PRICED BILL OF QUANTITIES
SUMMARY OF COST
Item
No.

Description

A.

STRUCTURAL WORKS

B.

ARCHITECTURAL FINISHES

10,113,919

BRICK WORKS

2,755

PLASTERING

15,848

ii

MARBLE FLOOR

Err:522

ii

MARBLE SKIRTING

276

ii

IFO WHITE (GLAZED TILE)

172

iii

LAMINATED DOORS

232

iii

SOLID WOOD DOORS

232

iii

ALUMINUM WINDOWS

167

iv

ICI VINYLE EMULSION PAINT

GRAFIATO FINISHING

viI

MISCELLANEOUS

15,848
806

viiii ROOF INSULATION

850
Err:522

PLUMBING WORKS 3%

ELECTRICAL WORKS 3%
G.TOTAL:

SUMMARY-1

RESIDENCE MR. ABDUL BASEER


VELANCIA LAHORE
PRICED BILL OF QUANTITIES
SUMMARY OF COST
Amount (Rs)
60%

595,600
Err:522

SUMMARY-2

RESIDENCE MR. ABDUL BASEER


VELANCIA LAHORE
PRICED BILL OF QUANTITIES
STRUCTURAL WORKS
DESCRIPTION
UNIT
QTY.

Sr.
No.

RATE
(Rs.)

AMOUNT
(Rs.)

GENERAL
All items of Civil works of building
described here of under the title
description unless specifically indicated
otherwise, shall be deemed to be read
in terms of supplying, making,
assembling,
installing,
providing,
laying, fixing and testing, etc, inclu

EARTH WORK
Excavation for foundations trenches
and drains, in all kinds of soil including
ramming, watering, dressing and
disposal of surplus material.
Supplying stacking and filling local
sand of best quality from outside
source including dressing, watering
and consolidation by ramming in layers
not exceeding 9 inches in depth to full
compaction.
ANTI TERMITE
Providing and applying anti-termite
treatment by using Biflix or Termidor
termite proffer mixed with water in ratio
as manufacturer specified, at bottom
and sides of foundation trenches and
under floors before laying of sub-base.

CEMENT
CONCRETE
IN
FOUNDATION
Providing and laying 1:4:8 (1 cement, 4
Chenab sand and 8 Marglla crush 1.5"
and down gauge) cement concrete in
foundation
including
leveling,
compacting and curing etc. complete.

Cft

19960

159,678

Cft

6912

10

69,118

Sft

17773

6.50

115,521

Cft

7026

85

597,231

CIVIL -3
MAIN REDSIDENCE BUILDING

Sr.
No.

STRUCTURAL WORKS
DESCRIPTION
UNIT
QTY.

RATE
(Rs.)

AMOUNT
(Rs.)

REINFORCED CEMENT CONCRETE


WORK
Providing and laying reinforced cement
concrete by using of Marglla crush
and down gauge, 50% Lewrancepur
sand and 50% Chenab sand for
following
minimum
works
cube
crushing strength in at 28 days,
including form work and its removal,
vibrating, levelin
a) 3000 lbs/inch2 (Ratio 1:2:4)
i) Footing.

Cft

1500

120

180,051

ii) Roof Slab.

Cft

5354

150

803,037

iii) Roof Beams/Lintels.

Cft

1642

160

262,651

iv) Stairs/Steps.

Cft

307.63

160

49,220

M.Ton

54

72,000

3,871,263

STEEL REINFORCEMENT
Providing and laying deformed steel
reinforcement bars AFCO, or approved
equivalent with guaranteed following
minimum yield stress including the cost
of straightening, cutting, bending,
binding, wastage, complete in all kinds
of RCC work. Testing of at r

a) ASTM A-615 G-60 (60000 psi)

CIVIL -4
MAIN REDSIDENCE BUILDING

Sr.
No.

STRUCTURAL WORKS
DESCRIPTION
UNIT
QTY.

RATE
(Rs.)

AMOUNT
(Rs.)

BRICK MASONRY
Providing and laying 1st class solid
burnt brick masonry set in cement and
Chenab sand mortar 1:5 in walls
including scaffolding raking out joints
and curing etc.
a) Basement, foundation and up to
Plinth level.

Cft

12868

90

1,158,152

b) 9" thick walls in super structure.

Cft

11000

90

990,000

c) Cavity walls (9" internal side and 41/2" outer side) with 1/4" dia iron wire
ties at every 6th course and 3' apart.

Sft

7720

135

1,042,172

Providing and laying 1st class solid


burnt brick masonry set in cement and
Chenab sand mortar 1:4 in walls 4-1/2
thick including scaffolding raking out
joints and curing etc.

Sft

289

75

21,694

Providing and laying damp proof


course of cement concrete 1:2:4 1"
thick including bitumen coating, with
two coats of bitumen and one coat
polythene sheet 500 gauge.

Sft

1733

40

69,306

CIVIL -5
MAIN REDSIDENCE BUILDING

Sr.
No.

STRUCTURAL WORKS
DESCRIPTION
UNIT
QTY.

ROOF INSULATION
34 Providing and applying water proofing
treatment on roof in following layers,
2" thick high density thermopore sheet
over covered with two layers of
polythen sheet one over and other
under of 500 gauge laying over two
coats of hot bitumen @ 20 lb / 100 Sft
over R.C.C roof slab.

Sft

8245

Each

16

RATE
(Rs.)

AMOUNT
(Rs.)

85

700,825

1,500

24,000

Brick tiles floor jointed and grouted with


1:3 cement sand mortar over 4" thick
mud including curing, making slope
towards the drains, complete in all
respects as per drawings, specification
and all as directed by the Engineer.

35 Making of Roof Khurras 2'x2' in cement


concrete 1:2:4 finished with steel trowel
including C.I grating, curing etc,
complete in all respects as per
drawings, specifications and all as
directed by the Engineer.

Total: 10,113,919

CIVIL -6
MAIN REDSIDENCE BUILDING

RESIDENCE MR. ABDUL BASEER


VELANCIA LAHORE
PRICED BILL OF QUANTITIES

Sr.
No.

DESCRIPTION

CIVIL WORKS
UNIT

QTY.

RATE
(Rs.)

AMOUNT
(Rs.)

A. FINISHING WORKS
GENERAL
All items of Civil works of building described
here of under the title description unless
specifically indicated otherwise, shall be
deemed to be read in terms of supplying,
making, assembling, installing, providing,
laying, fixing and testing, etc, including all
lead and lift upto any elevation/level
complete in all respects, and as directed by
the Engineer.

PLASTERING
Ceiling
11 1/2" thick cement, Chenab sand plaster in
1:3 on ceiling etc including making edges,
corners and curing etc.

Sft

#REF!

10

#REF!

Walls
12 1/2" thick cement, Chenab sand plaster in
1:4 on internal walls, columns etc. including
making edges, corners and curing etc.

Sft

#VALUE!

10

#VALUE!

Sft

#VALUE!

12

#VALUE!

Sub-Total of plastring:

#REF!

#REF!

#REF!

13 3/4" thick cement, Chenab sand plaster in


1:4 on external walls, columns etc. including
making edges, corners and curing etc.

B. FLOORS & DADO/SKIRTING


1

Providing and laying floor of approved


quality and shade Laminated wood laid as
per manufacturer's specifications, complete
in all respects. (Bed Rooms)
Bed Rooms

Sft

90

Providing and laying A-1 quality porcelain


tiles of Master or approved make, size and
quality on floor laid over 3/4" thick cement
mortar base 1:3 including jointing and
washing the tiles with white cement slurry of
matching color (by using pigment in white
cement) and curing, etc.

Structural Works-7

Sr.
No.

DESCRIPTION

CIVIL WORKS
UNIT

QTY.

RATE
(Rs.)

AMOUNT
(Rs.)

Kitchen, Pantry, open Setting, open


area

Sft

806

125

100,719

Providing and fixing 1" thick hard wood


skirting of approved design fixed to wall
with sunken head nails including polishing,
complete.

