For more than 30 years, REKIND

was reliable and trusted in building:


More than 11 Fertilizer Plants in Indonesia;
The largest Ammonium Nitrate Prill Plant in
the ASEAN region with capacity of 300,000
tons / year; More than 12 Geothermal
2
/
96

Power Plant with total capacity of 727 MW;


The first floating Liquefied Natural Gas
facilities in Indonesia; The first national
company that develops Basic & Detail
Engineering, Procurement, Construction,
and Commissioning (EPCC) of CO2 Removal
Unit. Focusing on the development of it's
expertise, we always try to become a part of
solution for our client and become pride
of the nation.

3
/
96

VISION & MISSION 9

SEVERAL PROJECTS 42

BRAND PERSONALITY 10

SBU REFINERY & PETROCHEMICAL

CORPORATE VALUES 12
ABOUT US 15
OUR HISTORY 17
REKIND SERVICES 18
SCOPE OF PROJECT 21
PROJECT GUARANTEE 21
4
/
96

PROJECT EXECUTION 22
HSE, QUALITY, 24
RISK MANAGEMENT POLICY

PROJECT PROFILE
TABLE OF EXPERIENCE LIST

44

48
52

SBU M.E.I. (MINERAL, 58


ENVIRONMENT, & INFRASTRUCTURE)
PROJECT PROFILE
TABLE OF EXPERIENCE LIST

62
64

SBU ONSHORE OIL & GAS

68

SBU GEOTHERMAL & POWER

76

SBU OFFSHORE OIL & GAS

84

PROJECT PROFILE
TABLE OF EXPERIENCE LIST

PROJECT PROFILE
TABLE OF EXPERIENCE LIST

72
74

80
82

OUR PEOPLE 25

PROJECT PROFILE
TABLE OF EXPERIENCE LIST

HEALTH & SAFETY ENVIRONMENT

29

PORTFOLIO UNIT 91

CORPORATE SOCIAL 33
RESPONSIBILITY

OFFICE FACILITIES 92

ORGANIZATION STRUCTURE 38
STRATEGIC BUSINESS UNIT 41

CONTENTS

88
89

AWARDS & CERTIFICATES 93


CONTACT US 96

5
/
96

6
/
96

REKIND is an Indonesian integrated EPC


company with an excellent track record in
technology and innovation that provides
comprehensive and effective solutions,
including project investment services
in new and renewable energy sector.

7
/
96

VISION
TO BECOME A WORLD CLASS
8
/
96

COMPANY IN THE FIELD OF


INTEGRATED INDUSTRIAL ENGINEERING,
CONSTRUCTION, COMMISSIONING,
AND COMPETITIVE INVESTMENT

MISSION

To provide and complete engineering and

construction services, for domestic and

To increase company long term value through


investment management

overseas market, by giving priority to high


quality services and innovation in technology

To give added values to customers, share


holders, employees and public in line with the

To improve competency in engineering and


construction and develop responsive and
powerful organization

To perform a good corporate governance

companys growth

9
/
96

BRAND
PERSONALITIES
10
/
96

Reliable

Caring

REKIND consistently fulfills its promises with

REKIND always fosters the consciousness of

integrity, ethical behavior and responsibility.

the need for building good relationships with

Future-Oriented

11
/
96

and among its stakeholders.

REKIND consistently proactive through its

Nationalistic

continuing dynamic spirit that drives the

REKIND believes that the strength of our nation

anticipation of opportunities and challenges for

must be further leveraged in the interest of all

both short and long term.

of our people rather than a privileged few.

Knowledgeable
REKIND has comprehensive knowledge
relevant to its expertise so that it can provide
the solutions needed.

THE LETTER R FORMED BY RECTANGLES THAT MERGE INTO ARROW SHAPES


STRENGTHENS THE IMAGE OF DYNAMIC SPIRIT AND FUTURE ORIENTATION

CONCERN
FOR PEOPLE

INTEGRITY
Sincerity, candid, honesty,
consistency between words

Improving and developing Human

and actions, and the willingness

Resources as the companys

to sacrifice personal interests,

main asset, by treating them in a

applied consistently; as well

transparent, fair, objective,

as seriously apply the values

and proportional manner,

of decency and compliance,

in order that they can willingly make

responsible and accountable in

active contributions by prioritizing

any situation and condition.

occupational safety and health as


well as increasing the values of the
company by taking into account the
interests of the stakeholders.

