Você está na página 1de 2

Federal Register / Vol. 72, No.

39 / Wednesday, February 28, 2007 / Notices 8981

the agency’s estimate of the burden of East Greenway Plaza, Houston, Texas to seek court review of the
the proposed collection of information, 77046 or by telephone at 713–544–7309 Commission’s final order.
including the validity of the or telecopy to 713–544–3540. Motions to intervene, protests and
methodology and assumptions used; (3) There are two ways to become comments may be filed electronically
ways to enhance the quality, utility and involved in the Commission’s review of via the internet in lieu of paper; see, 18
clarity of the information to be this project. First, any person wishing to CFR 385.2001(a)(1)(iii) and the
collected; and (4) ways to minimize the obtain legal status by becoming a party instructions on the Commission’s Web
burden of the collection of information to the proceedings for this project site under the ‘‘e-Filing’’ link. The
on those who are to respond, including should, on or before the below listed Commission strongly encourages
the use of appropriate automated, comment date, file with the Federal electronic filings.
electronic, mechanical, or other Energy Regulatory Commission, 888 Comment Date: March 5, 2007.
technological collection techniques or First Street, NE., Washington, DC 20426, Magalie R. Salas,
other forms of information technology a motion to intervene in accordance
Secretary.
e.g. permitting electronic submission of with the requirements of the
responses. [FR Doc. E7–3486 Filed 2–27–07; 8:45 am]
Commission’s Rules of Practice and
BILLING CODE 6717–01–P
Magalie R. Salas,
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
Secretary.
CFR 157.10). A person obtaining party
[FR Doc. E7–3485 Filed 2–27–07; 8:45 am] DEPARTMENT OF ENERGY
status will be placed on the service list
BILLING CODE 6717–01–P maintained by the Secretary of the Federal Energy Regulatory
Commission and will receive copies of Commission
all documents filed by the applicant and
DEPARTMENT OF ENERGY by all other parties. A party must submit [Docket No. ER07–407–000]

Federal Energy Regulatory 14 copies of filings made with the


High Prairie Wind Farm II, LLC; Notice
Commission Commission and must mail a copy to
of Issuance of Order
the applicant and to every other party in
[Docket No. CP06–446–002] the proceeding. Only parties to the February 22, 2007.
proceeding can ask for court review of High Prairie Wind Farm, LLC (High
Gulf South Pipeline Company, LP; Commission orders in the proceeding.
Notice of Amended Application Prairie) filed an application for market-
However, a person does not have to based rate authority, with an
February 22, 2007. intervene in order to have comments accompanying rate schedule. The
Take notice that on February 20, 2007, considered. The second way to proposed market-based rate schedule
Gulf South Pipeline Company, LP (Gulf participate is by filing with the provides for the sale of energy and
South), 20 East Greenway Plaza, Secretary of the Commission, as soon as capacity at market-based rates. High
Houston, Texas 77046, filed in Docket possible, an original and two copies of Prairie also requested waivers of various
No. CP06–446–002, an amendment to its comments in support of or in opposition Commission regulations. In particular,
pending application pursuant to to this project. The Commission will High Prairie requested that the
sections 7(b) and 7(c) of the Natural Gas consider these comments in Commission grant blanket approval
Act (NGA) in which it seeks determining the appropriate action to be under 18 CFR part 34 of all future
authorization to site, construct, and taken, but the filing of a comment alone issuances of securities and assumptions
operate facilities, and to abandon by will not serve to make the filer a party of liability by High Prairie
lease to Texas Gas Transmission, LLC to the proceeding. The Commission’s On February 20, 2007, pursuant to
(Texas Gas), 62,180 Dth/day of capacity rules require that persons filing delegated authority, the Director,
on the facilities proposed in Docket No. comments in opposition to the project Division of Tariffs and Market
CP06–446–000 filed September 1, 2006. provide copies of their protests only to Development—West, granted the
In the amended application, Gulf South the party or parties directly involved in requests for blanket approval under part
proposes to increase in pipeline wall the protest. 34. The Director’s order also stated that
thickness and internal pipe coating for Persons who wish to comment only the Commission would publish a
71.1 miles of pipeline, all as more fully on the environmental review of this separate notice in the Federal Register
set forth in the application which is on project should submit an original and establishing a period of time for the
file with the Commission and open to two copies of their comments to the filing of protests. Accordingly, any
public inspection. The Commission staff Secretary of the Commission. person desiring to be heard or to protest
will determine if this amendment will Environmental commenters will be the blanket approvals of issuances of
have an effect on the schedule for the placed on the Commission’s securities or assumptions of liability by
environmental review of this project. If environmental mailing list, will receive High Prairie should file a motion to
necessary, a revised Notice of Schedule copies of the environmental documents, intervene or protest with the Federal
for Environmental Review will be and will be notified of meetings Energy Regulatory Commission, 888
issued within 90 days of this Notice. associated with the Commission’s First Street, NE., Washington, DC 20426,
The instant filing may be also viewed on environmental review process. in accordance with Rules 211 and 214
the web at http://www.ferc.gov using the Environmental commenters will not be of the Commission’s Rules of Practice
‘‘eLibrary’’ link. Enter the docket required to serve copies of filed and Procedure. 18 CFR 385.211, 385.214
number excluding the last three digits in documents on all other parties. (2004).
the docket number field to access the However, the non-party commenters Notice is hereby given that the
sroberts on PROD1PC70 with NOTICES