Sft

130

120

15,634

Providing and laying approved quality


Ceramic tiles of "Spain" on walls and floor
laid over 3/4" thick cement base mortar 1:3
including jointing and washing the tiles with
white cement slurry of matching color (by
using pigment in white cement) and curing,
etc.
Bath Room, Dress, Powder

Sft

5977

130

777,010

Providing and laying Ceramic tiles bordar


of approved size, shade and quality on walls
and floor laid over 3/4" thick cement mortar
base 1:3 including jointing and washing the
tiles with white cement slurry of matching
color (by using pigment in white cement)
and curing, etc.

Rft

500

110

55,000

Providing and laying Stone Finish Tiles of


of approved make, size and quality on floor
laid over 3/4" thick cement mortar base 1:3
including jointing and washing the tiles with
white cement slurry of matching color (by
using pigment in white cement) and curing,
etc.
Sft

190

75

14,268

1/2" thick perpolished imported Granite


(Italy) skirting of approved quality, shade
and size as shown on drawings over cement
sand mortar 1:3 including grouting, finishing,
etc, complete in all respects.

Sft

25

350

8,750

a) on stairs/entrance steps
b) on bath vanity counter.

Sft
Sft

723
48

650
650

470,158
470,158

Providing and laying 1/2" thick terrazzo in


gray cement on walls and floor laid over 3/4"
thick cement sand mortar base 1:3 including
grouting, grinding, polishing, finishing, etc,
complete in all respects.

Sft

208

40

8,320

Providing and laying Glass Mosaic Tiles of


MEC, complete in all respects.
Swimming Pool, Water Body

Sft

2150

475

1,021,250

Drawing, Dinidng, Patio, Passages


7

Structural Works-8

Sr.
No.

DESCRIPTION

CIVIL WORKS
UNIT

10 Providing and laying 2" thick precast


concrete Tuff Paver of approved design and
shade on floor laid over 2" thick sand
cushion including grouted with sand,
leveling, mechanically compacting and
curing etc. complete.

Sft

QTY.

1750

RATE
(Rs.)

AMOUNT
(Rs.)

80

140,000

Sub-Total of Flooring/Dado & skirting:

#REF!

WOOD WORK
WOODEN DOORS
11 Providing and fixing 1-1/2" thick solid
approved quality wood door shutter hinged
with same wood main frame (Choket)
including best quality fitting, brass hinges,
anti-termite, polishing, etc, complete in all
respects
No.
No.
No.
No.
No.
No.

1
2
5
11
4
2

12 Providing and fixing Wooden Pergolas and


wooden beams of approved wood, as per
drawings, complete in all respects.

Sft

13 Providing and fixing Wooden Jeffrey of


approved design, as per drawings, complete
in all respects.

Type-D1
Type-D2
Type-D3
Type-D4
Type-D5
Type-D6

36,000
32,000
30,000
24,000
22,000
188,000

36,000
64,000
150,000
264,000
88,000
376,000

1325

1,200

1,590,000

Sft

732

500

366,000

Nos.
Nos.

1
24

3,200
1,000

3,200
24,000

L.s
225,000
350
375
Sub-Total of Wood Wook:

225,000
131,250
3,067,450

14 Providing and fixing best quality imported


Door Locks of approved make for doors
with approved handle .
a) Main doors
b) Internal doors
CABINETS & WARDROBES
a) Kitchen
b) Full height wardrobes.
PAINTING
15 Providing and applying Plastic emulsion
paint of approved make and shade in two
coats over and including the cost of one
priming coat including sand, preparing,
dusting and filling the holes, cracks and
inequalities if any on ceiling and walls.

Job
Sft

Sft

7873

62,983

Structural Works-9

Sr.
No.

DESCRIPTION

CIVIL WORKS
UNIT

16 Providing and applying weather sheild


painting of approved shade, quality on walls
as per manufacturer's specifications.

Sft

QTY.
250

RATE
(Rs.)

AMOUNT
(Rs.)
15

3,750

Sub-Total of Painting:

66,733

FAADE FINISHING
17 Providing and laying Stone tiles on faade
laid over 3/4" thick cement sand mortar
base 1:3, complete in all respects.

Sft

#VALUE!

175

#VALUE!

Sub-Total of Faade Finishing:

#VALUE!

ALUMINUM WINDOWS
16 Providing and fixing aluminum windows of
1.6 mm thick with 6mm thick imported
plain / colored glass.
a) fully glazed partly sliding/openable and 2513
partly fixed windows with ply proof shutter
on
openable
panels.
(Type1,2,3,4,5,6,7,8,10,11,12,13,14)

325

816,603

Sub-Total of Aluminum windows:

816,603

MISCELLANEOUS
18 Providing and fixing Stair/ Ent podium railing
of approved design of wrought iron of
including spay painting, etc, complete as per
drawings.
19 Stainless Steel Fire Places
ROOF INSULATION
20 Providing and applying water proofing
treatment on roof in following layers,
2" thick high density thermopore sheet
(25Kg/m3) over 1 layer of polythen sheet of
500 gauge laying over two coats of hot
bitumen @ 25 Kg / m2 over R.C.C roof slab.

Sft

Sft

143

350

50,050

No.

20,000

100,000

Sub-Total of Miscellaneous:

150,050

Sft

9237

75

692,812

Brick tiles floor jointed and grouted with 1:3


cement sand mortar over 4" thick mud
including curing, making slope towards the
drains, complete in all respects as per
drawings, specification and all as directed
by the Engineer.

Structural Works-10

Sr.
No.

DESCRIPTION

CIVIL WORKS
UNIT

21 Making of Roof Khurras 2'x2' in cement Each


concrete 1:2:4 finished with steel trowel
including C.I grating, curing etc, complete in
all respects as per drawings, specifications
and all as directed by the Engineer.

QTY.
8

RATE
(Rs.)

AMOUNT
(Rs.)

1,500

12,000

Sub-Total of Roof insulation:

704,812

Structural Works-11

RESIDENCE MR. ABDUL BASEER


VELANCIA LAHORE
PRICED BILL OF QUANTITIES
PLUMBING
Sr.
No.

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

1.1 Providing and installing water closet


english type, PORTA-China make coupled
cistern , Grohe make 15 mm dia. T.stop cock
,15 mm dia. supply and 32 mm dia. waste
water connections, complete including
testing, colour as specified by the architect.

Nos.

10,500

63,000

1.2 Providing and installing PORTA-China make


wash hand basin, Grohe make 15 mm
dia.T.stop cock,15 mm dia. supply and 32
mm dia. waste water connections, waste
coupling, P-trap complete including testing,
colour as specified.

Nos.

5,000

35,000

1.3 Providing and installing approved make


equivalent make shower cabinet, complete
including testing, colour as specified.

Nos.

45,000

180,000

1.4 Providing and installing approved make bath


tub, Grohe make 15 mm dia.T.stop cock,
waste coupling, P-trap complete including
testing, colour as specified.

Nos.

12,000

48,000

1.5 Providing and installing water closet indian


type, ICL or equivalent make coupled cistern
, Grohe make 15 mm dia. T.stop cock ,15
mm dia. supply and 32 mm dia. waste water
connections, complete including testing,
colour as specified by the architect.

Nos.

4,500

4,500

1.5 Providing and installing Jaccuyci Chinese


make, Grohe make 15 mm dia.T.stop cock,
waste coupling, P-trap complete including
testing, colour as specified.

Nos.

40,000

40,000

1.6 Providing and installing Shower Cabinet


Chinese make, complete including testing,
colour as specified.

Nos.

65,000

260,000

Part-1: PLUMBING FIXTURES

PLUMBING-12
MAIN REDSIDENCE BUILDING

PLUMBING
Sr.
Description
No.
1.6 Providing
and
fixing
15
mm
dia
bibcock/mixer of Grohe or equivalent make
with C.P pipe 15 mm dia. complete including
pipe connections, all fittings, testing etc.

Unit

Quantity

a) Wash basin mixer

Nos.

1,200

8,400

b) Muslim shower with double bib cock

Nos.

1,200

7,200

c) Shower wall mounted with double bib cock

Nos.
Nos.

4
1

850
650

3,400
650

Set

2,500

12,500

Nos.