12

13

/
96

/
96

P O S I T I V E
I M P A C T

CUSTOMER'S
SATISFACTION
Strongly commits to provide
services beyond the expectation

INNOVATION
Having high spirit of creating,
searching and utilizing

PROFESSIONALISM

TEAMWORK

through harmonious relationship

Continuously possessing and

Awareness and willingness

technology in the context of

in order to achieve mutual

developing knowledge and

to form synergy among

providing quality excellence,

satisfaction.

expertise according to the functions,

individuals, work units, clients,

improving competitiveness and

and being responsible for the

and work partners by utilizing

added value of the company.

optimal performance achievement

all capabilities sincerely and

with due observance of the

intelligently in order to achieve

professional and ethical standards.

the companys objectives.

of each customer by providing


quality services and products

opportunities continuously
through the implementation
of information, knowledge and

in a reliable and timely manner

CORPORATE
VALUES

14
/
96

01

ABOUT
US

"REKIND always works professionally and


consistently where both of them are the
synergy in making good corporate governance
in every business process."

15
/
96

OUR
HISTORY

16
/
96

PT Rekayasa Industri (also called as REKIND) was

Each Strategic Business Unit works as a partner

established by the Government of the Republic of

of the client, giving one stop solution. ranging

Indonesia on August 12, 1981 to develop national

from project conception up to the operation and

capabilities in Engineering, Procurement and

maintenance services. All works undertaken were

Construction services for large industrial plant.

completed in the highest international standard,

In the first 5 years of its operation, its main core

supported by a strong operational team and

business were chemical and petrochemical

modern technology. To present the finest result,

industries. Furthermore, taking into consideration of

REKIND utilized advance and modern information

the current market segment and demand, REKIND

technology, such as PDS (Plant Design System),

evolves and develops its competency and expertise

E Procurement and ERP AXAPTA. In 2007,

toward a world class company in its field.

REKIND re-emphasized its commitment to


become a company with a global and customer

REKAYASA OFFICE BUILDING 2,


JL. KALIBATA TIMUR I NO. 36, SOUTH JAKARTA

To meet market requirement and improve better

centric vision through the implementation of

ways to serve the wider market, since 2005 REKIND

cluster systems during the project execution.

took a bold step by changing its management

Through the cluster systems, comprising of civil,

structure and establishing Strategic Business

mechanical, instrument, electrical, process and

Units focusing in industry and energy segments,

piping, each technical discipline will be responsible

those are:

for the project execution from the initial stage of

1. Refinery and Petrochemical

engineering up to the commissioning. Through

2. Mineral, Environment, and Infrastructure

our 32 years of experience, REKIND today is one

3. Onshore Oil & Gas

of the leading national Engineering, Procurement,

4. Geothermal & Power

Construction and Commissioning (EPCC)

5. Offshore Oil & Gas

companies in Indonesia and abroad.

17
/
96

REKIND
SERVICES
MODERNIZATION OF LUBE OIL BLENDING PLANT, SURABAYA /
OWNER: PT PERTAMINA (PERSERO)
18
/
96

Total EPCC

Procurement Services

Provides complete and integrated

Provides purchasing, expediting, shipping &

Engineering, Procurement, Construction &

transportation of foreign and local equipment or

Commissioning services.

material, including, if necessary, provides importing

Engineering Services
Provides basic and detail engineering services-from
PFD (Process Flow Diagram), P & ID, Plant layout,

raw material for local fabricator.

Project Management
Consultancy Services

Single line diagram, Loop diagram, Civil G including

Provides project management services and project

foundation and structure design, pipe stress

management consultancy on behalf of owner (EPC-

analysis, Equipment & motor list, if necessary shop

Management), including Feasibility Study Services.

drawing-up to inquiry documents PDS (Plant Design


System of INTEGRAPH and AUTOCAD).

Construction &
Commissioning
Provides construction management services, rigging
study (including our latest PDS rigging simulation),
construction works, and commissioning services.

Plant Operation
& Maintenance
Provides operation and maintenance services,
including furnishing plant management, supplying
personnel and consumables.

19
/
96

20
/
96

SCOPE OF
PROJECT

PROJECT
GUARANTEE

Complete Turnkey Projects

Schedule Guarantee

Starting from grass root (site preparation, survey,

Most all of the projects were completed on or

soil study, reclamation) up to the commissioning

ahead schedule.

of the plant.

