Plan. The following species covered DEPARTMENT OF THE INTERIOR Action to the BLM on September 10,
under the proposed Plan would not be 1999, and the Notice of Intent was
covered under Alternative 3: the vernal Bureau of Land Management published in the Federal Register on
pool crustaceans, limestone salamander, [UT–080–06–1310–EJ] October 22, 1999 (64 FR 57122). A
California red-legged frog, giant garter notice of availability of the Draft EIS
snake, bank swallow, tricolored Notice of Availability of a Final (DEIS) and a 45-day comment period
blackbird, Buena Vista Lake shrew, Environmental Impact Statement for was published in the FR on August 8,
riparian brush rabbit, riparian woodrat, the Resource Development Group 2003.
Tipton kangaroo rat, and 11 plant Uinta Basin Natural Gas Project, The BLM prepared the FEIS to assess
species. This alternative would focus on Uintah County, UT the environmental and economic
those species that are currently Federal impacts associated with natural gas
AGENCY: Bureau of Land Management, development in the Uinta Basin, Utah.
or State listed and have been identified
Department of Interior. The FEIS is a complete document. It
as having more than 2 acres of habitat
ACTION: Notice of availability. includes Section 7 consultation and
likely to be disturbed by operations or
Biological Opinion from the FWS, plus
maintenance activities each year. SUMMARY: Under the National a presentation of substantive comments
Avoidance and minimization measures, Environmental Policy Act (NEPA), the received on the DEIS. The FEIS also
thresholds for implementation of Federal Land Policy and Management includes the BLM’s responses to these
avoidance and minimization measures, Act of 1976 (FLPMA) and associated comments and changes to the text in
and habitat compensation would be the regulations, the Bureau of Land response to the comments. Changes
same as the proposed Plan. Management (BLM) announces the were made to clarify, correct and/or
Under the No-Action/No-Project availability of a Final Environmental expand information to aid the public’s
alternative, the proposed Plan would Impact Statement (FEIS) for the understanding of the proposed project,
not be adopted, and a permit pursuant Resource Development Group Uinta reasonable alternatives and their effects
to section 10(a)(1)(B) of the ESA would Basin Natural Gas Project proposed by of the environment.
not be issued by the Service. the Resource Development Group The FEIS analyzes four alternatives
Compliance with the ESA would (RDG). for managing natural gas development
continue to be addressed on a case-by- DATES: A decision on the proposed on private, State of Utah, and BLM-
case basis. action will not be made until 30 days administered lands.
after the date EPA publishes this notice Alternative 1—The Proposed
Public Comments in the Federal Register (FR). Written Action—consists of the development of
comments may be submitted during this 423 natural gas wells, access roads,
The Service and PG&E invite the support facilities, a transmission
public to comment on the draft Plan, 30-day period.
pipeline, and a compressor station
draft EIS/EIR, and draft IA during a 90- ADDRESSES: Copies of the FEIS are
within the 79,914 acres project area.
day public comment period beginning available for public inspection at the
Alternative 2—Additional Wildlife
on the date of this notice. The comment following BLM office locations: Bureau
Considerations—would incorporate the
period is opened for 90 days to of Land Management, Utah State Office
same construction, operational,
eliminate the need for an extension 440 West 200 South, Suite 500, Salt
decommissioning, and reclamation
subsequent to the close of the comment Lake City, UT 84101 and the Bureau of
components as the Proposed Action,
period. All comments received, Land Management, Vernal Field Office,
with the addition of environmental
including names and addresses, will 150 South 500 East, Vernal, UT 84078.
considerations that could require the
become part of the administrative record FOR FURTHER INFORMATION CONTACT: relocation of well pads, roads, and
and may be made available to the Stephanie Howard, Project Manager, ancillary facilities within the lease, or
public. BLM Vernal Field Office 170 South 500 restrict development during certain
East, Vernal, UT 84078. Ms. Howard periods of the year, or require special
The Service will evaluate the may also be reached at 435–781–4469.
application, associated documents, and construction, operational, and
SUPPLEMENTARY INFORMATION: An reclamation methods to reduce potential
comments submitted thereon to prepare
Environmental Assessment (EA) was environmental impacts. Alternative 3—
the Final EIS/EIR, HCP and IA. A permit originally published in February 1999. Additional Environmental
decision will be made no sooner than 30 A Decision Record (DR)/Finding of No Considerations—would incorporate the
days after the publication of the final Significant Impact (FONSI) was signed same operational components as the
EIS/EIR and completion of the Record of by the BLM on January 29, 1999. Alternative 1 and the same
Decision. Subsequent to its decision, the BLM environmental considerations as
This notice is provided pursuant to received 12 requests for a State Director Alternative 2 as well as the expansion
section 10(a) of the ESA and Service Review and one request for a stay of the of the mule deer winter range protection
regulations for implementing NEPA, as DR/FONSI. A stay was issued until boundary and the application of United
amended (40 CFR 1506.6). We provide April 16, 1999 and subsequently States Fish and Wildlife Service
this notice in order to allow the public, extended, pending a thorough review of recommended guidelines for raptor
agencies, or other organizations to the requests received. Those requesting protection. Under this alternative, 50
review and comment on these the review and stay questioned the fewer wells would be drilled over the
documents. nature and extent of impacts disclosed life of the project when compared to the
in the EA and the validity of the DR/ Alternatives 1 and 2 (i.e., only 373
Dated: June 16, 2006.
FONSI. On May 21, 1999, the DR/FONSI wells). Alternative 4—No Action—
jlentini on PROD1PC65 with NOTICES
Douglas Vandegraft, was vacated and the proposal was would allow current land use practices
Acting Deputy Manager, California/Nevada remanded to the BLM, Vernal Field including existing oil and gas
Operations Office, Sacramento, California. Office (VFO) for the preparation of an production to continue. It was assumed
[FR Doc. E6–9847 Filed 6–22–06; 8:45 am] environmental impact statement (EIS). that 55 wells would be drilled over the
BILLING CODE 4310–55–P RDG operators submitted their Proposed 20 year life of the project, under the No
VerDate Aug<31>2005 17:22 Jun 22, 2006 Jkt 208001 PO 00000 Frm 00083 Fmt 4703 Sfmt 4703 E:\FR\FM\23JNN1.SGM 23JNN1
36136 Federal Register / Vol. 71, No. 121 / Friday, June 23, 2006 / Notices
VerDate Aug<31>2005 17:22 Jun 22, 2006 Jkt 208001 PO 00000 Frm 00084 Fmt 4703 Sfmt 4703 E:\FR\FM\23JNN1.SGM 23JNN1