8,500

8,500

Rft.
Rft.
Rft.
Rft.
Rft.
Rft.

150
290
335
200
365
300

45
55
65
75
110
125

6,750
15,950
21,775
15,000
40,150
37,500

Nos.
Nos.

5
7

125
150

625
1,050

d) Kitchen sink mixer


1.7 Providing and fixing bath room accessories
set consisting of 7 pieces (soap dish, toilet
paper holder, towel rail, Grohe or equivalent
make.

Rate
(Rs.)

Amount
(Rs.)

1.8 Providing and installing Kitchen Sink


Grohe or equivalent make, Grohe make 15
mm dia.T.stop cock,15 mm dia supply and
32 mm dia. waste water connections, waste
coupling, P-trap complete including testing,
colour as specified.
a) single bowl with double drain board
Part-2: INTERNAL WATER SUPPLY
2.1 Providing, fixing, jointing and testing
Polypropylene Random (PPR) pipes Dadex
make "Polydex" or approved equivalent
pressure pipe for cold water as per DIN
8077-8078 for pipes and DIN 16962,PN25
for fittings (polyfusion welded joints) inside
building
including fittings and specials
(sockets, tees, elbows, bends, crosses,
reducers, adaptor, plugs and union etc.)
supported on walls or suspended from roof
slab or run in chases including pipe hangers,
supports, cutting and making good the
chases and holes, complete in all respects.

1/2" i.d (20 mm)


3/4" i.d (25 mm)
1" i.d (32 mm)
1-1/4" i.d (40 mm)
1-1/2" i.d (50 mm)
2" i.d (63 mm)
2.2 Providing and installing ball
valves of
following nominal dia., kitz make ,including
jointing ,fitting, painting, testing, complete in
all respects to match with following G.I pipe
diameters.
1" i.d (32 mm)
1-1/4" i.d (40 mm)

PLUMBING-13
MAIN REDSIDENCE BUILDING

PLUMBING
Sr.
No.

Description

4
2

Rate
(Rs.)
200
265

Amount
(Rs.)
800
530

Rft.
Rft.
Rft.

225
430
745

90
140
180

20,250
60,200
134,100

3.2 Providing and fixing 4" dia uPVC Floor Trap


of make Nikassi or approved equivalent
including Stainless Steel grating ,and cover.

Nos.

10

500

5,000

3.3 Providing and constructing gully trap of size


6" x 6" at locations shown on drawings with
cover, complete in all respects.

Nos.

600

4,200

3.4 Providing and making 9" thick brick masonry


Manhole of 2'x2' size including, plastering,
18" dia C.I manhole cover, complete in all
respects.

Nos.

10

5,000

50,000

3.5 Reinforced cement concrete sewer pipes 6"


dia conforming to ASTM C-14 Class 3
including fittings, excavation bedding,
backfilling, etc, complete.

Rft

610

90

54,900

1-1/2" i.d (50 mm)


2" i.d (63 mm)

Unit

Quantity

Nos.
Nos.

Part-3: INTERNAL SEWERAGE , VENTS &


ROOF DRAINAGE
3.1 Providing, fixing , cutting, jointing and testing
uPVC
piping conforming to
ISO
3633:1991 ( wall thickness=3.2 mm)
including uPVC fittings with solvent cement
jointing Dadex make "Nikasi Type B" or
approved equal , rates include cost of
clamping to walls and ceiling , hangers,
supports, cutting through walls
and
providing sleeves through concrete slabs for
pipelines and pipe fittings of the following
diameter:
2" dia
3" dia
4" dia

PLUMBING-14
MAIN REDSIDENCE BUILDING

PLUMBING
Sr.
No.

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Rft.
Rft.

295
210

40
55

11,800
11,550

Nos.

120

720

5.1 Provide, install, test and commission clean water

Nos.

35,000

70,000

5.2 Providing, installing, testing and commissioning

Nos.

13,500

54,000

Total:

1,288,000

Part-4: GAS SUPPLY


4.1 Providing and fixing G.I. Pipe and fittings
make IIL medium quality for gas supply from
meter to kitchens of each floor including
cutting trenches, burring in floors and walls.
All buried pipes shall be provided with 3"
wide bituminous tape winded around the
pipe.
3/4" dia
1" dia
4.2 Providing and installing ball valves of
following nominal dia, Kitz make, including
jointing, fitting, painting, testing, complete in
all respects to match with following G.I pipe
dia meters.
3/4" dia
Part-5: MISCELLANEOUS
centrifugal submersible pumps of make KSB or
approved equivalent of 25 gpm each capable of
pumping against a total pumping head of 50 ft.
coupled with water cooled electric motor of
requiset HP, 250 volts, 1 - phase, 50 Hz. . The
pump shall be provided with auto / manual
switches, dry running protection, low / high level
water controls with alternative standby duty
operation system, complete in all repects.

stainless steel body gas geyser of 35 gallons


capacity of Ambassadors or equivalent make
including all necessary fittings, valves, complete
in all respects.

PLUMBING-15
MAIN REDSIDENCE BUILDING

Calculation of Quantities
Item
No.
1

Description

EXCAVATION
4-4
5-5
basement plan

ANTI TERMITE
In foundation
EXT WALLS
1-1
2-2
3-3
4-4
F-1
base for swimming pool
PILLER
under floor
Ground Floor Area
Ent.Pavers
Porc
Drawing
Passage +Stair all
Litcen
S.Q
Bat
Bed
swimming pool Podi.
Ext.Passage

First Floor Area


Sitting
Terrace
Living
Passege+Stair all
.Bed
D/Bat
Bed
Dress Bed
Landry
aid
Bat

No.

L (ft)

W (ft)

H (ft)

Qty.

1
1
1

124.5
124.25
4203

4
2.5
1

3
3
5.25

1494
932
22066

Say

25716

1
1
1
1
1
11
1

269.58
139.125
161.663
18.75
41.25
4.5
15.25

2.75
2.75
3.125
2.5
2.75
4.5
23.625

3
3
3
3
3
3
5.25

2224
1148
1516
141
340
668
1891

168

1
1
1
1
1
1
1
1
1
1
1
1

310
20
24
591
15.75
8.50
13.00
15.00
8.63
20.75
49.50
49.25

1
1
1
1
1
1
1
1
1
1
1
1

6.25
20.5
18
223.55
16
21.125
15.75
14.5
15
9
10
6.25

310
356
384
591
209
72
137
300
59
35
248
246

18
16
13.25
8.5
10.5
20
6.83
1.67
5
5

5.5
5.25
15.75
14.5
8.67
13.25
14.5
8.5
6.25
10.5
4
Say

Page 16

Cft

34
108
284
224
232
183
209
210
128
56
105
25
13480

Cft

Calculation of Quantities
Item
No.
3

4
4

Description

No.

L (ft)

W (ft)

H (ft)

Qty.

LEAN CONC.
In foundation
EXT WALLS
1-1
2-2
3-3
4-4
F-1
base for swimming pool

1
1
1
1
1
11
1

269.58
139.125
161.663
18.75
41.25
4.5
15.25

2.75
2.75
3.125
2.5
2.75
4.5
23.625

0.33
0.33
0.33
0.33
0.33
0.33
0.33

245
126
167
15
37
74
119

PILLER

3
Say

168
998

R.C.C.
ROOF SLAB
GROUND FLOOR SLAB

2448.33

0.500

1224

FIRST FLOOR SLAB

2075.51

0.500

1038

Say

2375

SLAB BEAMS
Ground Floor
B3
B4
LB2
LB3
LB4
CB1
CB2
CB3
CB6
PB1
PB2
First Floor
LB1
LB2
LB3
CB1
RB1
RB2
Sec. x - x
Side beam

1
1
1
1
1
1
1
1
1
1
1

57.75
18.75
9.83
20
15
112.125
12.125
42.67
46
21.25
5.83

0.75
0.75
0.75
0.75
0.75
1.5
1.25
1.75
1.75
1.25
0.75

0.75
1
0.75
0.75
1.5
0.33
0.33
0.33
0.33
1
0.5

32
14
6
11
17
56
5
25
27
27
2

1
1
1
1
1
1
2
2
2

13.875
72.045
5.5
24.25
12.125
18.5
13.08
1.67
7.92

0.75
0.75
0.75
1.25
0.75
0.75
7.92
7.92
0.75

1
0.75
0.75
0.75
0.5
0.92
0.33
0.33
1.75
Say

10
41
3
23
5
13
68
9
21
413

Cft

0.750
Say

11
11

Cft

PARGOLAS
20

Cft

1.50

FOOTINGS
Page 17

0.5

Calculation of Quantities
Item
No.

