Você está na página 1de 2

Federal Register / Vol. 72, No.

74 / Wednesday, April 18, 2007 / Notices 19489

via the Internet in lieu of paper. Any take, the Commission will consider all For additional information, please
questions, please contact the Secretary’s protests or other comments filed, but contact Arnold Meltz (202–502–8649).
Office. See, 18 CFR 385.2001(a)(1)(iii) only those who file a motion to
Kimberly D. Bose,
and the instructions on the intervene in accordance with the
Commission’s Web site at http:// Commission’s Rules may become a Secretary.
www.ferc.gov. party to the proceeding. Any comments, [FR Doc. E7–7314 Filed 4–17–07; 8:45 am]
Please include the docket number protests, or motions to intervene must BILLING CODE 6717–01–P
(DI07–7–000) on any comments, be received on or before the specified
protests, and/or motions filed. comment date for the particular
k. Description of Project: The application. DEPARTMENT OF ENERGY
proposed run-of-river U.S. Survey 295
o. Filing and Service of Responsive Federal Energy Regulatory
Micro Hydro Project would include: (1)
Documents—Any filings must bear in Commission
A 7-foot-long, 3-foot-high diversion
all capital letters the title
structure, with a 10-inch pipe directing
‘‘COMMENTS’’, ‘‘PROTESTS’’, and/or Notice of FERC Staff Attendance at
water into a 2,000 gallon plastic tank;
‘‘MOTIONS TO INTERVENE’’, as Southwest Power Pool Board of
(2) an 8-inch-diameter, 1,000-foot-long
applicable, and the Docket Number of Directors/Members Committee
pipe, connected to the powerhouse; (3)
the particular application to which the Meetings and Southwest Power Pool
a 12-foot-square powerhouse containing
filing refers. A copy of any motion to Regional State Committee Meeting
a 10-kW turbine/generator; (4) an 800-
foot-long transmission line, connected intervene must also be served upon each
April 11, 2007.
to an existing residence; and (5) representative of the Applicant
specified in the particular application. The Federal Energy Regulatory
appurtenant facilities. The project will Commission hereby gives notice that
not be connected to an interstate grid, p. Agency Comments—Federal, state, members of its staff may attend the
and will not occupy any tribal or federal and local agencies are invited to file meetings of the Southwest Power Pool
lands. comments on the described application. (SPP) Board of Directors/Members
When a Declaration of Intention is A copy of the application may be Committee and SPP Regional State
filed with the Federal Energy Regulatory obtained by agencies directly from the Committee noted below. Their
Commission, the Federal Power Act Applicant. If an agency does not file attendance is part of the Commission’s
requires the Commission to investigate comments within the time specified for ongoing outreach efforts.
and determine if the interests of filing comments, it will be presumed to
SPP Regional State Committee: April 23,
interstate or foreign commerce would be have no comments. One copy of an
2007 (1 p.m.–5 p.m.), The Skirvin
affected by the project. The Commission agency’s comments must also be sent to
Hilton Hotel, One Park Avenue,
also determines whether or not the the Applicant’s representatives.
Oklahoma City, Oklahoma 73102,
project: (1) Would be located on a
Kimberly D. Bose, 405–272–3040.
navigable waterway; (2) would occupy Board of Directors/Members Committee:
or affect public lands or reservations of Secretary.
[FR Doc. E7–7310 Filed 4–17–07; 8:45 am] April 24, 2007 (8:30 a.m.–3 p.m.), The
the United States; (3) would utilize Skirvin Hilton Hotel, One Park
surplus water or water power from a BILLING CODE 6717–01–P
Avenue, Oklahoma City, Oklahoma
government dam; or (4) if applicable, 73102, 405–272–3040.
has involved or would involve any
construction subsequent to 1935 that DEPARTMENT OF ENERGY The discussions may address matters
may have increased or would increase at issue in the following proceedings:
Federal Energy Regulatory Docket No. ER04–1232, Southwest
the project’s head or generating
Commission Power Pool, Inc.
capacity, or have otherwise significantly
modified the project’s pre-1935 design Docket No. ER05–799, Southwest Power
or operation. [Docket No. RP06–540–000] Pool, Inc.
l. Locations of the Application: Copies Docket No. ER05–526, Southwest Power
of this filing are on file with the High Island Offshore System, L.L.C.; Pool, Inc.
Notice of Informal Settlement Docket No. ER05–1416, Southwest
Commission and are available for public
Conference Power Pool, Inc.
inspection. This filing may be viewed
Docket No. EL06–83, Southwest Power
on the Web at http://www.ferc.gov using April 12, 2007. Pool, Inc.
the ‘‘eLibrary’’ link, select ‘‘Docket#’’ Docket No. ER06–432, Southwest Power
and follow the instructions. For Take notice that an informal
settlement conference will be convened Pool, Inc.
assistance, please contact FERC Online Docket No. ER06–448, Southwest Power
Support at in this proceeding commencing at 10
a.m. (EST) on Thursday, April 19, 2007 Pool, Inc.
FERCOnlineSupport@ferc.gov or toll- Docket No. ER06–451, Southwest Power
free at (866) 208–3676, or TTY, contact at the Federal Energy Regulatory
Commission, 888 First Street, NE., Pool, Inc.
(202) 502–8659. Docket No. ER06–1047, Southwest
m. Individuals desiring to be included Washington, DC 20426, for the purpose
of exploring the possible settlement of Power Pool, Inc.
on the Commission’s mailing list should Docket No. ER06–767, Southwest Power
so indicate by writing to the Secretary the above-referenced docket.
Pool, Inc.
of the Commission. Any party, as defined by 18 CFR Docket Nos. ER06–1485 and ER07–266,
n. Comments, Protests, or Motions to 385.102(c), or any participant as defined Xcel Energy Services, Inc.
Intervene—Anyone may submit by 18 CFR 385.102(b), is invited to Docket No. ER06–1488, Oklahoma Gas &
pwalker on PROD1PC71 with NOTICES