Expansion Projects

All of the projects were commissioned in

Plant capacity increase: from basic and detail

accordance with the schedule and project

engineering, including its simulation, procurement,

quality specifications.

construction, & commissioning.

Safety Guarantee

Revamping Projects

REKIND received THE 2004 SAFETY AWARD from

Plant improvement: from basic and detail

the President of Republic Indonesia, with more than

engineering of, including its simulation,

10 millions man-hour of work with no-accident and

up to procurement & commissioning.

received the OHSAS certificate for International

Relocation Projects
Plant relocation and recondition: from the
assessment of the existing plant condition,
relocation, assembly, and retrofit with new facilities.

SURALAYA COAL FIRED STEAM POWER PLANT 1 X 625 MW,


BANTEN / OWNER: PT PERUSAHAAN LISTRIK NEGARA (PERSERO)

Quality Guarantee

Health and Safety standard in 2007.

21
/
96

PROJECT
EXECUTION

22
/
96

REKIND has a proven track records of success in

To present the finest result of our services, REKIND

many types of upstream and downstream projects

utilized advanced and modern information &

in domestic and foreign countries. Customers have

communication technology, including but not

the opportunity to apply this wealth of knowledge

limited to PDS 3D Plant Modelling System, E-Pro

and expertise to the project conception, feasibility

(Electronic Procurement System), E-Doc (Electronic

study, technology arrangement, project initiation

Document Management System), MMS (Material

assistance and financing arrangement of their

Management System), FMCS (Field Material

projects. As an overall groups, REKINDs project

Control System), WCS (Welding Control System),

teams work hand in hand with our respected

and ERP AXAPTA. REKIND has also developed

customers and our most valuable partners as well

its own Project Management Software, known as

as our suppliers. With the approach of Cost-Quality-

SIMPROSA, to control project executions. Using

Time based Competition, where cost, quality and

the borderless office system, the companys

time are considered as our main constraints, the

own internal networking system is integrated

schedule, quality and cost are our first priority.

with international networks for Head Office to

23
/
96

communicate directly with Site Offices, mobile


Every project awarded to REKIND is organized

stations, suppliers, R&D institutions and government

under the direction of a Vice President of the

department and agencies.

responsible SBU whose together with the respective


supporting units, responsible for maintaining
the quality, cost and schedule of the project
and reporting to the Executive Vice President.
Each Strategic Business Unit being supported by
Strategic Resource Unit consists of EPC Operations
Unit, Project Services Unit, and Shared Services
Unit, who participate in the project execution,
preparation of proposals and consultancy services.

CO2 REMOVAL SUBANG PROJECTS, JAWA BARAT


/ OWNER: PT PERTAMINA D.O.H CIREBON

QUALITY
POLICY
1. Performing all of its activities based on customer

HEALTH,
SAFETY, &
ENVIRONMENT
POLICY

needs (customer oriented) to meet or exceed


customers contractual requirement;

2. Achieving or exceeding all corporate nancial


1. Put the occupational health, safety and

targets in achieving the companys growth by


always applying transparency principles;

environment to our top priority;

3. Prioritizing safety and environment with

2. Continually

continues efforts in increasing product quality,


speed of execution, and cost saving by

implementing state of the arts technologies and


also expanding its network of resources; and

24
/
96

4. Developing new capabilities through innovative


value creation by implementing knowledge
management system.

RISK
MANAGEMENT
POLICY

improving HSE performance

based on legal requirement, government

regulation, SMK3, OHSAS 18001:2007


standards and ISO 14001:2004 standards which
adjusted to the condition and risk level
identified at the company;

3. Prevent injuries and job illness related to hazard


on workplaces;

4. Prevent environmental pollution and impact on


any operation;

5. Comply with applicable legal and other


requirements in relation to hazards that exist in
the company;

"REKINDs major capital in winning the

objectives;

competition is a long experience with diverse

6. Provide the framework to set and review HSE


7. Organize documentation, implementation and
maintenance of HSE Management System;

1. To detect/identify risks as early as possible in


any and all activities;

2. To conduct assessment on risk level by taking


into account the impact and the likelihood of
the risks;

3. To evaluate the risk sources and causes as the


basis to map and control significant risks;

4. To

control risks which may jeopardize the

sustainability of the company; and

5. To continuously monitor risks which particularly


have significant impact to the company.