Description
F1
Swimming Pool base

R.C.C Stairs
GF, FF
Waste Slab
Steps

R.C.C walls
Swimming Pool walls

COLUMNS
Up to N.G.L
C1
Ground Floor
C1

No.

L (ft)

W (ft)

H (ft)

Qty.

1
1
1
1
1
1
1

4.00
23.75
23.75
23.75
12.75
12.75
10.00

4
3.5
5.5
6.42
3.5
5.5
6.42

0.750
0.750
0.750
0.750
1.000
1.000
0.330
Say

12
62
98
114
45
70
21
444

Cft

4.000
0.670
Say

85
109
194

Cft

4.580
4.580
Say

109
58
167

Cft

5.000
Say

146
146

Cft

1.500
11.000
7.000
Say

37
53
8
98

Cft

11.000
Say

34
34

Cft

4
10
10
5
8

1775
2787
4126
11931
1337
21957 lbs
9959 Kg
14 Tons

2
36

2
2

13

11
11
2

21.25
4.50

23.75
12.75

1.50

1.50
0.44
0.75

0.5
1

0.5
0.5

1.5

1.5
0.75

First Floor
C1
7

REINFORCMENT
Footings
Columns
Beams
Slabs, Perapet, Pergola
R.C.C Walls

1
1
1
1
1

0.44

444
279
413
2386
167

Say
BRICK MASONRY > 9" and above IN FOUNDATION AND UP TO PL
Ext. Walls
1
252
1.68
1
1
252
0.75
5.5
Internal walls
Kitchen+SQ
1
15.75
1.87
1.25
1
15.75
0.75
5.5
Page 18

422
1040
37
65

Calculation of Quantities
Item
No.

Description

Bath

Swimming

Boundry wall
Item
No.
6

Description

BRICK MASONRY ABOVE PL


GROUND FLOOR
DRAWING ROOM
DRAWING ROOM
BED FRONT
BED FRONT
BACK WALL
BED SIDE WALL
BED WALL
LOUNGE WALL
STORE
STORE
BED FRONT BATH
STAIR
STAIR BATH
STAIR BATH
LOBBY
KITCHNE LAUNDARY
KITCHNE LAUNDARY
KITCHNE LAUNDARY
LESS DOOR
LESS DOOR
LESS DOOR
LESS DOOR

No.

L (ft)

W (ft)

H (ft)

Qty.

1
1
1
1
1
1
1
1
1
1
1
1
No.

8.5
8.5
15.75
15.75
14
14
11.67
11.67
20.75
20.75
270
270
L (ft)

1.87
0.75
1.87
0.75
1.87
0.75
1.87
0.75
1.87
0.75
1.87
0.75
W (ft)

1.25
5.5
1.25
5.5
1.25
5.5
1.25
5.5
1.25
5.5
1
5.5
H (ft)

20
35
37
65
33
58
27
48
48
86
504
1114
Qty.

Say

3819

Cft

10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
7
7
7
7

221
191
287
266
274
349
210
111
186
47
92
162
49
15
98
240
68
22
-21
-110
-20
-16
2755

Cft

2
2
2
2
1
3
1
1
1
1
1
1
2
1
2
2
1
1
1
6
3
1

14.75
12.75
19.124
17.75
36.5
15.5
28
14.75
24.75
12.25
24.125
21.66
6.41
4
6.5
16
9
5.75
-4
-3.5
-2.5
-3

0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.38
0.38
0.75
0.38
0.38
0.75
0.75
0.75
0.38
0.75
0.75
0.38
0.75

FLOOR
GROUND FLOOR
LAWN
PORCH
DRAWING
LOUNGE
FRONT AREA OF KITCHEN
BED

1
1
1
1
1
1

12
11
12
24
9.00
13.75

Page 19

5
15.75
10
10
5
11

1
1
1
1
1
1

34
53
44
67
28
50

Calculation of Quantities
Item
No.

Description
KITCHEN
BACK YARD
FIRST FLOOR
BED
STORE
LOUNGE
FRONT OF STR
BED
FRONT OF TERRACE
TERRACE
MUMTY
SKIRTING
GROUND FLOOR
LAWN
PORCH
DRAWING
LOUNGE
FRONT AREA OF KITCHEN
BED
KITCHEN
BATH
BACK YARD
FIRST FLOOR
BED
STORE
LOUNGE
FRONT OF STR
BED
BATH
FRONT OF TERRACE
TERRACE
MUMTY

No.

L (ft)

W (ft)

H (ft)

Qty.

1
1

9.00
25.00

6.75
10

1
1

32
70

1
1
1
1
1
1
1
1

14
9
24
9
12.00
5.00
5.00
7.00

11
6.75
10
5
10
5
13
10

1
1
1
1
1
1
1
1

50
32
67
28
44
20
36
34
Err:522

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

12
11
12
24
9.00
13.75
9.00
8.00
25.00

5
15.75
10
10
5
11
6.75
6
10

1
1
1
1
1
1
1
1
1

68
106
88
134
56
99
63
56
140

14
9
24
9
12.00
5.00
5.00
5.00
7.00
212.25

11
6.75
10
5
10
5
5
13
10
155.25

1
1
1
1
1
1
1
1
1

99
63
134
56
88
40
40
72
68
276

12
11
12
24
9.00
13.75
9.00
8.00
25.00

5
15.75
10
10
5
11
6.75
6
10

10
10
10
10
10
10
10
10
10

680
1060
880
1340
560
990
630
560
1400

14
9

11
6.75

10
10

990
630

PLASTER ON WALLS
LAWN
PORCH
DRAWING
LOUNGE
FRONT AREA OF KITCHEN
BED
KITCHEN
BATH
BACK YARD
FIRST FLOOR
BED
STORE

2
2
2
2
2
2
2
2
2
2
2
2

Page 20

Calculation of Quantities
Item
No.

Description
LOUNGE
FRONT OF STR
BED
BATH
FRONT OF TERRACE
TERRACE
MUMTY
BOUNDRY WALL

GLAZED TILE
GROUND FLOOR
BATH
BATH
BATH
BATH

W (ft)

H (ft)

Qty.

2
2
2
2
2
2
2
1

24
9
12.00
5.00
5.00
5.00
7.00
59

10
5
10
5
5
13
10
7.00

10
10
10
10
10
10
10
1

1340
560
880
400
400
720
680
413
15113

1
1
1
1
1
1
1
1
1

12
11
12
24
9.00
13.75
9.00
8.00
25.00

5
15.75
10
10
5
11
6.75
6
10

34
53
44
67
28
50
32
28
70

1
1
1
1
1
1
1
1
1

14
9
24
9
12.00
5.00
5.00
5.00
7.00

11
6.75
10
5
10
5
5
13
10

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1

8.00
5.00
28.00
20.00

6
5
7
7

1
1
1
1

2
6
2
2

4
4
3
3

7
7
7
7

8
147
42
35
232

2
2
1

8
5
4

5
5
3.5

16
50
14

LAMINATED WOOD
D1
D2
D3
D4

10

L (ft)

PLASTER ON CEILING
LAWN
PORCH
DRAWING
LOUNGE
FRONT AREA OF KITCHEN
BED
KITCHEN
BATH
BACK YARD
FIRST FLOOR
BED
STORE
LOUNGE
FRONT OF STR
BED
BATH
FRONT OF TERRACE
TERRACE
MUMTY

10

No.

50
32
67
28
44
20
20
36
34
15848

28
20
70
54
172

ALUMINUM WINDOWS
W1
W2
W3

Page 21

Calculation of Quantities
Item
No.

Description
W4
DW
V1

11

No.