comments, a protest, or a motion to attend. Persons wishing to become a Electric Company.


intervene in accordance with the party must move to intervene and Docket No. ER06–1463, Empire District
requirements of Rules of Practice and receive intervenor status pursuant to the Electric Company.
Procedure, 18 CFR 385.210, .211, .214. Commission’s regulations (18 CFR Docket No. ER07–385, American
In determining the appropriate action to 385.214). Electric Power Service Corporation.

VerDate Aug<31>2005 18:01 Apr 17, 2007 Jkt 211001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\18APN1.SGM 18APN1
19490 Federal Register / Vol. 72, No. 74 / Wednesday, April 18, 2007 / Notices

Docket No. ER06–1471, Westar Energy, copies of a filing on CD/DVD and reduce Federal holidays. If you wish to
Inc. the number of paper copies to an examine these documents, you should
Docket No. ER06–1467, Southwest original and two copies in most cases. make an appointment at least 24 hours
Power Pool, Inc. These guidelines do not change any before the visiting day. The final Order
Docket No. EL06–71, Associated Electric FERC requirements concerning service is also available electronically at the
Cooperative, Inc. v Southwest Power of submissions on customers, parties, or each of the following addresses: http://
Pool. other persons. www.epa.gov/region07/programs/artd/
Docket No. ER07–14, Southwest Power The guidelines will be posted at: air/title5/petitiondb/petitions/
Pool, Inc. http://www.ferc.gov/help/submission- pope_talbot_decision2006.pdf. and
Docket Nos. ER07–211 and ER07–709, guide.asp and updated when necessary http://www.epa.gov/region07/programs/
Southwest Power Pool, Inc. to reflect revised procedures or changes artd/air/title5/petitiondb/
Docket No. ER07–314, Southwest Power in media. petitiondb2006.htm.
Pool, Inc.
Docket No. ER07–319, Southwest Power Kimberly D. Bose, FOR FURTHER INFORMATION CONTACT:
Pool, Inc. Secretary. Christopher Ajayi, Environmental
Docket No. ER07–603, Southwest Power [FR Doc. E7–7312 Filed 4–17–07; 8:45 am] Engineer, Air and Radiation Program,
Pool, Inc. BILLING CODE 6717–01–P Office of Partnerships and Regulatory
These meetings are open to the Assistance, Mail Code 8P–AR, U.S.
public. Environmental Protection Agency,
For more information, contact John ENVIRONMENTAL PROTECTION Region 8, 1595 Wynkoop Street, Denver,
Rogers, Office of Energy Markets and AGENCY CO 80202–1129, telephone (303) 312–
Reliability, Federal Energy Regulatory 6320, or e-mail at
Commission at (202) 502–8564 or [FRL–8301–1] ajayi.christopher@epa.gov.
john.rogers@ferc.gov. Clean Air Act Operating Permit SUPPLEMENTARY INFORMATION: The Clean
Kimberly D. Bose, Program; Petition for Objection to Air Act (Act) affords EPA a 45-day
Secretary. South Dakota State Operating Permit period to review and object to, as
for Pope & Talbot, Inc., Lumber Mill, appropriate, operating permits proposed
[FR Doc. E7–7311 Filed 4–17–07; 8:45 am]
Spearfish, SD by State permitting authorities. Section
BILLING CODE 6717–01–P
505(b)(2) of the Act authorizes any
AGENCY: Environmental Protection person to petition the EPA
Agency (EPA). Administrator within 60 days after the
DEPARTMENT OF ENERGY ACTION: Notice of direct final order. expiration of this review period to
Federal Energy Regulatory object to State operating permits if EPA
SUMMARY: This notice announces that
Commission has not done so. Petitions must be based
the EPA Administrator has responded to
only on objections to the permit that
a citizens’ petition asking EPA to object
Notice of Guidelines for Submission of were raised with reasonable specificity
