Você está na página 1de 2

43440 Federal Register / Vol. 71, No.

147 / Tuesday, August 1, 2006 / Notices

function in the braided channel. Barbs 9. Local diversion of the thalweg 1. Chickaloon Village, Angie Wade.
are built at an angle into the flow of upstream and downstream of the spur 2. Knikatnu Corp, Jennifer Raschke.
water to redirect flows away from the dikes away from the river bank. Based 3. Native Village of Eklutna, Marc
bank and back towards the center of the on observations of this river and Lamoreaux.
channel, whereas the rounded spur dike conventional experience with spur An interdisciplinary group including
head may direct flow back towards the dikes, the influence zone is roughly 500 the Matanuska-Susitna Borough Project
bank between dikes. However, building feet up and downstream of each dike. Planning and Land Development Staff,
a full barb structure into the Matanuska Beyond this distance, the Matanuska PND Consulting Engineers, USDA
River would require a large amount of River could easily swing into the bank Natural Resources Conservation Service
material and land due to the long again. (NRCS), biologists, engineers,
distance from the shore to where the 10. Increase in erosive effects at or environmental specialist, cultural
channel is being directed. The near structures due to increased flow resources coordinator, resource
composite structure is intended to velocities near tip of structures. conservationist, and others helped
minimize rock fill requirements in the 11. Possible increase of bank erosion gather basic project information,
river while presenting a more fish- immediately upstream or downstream of developed the preliminary
friendly approach to bank protection in structures due to repositioning of determinations of the environmental
a challenging braided river system. thalweg. and social effects of the alternatives, and
There are no threatened and provided input for the development of
Effect of Recommended Action endangered species or state species of this document. Local area residents, as
1. The spur dike is a proven bank concern, known in the project area. well as other private individuals and
protection technology on this stretch of However the river represents an agencies, were contacted during plan
river. The existing four spur dikes have important migratory corridor for five development to provide needed
protected the bank in their area of species of salmon. There are no known information and coordinate activities.
influence. sole source aquifers, prime and unique Agency consultation and public
2. The modification to the head of the farmlands, wild and scenic rivers or participation to date have shown no
spur dike is expected to provide a more wilderness areas designated in the unresolved significant conflicts with
fish-friendly migration pathway than project area. implementation of the selected plan.
the round-head style currently on site. There will be no irretrievable and
irreversible loss of natural resources, Conclusion
The barb-headed spur dike design
allows the water to move differentially except for fossil fuel during The Environmental Assessment
across the submerged portion of the dike construction activities and portions of summarized above indicates that this
head and thus adjust to flows. At higher needed equipment and materials which Federal action will not cause significant
flow rates, the barb-head design spreads have no recycling potential. No impacts local, regional, or national impacts on
the flow out and slows the velocity. to cultural or historic resources will the environment. Therefore, based on
3. The affects of the spur dike are occur. No environmental justice issues the above findings, I determine neither
expected to be localized to the project are at risk. the proposed action nor any of the
area. No significant environmental impacts alternatives is a major federal action
will result from installation of the significantly affecting the quality of the
4. Approximately 0.5 to 1 acre of
proposed measures. human environment, and that an
recovered riparian area for the spur dike
will be established. Natural revegetation Consultation—Public Participation environmental impact statement is not
will occur along the bank and is needed for the Construction in the
An ongoing series of monthly
expected to consist of locally available Matanuska River of Spur Dike #5, at
meetings are held open to the public by
grasses, shrubs, and trees. Palmer, Alaska.
the Circleview and Stampede Estates
5. Reduce loss of land (approximately Erosion Service Area. The Draft Dated: July 20, 2006.
1–4 acres) over next 50 years. Environmental Assessment for the Thomas Hedt,
6. Reduction of long term project was published May 26, 2006. No Assistant State Conservationist—Programs,
maintenance and repair costs of lost comments or questions were received by NRCS.
infrastructure and residential structures the NRCS or the project sponsors. [FR Doc. E6–12349 Filed 7–31–06; 8:45 am]
(estimated at $0.5–1 million). A pre-application meeting was held BILLING CODE 3410–16–P
7. The new spur dikes will have on August 24, 2005 to discuss both the
minor effects on navigation in the river. permitting and EA for this project. The
The barb head design alternative purpose of this meeting was to
features a submerged weir tip which is introduce the project to the agency DEPARTMENT OF COMMERCE
designed to overtop. This should not personnel who will be reviewing the
pose a significant hazard to navigation, Bureau of the Census
permit applications and to ensure that
however, because only shallow draft their comments and concerns were Dynamics of Economic Well-Being
river boats will typically be present in incorporated into the EA and permit System
the river, and the boaters are application.
accustomed to shallow conditions Other agency contact includes several AGENCY: Bureau of the Census,
which prevail in many areas of the river. e-mails and phone calls between the Department of Commerce.
8. While there are initial capital and Borough hired consultant and the ACTION: Notice of public meeting.
annual O&M costs for construction of agencies regarding structures or
the spur dike, these could be methodologies the agencies SUMMARY: The Bureau of the Census
rwilkins on PROD1PC63 with NOTICES