L (ft)

W (ft)

2
1
2

4
5
3

5
7
2

40
35
12
167

1
1
1
1

14
11.50
6.50
18.00

25
18
12.5
10

338
207
81
180
806

ROOF INSULATION

FIRST FLOOR
1
CERAMIC TILES FLOOR (Master ) 8"x12"
GROUND FLOOR
BATH-1
DRESS
BATH-2
DRESS
BATH-3
DRESS
POW
PANT
KIT
LAND
SH/BTH
FIRST FLOOR
BATH-4
DRESS
BATH-5
DRESS

Sft

25

34

850

1
1
1
1
1
1
1
1
1
1
2

10.00
10.00
10.00
10.00
11.00
18.00
8.00
10.00
17.00
8.00
4.00

12
7.25
10
9.75
13
13.25
8
8
14
5
6

120
73
100
98
143
239
64
80
238
40
48
0

1
1
1
1

12
10
10
10

10
7.25
10
9.25
Say

120
73
100
93
1627

Sft

Say

144
64
208

Sft

Terrazo Finish
GROUND FLOOR
SER.

Qty.

EXTERNAL FINISH
DRAWING EXTERNAL WALL
PORCH WALL
TERRACE
MUMTY

H (ft)

1
1

12.00
8

12
8

STONE FINISH TILE


GROUND FLOOR
SITTING
COVERED PATIO
OUTER KIT
DINING
DRAWING
VER
PASSAGE
STAIR CASE

1
1
1
1
1
1
1
1
1

22
30
16.00
20.00
23.00
20.00
48.00
62.00
14.00

Page 22

13.25
20
21.75
20
20
20
8
8
12

292
30
348
400
460
400
384
496
168

Calculation of Quantities
Item
No.

Description
POW
CROC
PANT
OPEN SITTING

OPEN BAR
FIRST FLOOR
PASSAGE
10

10

10

TUFF PAVERS
GROUND FLOOR
PORCH

W (ft)

1
1
1
1
1
1
1

8.00
7.00
10.00
43.50
30.00
16.00
20.00

8
8
8
14.6
20
16
20

64
56
80
635
600
256
400
0

48

8
Say

384
5453

Sft

Say

1750
1750

Sft

H (ft)

1750

Qty.

1
1
1

7958.49
22
39.75

1
22
20

2
1

20
18

18
18

20

18

7958
484
795
9237

WOOD SKIRTING
GROUND FLOOR
0.33
0.33
0.33
0.33
Say

50
24
0
50
130

Sft

0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
Say

23
37
46
17
10
12
20
16
9
190

Sft

7
7
7
7
7
7
7

308
242
280
277
336
438
224

PORCLINE TILE SK
GROUND FLOOR
SITTING
PASSAGE
STAIR CASE
CROC
PANT
KIT
SER.
LAND

L (ft)

BRICK TILE ON ROOF

BED
M.BED
FIRST FLOOR
BED
11

No.

1
1
1
1
1
1
1
1
1

22
48.00
62.00
14.00
7.00
10.00
17.00
12.00
8.00

13.25
8
8
12
8
8
14
12
5

CERAMIC TILES FLOOR (Master ) 8"x12"


GROUND FLOOR
BATH-1
DRESS
BATH-2
DRESS
BATH-3
DRESS
POW

1
1
1
1
1
1
1

10.00
10.00
10.00
10.00
11.00
18.00
8.00

Page 23

12
7.25
10
9.75
13
13.25
8

Calculation of Quantities
Item
No.

Description
PANT
KIT
LAND
SH/BTH
FIRST FLOOR
BATH-4
DRESS
BATH-5
DRESS

11

11

13

L (ft)

W (ft)

H (ft)

Qty.

1
1
1
2

10.00
17.00
8.00
4.00

8
14
5
6

1
1
1
1

12
10
10
10

10
7.25
10
9.25

7
7
7
7
7
7
7
7
7
Say

252
434
182
280
0
308
242
280
270
4351

Sft

96
0
90
48
72
88
20
414

Sft

40
96
136

Sft

96
96

Sft

484
104
84
51
723

Sft

SOID WOODEN DOORS


D3
D4
D5
D6
D7
D8
D9

11

No.

GLAZED WOODEN DOORS


D1
D2
Sliding Door
SD1
STAIRS FINISH (GR)
GROUND FLOOR
PODIUM
RISER
MAIN STAIR TR
RISER

3
2
3
4
1

3.75
3
3
2.75
2.5

8
8
8
8
8

1
3

5
4

1
3
21
22

8
8

22
22
4
4

22
1.58
1
0.58
Say

14

14

MARBLE VENITY/KIT TOP


BATH
1ST FLOOR
BATH
BATH

Cabnit Wall mounted


KIT

1.6

29

1
1

7.5
5

1.5
1.5
Say

11
8
48

Sft

Say

65
65

Sft

32.375

Page 24

Calculation of Quantities
Item
No.
14

25

28

Description
Cabnit Floor mounted
KIT

WINDOWS GLAZED
W1
W2
W3
W4
W5
W6
W7
W8
W9
W10
W11
W12
W13
W14
STAIR RAILNG
GF
FF

29

STEEL STAIR

30

WARD ROBES
GROUND FLOOR
Bed
F.F

11

L (ft)

32.375

1
1
1
1
4
2
2
4
1
2
1
1
1
2

1
2

W (ft)

16
15
13
13
12
21
10
8
8
6
4.75
4
3
2

28
12

H (ft)

Qty.

2.75
Say

89
89

Sft

16
16
8
12
7.5
16
16
7
5
5
7.5
5
5
2.5

256
240
104
156
360
672
320
224
40
60
36
20
15
10
2513

Sft

77
66
143

Sft

Sft

2.75
2.75
Say

1
2
1
1

14.455
7
8.625
10.625

10
10
10
10

145
140
86
106
477

SFT

2940
2892
-136
-2513
3343

SFT

Graphiiotoo
Around Building
Around Building
Less Doors
Less Windows

11

No.

1
1

12
12

245
241

Vynile Emultion on ceiling


GROUND FLOOR
Porc
Drawing
Passage +Stair all
Litcen
S.Q
Bat
Bed
swimming pool Podi.
Ext.Passage

1
1
1
1
1
1
1
1
1
1
1

20
24
591
15.75
8.50
13.00
15.00
8.63
20.75
49.50
49.25

FIRST FLOOR
Page 25

18
16
13.25
8.5
10.5
20
6.83
1.67
5
5

356
384
591
209
72
137
300
59
35
248
246

Calculation of Quantities
Item
No.

Description
Sitting
Terrace
Living
Passege+Stair all
.Bed
D/Bat
Bed

11

Dress Bed
Landry
aid
Bat
Vynile Emultion on walls
GROUND FLOOR
Porc
Litcen
S.Q
Bath
FIRST FLOOR
Sitting
D/Bat
Dress Bed
Landry
maid
Bath

No.

L (ft)

W (ft)

H (ft)

Qty.

1
1
1
1
1
1
1
1
1
1
1
1

6.25
20.5
18
223.55
16
21.125
15.75
14.5
15
9
10
6.25

5.5
5.25
15.75

1
1
1
1

20
15.75
8.50
13.00

18
13.25
8.5
10.5

10
5
10
5

755
290
340
235

1
1
1
1
1
1

6.25
21.125
15
9
10
6.25

5.5
8.67
8.5
6.25
10.5
4

10
5
10
10
10
5

235
298
470
305
410
103

34
108
284
224
232
183
209
210
128
56
105
25

14.5
8.67
13.25
14.5
8.5
6.25
10.5
4

7873
11

SFT

Texture Coating
GROUND FLOOR
Drawing
Passage +Stair all
Bed
FIRST FLOOR
Sitting
Living
Passege+Stair all
.Bed
Bed
Dress Bed

1
1
1
1

24
591
15.00
8.63

1
1
1
1
1
1
1

6.25
18
223.55
16
15.75
14.5
15

Page 26

16
20
6.83
5.5
15.75
14.5
13.25
14.5
8.5

10
1
10
10

800
591
700
309

10
10
10
10
10
10
10

235
675
224
610
580
580
470
5774

SFT

27

SALMAN TASEER FARM HOUSE


MEASUREMENT SHEETS
STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

Excavation

NO.