02

OUR
PEOPLE

8. Facilitate all employees, vendors and sub-

accomplishments and capabilities working on

contractors in giving information regarding


all aspect of HSE implemented under the control

large scale projects, our human capital is integral

of the company; and

9. Review HSE Management System periodically


in ensuring that it remains relevant and
appropriate to the company.

& invaluable ingredient for our success."

25
/
96

OUR
PEOPLE

TA L E N T W I N S
GAMES, BUT
26
/
96

TEAMWORK AND

As an EPC company, REKINDs success relies

The human capital development focused on the

heavily on the capability of human capital as the

following programs:

spearhead of the companys competitiveness. This

WINS

Rekayasa Knowledge Center Software

refined through various domestic and overseas

as Knowledge Management platform

of public classes, in-house trainings, or lessons


to anticipate the challenges, namely the erce

27
/
96

2. Training and courses, in the form of


Competency Based Development

Program (COMBAD Pro)

competition and increasing rapid development of


global technology.
Declaring concern for people as one of its corporate
value, REKIND is committed in implementing
competency based human resources management
and competent quality oriented resources. Based

3. Seminar and Workshop


4. Professional membership
and Certification

5. Scholarship

on Human Capital Development blue print,


throughout the years there have been several
milestone achieved in reaching the vision. REKINDs
Competency Directories was rstly published in
2008, that serves as guideline for both employees
and management in reaching the ultimate goals
on Human Capital Development. In the years after,

6. Coaching
7. Talent assessment
8. Structured career path and plan,

several program such as Rekayasa Knowledge

monitored using Human Capital

Center (RKC), competency based career path

Management System Software

initiative, job evaluation, Competency Based


Development Program (COMBAD Pro), talent
management, and Human Capital Management
System (HCMS).
POSITIVE CORPORATE CULTURE

education and training programs, either in the form

in order to fulfil clients expectations on expert

C H A M P I O N S H I P S .

Systemized learning and sharing using

capability has been continuously honed and

learned, so that the company has been able

INTELLIGENCE

1.

EPCIC SUBSEA PIPELINE AND ORF MUARA KARANG


FLNG WEST JAVA / OWNER: PT NUSANTARA REGAS

03

28
/
96

Throughout the years REKIND has awarded 56

forum of discussion with the expert. It is also as a

scholarships for its staff to further study abroad and

knowledge data bank in various kinds of files, such

local universities. Some others programs to improve

as office files and interactive video files. By log-in

skill and knowledge are continuously arranged and

RKC employees are eligible to access individual

always been involved the employees participation

record of learning & development; training program;

such as Sharing Program and Lesson Learned

on-going and incoming program; and even to

Program. Human Capital Empowerment as the unit

register on-line for the whole programs within

in-charge on human resources matters also provides

learning & development programs. We also can find

services of Counseling for employees both for

the e-Library as well in here.

personal counseling and career counseling.


REKIND focuses on the development of human
To speed up the knowledge transfer, REKIND has

resources quality by implementing corporate

established the knowledge system on-line which

values which consists of Integrity, Focus on

is known as RKC (Rekayasa Industri Knowledge

Customer,Professional, Teamwork, Innovation,

Centre). It is able to be accessed by all employees.

and Concern for People. REKIND believes that

As a web-based knowledge system on-line, RKC

human resource is one of the REKINDs strongest

is a hub of knowledge. Everyone is able to share

differentiation values.

knowledge, to get the problem solving through

HEALTH & SAFETY


ENVIRONMENT

"They may defined success by many criteria,


but in REKIND, we are ensuring that the safest
work environment for our employees is a must.
It helps us to build trust which have been given
by customers. In getting there, we are not only
achieve but also activating Occupational Health
and Safety Assessment Series (OHSAS)
in our daily activities."

29
/
96

SAFETY
ISNT

30
/
96

EXPENSIVE,
ITS
P R I C E L E S S .

HEALTH & SAFETY


ENVIRONMENT
REKIND as an Engineering, Procurement, and

In line with the increasing demand for HSE

31

Construction (EPC) company has a vision to

personnel on REKIND projects, Corporate HSE

/
96

become a World Class Industrial, Engineering,

initiated a program called HSE training school in

and Construction Company placing occupational

2013. The purpose of this program is to create

health, safety and environment matters as top

the HSE personnel in supervisor level in order to

priority and being the concern and business of

be ready for the assigned projects in REKIND. In

every REKINDs employees related vendor and

addition to that, this program is also a form of

sub contractor in their daily activities. In every

corporate HSE CSR program to educate the public

implementation of its project, REKIND always

and the stakeholders surrounding the project

refers its standards to international scale of Safety

as HSE training school participants come from

Management System: OHSAS (Occupational Health

surrounding communities.

and Safety Assessment Series) 18001 : 2007, whose


certification is granted by Det Norske Veritas (DNV)

Material presented covers 17 HSE passport training

at the end of 2007.

plus some other material deemed necessary and


in accordance with the conditions of each project.

