Você está na página 1de 2

CONMIX LTD.

DECORATIVE PLASTER - ERP

Traditional arabic plaster...


ERP is a pre mix, pigmented mineral based decorative plaster for internal and external application. It is designed to match
the appearance for traditional Arabian houses and forts and combines it with the characteristics of modern building
materials.
TECHNICAL DATA
Composition

APPLICATION METHOD

White Portland Cement, puzzolonic filler, fibres, hydrated


lime, processed sand, non-fading colour pigments and
chemical additives

The
blocks

Binder

White Portland Cement

Aggregate Size

0-1.0 mm processed sand

Appearance

Granular powder, available in different colours

Mixing Ratio

8.5 ltrs of water per 50 kg bag


Water/Powder ratio = 0.17

BACKGROUND
fair

faced

concrete

background and the concrete


should

be

thoroughly

cleaned using a stiff brush to


remove any dust, loose particles,
wood pieces, mould oil etc.
The suction in the background of

Approx. Yield *

34 ltrs per 50 kg bag

Approx. Coverage *

1.7 m2 per 50 kg bag at 18 mm thickness

Density *

Wet : 1.7 kg/ltr

Compressive Strength *

5.0 N/mm2 @ 28 days

Flexural Strength *

1 N/mm2 @ 28 days

both fair faced concrete and block


work should be neutralized by
applying potable water.
Free water on the surface should

Dry : 1.6 kg/ltr

be allowed to disperse before


applying ERP.
Preparation of normal fair faced
concrete surface
Conmix Bonding Rush Coat (BRC)
mixed with appropriate amount of

Working Time

Approx. 40 minutes

Curing

Minimum 48 hours by potable water

Specification

BSEN998-1, BSEN13914-1 & BSEN13914-2:2005

Pack Size

50 kg paper bags

Shelf Life

12 months from the date of manufacture when stored under


dry conditions

potable water (approximately 19%


by weight i.e. 9.5 ltrs per 50 kg
bag) using a mechanical mixer,
should be spray applied on the
prepared

fair

faced

concrete

surface.
Cont...

* Typical results under laboratory condition

APPLICATION TOOLS

1/2

PMP/ERP/Ver5/07/15

A rough texture has to be obtained to provide a mechanical key for the subsequent coat. The applied BRC should be water cured for a
period of 2 days (3-4 times daily). A spatter dash/key coat of Conmix CP2 or site mixed cement sand (1:4) is to be applied to a thickness
of 6-8 mm over the entire area (block work & prepared concrete areas). A minimum of 48 hours has to elapse prior to the application of
ERP. Water curing is an absolute must during this period. Conmix AUTEX Fibre Glass Mesh /Expanded metal Lath (As approved by
the consultant) to be fixed at all junctions of dissimilar backgrounds (i.e. fair faced concrete and block work) or a groove has to be formed
at the junction while the plaster is still soft.
MIXING
ERP supplied in 50 kg bags has to be mixed with potable water only, in a clean plastic bucket or clean non-corrosive, uncontaminated
metal tub. To ensure a homogeneous and uniform mix, an electric agitator must be used. The amount of water to be added is 8.5 ltrs
per 50 kg bag (i.e. approximately 17% by weight) . Add ERP to water, turn the contents of the bag carefully and stir frequently.
The amount of water added and mixing time should be constant for every batch to avoid colour variations in the finished product. Once
mixed, allow to stand for 5 minutes and mix again before applying. No further water should be added to the mix. Hard and set plaster
should not be re-mixed or used.
APPLICATION
Mixed ERP can be applied, in a single coat, onto the prepared background to a thickness of 18 mm, levelled and finished to achieve
the required design. Various types of finishes can be achieved by using different techniques during final finishing stage (approximately
1.5 hours after application depending on ambient conditions).
Suggested finishes are as follows:
1. Sponge float to achieve a wavy, semi rough, traditional finish.
2. Wood or plastic float to achieve an even and rough texture.
SPECIAL NOTES
ERP has to be protected from direct wind, sunlight and rain during application. ERP should be applied in one continuous operation up
to angles, features or in panels measuring not more than 15 m2. Cold joints should be avoided. ERP has to be water cured for at least
2 days (3-4 times daily) by applying a fine mist spray of potable water on the entire surface.
Conmix Technical Service Department will assist in these procedures upon request.
For application procedure in case of light weight blocks, concrete containing micro silica, GGBS, curing compound or any special additive
or special building material, kindly contact Conmix Technical Service Department for assistance. In areas of high pollution or other
contaminations, the cleaning of the surface of Scratch Coat can be made easy by the application of Conmix CONTXTRA range of
products.
STORAGE
Conmix ERP must be stored in a dry place, off the ground and well covered. Hard or lumpy material must be rejected.

Building History
P.O.Box 5936, Sharjah, United Arab Emirates
Head Office: Tel: + 971 6 5314155, Fax: +971 6 5314332

Sales Office: Tel: + 971 6 5682422, Fax: +971 6 5681442

e-mail: conmix@conmix.com

www.conmix.com
PMP/ERP/Ver5/07/15

2/2

It is the customers responsibility to satisfy themselves by checking with the company that the information is still current at the time of use. The customer must be satisfied that the
product is suitable for the use intended. All products comply with the properties shown on current data sheets. Conmix however do not warrant or guarantee the installation of the
products as it does not have any control over installation or end use of product. All information and in particular the recommendations relating to application and end use are given
in good faith. The products are guaranteed against any defect and are manufactured and sold to Conmix standard terms and conditions of sale.