facilities. The proposed project is that we receive your comments before documents issued by the Commission,
associated with CNYOG’s existing the date specified below. Please such as orders, notices, and
Stagecoach Storage Project which has carefully follow these instructions to rulemakings.
been in operation since 2002 and has a ensure that your comments are received In addition, the Commission now
working storage capacity of 13.25 billion in time and properly recorded: offers a free service called eSubscription
cubic feet (Bcf). The Stagecoach Phase II • Send an original and two copies of which allows you to keep track of all
Expansion Project would convert four your comments to: Magalie R. Salas, formal issuances and submittals in
existing natural gas production fields Secretary, Federal Energy Regulatory specific dockets. This can reduce the
that are nearly depleted into storage Commission, 888 First St., NE., Room amount of time you spend researching
reservoirs in Bradford County, 1A, Washington, DC 20426; proceedings by automatically providing
Pennsylvania and Tioga County, New • Reference Docket No. CP06–64– you with notification of these filings,
York. The facilities required by the 000; document summaries and direct links to
project would include: An additional • Label one copy of the comments for the documents. Go to www.ferc.gov/
12,000-horsepower electric-drive the attention of the Gas Branch 1, PJ– esubscribenow.htm.
centrifugal compressor unit; eight 11.1; and
• Mail your comments so that they Magalie R. Salas,
storage injection/withdrawal wells;
will be received in Washington, DC on Secretary.
approximately 6.7 miles of 6-inch- and
20-inch-diameter gathering pipeline and or before August 28, 2006. [FR Doc. E6–12712 Filed 8–4–06; 8:45 am]
associated rights-of-way; eight wellhead Please note that the Commission BILLING CODE 6450–01–P

meter stations and other appurtenant strongly encourages electronic filing of


facilities, including isolation valves, any comments or interventions or
separators, measurement and protests to this proceeding. See 18 CFR DEPARTMENT OF ENERGY
communication equipment; about 4.4 385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at http:// Federal Energy Regulatory
miles of access roads not contained Commission
within pipeline or well easements; and www.ferc.gov under the ‘‘e-Filing’’ link
a 9.3-mile-long, 20-inch-diameter lateral and the link to the User’s Guide. Before [Project No. 1971–079]
(North Lateral) from the existing you can file comments you will need to
compressor station to the proposed create an account which can be created Idaho Power Company; Notice of
Millennium Pipeline located north of on-line. Availability of the Draft Environmental
the town of Owego, New York.1 Comments will be considered by the Impact Statement for the Hells Canyon
The purpose of the project is to Commission but will not serve to make Hydroelectric Project
support increased demand for natural the commentor a party to the
July 28, 2006.
gas service in the northeast United proceeding. Any person seeking to
become a party to the proceeding must In accordance with the National
States. The connection and integration Environmental Policy Act of 1969 and
of the additional reservoirs would file a motion to intervene pursuant to
Rule 214 of the Commission’s Rules of the Federal Energy Regulatory
essentially double the working storage Commission’s (Commission)
capacity of the Stagecoach Facility from Practice and Procedures (18 CFR
385.214).2 Only intervenors have the regulations, 18 CFR part 380 (Order No.
13.25 Bcf to about 26.25 Bcf. The 486, 52 FR 47897), the Office of Energy
increase in storage capacity is expected right to seek rehearing of the
Projects has reviewed the application
to extend the facility’s capability to Commission’s decision.
Affected landowners and parties with for license for the Hells Canyon Project
handle withdrawals at a maximum rate (FERC No. 1971), located on the Snake
of 500,000 million cubic feet (Mcf)/day environmental concerns may be granted
intervenor status upon showing good River in Washington and Adams,
from the existing level of 12 consecutive Counties, Idaho, and Wallowa and
days to 20 consecutive days. cause by stating that they have a clear
and direct interest in this proceeding Baker Counties, Oregon, and has
The EA has been placed in the public
which would not be adequately prepared a Draft Environmental Impact
files of the FERC. A limited number of
represented by any other parties. You do Statement (draft EIS) for the project.
copies of the EA are available for
not need intervenor status to have your About 5,270 acres of Federal lands
distribution and public inspection at:
comments considered. administered by the Forest Service
Federal Energy Regulatory Commission,
Additional information about the (Payette and Wallowa-Whitman
Public Reference Room, 888 First Street,
project is available from the National Forests and Hells Canyon
NE., Room 2A, Washington, DC 20426,
Commission’s Office of External Affairs, National Recreational Area) and the
(202) 502–8371.
Copies of the EA have been mailed to at 1–866–208–FERC or on the FERC Bureau of Land Management are
Federal, State and local agencies, public Internet Web site (www.ferc.gov) using included within the project boundary.
the eLibrary link. Click on the eLibrary The draft EIS contains staff
interest groups, interested individuals,
link, click on ‘‘General Search’’ and evaluations of the Idaho Power
newspapers, and parties to this
enter the docket number excluding the Company’s proposal and the
proceeding.
Any person wishing to comment on last three digits in the Docket Number alternatives for relicensing the Hells
the EA may do so. To ensure field. Be sure you have selected an Canyon Project. The draft EIS
consideration prior to a Commission appropriate date range. For assistance, documents the views of governmental
decision on the proposal, it is important please contact FERC Online Support at agencies, non-governmental
FercOnlineSupport@ferc.gov or toll free organizations, affected Indian tribes, the
1 The Millennium Pipeline Project was approved
at 1–866–208–3676, or for TTY, contact public, the license applicant, and
Commission staff.
sroberts on PROD1PC70 with NOTICES