This certificate specifications gives requirement

Participants who take part in this training and

for an occupational health and safety (OH&S)

will
successfully pass the standard values specified,

management system, to enable organization to

receive a certificate of graduation which will surely

control its performance and minimize its risk and

add value to the participants of the HSE training

business also to ameliorate the performance of

school.

business. This also a proof that all requirements


related to safety (emergency team, self protection

Currently, HSE training school was held in Pusri II-B

devices, working procedure, security of working

project as the pilot project. Later this program is

environment, etc.) has been fulfilled in every aspect

expected to be a solution to meet the needs of HSE

of activity conducted by REKIND.

personnel who are competent and have sufficient


insight into the HSE.

PRIORITIZING OCCUPATIONAL HEALTH,


SAFETY AND ENVIRONMENT MATTERS.

04

32
/
96

CORPORATE SOCIAL
RESPONSIBILITY

"Our continuous effort to give the best


contribution through social responsibility
IMPLEMENTATION OF PROFESSIONAL ATTITUDES AND BEHAVIORS.

function has strengthened REKINDs


achievement as a leading EPC company.
It is a long term commitment to develop
a sustainable environment."

33
/
96

CORPORATE SOCIAL
RESPONSIBILITY

O N LY A L I F E
34
/
96

LIVED FOR
OTHERS IS A LIFE
W O R T H W H I L E .

Beside reaching a profit, the company is also

and skill to carry out social role of the company pro-

insisting to increase quality of life for community

actively (corporate culture). Thirdly, the placement

and its environment. The appearing of collective

of task force in organization structure, budget and

corporate awareness (as a concept) boost business

program of CSR can represent the seriousness of

organization to voluntarily consider wide public

the company to carry out CSR. Fourthly, report

interest by involving more than its basic adhered

(activities, impact and finance) can present

obligation to the company to increase quality of

descriptive information. Awareness concerning

life from its stakeholder (customer, employee,

the kind and type of its business make REKIND

clients, shareholders, public surroundings) and give

focuses on sustainability role to project and head

added value to quality of environments. This is a

quarter environment. Sustainability means paying

fundamental idea of Corporate Social Responsibility

attention to the need of current generation, without

(CSR).

compromising the need of next generation. The


essence of REKIND CSR program is the increasing

Firstly, CSR program appears from the Principal

quality of life environment either before or after

idea concerning the vision and mission of the

REKIND project.

company to accommodate and reflect background,

CSR ACTIVITIES IN WAYANG WINDU GEOTHERMAL


POWER PLANT PROJECT, WEST JAVA

purpose and policy which support CSR activities.

The objectives of CSR role for REKIND has three

Secondly, management and all employees have

purposes by consistently paying attention to the

personal awareness initiative empathy, knowledge

need of stakeholders:

35
/
96

CSR ACTIVITIES IN TONASA COAL FIRED POWER PLANT


PROJECT, SOUTH SULAWESI

REKIND IS ALSO AWARE OF THE IMPORTANCE OF SOCIAL RESPONSIBILITY PROGRAM AND ALSO
CONSCIOUSLY MAKES CONTINUOUS INNOVATION IN THE FIELD OF SOCIAL RESPONSIBILITY

36

37

/
96

/
96

Local Sociality
Around Project

REKIND Socialization
in Project Environment

Development of
Corporate Image

REKIND is aware that the execution of a project has

The importance of public support and the creation

The impact of good CSR program has close

a direct impact to the environment. In accordance

of conductive environment will have a very positive

relations with the development of Corporate

with REKIND commitment to the project execution,

impact to the project execution as well as the

Image. The image development is not only made

which is not only measuring to the accuracy of

existing positive mutual relations between REKIND

in certain project area, but more than that which is

time and execution quality, the improvement of

and the project stake holders in the surrounding

the existing positive correlation between a project

the living quality is significant portion to measure

environment. A good CSR program which is in

and another through parallel massive and systemic

the success of a project. As a realization of the

accordance with the project stake holder demand

means. It is undeniable that the role of corporate

consistency of this paradigm business, REKIND tries

is badly needed and it is more than the project

image now becomes more important as part of

to understand and provides the best contribution

cosmetic meaning, but become an initial series of

Corporate intangible asset and CSR as important

to the improvement of living environment and

REKIND relations with the project.

part, which plays to improve the intangible

transformation in the steps to arrange the


CSR program.

asset value.

