM REFERENCE NO
PAGE
NO.
ENGINEER
OF
REV.
NO.
5
15
00
DESIGN CHECKLIST
PROPONENTS TASKS
Provide site survey assistance
Provide required data/information
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
CRM REFERENCE NO
PAGE
NO.
ENGINEER
OF
REV.
NO.
6
15
00
Package
Submit the electronic files to EDSD
N/A
Yes ()
CRM REFERENCE NO
PAGE
NO.
ENGINEER
OF
REV.
NO.
7
15
00
Prepared By
Facilities Engineer
Reviewed by
Facilities Engineer
Approved by
ELECTRONIC DISTRIBUTION
GROUP
UDHILIYAH FACILITIES GROUP
CE&TSD/ FEG GROUP
ENGINEER
INITIA
L
_______
SEND
DATE
____________
FILE COPY
_______
ELECTRONIC _______
COPY
____________
____________
CRM REFERENCE NO
PAGE
NO.
ENGINEER
OF
FILE COPY
REV.
NO.
8
15
00
ELECTRONIC _______
COPY
REVIEWER
____________
DESIGN CONSIDERATIONS
Observations (Uthmaniya DCO):
Site survey was conducted on December 16, 2014 to gather technical
information about the existing air conditioning system at Uthmaniya Digital
Communications Office (DCO) building. The DCO building consists of communication
equipment room, generator room and battery room.
The main cooling for the communication equipment room and the battery room
comes from the duty and standby air conditioning units (AHU1 and AHU2). Both of
AHU1 and AHU2 are located inside the communication equipment room.
In addition to AHU1 and AHU2, there exist two air conditioning units inside the
communication equipment room. These two units are old and obsolete and no longer
in used.
Observations (AlHasa Clinic DCO):
Site survey was conducted on December 22, 2014 to gather technical
information about the existing air conditioning system at AlHasa Clinic Digital
Communications Office (DCO) building. The DCO building consists of communication
equipment room, generator room and battery room.
Findings (Uthmaniya DCO):
Based on the observation during the site survey and analysis performed, the
following are the findings:
1. Indoor temperature measurements were taken during the site survey for the
Communication equipment room and the battery room. The results are as
follows:
a. Communication equipment room: ranging between 72.5 86 degrees F.
CRM REFERENCE NO
PAGE
NO.
ENGINEER
OF
REV.
NO.
9
15
00
CRM REFERENCE NO
PAGE
NO.
ENGINEER
OF
REV.
NO.
10
15
00
4. Ensure the new A/C units humidifier piping outlet will be connected to the
potable (sweet) water supply piping and not to the raw water piping.
5. Remove the two old air conditioning units that are no longer in used to make
space for the new units.
6. Perform testing, balancing, and commissioning of the new air conditioning
system.
PROPOSED ACTION PLAN/RECOMMENDATIONS (AlHasa Clinic DCO):
1. Since the existing main air conditioning units (AHU 1 and AHU2) are
undersized
CRM REFERENCE NO
PAGE
NO.
ENGINEER
OF
REV.
NO.
11
15
00
2. Provide design drawings for the installation of the duty and standby precision
type air conditioning units with matching air condenser, re heater, humidifier,
auto change over, and standard associated accessories.
3. Provide design drawings for the installation of the duty and standby centralized
air conditioning units with matching air condenser, electric duct heater,
humidifier, and standard associated accessories.
4. Provide design drawings for the ductwork modifications.
5. Provide design drawings for the installation of DDC panel and its connection
with the centralized air conditioning units and the exhaust fans in the battery
room.
6. Provide design drawings for the connection of the new air conditioning units to
the fire alarm control panel and facility alarm panel/RTU for remote
monitoring.
7. Provide design drawings for the installation of the standby exhaust fan in the
battery room.
8. Provide design drawings for the installation of refrigerant piping, humidifier
potable (sweet) water supply piping, condensate drain piping, piping insulation,
supports and vibration isolators.
9. Provide design drawings for the electrical and civil/structural.
10. Provide construction scope of work, material take off, calculations, and cost
estimates.
CRM REFERENCE NO
PAGE
NO.
ENGINEER
OF
REV.
NO.
12
15
00
be worn. This is to ensure the compliance to the Saudi Aramco GI# 2.721 to
mitigate/control Arc Flash Hazards and provide minimum safe work
requirements for protection of personnel against these hazards in the
workplace.
Refer to this link for more details: (http://sharek.aramco.com.sa/cops/GI/Operation
%20Services/Industrial%20Services/Power%20Distribution/0002_721.pdf)
3 All personnel shall strictly follow all SAUDI ARAMCO safety regulations and
standard construction safety practices.
4 All matters relating to safety should be in consultation with the SAUDI
ARAMCO Loss Prevention Unit and the SAUDI ARAMCO Representative.
5 All personnel shall be supplied with approved safety equipment, including but
not limited to, safety helmets, safety glasses, gloves, welding shields and safety
footwear. Safety equipment shall be used where appropriate at all times. SAUDI
ARAMCO Loss Prevention requirements shall be used to determine appropriate
safety equipment areas for its use.
6 The Contractor/Supplier shall exercise extra precautions in the field to avoid
damaging any existing structures, utilities, etc., during the construction works.
DRAWINGS
Not Applicable
CRM REFERENCE NO
PAGE
NO.
ENGINEER
OF
REV.
NO.
13
15
00
ATTACHMENTS
Not Applicable
CERTIFICATE OF COMPLETION
Not Applicable
Notice of Completion
After the completion of the required work in this CRM, please fax a signed copy of this form
to C&FED/FEG at Fax No. 875-8166
CRM REFERENCE NO
PAGE
NO.
ENGINEER
OF
REV.
NO.
14
15
00
This is to inform you that the required work in this CRM has been completed by
CE&TSD/C&FED/Facilities Engineering Group
NAME
COMPLETION
DATE
____________
SIGNATURE
___________________________________
__________________
COMMENTS: Please note any as-built changes/corrections and forward these changes along with this document.
This is to inform you that the required work in this engineering package design has been
completed by
CE&TSD/C&FED/Facilities Engineering group
COMPLETION
NAME
SIGNATURE
DATE
___________________________________
__________________
____________
COMMENTS: Please note any as-built changes/corrections and forward these changes along with this document.
This is to inform you that the required work completion in this CRM package has been
verified by
Area IT / Udhiliyah Facilities Group
NAME
COMPLETION
DATE
____________
SIGNATURE
___________________________________
__________________
COMMENTS: Please note any as-built changes/corrections and forward these changes along with this document.
This is to verify that all as-built changes/corrections have been incorporated into the
appropriate documents and the current document revision number for this Engineering
Service Request is ____.
ENGINEER
SIGNATURE
___________________________________
__________________
COMPLETION
DATE
____________
CRM REFERENCE NO
PAGE
NO.
ENGINEER
OF
REV.
NO.
15
15
00