Você está na página 1de 2

37266 Federal Register / Vol. 72, No.

130 / Monday, July 9, 2007 / Notices

Negative Determinations for Worker TA–W–61,682; NC Furniture House, NUCLEAR REGULATORY


Adjustment Assistance and Alternative Inc., Jamestown, NC COMMISSION
Trade Adjustment Assistance
The investigation revealed that
In the following cases, the criteria of section 222(b)(2) has not been [Docket No. 50–458]
investigation revealed that the eligibility met. The workers’ firm (or subdivision)
criteria for worker adjustment assistance Entergy Gulf States, Inc., River Bend
is not a supplier to or a downstream
have not been met for the reasons Station, Unit 1; Notice of Consideration
producer for a firm whose workers were of Approval of Transfer of Facility
specified. certified eligible to apply for TAA.
Because the workers of the firm are Operating License and Conforming
not eligible to apply for TAA, the None Amendment and Opportunity for a
workers cannot be certified eligible for Hearing
I hereby certify that the
ATAA.
aforementioned determinations were The U.S. Nuclear Regulatory
The investigation revealed that
criteria (a)(2)(A)(I.A.) and (a)(2)(B)(II.A.) issued during the period of June 18 Commission (NRC or the Commission)
(employment decline) have not been through June 22, 2007. Copies of these is considering the issuance of an order
met. determinations are available for under 10 CFR 50.80 approving the
inspection in Room C–5311, U.S. direct transfer of the Facility Operating
TA–W–61,424; Hewlett Packard, Design License (No. NPF–47) for the River Bend
Delivery Organization Operations, Department of Labor, 200 Constitution
Avenue, NW., Washington, DC 20210 Station, Unit 1 (RBS), to the extent
Image PermananceLab, Planning currently held by Entergy Gulf States,
Div., Corvallis, OR during normal business hours or will be
mailed to persons who write to the Inc. (EGS), as owner of RBS. The
TA–W–61,424A; Hewlett Packard, transfer would be to Entergy Gulf States
Technology Delivery Operations, above address.
Louisiana, L.L.C. (EGS–LA), a Louisiana
Process Development Operations Dated: June 29, 2007. limited liability company. Entergy
Division, Corvallis, OR Ralph DiBattista, Operations, Inc. (EOI), the licensed
The investigation revealed that Director, Division of Trade Adjustment operator of the facility, will remain as
criteria (a)(2)(A)(I.B.) (Sales or Assistance. such and will continue to operate RBS.
production, or both, did not decline) [FR Doc. E7–13173 Filed 7–6–07; 8:45 am] The Commission is also considering
and (a)(2)(B)(II.B.) (shift in production amending the license for administrative
BILLING CODE 4510–FN–P
to a foreign country) have not been met. purposes to reflect the proposed
TA–W–61,467; Federal Mogul Corp., transfer.
Sealing System Division, Tool DEPARTMENT OF LABOR According to an application for
Room, Frankfort, IN approval filed by EGS and EOI, both
TA–W–61,515; Invitrogen Corporation, Employment and Training EGS and EOI are direct subsidiaries of
BioDiscovery Division, San Administration Entergy Corporation. Under a proposed
Francisco, CA restructuring, EGS will merge into EGS-
The investigation revealed that [TA–W–61,524] LA, with EGS-LA being the surviving
criteria (a)(2)(A)(I.C.) (increased entity. EGS–LA, will own all of EGS’
imports) and (a)(2)(B)(II.B.) (shift in World Kitchen, LLC; Charleroi, PA; Louisiana assets, including RBS, except
production to a foreign country) have Notice of Termination of Investigation for EGS’ undivided ownership interests
not been met. in Big Cajun, Unit 2 and the Nelson 6
TA–W–61,458; S & S Plastics, Inc., Pursuant to section 221 of the Trade coal plants, which will be jointly owned
Hillside, NJ Act of 1974, as amended, an with Entergy Texas, Inc. (ETI), a
TA–W–61,530; Track Corp, Spring Lake, investigation was initiated on May 16, company to be formed by EGS.
MI 2007 in response to a petition filed by Once these and other steps of the
TA–W–61,545; Bell Sponging Co., Inc., a company official on behalf of workers restructuring are competed, EGS–LA
Allentown, PA at World Kitchen, LLC, Charleroi, will serve EGS’ current retail customers
The workers’ firm does not produce Pennsylvania. The workers at the in Louisiana and EGS’ current
an article as required for certification subject facility produce Pyrex glass wholesale customers, and ETI will serve
under section 222 of the Trade Act of prep-ware, bake-ware and storage EGS’ current retail customers in Texas.
1974. containers. EGS–LA’s retail utility operations will
TA–W–61,287; Kelly Services, On-Site at be subject to the jurisdiction of the
The petitioner has requested that the Louisiana Public Service Commission
Delphi (Through HSS Material), petition be withdrawn. Consequently,
Saginaw, MI (LPSC) to the same extent that LPSC
the investigation has been terminated. currently possesses jurisdiction over
TA–W–61,506; Celestica, Carrollton, TX
TA–W–61,598; Penn-Plax Inc., Signed in Washington, DC, this 29th day of EGS’ retail utility operations. EGS–LA
Hauppauge, NY June 2007. will succeed to and assume all of EGS’
TA–W–61,615; American Food and Richard Church, jurisdictional tariffs, rate schedules, and
Vending, Springhill, TN service agreements, and provide electric
Certifying Officer, Division of Trade
TA–W–61,630; Qwest Services Adjustment Assistance.
service to EGS’ customers without
Corporation, A Subsidiary of Qwest interruption.
[FR Doc. E7–13175 Filed 7–6–07; 8:45 am]
Communications, Quality EOI operates RBS pursuant to an
BILLING CODE 4510–FN–P
Assurance Team, Idaho Falls, ID Operating Agreement with EGS. EOI
rwilkins on PROD1PC63 with NOTICES