outweighed by the short and long-term recommended for review. (U.S. Census Bureau) is giving notice of
costs to the community for loss of land, At the request of NRCS, the a meeting to discuss the re-engineering
structures, infrastructure, and utilities. consultant contacted via phone and e- of the Survey of Income and Program
General effects on the river will mails the following Alaska native Participation (SIPP)—specifically, the
include: villages: content of the new survey.

VerDate Aug<31>2005 20:04 Jul 31, 2006 Jkt 208001 PO 00000 Frm 00008 Fmt 4703 Sfmt 4703 E:\FR\FM\01AUN1.SGM 01AUN1
Federal Register / Vol. 71, No. 147 / Tuesday, August 1, 2006 / Notices 43441

DATES: August 24, 2006. The meeting data, combined with a new ACTION: Notice of Opportunity to
will begin at approximately 10 a.m. and demographic survey instrument. A Request Administrative Review of
adjourn at approximately 12 noon. major goal of this new system is to Antidumping or Countervailing Duty
ADDRESSES: The meeting will be held in develop monthly estimates of whether Order, Finding, or Suspended
the Gannett/Hollerith conference rooms and how much individuals participate Investigation.
at the U.S. Census Bureau Headquarters, in cash-assistance programs and to
4700 Silver Hill Road, Suitland, include a longitudinal component.
FOR FURTHER INFORMATION CONTACT:
Maryland 20746–8500. The meeting is open to the public, Sheila E. Forbes, Office of AD/CVD
FOR FURTHER INFORMATION CONTACT: and a brief period is set aside for public
Operations, Office 4, Import
David Johnson, Chief, Housing and comment and questions. Those persons
Administration, International Trade
Household Economics Statistics with extensive questions or statements
must submit them in writing, at least Administration, U.S. Department of
Division, Department of Commerce, U.S.
three days before the meeting, to the Commerce, 14th Street and Constitution
Census Bureau, Room 1071, Federal
Building 3, Washington, DC 20233. His Committee Liaison Officer named Avenue, NW., Washington, DC 20230,
telephone number is (301) 763–6443. above. Seating is available to the public telephone: (202) 482–4697.
SUPPLEMENTARY INFORMATION: The SIPP on a first-come, first-serve basis. Background
has been the primary data source used This meeting is physically accessible
by policymakers to evaluate the to people with disabilities. Requests for Each year during the anniversary
effectiveness of government programs sign language interpretation or other month of the publication of an
and to analyze the impacts of options auxiliary aids should be sent via e-mail antidumping or countervailing duty
for modifying them. The SIPP’s to Mary Chin (mary.p.chin@census.gov) order, finding, or suspension of
longitudinal design has many at least two weeks prior to the meeting. investigation, an interested party, as
advantages, but imposes considerable Dated: July 26, 2006. defined in section 771(9) of the Tariff
burden on respondents and makes Charles Louis Kincannon, Act of 1930, as amended, may request,
review and data processing difficult and in accordance with section 351.213
Director, Bureau of the Census.
time-consuming. The re-engineered (2002) of the Department of Commerce
system, to be known as the dynamics of [FR Doc. E6–12329 Filed 7–31–06; 8:45 am]
BILLING CODE 3510–07–P
(the Department) Regulations, that the
economic well-being system, is Department conduct an administrative
expected to reduce respondent burden review of that antidumping or
and attrition and deliver data on a
DEPARTMENT OF COMMERCE countervailing duty order, finding, or
timely basis. Although it will not supply
suspended investigation.
the same level of detail as the SIPP, its International Trade Administration
design must offer policymakers and Opportunity to Request a Review: Not
researchers data that address the same Antidumping or Countervailing Duty later than the last day of August 2006,1
basic issues. Order, Finding, or Suspended interested parties may request
The dynamics of economic well-being Investigation; Opportunity To Request administrative review of the following
system will use data from current Administrative Review orders, findings, or suspended
demographic surveys and investigations, with anniversary dates in
administrative records to identify a AGENCY: Import Administration, August for the following periods:
population cohort that will be measured International Trade Administration,
longitudinally by using administrative Department of Commerce.

