Escolar Documentos
Profissional Documentos
Cultura Documentos
THE ELECTRICITY
COMPANY OF GHANA
OUTLINE OF
PRESENTATION
22/08/2012
Introduction
Map of Operational Area
Company Mandate, Vision & Mission
Organizational Structure
1.0 INTRODUCTION
22/08/2012
Company Mandate ..
To distribute and supply electric
power to the southern part of Ghana
22/08/2012
Mission Statement ..
Organizational Structure
Organizational Chart
22/08/2012
2.0 CORPORATE
VITAL STATISTICS
22/08/2012
10
UNITS
2008
2009
2010
2011
PERFORMANCE INDICATOR
ACTUAL
Energy Purchases
GWh
5,799.4
6,052.2
6,771.29
7,259
Energy Sales
GWh
4,315.8
4,481.5
4,972.36
5,285
GHm
642.1
661.0
1,006.36
1,273
GHm
598.3
616.1
974.59
1,174
GH/kWh
0.13
0.14
0.1960
0.23
GH/kWh
0.06
0.06
0.0976
0.09
System Losses
23.7
26.0
24.36
25.01
Staff Strength
No.
5,280
5,390
5,493
5,799
No. of Customers
No.
1,722,245
1,963,958
2,120,564
2,336,286
Revenue Collection
GHm
573.1
668.7
897.77
1,252
GHm
36.4
32.1
38.57
37.22
GHm
25.1
(20.7)
1.149
17.57
2.4
(0.99)
0.05
0.61
Administrative Cost
GHm
12.0
39.8
38.8
38
Staff Cost
GHm
57.3
64.2
77.1
140
Labour Productivity
GWh/Staff
0.82
0.83
0.91
0.9
1.88
6.01
3.85
2.95
3.52
10.90
7.7
12
-0.13
3.84
11.9
7.2
89.3
101.2
89.2
OTHER
INDICATORS
98.37 11
PERFORMANCE INDICATOR
UNITS
2008
2009
2010
ACTUAL
Peak Demand
MW
927.5
1,036.0
Average Outage Duration (Urban Hrs/ Customer/
26.58
51.22
Communities)
Year
Average Outage Duration (Rural Hrs/ Customer/
58.24
78.19
Communities)
Year
OPERATIONAL
Average Outage Duration
Hrs/ Customer/
INDICATORS
(Metropolitan Areas)
Year
Average No. of Outages (Urban
No./ Customer/
1,211
1,125
Communities
Year
Average No. of Outages (Rural
No./ Customer/
1,422
1353
Communities)
Year
No. of Bulk Supply Points
No.
26
26
No. of 33/11kV Primary
No.
81
87
Substations
No. Secondary Substations
No.
8,222.0
8,378.0
33kV Overhead Lines
km
12,033.7
12,033.7
33kV Underground Cables
km
281.7
293.1
NETWORK
Total
km
12,315.4
12,326.8
STATISTICS
11kV Overhead Line
km
13,970.8
14,166.9
11kV Underground Cable
km
1,051.8
1,075.3
Total
km
15,022.6
15,242.2
LV Overhead Line
km
1,450,033.0 1,450,973.7
LV Underground Lines
km
5,010.4
5,016.7
Total
km
1,455,043.3 1,455,990.4
2011
1,115.6
1,156.0
65.60
67.9
104.1
185
29
282.0
293
266.0
282
26
26
98
108
8,787.0
12,783.7
1,393.1
14,176.8
14,441.5
1,079.9
15,521.4
1,453,282.6
5,072.6
1,458,355.3
9,550.0
13,461.3
1,462.8
14,924.1
14,946.2
1,084.4
16,030.6
1,469,312.4
5,092.9
1,474,405.3
Notes
System losses from 2010 to 2011 excludes energy consumption of street lights which is estimated at 3% of energy sales
12
The finance data is provisional
3.0 STRATEGIC
ISSUES
22/08/2012
13
Financial
Inability to self-finance capital
investment projects
Dependence on Government of
Ghana, IDA, AfDB and other
development
partners
for
financial support
22/08/2012
14
Technical
1) Meeting the rapid energy demand
growth of customers (about 7% p.a.
over the past 10years; was 11.5% and
7.2% in 2010 and 2011 respectively)
High Level of Suppressed Demand
Increasing demand of existing customers
Rapid extension of network through rural
electrification
2)
15
3)
4)
5)
16
Commercial
1) High customer population growth (abt.
9.8% p.a.)
2)
3)
3)
Prepayment Metering
Vandalism
Theft of network assets (i.e. transformer
oil, cables, conductors, etc.)
22/08/2012
18
22/08/2012
19
A.
B.
Financial Interventions
22/08/2012
20
21
22
23
24
25
RURAL ELECTRIFICATION
Chinese Contract
Phase I extended power supply to 417
communities
Phase II will connect an additional 1,000
communities
22/08/2012
26
22/08/2012
27
B. FINANCIAL INTERVENTIONS1
28
5.0 EXPECTED
BENEFITS
22/08/2012
29
EXPECTED BENEFITS1
30
EXPECTED BENEFITS2
Improve the network by providing
redundancies (alternative sources of
supply)
Reduce system losses to regulated
levels
Improve voltage levels to achieve
230V10%
Reduce outage levels to achieve
regulated levels
22/08/2012
31
B.
Grid Intensification
C.
D.
HVDS
Roll-Out the HVDS across all Operational Areas (Pilot ongoing in Madina and
Suame)
D.
E.
F.
(ECG)
32
22/08/2012
33
Export Credits
34
ECG requires .
35
ECG is required to .
Implement similar
operational areas
projects
across
of
the
its
sub
36
But requires .
37
7.0 CONCLUSION
22/08/2012
38
We
have
presented
ECGs
39
40
22/08/2012
41