Você está na página 1de 1

Federal Register / Vol. 71, No.

209 / Monday, October 30, 2006 / Notices 63305

in lieu of paper. The Commission Enter the project number (prefaced by With this notice, the FERC staff is
strongly encourages electronic filings. P–) and excluding the last three digits, asking other Federal, State, local, and
See 18 CFR 385.2001(a)(1)(iii) and the in the docket number field to access the tribal agencies with jurisdiction and/or
instructions on the Commission’s Web document. For assistance, contact FERC special expertise with respect to
site under the ‘‘eFiling’’ link. For further Online Support at environmental issues to cooperate with
information, contact Chris Yeakel at FERCOnlineSupport@ferc.gov or toll- us in the preparation of the EA. These
(202) 502–8132. free at (866) 208–3676, or for TTY, agencies may choose to participate once
contact (202) 502–8659. they have evaluated Transco’s proposal
Magalie R. Salas,
relative to their responsibilities.
Secretary. Magalie R. Salas,
Agencies that would like to request
[FR Doc. E6–18104 Filed 10–27–06; 8:45 am] Secretary. cooperating status should follow the
BILLING CODE 6717–01–P [FR Doc. E6–18129 Filed 10–27–06; 8:45 am] instructions for filing comments
BILLING CODE 6717–01–P described later in this notice.
This notice is being sent to affected
DEPARTMENT OF ENERGY landowners; Federal, State, and local
DEPARTMENT OF ENERGY government representatives and
Federal Energy Regulatory agencies; environmental and public
Commission Federal Energy Regulatory interest groups; Native American tribes;
[Project No. 516–417]
Commission other interested parties in this
proceeding; and local libraries and
South Carolina Electric & Gas [Docket No. PF06–32–000] newspapers. We encourage government
Company; Notice of Availability of representatives to notify their
Environmental Assessment Transcontinental Gas Pipe Line constituents of this planned project and
Corporation; Notice of Intent To encourage them to comment on their
October 24, 2006. Prepare an Environmental Assessment areas of concern.
In accordance with the National for the Proposed Sentinel Expansion If you are a landowner receiving this
Environmental Policy Act of 1969 and Project; Request for Comments on notice, you may be contacted by a
the Federal Energy Regulatory Environmental Issues and Notice of Transco representative about the
Commission’s (Commission) Public Scoping Meeting acquisition of an easement to construct,
regulations, 18 CFR part 380 (Order No. operate, and maintain the proposed
486, 52 FR 47897), the Office of Energy October 18, 2006.
facilities. The pipeline company would
Projects has reviewed an application for The staff of the Federal Energy
seek to negotiate a mutually acceptable
non-project use of project lands and Regulatory Commission (FERC or
agreement. However, if the project is
waters at the Saluda Hydroelectric Commission) will prepare an
approved by the FERC, that approval
Project (FERC No. 516), and has environmental assessment (EA) that will
conveys with it the right of eminent
prepared an Environmental Assessment discuss the environmental impacts of
domain. Therefore, if easement
(EA) for the proposed non-project use. Transcontinental Gas Pipe Line
negotiations fail to produce an
The project is located on Lake Murray, Corporation’s (Transco’s) planned
agreement, the pipeline company could
in Lexington County, South Carolina. Sentinel Expansion Project located in
initiate condemnation proceedings in
In the application, South Carolina Pennsylvania and New Jersey. This
accordance with State law.
Electric & Gas Company requests notice explains the scoping process that A fact sheet prepared by the FERC,
Commission authorization to permit the will be used to gather input from the ‘‘An Interstate Natural Gas Facility on
use of almost 2.0 acres of project lands public and interested agencies on the My Land? What Do I Need To Know?’’
that lie below the 360-foot-msl-contour project. Your input will help the is available for viewing on the FERC
(full pool elevation) to construct a 100- Commission staff determine which Web site (http://www.ferc.gov). This fact
slip docking facility and a boat launch issues need to be evaluated in the EA. sheet addresses a number of typically
for the residents of Pintail Point Please note that the scoping period will asked questions, including those
subdivision. The EA contains close on November 18, 2006. focusing on the use of eminent domain
Commission staff’s analysis of the Comments may be submitted in and how to participate in the FERC’s
probable environmental impacts of the written form or verbally. In lieu of proceedings.
proposal and concludes that approving sending written comments, you are
the licensee’s application, with staff’s invited to attend the public scoping Summary of the Proposed Project
recommended measures and meeting that has been scheduled in the Transco proposes to expand its
modifications, would not constitute a project area in Exton, Pennsylvania, on natural gas transmission system to
major federal action significantly November 8, 2006. Further details on provide incremental firm service of
affecting the quality of the human how to submit written comments and 151,000 dekatherms per day (Dt/d) in
environment. additional details of the public scoping Transco’s market area. More
The EA is attached to a Commission meeting area are provided in the public specifically, Transco seeks authority to
order titled ‘‘Order Modifying and participation section of this notice. construct the following facilities in
Approving Application for Non-Project The FERC will be the lead Federal various counties in Pennsylvania and
Use of Project Lands and Waters,’’ agency for the preparation of the EA. New Jersey:
which was issued October 10, 2006, and The document will satisfy the • Construct approximately 10.58
is available for review and reproduction requirements of the National miles of 42-inch-diameter pipeline loop
at the Commission’s Public Reference Environmental Policy Act (NEPA) and in Chester County, Pennsylvania
sroberts on PROD1PC70 with NOTICES

Room, located at 888 First Street, NE., will be used by the FERC to consider the (Downingtown Loop);
Room 2A, Washington, DC 20426. The environmental impacts that could result • Construct approximately 5.48 miles
EA may also be viewed on the if it issues Transco a Certificate of of 42-inch-diameter extension in
Commission’s Web site at http:// Public Convenience and Necessity Luzerne County, Pennsylvania
www.ferc.gov using the ‘‘elibrary’’ link. under Section 7 of the Natural Gas Act. (Conygham Loop);

VerDate Aug<31>2005 02:16 Oct 28, 2006 Jkt 211001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\30OCN1.SGM 30OCN1

Você também pode gostar