MEASUREMENT
Length

Breadth

Height

Contents

F1

18

5.50

5.50

2.25

1225.13

F2

4.00

4.00

2.25

180.00

F3

4.50

4.50

2.25

182.25

F4

4.00

4.00

2.25

36.00

F4A

4.00

4.00

2.25

36.00

Cavity Wall

162.00

3.50

2.25

1275.75

6.75

3.50

2.25

53.16

22.00

3.50

2.25

173.25

45.00

3.50

2.25

354.38

5.00

3.50

2.25

39.38

26.50

3.50

2.25

208.69

18.50

3.50

2.25

145.69

13.00

3.50

2.25

204.75

13.75

3.50

2.25

108.28

6.75

3.50

2.25

53.16

14.83

3.50

2.25

116.79

6.50

3.50

2.25

102.38

14.50

3.50

2.25

114.19

4.00

3.50

2.25

31.50

32.00

3.50

2.25

252.00

8.00

3.50

2.25

63.00

48.00

3.50

2.25

378.00

18.50

3.50

2.25

291.38

47.00

3.50

2.25

370.13

10.00

3.50

2.25

78.75

32.00

3.50

2.25

252.00

25.75

3.50

2.25

608.34

28

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

NO.

Sec 2-2

MEASUREMENT

Contents

Length

Breadth

Height

20.00

3.00

2.25

675.00

13.00

3.00

2.25

87.75

10.00

3.00

2.25

67.50

60.25

3.00

2.25

406.69

6.00

3.00

2.25

40.50

17.00

3.00

2.25

229.50

20.00

3.00

2.25

135.00

22.00

3.00

2.25

148.50

6.75

3.00

2.25

45.56

7.75

3.00

2.25

104.63

12.00

2.00

1.75

42.00

5.00

2.00

1.75

35.00

17.08

2.00

1.75

119.58

27.17

2.00

1.75

95.10

Sec 4-4

6.75

2.75

2.25

41.77

"

10.00

2.75

2.25

61.88

"

10.75

2.75

2.25

66.52

Swimming pool

1450.00

6.00

8700.00

Water pound

620.00

3.00

1860.00

Fire Place Raft

7.00

3.00

63.00

Total:

19959.74

Sec 2a-2a

Sec 3-3

3.00

Cft

Sand filling
Total Qty of excavation

19959.74

Less Brick work in foundation

-1

-4521.32

Less lean conc. in foundation

-1

-7026.25

Less foundation

-1

-1500.43
Total:

6911.75

Termite proofing
F1

18

5.50

5.50

544.50

F2

4.00

4.00

80.00

F3

4.50

4.50

81.00

Cft

29

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

NO.

F4

MEASUREMENT
Breadth

4.00

4.00

16.00

F4A

4.00

4.00

16.00

Cavity Wall

162.00

3.50

567.00

6.75

3.50

23.63

22.00

3.50

77.00

45.00

3.50

157.50

5.00

3.50

17.50

26.50

3.50

92.75

18.50

3.50

64.75

13.00

3.50

91.00

13.75

3.50

48.13

6.75

3.50

23.63

14.83

3.50

51.91

6.50

3.50

45.50

14.50

3.50

50.75

4.00

3.50

14.00

32.00

3.50

112.00

8.00

3.50

28.00

48.00

3.50

168.00

18.50

3.50

129.50

47.00

3.50

164.50

10.00

3.50

35.00

32.00

3.50

112.00

25.75

3.50

270.38

20.00

3.00

300.00

13.00

3.00

39.00

10.00

3.00

30.00

60.25

3.00

180.75

6.00

3.00

18.00

17.00

3.00

102.00

20.00

3.00

60.00

Sec 2-2

Height

Contents

Length

30

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

MEASUREMENT
Breadth

22.00

3.00

66.00

6.75

3.00

20.25

7.75

3.00

46.50

12.00

2.00

24.00

5.00

2.00

20.00

17.08

2.00

68.33

27.17

2.00

54.34

Sec 4-4

6.75

2.75

18.56

"

10.00

2.75

27.50

"

10.75

2.75

29.56

Swimming pool

1450.00

Water pound

620.00

Fire Place Raft

7.00

under floor

11780.00

Sec 3-3

Height

Contents

Length

Sec 2a-2a

NO.

1450.00

3.00

0.54

334.80

1.00

21.00
11780.00

Total:

Cft

17772.50

Reinforcement bars
Qty as per Footings

3.50

1500

Cft

5251.49

Kg

Qty of slab & stair concrete

4.00

6123

Cft

24490.35

Kg

Qty of beams & lintle concrete

5.00

1642

Cft

8207.86

Kg

Qty of column & walls concrete

6.00

2636

Cft

15817.85

Kg

Total:

53767.54

P.C.C. 1:4:8 using crushed stone under


foundation
F1

18

5.50

5.50

0.50

272.25

F2

4.00

4.00

0.50

40.00

F3

4.50

4.50

0.50

40.50

F4

4.00

4.00

0.50

8.00

F4A

4.00

4.00

0.50

8.00

Cavity Wall

162.00

3.50

0.50

283.50

31

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

Sec 2-2

Sec 2a-2a

NO.

MEASUREMENT

Contents

Length

Breadth

Height

6.75

3.50

0.50

11.81

22.00

3.50

0.50

38.50

45.00

3.50

0.50

78.75

5.00

3.50

0.50

8.75

26.50

3.50

0.50

46.38

18.50

3.50

0.50

32.38

13.00

3.50

0.50

45.50

13.75

3.50

0.50

24.06

6.75

3.50

0.50

11.81

14.83

3.50

0.50

25.95

6.50

3.50

0.50

22.75

14.50

3.50

0.50

25.38

4.00

3.50

0.50

7.00

32.00

3.50

0.50

56.00

8.00

3.50

0.50

14.00

48.00

3.50

0.50

84.00

18.50

3.50

0.50

64.75

47.00

3.50

0.50

82.25

10.00

3.50

0.50

17.50

32.00

3.50

0.50

56.00

25.75

3.50

0.50

135.19

20.00

3.00

0.50

150.00

13.00

3.00

0.50

19.50

10.00

3.00

0.50

15.00

60.25

3.00

0.50

90.38

6.00

3.00

0.50

9.00

17.00

3.00

0.50

51.00

20.00

3.00

0.50

30.00

22.00

3.00

0.50

33.00

6.75

3.00

0.50

10.13

7.75

3.00

0.50

23.25

Cft

Cft

32

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

NO.

Sec 3-3

MEASUREMENT

Contents

Length

Breadth

Height

12.00

2.00

0.50

12.00

5.00

2.00

0.50

10.00

17.08

2.00

0.50

34.17

27.17

2.00

0.50

27.17

Sec 4-4

6.75

2.75

0.50

9.28

"

10.00

2.75

0.50

13.75

"

10.75

2.75

0.50

14.78

Swimming pool

1450.00

0.50

725.00

Water pound

620.00

0.50

310.00

Fire Place Raft

7.00

0.50

10.50

under floor

11780.00

0.33

3887.40

Total:

7026.25

3.00

Cft

R.C.C. 1:1/2:3 in foundations


F1

18

5.00

5.00

0.75

337.50

F2

3.50

3.50

0.50

30.63

F3

4.00

4.00

0.50

32.00

F4

3.50

3.50

0.50

6.13

F4A

3.50

3.50

0.50

6.13

Swimming pool Raft

1450.00

0.50

725.00

Water pound

620.00

0.54

334.80

Fire Place Raft

7.00

3.00

0.50

10.50

FB1

17.75

1.00

1.00

17.75

Total:

1500.43

R.C.C. 1:1/2:3 in Slab, Beams & Lintels


Ground floor
Slab (Ground floor)

6960.00

Sft

0.50

3480.00

500.00

Sft

0.50

250.00

785.00

Sft

0.58

455.30

Cft

33

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

NO.