by the Commission on September 19, 2002 in (202)502–8659. The eLibrary link also
Docket Nos. CP98–150–000. Construction of the A copy of the draft EIS is available for
Millennium Pipeline has not commenced to date, provides access to the texts of formal
review in the Commission’s Public
and Millennium Piepline L.P. is currently seeking
Commission approval for design and route changes 2 Interventions may also be filed electronically via Reference Branch, Room 2A, located at
to its project in Docket Nos. CP98–150–006 and the Internet in lieu of paper. See the previous 888 First Street, NE., Washington, DC
CP98–150–007. discussion on filing comments electronically. 20426, 1–866–208–3676,

VerDate Aug<31>2005 17:19 Aug 04, 2006 Jkt 208001 PO 00000 Frm 00078 Fmt 4703 Sfmt 4703 E:\FR\FM\07AUN1.SGM 07AUN1
Federal Register / Vol. 71, No. 151 / Monday, August 7, 2006 / Notices 44683

public.referenceroom@ferc.gov. The Carter at (202) 502–6512, If you are a landowner receiving this
draft EIS also may be viewed on the emily.carter@ferc.gov. notice, you may be contacted by a Puget
Commission’s Web site at http:// representative about the acquisition of
Magalie R. Salas,
www.ferc.gov under the eLibrary link. an easement to construct, operate, and
Secretary.
Enter the docket number excluding the maintain the proposed facilities. The
[FR Doc. E6–12717 Filed 8–4–06; 8:45 am] pipeline company would seek to
last three digits in the docket number
BILLING CODE 6450–01–P negotiate a mutually acceptable
field to access the document. For
assistance, contact FERC Online agreement. However, if the project is
Support at approved by the Commission, that
DEPARTMENT OF ENERGY
FERCOnlineSupport@ferc.gov or toll- approval conveys with it the right of
free at 1–866–208–3676, or for TTY, Federal Energy Regulatory eminent domain. Therefore, if easement
(202) 502–8659. Commission negotiations fail to produce an
agreement, the pipeline company could
CD versions of the draft EIS have been [Docket No. CP06–412–000] initiate condemnation proceedings in
mailed to everone on the mailing list for accordance with state law.
the project. Copies of the CD, as well as Puget Sound Energy, Inc., Notice of
a limited number of paper copies, are Intent To Prepare an Environmental Summary of the Proposed Project
available from the Public Reference Assessment for the Proposed Jackson Puget is seeking authorization to
Prairie Storage Deliverability design, construct, operate, and maintain
Room identified above.
Expansion Project, Request for the following new facilities at the
You may also register online at Comments on Environmental Issues existing JP Storage Field in Lewis
http://www.ferc.gov/docs-filing/
July 28, 2006. County, Washington:
esubscription.asp to be notified via e- • Up to ten new withdrawal/injection
mail of new filings and issuances The staff of the Federal Energy
Regulatory Commission (FERC or wells with associated well connect
related to this or other pending projects. pipeline;
For assistance, contact FERC Online Commission) will prepare an
environmental assessment (EA) that will • About 0.8 mile of new 24-inch-
Support. diameter pipeline to loop a portion of
discuss the environmental impacts of
Comments should be filed with the Jackson Prairie (JP) Storage the existing gathering system;
Magalie R. Salas, Secretary, Federal Deliverability Expansion Project • One new 10,480-horsepower (hp)
Energy Regulatory Commission, 888 involving abandonment, construction, compressor unit at the existing JP
First Street, NE., Washington, DC 20426. and operation of facilities by Puget Compressor Station; and
All comments must be filed by October Sound Energy, Inc. (Puget) in Lewis • Upgrades and auxiliary facility
3, 2006, and should reference Project County, Washington.1 The Commission additions at both the JP Compressor
No. 1971–079. Comments may be filed will use the EA in its decision-making Station (total 1,551 hp increase) and JP
