Federal Register / Vol. 72, No.

124 / Thursday, June 28, 2007 / Notices 35459

information, contact Patrick Murphy at files comments or documents with the application allows an interested person
(202) 502–8755. Commission relating to the merits of an to file the competing application no
issue that may affect the responsibilities later than 120 days after the specified
Kimberly D. Bose,
of a particular resource agency, they comment date for the particular
Secretary. must also serve a copy of the document application. A competing license
[FR Doc. E7–12479 Filed 6–27–07; 8:45 am] on that resource agency. application must conform with 18 CFR
BILLING CODE 6717–01–P j. Description of Existing Facilities 4.30(b) and 4.36.
and Proposed Project: The proposed o. Notice of Intent: A notice of intent
project, utilizing the existing U.S. Army must specify the exact name, business
DEPARTMENT OF ENERGY Corps of Engineers’ Fall Creek Dam and address, and telephone number of the
reservoir would consist of: (1) A prospective applicant, and must include
Federal Energy Regulatory proposed intake structure, (2) a an unequivocal statement of intent to
Commission proposed 650-foot-long, 144-inch- submit, if such an application may be
[Project No. 12778–001] diameter steel penstock, (3) a proposed filed, either a preliminary permit
powerhouse containing three generator application or a development
Fall Creek Hydro, LLC; Notice of units with an installed capacity of 10.0 application (specify which type of
Application Accepted for Filing and megawatts, (4) a 1.0-mile-long, 15 kV application). A notice of intent must be
Soliciting Comments, Protests, and transmission line, and (5) appurtenant served on the applicant(s) named in this
Motions To Intervene facilities. The project would have an public notice.
annual generation of 18.7 GWh. p. Proposed Scope of Studies under
June 21, 2007. k. Location of Applications: A copy of Permit: A preliminary permit, if issued,
Take notice that the following the application is available for does not authorize construction. The
hydroelectric application has been filed inspection and reproduction at the term of the proposed preliminary permit
with the Commission and is available Commission in the Public Reference would be 36 months. The work
for public inspection: Room or may be viewed on the proposed under the preliminary permit
a. Type of Application: Preliminary Commission’s Web site at http:// would include economic analysis,
Permit. www.ferc.gov using the ‘‘eLibrary’’ link. preparation of preliminary engineering
b. Project No.: 12778–001. Enter the docket number excluding the plans, and a study of environmental
c. Date filed: March 12, 2007. last three digits in the docket number impacts. Based on the results of these
d. Applicant: Fall Creek Hydro, LLC. field to access the document. For studies, the Applicant would decide
e. Name and Location of Project: The assistance, call toll-free 1–866–208– whether to proceed with the preparation
proposed Fall Creek Hydroelectric 3676 or e-mail of a development application to
Project would be located on Fall Creek FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
in Lane County, Oregon. The existing call (202) 502–8659. A copy is also q. Comments, Protests, or Motions to
Fall Creek Dam is administered by the available for inspection and Intervene: Anyone may submit
U.S. Army Corps of Engineers. reproduction at the address in item g comments, a protest, or a motion to
f. Filed Pursuant to: Federal Power above. intervene in accordance with the
Act, 16 U.S.C. 791(a)–825(r). l. Individuals desiring to be included requirements of Rules of Practice and
g. Applicant contact: Mr. Brent Smith, on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214.
Northwest Power Services, Inc., 975 so indicate by writing to the Secretary In determining the appropriate action to
South State Highway, Logan, UT 84321, of the Commission. take, the Commission will consider all
(208) 745–0834. m. Competing Preliminary Permit: protests or other comments filed, but
h. FERC Contact: Tom Papsidero, Anyone desiring to file a competing only those who file a motion to
(202) 502–6002. application for preliminary permit for a intervene in accordance with the
i. Deadline for filing comments, proposed project must submit the Commission’s Rules may become a
protests, and motions to intervene: 60 competing application itself, or a notice party to the proceeding. Any comments,
days from the issuance date of this of intent to file such an application, to protests, or motions to intervene must
notice. the Commission on or before the be received on or before the specified
All documents (original and eight specified comment date for the comment date for the particular
copies) should be filed with Kimberly D. particular application (see 18 CFR 4.36). application.
Bose, Secretary, Federal Energy Submission of a timely notice of intent Comments, protests and interventions
Regulatory Commission, 888 First allows an interested person to file the may be filed electronically via the
Street, NE., Washington, DC 20426. competing preliminary permit Internet in lieu of paper; See 18 CFR
Comments, protests and interventions application no later than 30 days after 385.2001(a)(1)(iii) and the instructions
may be filed electronically via the the specified comment date for the on the Commission’s web site under ‘‘e-
Internet in lieu of paper; see 18 CFR particular application. A competing filing’’ link. The Commission strongly
385.2001(a)(1)(iii) and the instructions preliminary permit application must encourages electronic filing.
on the Commission’s Web site under the conform with 18 CFR 4.30(b) and 4.36. r. Filing and Service of Responsive
‘‘e-Filing’’ link. The Commission n. Competing Development Documents: Any filings must bear in all
strongly encourages electronic filings. Application: Any qualified development capital letters the title ‘‘COMMENTS’’,
Please include the project number (P– applicant desiring to file a competing ‘‘NOTICE OF INTENT TO FILE
12778–001) on any comments or development application must submit to COMPETING APPLICATION’’,
motions filed. the Commission, on or before a ‘‘COMPETING APPLICATION’’,
mstockstill on PROD1PC66 with NOTICES