document. For assistance, call (866) will not receive copies of all documents deadline for filing motions to intervene
208–3676 or TTY, (202) 502–8659. filed by other parties or issued by the or protest is March 26, 2007.
Any questions regarding this Commission (except for the mailing of Absent a request to be heard in
application may be directed to J. Kyle environmental documents issued by the opposition by the deadline above, High
Stephens, Director of Certificates, 20 Commission) and will not have the right Prairie is authorized to issue securities

VerDate Aug<31>2005 16:08 Feb 27, 2007 Jkt 211001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\28FEN1.SGM 28FEN1
8982 Federal Register / Vol. 72, No. 39 / Wednesday, February 28, 2007 / Notices

and assume obligations or liabilities as requests for blanket approval under part DEPARTMENT OF ENERGY
a guarantor, indorser, surety, or 34. The Director’s order also stated that
otherwise in respect of any security of the Commission would publish a Federal Energy Regulatory
another person; provided that such separate notice in the Federal Register Commission
issuance or assumption is for some establishing a period of time for the [Docket Nos. CP07–84–000]
lawful object within the corporate filing of protests. Accordingly, any
purposes of High Prairie, compatible person desiring to be heard or to protest Viking Gas Transmission Company;
with the public interest, and is the blanket approvals of issuances of Notice of Application
reasonably necessary or appropriate for securities or assumptions of liability by
such purposes. February 22, 2007.
Nevada Solar One should file a motion Take notice that on February 15, 2007,
The Commission reserves the right to
to intervene or protest with the Federal Viking Gas Transmission Company
require a further showing that neither
Energy Regulatory Commission, 888 (Viking), 13710 FNB Parkway, Omaha,
public nor private interests will be
First Street, NE., Washington, DC 20426, Nebraska 68154, filed in Docket No.
adversely affected by continued
approvals of High Prairie’s issuance of in accordance with Rules 211 and 214 CP07–84–000, an application pursuant
securities or assumptions of liability. of the Commission’s Rules of Practice to section 7(b) of the Natural Gas Act,
Copies of the full text of the Director’s and Procedure. 18 CFR 385.211, 385.214 for an order to abandon in place
Order are available from the (2004). Compressor Unit 1A, with
Commission’s Public Reference Room, Notice is hereby given that the appurtenances at the Hallock
888 First Street, NE., Washington, DC deadline for filing motions to intervene Compressor Station located in Kittson
20426. The Order may also be viewed County, Minnesota, all as more fully set
or protest is March 26, 2007.
on the Commission’s Web site at http:// forth in the application which is on file
Absent a request to be heard in with the Commission and open to
www.ferc.gov, using the eLibrary link.
opposition by the deadline above, public inspection. This filing is
Enter the docket number excluding the
Nevada Solar One is authorized to issue available for review at the Commission
last three digits in the docket number
filed to access the document. securities and assume obligations or in the Public Reference Room or may
Comments, protests, and interventions liabilities as a guarantor, indorser, also be viewed on the Commission’s
may be filed electronically via the surety, or otherwise in respect of any Web site at http://www.ferc.gov using
Internet in lieu of paper. See, 18 CFR security of another person; provided the ‘‘eLibrary’’ link. Enter the docket
385.2001(a)(1)(iii) and the instructions that such issuance or assumption is for number, excluding the last three digits,