Slab (1st floor)

MEASUREMENT

Contents

Length

Breadth

Height

1338.00

Sft

0.50

669.00

632.00

Sft

0.79

499.28

Total:

5353.58

Beams
Ground floor
B1

39.25

1.25

1.42

139.34

B2

18.50

0.75

1.58

43.85

B3

37.08

0.75

1.58

43.94

B4

20.33

1.25

0.33

8.39

11.50

1.25

0.33

4.74

22.00

1.25

0.33

9.08

B5

24.25

0.75

1.50

27.28

B6

22.17

0.75

1.00

16.63

43.00

0.75

1.00

32.25

B7

8.00

1.00

0.33

2.64

B8

18.00

2.00

0.33

11.88

B9

14.00

1.25

0.75

13.13

B10

13.75

1.50

0.75

15.47

B11

67.00

1.25

2.00

335.00

B12

19.25

1.00

1.00

38.50

B13

59.00

1.50

0.75

66.38

P1

12

18.00

0.67

1.00

144.72

P2

41.00

0.67

2.00

109.88

P3

13.00

0.50

1.00

58.50

PB1

33.00

1.00

1.00

33.00

SB1

18.75

4.00

0.83

62.25

SB2

6.00

0.83

0.83

4.13

P1

27

8.00

0.67

1.00

144.72

P2

60.75

0.67

2.00

81.41

LB1

22.00

0.75

2.00

33.00

1st floor

Cft

34

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

NO.

MEASUREMENT

Contents

Length

Breadth

Height

L1

3.00

0.75

0.50

0.00

L2

3.25

0.75

0.50

0.00

3.50

1.25

0.50

4.38

3.75

0.75

0.50

0.00

Lintels doors

L3

L4
L5

4.00

1.25

0.50

5.00

L6

4.25

0.75

0.50

7.97

L7

13

4.50

0.75

0.75

32.91

L7a

4.75

0.75

0.75

0.00

L8

5.00

0.75

0.75

0.00

L9

5.25

0.75

0.75

14.77

L10

5.50

0.75

0.75

9.28

5.75

0.75

0.75

0.00

6.00

0.75

0.75

3.38

L13

6.25

0.75

0.75

0.00

L14

6.50

0.75

0.75

0.00

L15

6.75

0.75

0.75

0.00

L16

7.00

0.75

0.75

0.00

L17

7.25

0.75

0.75

0.00

7.50

0.75

0.75

8.44

L19

8.00

0.75

0.75

0.00

L20

8.50

0.75

0.75

0.00

L21

9.00

0.75

0.75

0.00

L21a

9.25

0.75

0.75

0.00

11.00

0.75

0.75

30.94

L23

11.50

0.75

0.75

0.00

L24

12.00

0.75

1.50

0.00

L25

12.50

0.75

1.50

0.00

L11
L12

L18

L22

L26

13.00

0.75

1.50

29.25

L27

13.50

0.75

1.50

15.19

35

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

NO.

MEASUREMENT
Length

Breadth

Height

Contents

Total:

1641.57

Cft

R.C.C. 1:1:2 in Stairs


Main staircase (waste slab)

36.25

4.00

0.58

84.10

Steps

4.0

4.00

1.00

0.58

9.28

4.0

4.00

1.13

0.58

10.44

Main enterance steps (waste slab)

24.00

5.00

0.50

60.00

Steps

1.5

24.00

1.50

0.58

31.32

8.75

4.60

0.50

60.38

10.5

4.50

1.00

0.58

27.41

9.00

3.75

0.50

16.88

1.5

9.00

1.00

0.58

7.83

Total:

307.63

3 No,s short waste Steps (waste


slab)
Steps
Lhort waste Steps (waste slab)
Steps

R.C.C. 1:1:2 in Columns,


Retaining walls, Lift well and
Parapet
Walls (Swimming pool)

Cft

174.00

0.75

6.25

815.63

185.00

0.75

1.50

208.13

102.00

0.50

6.25

318.75

57.50

0.50

6.25

179.69

12

5.00

0.33

6.25

123.75

5.00

1.25

0.75

28.13

C1

1.50

1.50

23.33

209.97

C2

0.79

23.33

91.57

C3

10

1.00

1.00

23.33

233.30

C4

1.00

1.25

23.33

204.14

C5

0.79

23.33

36.63

C6

1.00

23.33

186.64

Total:

2636.31

11.00

27.50

Walls (water pound)

Cft

Ground floor

2.00

First floor
C4

1.00

1.25

Cft

Cft

36

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

NO.

C6

parapet

MEASUREMENT

Contents

Length

Breadth

Height

1.00

2.00

11.00

88.00

127.75

0.33

2.50

105.39

125.00

0.33

2.50

103.13

82.50

0.33

2.50

68.06

84.00

0.33

2.50

69.30

Total:

461.38

Brick Masonry in foundation


Ground Floor
Cavity Wall

162.00

2.25

0.50

182.25

162.00

1.88

0.50

151.88

162.00

1.50

0.50

121.50

162.00

1.13

9.25

1685.81

6.75

2.25

0.50

7.59

6.75

1.88

0.50

6.33

6.75

1.50

0.50

5.06

6.75

1.13

9.25

70.24

22.00

2.25

0.50

24.75

22.00

1.88

0.50

20.63

22.00

1.50

0.50

16.50

22.00

1.13

9.25

228.94

45.00

2.25

0.50

50.63

45.00

1.88

0.50

42.19

45.00

1.50

0.50

33.75

45.00

1.13

9.25

468.28

5.00

2.25

0.50

5.63

5.00

1.88

0.50

4.69

5.00

1.50

0.50

3.75

5.00

1.13

9.25

52.03

26.50

2.25

0.50

29.81

26.50

1.88

0.50

24.84

Cft

37

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

NO.

MEASUREMENT

Contents

Length

Breadth

Height

26.50

1.50

0.50

19.88

26.50

1.13

9.25

275.77

18.50

2.25

0.50

20.81

18.50

1.88

0.50

17.34

18.50

1.50

0.50

13.88

18.50

1.13

9.25

192.52

13.00

2.25

0.50

29.25

13.00

1.88

0.50

24.38

13.00

1.50

0.50

19.50

13.00

1.13

9.25

270.56

13.75

2.25

0.50

15.47

13.75

1.88

0.50

12.89

13.75

1.50

0.50

10.31

13.75

1.13

9.25

143.09

6.75

2.25

0.50

7.59

6.75

1.88

0.50

6.33

6.75

1.50

0.50

5.06

6.75

1.13

9.25

70.24

14.83

2.25

0.50

16.68

14.83

1.88

0.50

13.90

14.83

1.50

0.50

11.12

14.83

1.13

9.25

154.32

6.50

2.25

0.50

14.63

6.50

1.88

0.50

12.19

6.50

1.50

0.50

9.75

6.50

1.13

9.25

135.28

14.50

2.25

0.50

16.31

14.50

1.88

0.50

13.59

14.50

1.50

0.50

10.88

14.50

1.13

9.25

150.89

4.00

2.25

0.50

4.50

38

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

NO.

MEASUREMENT

Contents

Length

Breadth

Height

4.00

1.88

0.50

3.75

4.00

1.50

0.50

3.00

4.00

1.13

9.25

41.63

32.00

2.25

0.50

36.00

32.00

1.88

0.50

30.00

32.00

1.50

0.50

24.00

32.00

1.13

9.25

333.00

8.00

2.25

0.50

9.00

8.00

1.88

0.50

7.50

8.00

1.50

0.50

6.00

8.00

1.13

9.25

83.25

48.00

2.25

0.50

54.00

48.00

1.88

0.50

45.00

48.00

1.50

0.50

36.00

48.00

1.13

9.25

499.50

18.50

2.25

0.50

41.63

18.50

1.88

0.50

34.69

18.50

1.50

0.50

27.75

18.50

1.13

9.25

385.03

47.00

2.25

0.50

52.88

47.00

1.88

0.50

44.06

47.00

1.50

0.50

35.25

47.00

1.13

9.25

489.09

10.00

2.25

0.50

11.25

10.00

1.88

0.50

9.38

10.00

1.50

0.50

7.50

10.00

1.13

9.25

104.06

32.00

2.25

0.50

36.00

32.00

1.88

0.50

30.00

32.00

1.50

0.50

24.00

32.00

1.13

9.25

333.00

39

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

Sec 2-2

NO.