The Commission’s Rules of Practice specified comment date for the ‘‘PROTEST’’, or ‘‘MOTION TO
and Procedure require all intervenors particular application, either a INTERVENE’’, as applicable, and the
filing documents with the Commission competing development application or a Project Number of the particular
to serve a copy of that document on notice of intent to file such an application to which the filing refers.
each person in the official service list application. Submission of a timely Any of the above-named documents
for the project. Further, if an intervenor notice of intent to file a development must be filed by providing the original

VerDate Aug<31>2005 18:23 Jun 27, 2007 Jkt 211001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\28JNN1.SGM 28JNN1
35460 Federal Register / Vol. 72, No. 124 / Thursday, June 28, 2007 / Notices

and the number of copies provided by Henry Ecton, (202) 502–8768, or E-mail m. Individuals desiring to be included
the Commission’s regulations to: The address: henry.ecton@ferc.gov. on the Commission’s mailing list should
Secretary, Federal Energy Regulatory j. Deadline for filing comments, so indicate by writing to the Secretary
Commission, 888 First Street, NE., protests, and/or motions: July 23, 2007. of the Commission.
Washington, DC 20426. An additional All documents (original and eight n. Comments, Protests, or Motions to
copy must be sent to Director, Division copies) should be filed with: Secretary, Intervene: Anyone may submit
of Hydropower Administration and Federal Energy Regulatory Commission, comments, a protest, or a motion to
Compliance, Federal Energy Regulatory 888 First Street, NE., Washington, DC intervene in accordance with the
Commission, at the above-mentioned 20426. Comments, protests, and/or requirements of Rules of Practice and
address. A copy of any notice of intent, interventions may be filed electronically Procedure, 18 CFR 385.210, .211, .214.
competing application or motion to via the Internet in lieu of paper. Any In determining the appropriate action to
intervene must also be served upon each questions, please contact the Secretary’s take, the Commission will consider all
representative of the Applicant Office. See, 18 CFR 385.2001(a)(1)(iii) protests or other comments filed, but
specified in the particular application. and the instructions on the only those who file a motion to
s. Agency Comments: Federal, State, Commission’s Web site at http:// intervene in accordance with the
and local agencies are invited to file www.ferc.gov under the ‘‘e-Filing link. Commission’s Rules may become a
comments on the described application. Please include the docket number party to the proceeding. Any comments,
A copy of the application may be (DI07–10–000) on any comments, protests, or motions to intervene must
obtained by agencies directly from the protests, and/or motions filed. be received on or before the specified
Applicant. If an agency does not file k. Description of Project: The comment date for the particular
comments within the time specified for proposed run-of-river Baxter Ranch application.
filing comments, it will be presumed to Hydropower Project will include: (1) A
have no comments. One copy of an o. Filing and Service of Responsive
67-foot-long conduit from Birch Creek to Documents: Any filings must bear in all
agency’s comments must also be sent to the powerhouse, including a 25-foot-
the Applicant’s representatives. capital letters the title ‘‘COMMENTS’’,
long sand trap; (2) A 16-foot-square ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO
Kimberly D. Bose, powerhouse containing an impulse INTERVENE’’, as applicable, and the
Secretary.
turbine and a 30-kW generator; (3) a 65- Docket Number of the particular
