Escolar Documentos
Profissional Documentos
Cultura Documentos
Issued in Renton, Washington, on July 20, Management, Dept. C1–L5A (D800– additional requirements of paragraph (b)
2006. 0024). This information may be of this AD must be done on airplanes in
Ali Bahrami, examined at the FAA, Transport Configuration 4, as defined in Boeing
Manager, Transport Airplane Directorate, Airplane Directorate, 1601 Lind Alert Service Bulletin MD80–29A070,
Aircraft Certification Service. Avenue, SW., Renton, Washington; or at Revision 1. Therefore, we have revised
[FR Doc. E6–12092 Filed 7–28–06; 8:45 am] the FAA, Los Angeles Aircraft paragraph (a) of this AD accordingly.
BILLING CODE 4910–13–P Certification Office, 3960 Paramount We also have clarified the Cost Impact
Boulevard, Lakewood, California. section of this AD in regard to the
FOR FURTHER INFORMATION CONTACT: airplane configurations.
DEPARTMENT OF TRANSPORTATION Elvin Wheeler, Aerospace Engineer,
Conclusion
Systems and Equipment Branch, ANM–
Federal Aviation Administration
130L, FAA, Los Angeles Aircraft We have carefully reviewed the
Certification Office, 3960 Paramount available data and determined that air
14 CFR Part 39
Boulevard, Lakewood, California safety and the public interest require
[Docket No. 2001–NM–387–AD; Amendment 90712–4137; telephone (562) 627–5344; adopting the AD with the change
39–14696; AD 2006–15–15] fax (562) 627–5210. described previously. We have
RIN 2120–AA64 SUPPLEMENTARY INFORMATION: A determined that this change will neither
proposal to amend part 39 of the Federal increase the economic burden on any
Airworthiness Directives; McDonnell Aviation Regulations (14 CFR part 39) to operator nor increase the scope of the
Douglas Model DC–9–81 (MD–81), DC– include an airworthiness directive (AD) AD.
9–82 (MD–82), DC–9–83 (MD–83), DC– that is applicable to certain McDonnell
9–87 (MD–87), and MD–88 Airplanes Douglas Model DC–9–81 (MD–81), DC– Cost Impact
9–82 (MD–82), DC–9–83 (MD–83), DC–
AGENCY: Federal Aviation There are approximately 1,063
9–87 (MD–87), and MD–88 airplanes,
Administration, DOT. airplanes of the affected design in the
was published as a second
ACTION: Final rule. supplemental notice of proposed worldwide fleet. We estimate that 732
rulemaking (NPRM) in the Federal airplanes of U.S. registry (i.e., airplane
SUMMARY: This amendment adopts a Configurations 1 through 4; we do not
new airworthiness directive (AD), Register on March 14, 2006 (71 FR
13050). That action proposed to require know how many airplanes are in
applicable to certain McDonnell Configuration 4) will be affected by this
Douglas airplane models, that requires a a one-time inspection for chafing or
signs of arcing of the wire bundle for the AD, that it will take up to 12 work hours
one-time inspection for chafing or signs per airplane to accomplish the required
of arcing of the wire bundle for the auxiliary hydraulic pump, and other
specified and corrective actions, as inspection and other specified actions,
auxiliary hydraulic pump, and other and that the average labor rate is $65 per
specified and corrective actions, as applicable. That action also proposed to
require, for certain airplanes, work hour. Required parts will cost up
applicable. This AD also requires that, to $524 per airplane. Based on these
for certain airplanes, installation of installation of additional protective
sleeving on the upper portion of the figures, the cost impact of this AD on
additional protective sleeving on the U.S. operators is estimated to be up to
upper portion of the auxiliary hydraulic auxiliary hydraulic pump wire
assembly. $954,528, or up to $1,304 per airplane.
pump wire assembly. This AD results
from reports of shorted wires and Comments For airplanes in Configuration 4, as
evidence of arcing on the power cables defined in Boeing Alert Service Bulletin
We provided the public the MD80–29A070, Revision 1, it will take
of the auxiliary hydraulic pump, as well
opportunity to participate in the approximately 2 work hours to
a fuel system reviews conducted by the
development of this AD. No comments accomplish the required additional
manufacturer. We are issuing this AD to
have been received on the second wiring protection, at an average labor
prevent shorted wires or arcing at the
supplemental NPRM or on the rate of $65 per work hour. Required
auxiliary hydraulic pump, which could
determination of the cost to the public. parts will cost approximately $40 per
result in loss of auxiliary hydraulic
power, or a fire in the wheel well of the Explanation of Changes to the Second airplane. Based on these figures, the cost
airplane. The actions specified by this Supplemental NPRM impact of this action on an affected
AD are also intended to reduce the airplane is estimated to be $170 per
In paragraph (a) of the second
potential of an ignition source adjacent airplane.
supplemental NPRM we inadvertently
to the fuel tanks, which, in combination referred to Configurations 1 through 3 The cost impact figures discussed
with flammable fuel vapors, could result when we should have referred to above are based on assumptions that no
in a fuel tank explosion and consequent Configurations 1 through 4. It was our operator has yet accomplished any of
loss of the airplane. intent that the requirements of the proposed requirements of this AD
DATES: Effective September 5, 2006. paragraph (a) apply to Configurations 1 action, and that no operator would
The incorporation by reference of a through 4 airplanes, as described in the accomplish those actions in the future if
certain publication listed in the referenced Boeing Alert Service Bulletin this AD were not adopted. The cost
regulations is approved by the Director MD80–29A070, Revision 1, dated July impact figures discussed in AD
of the Federal Register as of September 28, 2005. As described in the preamble rulemaking actions represent only the
5, 2006. of the second supplemental NPRM, we time necessary to perform the specific
ADDRESSES: The service information added paragraph (c) to this AD to give actions actually required by the AD.
rmajette on PROD1PC67 with RULES1
referenced in this AD may be obtained credit for actions done before the These figures typically do not include
from Boeing Commercial Airplanes, effective date of this AD in accordance incidental costs, such as the time
Long Beach Division, 3855 Lakewood with the original issue of Boeing Alert required to gain access and close up,
Boulevard, Long Beach, California Service Bulletin MD80–29A070, dated planning time, or time necessitated by
90846, Attention: Data and Service August 3, 2004, except that the other administrative actions.
VerDate Aug<31>2005 14:56 Jul 28, 2006 Jkt 208001 PO 00000 Frm 00005 Fmt 4700 Sfmt 4700 E:\FR\FM\31JYR1.SGM 31JYR1
43036 Federal Register / Vol. 71, No. 146 / Monday, July 31, 2006 / Rules and Regulations
VerDate Aug<31>2005 14:56 Jul 28, 2006 Jkt 208001 PO 00000 Frm 00006 Fmt 4700 Sfmt 4700 E:\FR\FM\31JYR1.SGM 31JYR1