MEASUREMENT

Contents

Length

Breadth

Height

25.75

2.25

0.50

86.91

25.75

1.88

0.50

72.42

25.75

1.50

0.50

57.94

25.75

1.13

9.25

803.88

20.00

2.25

0.50

112.50

20.00

1.88

0.50

93.75

20.00

1.50

0.50

75.00

20.00

1.13

0.50

56.25

20.00

0.75

9.25

693.75

13.00

2.25

0.50

14.63

13.00

1.88

0.50

12.19

13.00

1.50

0.50

9.75

13.00

1.13

0.50

7.31

13.00

0.75

9.25

90.19

10.00

2.25

0.50

11.25

10.00

1.88

0.50

9.38

10.00

1.50

0.50

7.50

10.00

1.13

0.50

5.63

10.00

0.75

9.25

69.38

60.25

2.25

0.50

67.78

60.25

1.88

0.50

56.48

60.25

1.50

0.50

45.19

60.25

1.13

0.50

33.89

60.25

0.75

9.25

417.98

6.00

2.25

0.50

6.75

6.00

1.88

0.50

5.63

6.00

1.50

0.50

4.50

6.00

1.13

0.50

3.38

6.00

0.75

9.25

41.63

17.00

2.25

0.50

38.25

40

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

Sec 2a-2a

Sec 3-3

NO.

MEASUREMENT

Contents

Length

Breadth

Height

17.00

1.88

0.50

31.88

17.00

1.50

0.50

25.50

17.00

1.13

0.50

19.13

17.00

0.75

9.25

235.88

20.00

2.25

0.50

22.50

20.00

1.88

0.50

18.75

20.00

1.50

0.50

15.00

20.00

1.13

0.50

11.25

20.00

0.75

9.25

138.75

22.00

2.25

0.50

24.75

22.00

1.88

0.50

20.63

22.00

1.50

0.50

16.50

22.00

1.13

0.50

12.38

22.00

0.75

9.25

152.63

6.75

2.25

0.50

7.59

6.75

1.88

0.50

6.33

6.75

1.50

0.50

5.06

6.75

1.13

0.50

3.80

6.75

0.75

9.25

46.83

7.75

2.25

0.50

17.44

7.75

1.88

0.50

14.53

7.75

1.50

0.50

11.63

7.75

1.13

0.50

8.72

7.75

0.75

9.25

107.53

12.00

1.88

0.50

11.25

12.00

1.50

0.50

9.00

12.00

1.13

0.50

6.75

12.00

0.75

9.25

83.25

5.00

1.88

0.50

9.38

5.00

1.50

0.50

7.50

5.00

1.13

0.50

5.63

41

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

Sec 4-4

"

"

NO.

MEASUREMENT

Contents

Length

Breadth

Height

5.00

0.75

9.25

69.38

17.08

1.88

0.50

32.03

17.08

1.50

0.50

25.62

17.08

1.13

0.50

19.22

17.08

0.75

9.25

236.99

27.17

1.88

0.50

25.47

27.17

1.50

0.50

20.38

27.17

1.13

0.50

15.28

27.17

0.75

9.25

188.49

6.75

2.25

0.50

7.59

6.75

1.88

0.50

6.33

6.75

1.50

0.50

5.06

6.75

1.13

0.50

3.80

6.75

0.75

9.25

46.83

10.00

2.25

0.50

11.25

10.00

1.88

0.50

9.38

10.00

1.50

0.50

7.50

10.00

1.13

0.50

5.63

10.00

0.75

9.25

69.38

10.75

2.25

0.50

12.09

10.75

1.88

0.50

10.08

10.75

1.50

0.50

8.06

10.75

1.13

0.50

6.05

10.75

0.75

9.25

74.58

Total:

12868.36

Brick Masonry
Ground floor
Cavity Wall

162.00

13.00

2106.00

6.75

13.00

87.75

22.00

13.00

286.00

45.00

13.00

585.00

Cft

42

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

11

Sec 2-2

Sec 2a-2a

Sec 3-3

NO.

MEASUREMENT
Length

Breadth

Height

Contents

5.00

13.00

65.00

26.50

13.00

344.50

18.50

13.00

240.50

13.00

13.00

338.00

13.75

13.00

178.75

6.75

13.00

87.75

14.83

13.00

192.79

6.50

13.00

169.00

14.50

13.00

188.50

4.00

13.00

52.00

32.00

13.00

416.00

8.00

13.00

104.00

48.00

13.00

624.00

18.50

13.00

481.00

47.00

13.00

611.00

10.00

13.00

130.00

32.00

13.00

416.00

25.75

13.00

1004.25

-1

76.00

13.00

-988.00

Total:

7719.79

20.00

0.75

13.00

975.00

13.00

0.75

13.00

126.75

10.00

0.75

13.00

97.50

60.25

0.75

13.00

587.44

6.00

0.75

13.00

58.50

17.00

0.75

13.00

331.50

20.00

0.75

13.00

195.00

22.00

0.75

13.00

214.50

6.75

0.38

13.00

32.91

7.75

0.38

13.00

75.56

12.00

0.75

13.00

117.00

Sft

43

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

NO.

MEASUREMENT

Contents

Length

Breadth

Height

5.00

0.75

13.00

97.50

17.08

0.75

13.00

333.06

27.17

0.75

13.00

264.91

6.75

0.75

13.00

65.81

10.00

0.75

13.00

97.50

10.75

0.75

13.00

104.81

22.00

1.13

11.00

272.25

60.75

1.13

11.00

751.78

13.17

1.13

11.00

162.98

30.25

1.13

11.00

374.34

20.00

0.75

13.00

780.00

10.00

0.75

13.00

195.00

D1

-1

4.50

0.75

8.00

-27.00

D2

-2

4.00

0.75

8.00

-48.00

D3

-5

3.75

0.75

8.00

-112.50

D4

-11

3.00

0.75

8.00

-198.00

D5

-4

2.75

0.75

8.00

-66.00

D6

-2

2.50

0.75

13.00

-48.75

-2

10.00

0.75

13.00

-195.00

-2

10.00

0.75

13.00

-195.00

Total:

5421.35

Sec 4-4

1st floor

Sec 2-2

Deductions

Sec 2a-2a

6.75

13.00

87.75

7.75

13.00

201.50

Total:

289.25

Horizontal D.P.C
Cavity Wall

162.00

1.13

364.50

6.75

1.13

15.19

Cft

Sft

44

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

22

Sec 2-2

Sec 2a-2a

NO.

MEASUREMENT
Height

Contents

Length

Breadth

22.00

1.13

49.50

45.00

1.13

101.25

5.00

1.13

11.25

26.50

1.13

59.63

18.50

1.13

41.63

13.00

1.13

58.50

13.75

1.13

30.94

6.75

1.13

15.19

14.83

1.13

33.37

6.50

1.13

29.25

14.50

1.13

32.63

4.00

1.13

9.00

32.00

1.13

72.00

8.00

1.13

18.00

48.00

1.13

108.00

18.50

1.13

83.25

47.00

1.13

105.75

10.00

1.13

22.50

32.00

1.13

72.00

25.75

1.13

173.81

-1

76.00

1.13

-85.50

20.00

0.75

75.00

13.00

0.75

9.75

10.00

0.75

7.50

60.25

0.75

45.19

6.00

0.75

4.50

17.00

0.75

25.50

20.00

0.75

15.00

22.00

0.75

16.50

6.75

0.38

2.53

7.75

0.38

5.81

45

STRUCTURAL WORKS
Note: All measurements are calculated for estimate only. These measurements cannot be used for
payments.
SI. No.

DESCRIPTION

NO.

Sec 3-3

Sec 4-4

MEASUREMENT
Height

Contents

Length

Breadth

12.00

0.75

9.00

5.00

0.75

7.50

17.08

0.75

25.62

27.17

0.75

20.38

6.75

0.75

10.13

10.00

0.75

15.00

10.75

0.75

16.13
Total:

1732.65

Sft