to a State operating permit issued by the
CDs, DVDs, and Other Electronic during the public comment period
South Dakota Department of
Media provided by the State, unless the
Environmental and Natural Resources
Petitioner demonstrates that it was
April 12, 2007. (DENR). Specifically, the Administrator
impracticable to object during the
Take notice that the Commission is has partially granted and partially
comment period or that the grounds for
issuing notice of guidelines for denied the petition submitted by Jeremy
the objection or other issue arose after
submission of CDs, DVDs and other Nichols, and the other Petitioners, to
this period.
electronic media. An increasing number object to the issuance of the operating On April 11, 2006, the EPA received
of traditionally paper documents permit issued to Pope and Talbot, Inc., a petition from Petitioners requesting
submitted to the Federal Energy for its lumber mill, located in Spearfish, that EPA object to the issuance of the
Regulatory Commission (FERC) are now South Dakota. Title V operating permit issued by
accompanied by one or more CDs, DVDs Pursuant to section 505(b)(2) of the
South Dakota Department of
or other electronic media that contain Clean Air Act (Act), Petitioners may
Environmental and Natural Resources
all or part of the submission, or contain seek judicial review of those portions of
(DENR) to Pope and Talbot, Inc., to
supplements to the submission. These the petition which EPA denied in the
operate a lumber mill in Spearfish,
guidelines address such submissions United States Court of Appeals for the
South Dakota (‘‘the Facility’’).
and require that, among other things, appropriate Circuit. Any petition for The Petitioners request that EPA
the CDs/DVDs contain the entire review shall be filed within 60 days of object to the issuance of the proposed
submission. the date this notice appears in the permit and raise the following
These guidelines apply to documents Federal Register, pursuant to section objections as the bases for their petition:
that cannot be submitted through any of 307(d) of the Act. 1. Permit fails to ensure compliance
the Commission’s existing electronic ADDRESSES: You may review copies of with Carbon Dioxide (CO) emission
gateways: The eFiling system, the the final Order, the petition, and other limits,
eForms system, or the Electric Quarterly supporting information at the 2. Permit lacks sufficient periodic
Reports (EQR) system. They thus are Environmental Protection Agency, monitoring of CO emissions,
primarily intended for larger filings and Region 8, 1595 Wynkoop Street, Denver, 3. Permit may need ‘‘schedule of
those filings that contain Privileged, Colorado 80202–1129 after April 16, compliance’’ because it fails to ensure
Critical Energy Infrastructure (CEII), or 2007. EPA requests that you contact the that CO emission limits are below
pwalker on PROD1PC71 with NOTICES

Non-Internet Public (NIP) information. individual listed in the FOR FURTHER Prevention of Significant Deterioration
Persons following these guidelines INFORMATION CONTACT section to view (PSD) levels and thus not in compliance
will be granted an automatic waiver of the copies of these documents. You may with PSD requirements,
the number of paper copies and may view these documents Monday through 4. Permit fails to ensure compliance
instead submit the requisite number of Friday, 8 a.m. to 4 p.m., excluding with South Dakota State

VerDate Aug<31>2005 17:04 Apr 17, 2007 Jkt 211001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\18APN1.SGM 18APN1