TA–W–61,633; World Wide Apparel will continue to operate RBS and the
Resources, Carteret, NJ current Operating Agreement will be
TA–W–61,641; Coresource, A Subsidiary amended to reflect the new owner of the
of Trustmark Insurance, Jackson, plant. EOI will not be affected by the
MN restructuring.

VerDate Aug<31>2005 16:59 Jul 06, 2007 Jkt 211001 PO 00000 Frm 00085 Fmt 4703 Sfmt 4703 E:\FR\FM\09JYN1.SGM 09JYN1
Federal Register / Vol. 72, No. 130 / Monday, July 9, 2007 / Notices 37267

No physical changes to the RBS Powers, and General Hearing Electronic Reading Room on the Internet
facility or operational changes are being Management for NRC Adjudicatory at the NRC Web site, http://
proposed in the application. Hearings,’’ of 10 CFR Part 2. In www.nrc.gov/reading-rm/adams.html.
The proposed amendment would particular, such requests and petitions Persons who do not have access to
replace references to Entergy Gulf must comply with the requirements set ADAMS or who encounter problems in
States, Inc., in the license with forth in 10 CFR 2.309. Untimely accessing the documents located in
references to Entergy Gulf States requests and petitions may be denied, as ADAMS should contact the NRC PDR
Louisiana, L.L.C., to reflect the proposed provided in 10 CFR 2.309(c)(1), unless Reference staff by telephone at 1–800–
transfer. good cause for failure to file on time is 397–4209, or 301–415–4737 or by e-mail
Pursuant to 10 CFR 50.80, no license, established. In addition, an untimely to pdr@nrc.gov.
or any right thereunder, shall be request or petition should address the Dated at Rockville, Maryland this 2nd day
transferred, directly or indirectly, factors that the Commission will also of July, 2007.
through transfer of control of the consider, in reviewing untimely For the Nuclear Regulatory Commission.
license, unless the Commission shall requests or petitions, set forth in 10 CFR
give its consent in writing. The Bhalchandra Vaidya,
2.309(c)(1)(i)–(viii).
Commission will approve an Requests for a hearing and petitions Project Manager, Plant Licensing Branch IV,
application for the direct transfer of a for leave to intervene should be served Division of Operating Reactor Licensing,
license, if the Commission determines Office of Nuclear Reactor Regulation.
upon Terence A. Burke, Associate
that the proposed transferee is qualified General Counsel—Nuclear, Entergy [FR Doc. E7–13259 Filed 7–6–07; 8:45 am]
to hold the license, and that the transfer Services, Inc., 1340 Echelon Parkway, BILLING CODE 7590–01–P
is otherwise consistent with applicable Jackson MS 39213; the General Counsel,
provisions of law, regulations, and U.S. Nuclear Regulatory Commission,
orders issued by the Commission Washington, DC 20555–0001 (e-mail NUCLEAR REGULATORY
pursuant thereto. address for filings regarding license COMMISSION
Before issuance of the proposed transfer cases only: OGCLT@NRC.gov);
conforming license amendment, the Sunshine Act Meeting
and the Secretary of the Commission,
Commission will have made findings U.S. Nuclear Regulatory Commission, DATES: Weeks of July 9, 16, 23, 30,
required by the Atomic Energy Act of Washington, DC 20555–0001, Attention: August 6, 13, 2007.
1954, as amended (the Act), and the Rulemakings and Adjudications Staff, in
Commission’s regulations. accordance with 10 CFR 2.302 and PLACE: Commissioners’ Conference
As provided in 10 CFR 2.1315, unless 2.305. Room, 11555 Rockville Pike, Rockville,
otherwise determined by the The Commission will issue a notice or Maryland.
