Você está na página 1de 2

11350 Federal Register / Vol. 72, No.

48 / Tuesday, March 13, 2007 / Notices

• Montezuma 100-Line (Parke • Label one copy of the comments for DEPARTMENT OF ENERGY
County, IN)—Replacing 6.6 miles of the the attention of the Gas Branch 2, PJ11.2
existing 100-Line 20-inch diameter Reference Docket No. CP06–428–000; Federal Energy Regulatory
pipeline with 36-inch diameter and Commission
pipeline, designating the new pipeline • Mail your comments so that they [Project No. 120–020]
as the 500-Line, and installing a new pig will be received in Washington, DC on
launcher/receiver; and Southern California Edison Company;
• Zionsville 200-Line (Marion, Boone, or before April 6, 2006.
Notice of Application and Amended
and Hamilton Counties, IN)—Replacing Comments will be considered by the Preliminary Draft Environmental
17.9 miles of the existing 200-Line 24- Commission but will not serve to make Assessment Tendered for Filing With
inch diameter pipeline with 30-inch the commentor a party to the the Commission, and Establishing
diameter pipeline, designating the new proceeding. Any person seeking to Procedual Schedule for Licensing and
pipeline as the 500-Line, and installing become a party to the proceeding must Deadline for Submission of Final
a new pig launcher/receiver and a new file a motion to intervene pursuant to Amendments
mainline valve (MLV). Rule 214 of the Commission’s Rules of
Due to the age of Panhandle’s existing Practice and Procedures (18 CFR March 7, 2007.
line and the U.S. Department of 385.214).1 Only intervenors have the Take notice that the following
Transportation’s Integrity Management right to seek rehearing of the hydroelectric application has been filed
Plan regulations, Panhandle reduced the Commission’s decision. with the Commission and is available
operating pressure on one line by 20 for public inspection.
percent in 2004. Additional measures to Affected landowners and parties with
a. Type of Application: New License
mitigate risk for High Consequence environmental concerns may be granted for Major Project-Existing Dam.
Areas must be implemented by end of intervenor status upon showing good b. Project No: P–120–020.
2011. Panhandle’s project purpose is to cause by stating that they have a clear c. Date Filed: February 23, 2007.
restore long-haul transportation capacity and direct interest in this proceeding d. Applicant: Southern California
from Tuscola heading east to Michigan which would not be adequately Edison Company.
by replacing the existing diameter represented by any other parties. You do e. Name of Project: Big Creek No. 3
pipeline with larger diameter pipeline. not need intervenor status to have your Hydroelectric Power Project.
The EA has been placed in the public comments considered. f. Location: The Big Creek No. 3
files of the FERC. A limited number of Additional information about the Hydroelectric Project is located in
copies of the EA are available for project is available from the Fresno and Madera Counties, California
distribution and public inspection at: Commission’s Office of External Affairs, near the town of Auberry within the San
Federal Energy Regulatory Commission, at 1–866–208–FERC or on the FERC Joaquin River watershed. The Project
Public Reference Room, 888 First Street, Internet Web site (http://www.ferc.gov) occupies 377.16 acres of Federal lands.
NE., Room 2A, Washington, DC 20426, using the eLibrary link. Click on the g. Filed Pursuant to: Federal Power
(202) 502–8371. Act 16 U.S.C. 791 (a)–825(r).
eLibrary link, click on ‘‘General Search’’
Copies of the EA have been mailed to h. Applicant Contact: Russ W.
and enter the docket number excluding
Federal, State and local agencies, public Krieger, Vice President, Power
the last three digits in the Docket
interest groups, interested individuals, Production, Southern California Edison
Number field. Be sure you have selected Company, 300 North Lone Hill Ave.,
newspapers, and parties to this an appropriate date range. For
proceeding. San Dimas, California 91773. Phone:
assistance, please contact FERC Online (909) 394–8667.
Any person wishing to comment on
Support at FercOnlineSupport@ferc.gov i. FERC Contact: Jim Fargo, (202) 502–
the EA may do so. To ensure
or toll free at 1–866–208–3676, or for 6095, or e-mail: james.fargo@ferc.gov.
consideration prior to a Commission
decision on the proposal, it is important TTY, contact (202)502–8659. The j. Cooperating Agencies: We are
that we receive your comments before eLibrary link also provides access to the asking Federal, State, local, and tribal
the date specified below. texts of formal documents issued by the agencies with jurisdiction and/or
Please note that the Commission Commission, such as orders, notices, special expertise with respect to
strongly encourages electronic filing of and rulemakings. environmental issues to cooperate with
any comments or interventions or In addition, the Commission now us in the preparation of the
protests to this proceeding. See 18 CFR offers a free service called eSubscription environmental document. Agencies who
385.2001(a)(1)(iii) and the instructions which allows you to keep track of all would like to request cooperating status
on the Commission’s Web site at formal issuances and submittals in should follow the instructions for filing
http://www.ferc.gov under the ‘‘e- specific dockets. This can reduce the comments described in item k below.
Filing’’ link and the link to the User’s amount of time you spend researching Agencies granted cooperating status will
Guide. Before you can file comments proceedings by automatically providing be precluded from being an intervenor
you will need to create a free account you with notification of these filings, in this proceeding consistent with the
which can be created by clicking on document summaries and direct links to Commission’s regulations.
‘‘Sign-up.’’ the documents. Go to http:// k. Deadline for requests for
If you are filing written comments, www.ferc.gov/esubscribenow.htm. cooperating agency status: 60 days from
please carefully follow these the date of this notice. All documents
instructions to ensure that your Philis J. Posey, (original and eight copies) should be
comments are received in time and filed with: Philis J. Posey, Acting
cprice-sewell on PROD1PC66 with NOTICES