foot-long tailrace to Birch Creek; and (4) application to which the filing refers. A
[FR Doc. E7–12481 Filed 6–27–07; 8:45 am]
appurtenant facilities. The proposed copy of any motion to intervene must
BILLING CODE 6717–01–P
project will provide power to ranch also be served upon each representative
facilities, including a honey house and of the Applicant specified in the
irrigation facilities. The project will not particular application.
DEPARTMENT OF ENERGY
be connected to an interstate grid, and
will not occupy any tribal or federal p. Agency Comments: Federal, State,
Federal Energy Regulatory and local agencies are invited to file
Commission lands
When a Declaration of Intention is comments on the described application.
[Docket No. DI07–10–000] filed with the Federal Energy Regulatory A copy of the application may be
Commission, the Federal Power Act obtained by agencies directly from the
David and John Baxter; Notice of Applicant. If an agency does not file
requires the Commission to investigate
Declaration of Intention and Soliciting comments within the time specified for
and determine if the interests of
Comments, Protests, and/or Motions to filing comments, it will be presumed to
interstate or foreign commerce would be
Intervene have no comments. One copy of an
affected by the project. The Commission
also determines whether or not the agency’s comments must also be sent to
June 21, 2007.
project: (1) Would be located on a the Applicant’s representatives.
Take notice that the following
application has been filed with the navigable waterway; (2) would occupy Kimberly D. Bose,
Commission and is available for public or affect public lands or reservations of Secretary.
inspection: the United States; (3) would utilize [FR Doc. E7–12482 Filed 6–27–07; 8:45 am]
a. Application Type: Declaration of surplus water or water power from a BILLING CODE 6717–01–P
Intention. government dam; or (4) if applicable,
b. Docket No.: DI07–10–000. has involved or would involve any
c. Date Filed: June 4, 2007. construction subsequent to 1935 that DEPARTMENT OF ENERGY
d. Applicant: David and John Baxter. may have increased or would increase
e. Name of Project: Baxter Ranch the project’s head or generating Federal Energy Regulatory
Hydropower Project. capacity, or have otherwise significantly Commission
f. Location: The proposed Baxter modified the project’s pre-1935 design
Ranch Hydropower Project will be or operation. [Project No. 9074–051]
located on Birch Creek, near Big Pine, l. Locations of the Application: Copies
in Inyo County, California, affecting T. of this filing are on file with the Warrensburg Hydro Power Limited
10 S., R. 34 E, sec. 19, Mt. Diablo Commission and are available for public Partnership; Notice of Application for
Meridian. inspection. This filing may be viewed Amendment of License and Soliciting
g. Filed Pursuant to: Section 23(b)(1) on the web at http://www.ferc.gov using Comments, Motions To Intervene, and
of the Federal Power Act, 16 U.S.C. the ‘‘eLibrary’’ link, select ‘‘Docket#’’ Protests
mstockstill on PROD1PC66 with NOTICES

817(b). and follow the instructions. For


h. Applicant Contact: Rachel Weksler, assistance, please contact FERC Online June 21, 2007.
363 Academy Avenue, Bishop, CA Support at Take notice that the following
93514; telephone: (760) 873–4211. FERCOnlineSupport@ferc.gov or toll- hydroelectric application has been filed
i. FERC Contact: Any questions on free at (866) 208–3676, or TTY, contact with the Commission and is available
this notice should be addressed to (202) 502–8659. for public inspection:

VerDate Aug<31>2005 18:23 Jun 27, 2007 Jkt 211001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\28JNN1.SGM 28JNN1

Você também pode gostar