Period

Antidumping Duty Proceeding


Argentina:
Oil Country Tubular Goods, A–357–810 ................................................................................................................................ 8/1/05–7/31/06
Seamless Line and Pressure Pipe, A–357–809 .................................................................................................................... 8/1/05–7/31/06
Australia: Corrosion-Resistant Carbon Steel Flat Products, A–602–803 ..................................................................................... 8/1/05–7/31/06
Belgium: Cut-to-Length Carbon Steel Plate, A–423–805 ............................................................................................................. 8/1/05–7/31/06
Brazil:
Cut-to-Length Carbon Steel Plate, A–351–817 ..................................................................................................................... 8/1/05–7/31/06
Seamless Line and Pressure Pipe, A–351–826 .................................................................................................................... 8/1/05–7/31/06
Canada: Corrosion-Resistant Carbon Steel Flat Products, A–122–822 ....................................................................................... 8/1/05–7/31/06
Czech Republic: Carbon and Alloy Seamless Standard, Line, and Pressure Pipe (Under 41⁄2 Inches), A–851–802 ................. 8/1/05–8/13/05
Finland: Cut-to-Length Carbon Steel Plate, A–405–802 ............................................................................................................... 8/1/05–7/31/06
France:
Corrosion-Resistant Carbon Steel Flat Products, A–427–808 .............................................................................................. 8/1/05–7/31/06
Stainless Steel Sheet and Strip in Coils 2, A–427–814 ......................................................................................................... 7/1/05–6/30/06
Germany:
Corrosion-Resistant Carbon Steel Flat Products, A–428–815 .............................................................................................. 8/1/05–7/31/06
Cut-to-Length Carbon Steel Plate, A–428–816 ..................................................................................................................... 8/1/05–7/31/06
Seamless Line and Pressure Pipe, A–428–820 .................................................................................................................... 8/1/05–7/31/06
Italy:
Grain Oriented Electrical Steel, A–475–811 .......................................................................................................................... 8/1/05–3/13/06
rwilkins on PROD1PC63 with NOTICES

Oil Country Tubular Goods, A–475–816 ................................................................................................................................ 8/1/05–7/31/06


Granular Polytetrafluoroethylene Resin, A–475–703 ............................................................................................................. 8/1/05–7/31/06

1 Or the next business day, if the deadline falls

on a weekend, federal holiday or any other day


when the Department is closed.

VerDate Aug<31>2005 20:04 Jul 31, 2006 Jkt 208001 PO 00000 Frm 00009 Fmt 4703 Sfmt 4703 E:\FR\FM\01AUN1.SGM 01AUN1

Você também pode gostar