on the Commission’s Web site under the some lawful object within the corporate in the docket number field to access the
‘‘e-Filing’’ link. The Commission purposes of Nevada Solar One, document. For assistance, call (202)
strongly encourages electronic filings. compatible with the public interest, and 502–8659 or TTY, (202) 208–3676.
is reasonably necessary or appropriate Any questions regarding this
Magalie R. Salas, application should be directed to
for such purposes.
Secretary. Patricia Anderson, General Manager
[FR Doc. E7–3489 Filed 2–27–07; 8:45 am]
The Commission reserves the right to Rates, Regulatory Affairs, ONEOK
require a further showing that neither Partners GP, L.L.C., 100 West 5th Street,
BILLING CODE 6717–01–P
public nor private interests will be 12th Floor Tulsa, OK 74103, phone:
adversely affected by continued (918) 588–7729.
DEPARTMENT OF ENERGY approvals of Nevada Solar One’s Pursuant to Section 157.9 of the
issuance of securities or assumptions of Commission’s rules, 18 CFR 157.9,
Federal Energy Regulatory liability. within 90 days of this Notice the
Commission Copies of the full text of the Director’s Commission staff will either: Complete
its environmental assessment (EA) and
[Docket No. ER07–390–000] Order are available from the
place it into the Commission’s public
Commission’s Public Reference Room,
Nevada Solar One, LLC; Notice of record (eLibrary) for this proceeding; or
888 First Street, NE., Washington, DC issue a Notice of Schedule for
Issuance of Order 20426. The Order may also be viewed Environmental Review. If a Notice of
February 22, 2007. on the Commission’s Web site at http:// Schedule for Environmental Review is
Nevada Solar One, LLC (Nevada Solar www.ferc.gov, using the eLibrary link. issued, it will indicate, among other
One) filed an application for market- Enter the docket number excluding the milestones, the anticipated date for the
based rate authority, with an last three digits in the docket number Commission staff’s issuance of the final
accompanying rate schedule. The filed to access the document. environmental impact statement (FEIS)
proposed market-based rate schedule Comments, protests, and interventions or EA for this proposal. The filing of the
provides for the sale of energy, capacity may be filed electronically via the EA in the Commission’s public record
and ancillary services at market-based Internet in lieu of paper. See, 18 CFR for this proceeding or the issuance of a
rates. Nevada Solar One also requested 385.2001(a)(1)(iii) and the instructions Notice of Schedule for Environmental
waivers of various Commission on the Commission’s Web site under the Review will serve to notify federal and
regulations. In particular, Nevada Solar ‘‘e-Filing’’ link. The Commission state agencies of the timing for the
One requested that the Commission strongly encourages electronic filings. completion of all necessary reviews, and
grant blanket approval under 18 CFR the subsequent need to complete all
part 34 of all future issuances of Magalie R. Salas, federal authorizations within 90 days of
securities and assumptions of liability Secretary. the date of issuance of the Commission
sroberts on PROD1PC70 with NOTICES

by Nevada Solar One. [FR Doc. E7–3488 Filed 2–27–07; 8:45 am] staff’s FEIS or EA.
On February 20, 2007, pursuant to BILLING CODE 6717–01–P There are two ways to become
delegated authority, the Director, involved in the Commission’s review of
Division of Tariffs and Market this project. First, any person wishing to
Development—West, granted the obtain legal status by becoming a party

VerDate Aug<31>2005 16:08 Feb 27, 2007 Jkt 211001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\28FEN1.SGM 28FEN1

Você também pode gostar