Commission with regard to a specific order granting or denying a hearing STATUS: Public and closed.
application, the Commission has request or intervention petition,
MATTERS TO BE CONSIDERED:
determined that any amendment to the designating the issues for any hearing
license of a utilization facility which that will be held and designating the Week of July 9, 2007
does no more than conform the license Presiding Officer. A notice granting a
to reflect the transfer action involves no There are no meetings scheduled for
hearing will be published in the Federal
significant hazards consideration. No the Week of July 9, 2007.
Register and served on the parties to the
contrary determination has been made hearing. Week of July 16, 2007—Tentative
with respect to this specific license As an alternative to requests for
amendment application. In light of the hearing and petitions to intervene, Wednesday, July 18, 2007
generic determination reflected in 10 within 30 days from the date of 10 a.m.
CFR 2.1315, no public comments with publication of this notice, persons may Discussion of Security Issues
respect to significant hazards submit written comments regarding the (Closed—Ex. 1 & 3).
considerations are being solicited, license transfer application, as provided 1 p.m.
notwithstanding the general comment for in 10 CFR 2.1305. The Commission
Briefing on Digital Instrumentation
procedures contained in 10 CFR 50.91. will consider and, if appropriate,
The filing of requests for hearing and and Control (Public Meeting)
respond to these comments, but such
petitions for leave to intervene, and (Contact: William Kemper, 301
comments will not otherwise constitute
written comments with regard to the part of the decisional record. Comments 415–7585).
license transfer application, are should be submitted to the Secretary, This meeting will be webcast live at
discussed below. U.S. Nuclear Regulatory Commission, the Web address—www.nrc.gov.
Within 20 days from the date of Washington, DC 20555–0001, Attention: Week of July 23, 2007—Tentative
publication of this notice, any person Rulemakings and Adjudications Staff,
whose interest may be affected by the and should cite the publication date and Tuesday, July 24, 2007
Commission’s action on the application page number of this Federal Register 2 p.m.
may request a hearing and, if not the notice.
applicant, may petition for leave to For further details with respect to this Briefing on Palo Verde Nuclear
intervene in a hearing proceeding on the action, see the application dated May Generating Station (Public Meeting)
Commission’s action. Requests for a 29, 2007, available for public inspection (Contact: Michael Markley, 301
hearing and petitions for leave to at the Commission’s Public Document 415–5723).
intervene should be filed in accordance Room (PDR), located at One White Flint This meeting will be webcast live at
with the Commission’s rules of practice North, Public File Area O1 F21, 11555 the Web address— www.nrc.gov.
rwilkins on PROD1PC63 with NOTICES

set forth in Subpart C ‘‘Rules of General Rockville Pike (first floor), Rockville, Wednesday, July 25, 2007
Applicability: Hearing Requests, Maryland. Publicly available records
Petitions to Intervene, Availability of will be accessible electronically from 2 p.m.
Documents, Selection of Specific the Agencywide Documents Access and Discussion of Management Issues
Hearing Procedures, Presiding Officer Management System’s (ADAMS) Public (Closed—Ex. 2).

VerDate Aug<31>2005 16:59 Jul 06, 2007 Jkt 211001 PO 00000 Frm 00086 Fmt 4703 Sfmt 4703 E:\FR\FM\09JYN1.SGM 09JYN1

Você também pode gostar