Acting Secretary.
properly recorded: [FR Doc. E7–4471 Filed 3–12–07; 8:45 am] Secretary, Federal Energy Regulatory
• Send an original and two copies of BILLING CODE 6717–01–P
Commission, 888 First Street, NE.,
your comments to: Secretary, Federal Washington, DC 20426. Comments may
Energy Regulatory Commission, 888 1 Interventions may also be filed electronically via be filed electronically via the Internet in
First St., NE., Room 1A, Washington, DC the Internet in lieu of paper. See the previous lieu of paper; see 18 CFR
20426; discussion on filing comments electronically. 385.2001(a)(1)(iii) and the instructions

VerDate Aug<31>2005 14:58 Mar 12, 2007 Jkt 211001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\13MRN1.SGM 13MRN1
Federal Register / Vol. 72, No. 48 / Tuesday, March 13, 2007 / Notices 11351

on the Commission’s Web site (http:// The project would have an average FERC Online Support at
www.ferc.gov) under the ‘‘e-Filing’’ link. annual generation of 804,240 megawatt- FERCOnlineSupport@ferc.gov or toll
After logging into the e-Filing system, hours. free at (866) 208–3676, or for TTY,
select ‘‘Comment on Filing’’ from the • Powerhouse: Big Creek Powerhouse contact (202) 502–8659. A copy is also
Filing Type Selection screen and No. 3, with five turbine generator units. available for inspection and
continue with the filing and process. • Moderate-sized dam and forebay: reproduction at the address in item h
The Commission strongly encourages Dam 6 and Dam 6 Impoundment, with above.
electronic filing. a capacity of about 933 ac–ft, at an You may also register online at
l. Status: This application has not elevation of about 2,230 ft above mean http://www.ferc.gov/docs-filing/
been accepted for filing. We are not sea level (msl). esubscription.asp to be notified via e-
soliciting motions to intervene, protests, • Water conveyance system:
mail of new filings and issuances
or final terms and conditions at this Powerhouse No. 3 water conveyance
related to this or other pending projects.
time. system, about 5.3 miles long, conveys
For assistance, contact FERC Online
m. Description of Project: The existing water from Dam No. 6 Impoundment to
Support.
Big Creek No. 3 Hydroelectric Power Big Creek Powerhouse No. 3 through a
Project consists of one powerhouse; one tunnel with a capacity of about 3,250 o. With this notice, we are initiating
moderate-sized dam and forebay; and cfs. The system includes a pressure- consultation with the California State
one water conveyance system. The relief valve system and penstocks Historic Preservation Officer (SHPO), as
Project is operated as a reservoir-storage providing pressurized water from the required by section 106, National
type plant with an installed operating tunnel to the turbine. Historic Preservation Act, and the
capacity of 174.45 MW. Water for the n. A copy of the application is regulations of the Advisory Council on
Project is taken from the San Joaquin available for review at the Commission Historic Preservation, 36 CFR 800.4.
River just downstream of its confluence in the Public Reference Room or may be p. Procedural schedule and final
with Big Creek and conveyed to the Big viewed on the Commission’s Web site at amendments: The application will be
Creek No. 3 Powerhouse through http://www.ferc.gov using the processed according to the following
Tunnel No. 3. The energy generated by ‘‘eLibrary’’ link. Enter the docket Hydro Licensing Schedule. Revisions to
the Project is transmitted to the SCE number excluding the three digits in the the schedule will be made if the
transmission and distribution system docket number field to access the Commission determines it necessary to
and used for public utility purposes. document. For assistance, please contact do so:

Milestone Tentative date

Issue Acceptance/Deficiency Letter and request Additional Information, if needed ............................................................. June 2007.
Notice asking for final terms and conditions ......................................................................................................................... September 2007.
Notice of the availability of the draft EIS ............................................................................................................................... March 2008.
Notice of the availability of the final EIS ................................................................................................................................ September 2008.

Final amendments to the application e. Name of Project: Morris Sheppard k. Description of Proposal: In 2004,
must be filed with the Commission no Project. the Brazos River Authority (BRA)
later than 30 days from the issuance f. Location: Brazos River in Palo Pinto requested a permit for a 302 slip facility
date of the notice soliciting final terms County, TX. This project does not (120 existing and 182 proposed) at Hill
and conditions. occupy any federal or tribal lands. Country Harbor Marina on Possum
g. Filed Pursuant to: Federal Power Kingdom Lake. The permit was
Philis J. Posey,
Act, 16 U.S.C. 791(a)–825(r). authorized by the Commission on June
Acting Secretary. 1, 2005. In January 2007, BRA
[FR Doc. E7–4477 Filed 3–12–07; 8:45 am] h. Applicant Contact: Mr. Kent Rindy,
discovered that the facility that was
Upper Basin Regional Manager, 4600
BILLING CODE 6717–01–P proposed and approved incorrectly
Cobbs Drive, P.O. Box 7555, Waco, TX,
identified the number of boat slips.
76714; (254) 761–3100.
While the footprint of the facility
DEPARTMENT OF ENERGY i. FERC Contacts: Any questions on remains virtually unchanged, the BRA is
this notice should be addressed to Ms. requesting authorization for 402 total
Federal Energy Regulatory Shana High at (202) 502–8674. boat slips. The remainder of the
Commission j. Deadline for filing comments and or application remains unchanged as the
motions: April 9, 2007. slips will be constructed off-site and
Notice of Application for Non-Project
Use of Project Lands and Waters and All documents (original and eight floated into place, and no dredging or
Soliciting Comments, Motions To copies) should be filed with: Secretary, excavation will be necessary.
Intervene, and Protests Federal Energy Regulatory Commission, l. Location of the Applications: The
888 First Street, NE., Washington DC filings are available for review at the
March 7, 2007. 20426. Please include the project Commission in the Public Reference
Take notice that the following number (P–1490–044) on any comments Room, located at 888 First Street, NE.,
application has been filed with the or motions filed. Comments, protests, Room 2A, Washington, DC 20426, or
Commission and is available for public and interventions may be filed may be viewed on the Commission’s
cprice-sewell on PROD1PC66 with NOTICES

inspection: electronically via the Internet in lieu of website at http://www.ferc.gov using the
a. Application Type: Non-Project Use paper. See, 18 CFR 385.2001(a)(1)(iii) ‘‘eLibrary’’ link. Enter the docket
of Project Lands and Waters. and the instructions on the number excluding the last three digits in
b. Project No: 1490–044. Commission’s Web site under the e- the docket number field to access the
c. Date Filed: February 12, 2007. Filing link. The Commission strongly document. For assistance, please call
d. Applicant: Brazo River Authority. encourages e-filings. the Helpline at (866) 208–3676 or

VerDate Aug<31>2005 14:58 Mar 12, 2007 Jkt 211001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\13MRN1.SGM 13MRN1

Você também pode gostar