process to determine whether or not to Meter Station.
electronically via the Internet in lieu of
authorize the project. This notice Puget also requests to abandon
paper. The Commission strongly various facilities that would be replaced
encourages electronic filings. See 18 announces the opening of the scoping
period that will be used to gather by the proposed upgraded facilities.
CFR 385.2001(a)(1)(iii) and instructions The existing JP Storage Field
on the Commission’s Web site at environmental input from the public
and interested agencies on the project. interconnects with Northwest Pipeline
http://www.ferc.gov under the eLibrary Corporation’s transmission system
Your input will help us determine the
link. which provides natural gas supplies to
issues that need to be evaluated in the
Anyone may intervene in this EA. Please note that the scoping period markets in the Pacific Northwest.
proceeding based on this draft EIS (18 will close on August 28, 2006. Puget’s proposed new and upgraded
CFR 380.10). You must file your request This notice is being sent to potentially facilities would allow it to increase
to intervene as specified above.1 You do affected landowners; Federal, State, and maximum firm withdrawal
not need intervenor status to have your local government agencies; elected deliverability of the JP Storage Field
comments considered. officials; environmental and public from 850 million cubic feet per day
interest groups; Native American Tribes, (MMcfd) to 1,150 MMcfd. Puget is
In addition to or in lieu of sending expected to commence construction for
other interested parties; local libraries
written comments, you are invited to the drilling of up to five of the new
and newspapers. State and local
attend public meetings that will be held government representatives are asked to wells and installation of associated well
to receive comments on the draft EIS. notify their constituents of this planned connect lines in the spring of 2007.
Two meetings have been scheduled for project and encourage them to comment Production rate tests on the initial wells
Thursday night, September 7, and on their areas of concern. would be conducted to help determine
Friday morning, September 8, 2006, in A fact sheet prepared by the FERC the minimum number of wells required
Boise, Idaho. Details of these public entitled ‘‘An Interstate Natural Gas to achieve the desired 300 MMcfd. The
meetings, and other meetings yet to be Facility on My Land? What Do I Need remaining facilities are anticipated to be
scheduled, will be included in a To Know?’’ is available for viewing on constructed in 2008.
separate notice, as well as posted on the the FERC Web site (www.ferc.gov). This The general location of Puget’s
Commission’s Web site (www.ferc.gov). fact sheet addresses a number of proposed facilities is shown on the map
typically asked questions, including the attached as Appendix 1.2
For further information, contact Alan
Mitchnick at (202) 502–6074, use of eminent domain and how to
sroberts on PROD1PC70 with NOTICES

2 The appendices referenced in this notice are not


alan.mitchnick @ferc.gov; or Emily participate in the Commission’s
being printed in the Federal Register. Copies of this
proceedings. notice, other than appendix 1 (maps), are available
on the Commission’s Web site at the ‘‘eLibrary’’ link
1 Interventions may also be filed electronically via 1 Puget’s application was filed with the or from the Commission’s Public Reference Room,
the Internet in lieu of paper. See the previous Commission under section 7 of the Natural Gas Act 888 First Street, NE., Washington, DC 20426, or call
discussion on filing comments electronically. and part 157 of the Commmission’s regulations. Continued

VerDate Aug<31>2005 17:19 Aug 04, 2006 Jkt 208001 PO 00000 Frm 00079 Fmt 4703 Sfmt 4703 E:\FR\FM\07AUN1.SGM 07AUN1

Você também pode gostar