OPERATION
DIRECTOR

SUB
DIRECTORATE
OPERATION

EPC
OPERATION
UNIT

SBU
GEOTHERMAL
& POWER

SBU MINERAL,
ENVIRONMENT, &
INFRASTRUCTURE

PROJECT
SERVICE
UNIT

INTERNAL AUDIT &


COMPLIANCE UNIT
ENERGY &
INFRASTRUCTURE
DIRECTORATE

38
/
96

C.E.O.

39

PORTFOLIO
UNIT

/
96

INDUSTRIAL
PLANT
DIRECTORATE

SBU
REFINERY &
PETROCHEMICAL

SBU ONSHORE
OIL & GAS

SBU OFFSHORE
OIL & GAS

SHARE
SERVICE UNIT

HUMAN CAPITAL
EMPOWERMENT
UNIT

PKBL

CORPORATE
TECHNOLOGY &
DEVELOPMENT UNIT

BUSINESS
INFRASTRUCTURE
DIRECTORATE

ORGANIZATION
STRUCTURE

40
/
96

05

STRATEGIC
BUSINESS UNIT

"To fit in market requirement and improve better


ways to serve the wider market, we took
a bold step with reshaping our business model
and significant performance."

41
/
96

EAST
KALIMANTAN

RIAU
ENGINEEERING & CONSTRUCTION
MANAGEMENT PROJECT
Owner: Chevron

PMS LEMBAH BATU


Owner: PTPN XIII

MALAYSIA

RIAU

SABAH AMMONIA
UREA PLANT
Owner: Petronas Chemical
Fertilizer Sabah Sdn Bhd

COAL FIRED STEAM


POWER PLANT RIAU
Owner: PT Perusahaan
Listrik Negara (Persero)

JAMBI

WEST SUMATERA

42
/
96

COAL FIRED STEAM


POWER PLANT SUMBAR
Owner: PT Perusahaan
Listrik Negara (Persero)

CNG SEI GELAM JAMBI


Owner: PT Perusahaan
Listrik Negara (Persero)

"WE HAVE BEEN


PROVEN FOR
MORE OVER
THREE DECADES
IN HANDLING
VARIOUS AND
CHALLENGING
PROJECTS IN
DOMESTIC AND
REGIONAL AREA."

SOUTH SULAWESI
COAL FIRED STEAM
POWER PLANT TONASA
Owner: Semen Tonasa Indonesia
43

JAMBI

/
96

DAYUNG GAS EPC


Owner: ConocoPhilips

CENTRAL
SULAWESI
PPGM DONGGI
Owner: Pertamina EP

SOUTH SUMATERA
PUSRI II-B
FERTILIZER PLANT
Owner: PT Pupuk
Sriwidjadja Palembang

LAMPUNG

WEST JAVA
GEOTHERMAL POWER
PLANT KAMOJANG 5
Owner: Pertamina
Geothermal Energy

EAST JAVA
BANYU URIP EPC 5
Owner: Mobil Cepu Limited

EPC LABUHAN MARINGGAITANJUNG KARANG PIPELINE


PROJECT (CP 7)
Owner: PT Perusahaan Gas
Negara (Persero)

LAMPUNG

Geothermal & Power

FSRU LAMPUNG
Owner: PT Perusahaan
Gas Negara (Persero)

Mineral, Environment,
& Infrastructure (M.E.I.)

CENTRAL JAVA

SEVERAL
PROJECTS
Based on Ongoing Projects

GONDORUKEM & TERPENTIN


DERIVATIVES PLANT
Owner: Perum Perhutani

EAST JAVA
MOORING TOWER &
OFFSHORE PIPELINE EPC 3
Owner: Mobil Cepu Limited

Refinery & Petrochemical


Onshore Oil & Gas

EAST JAVA
PHOSPORIC ACID AND
BY PRODUCT PLANT
Owner: Petro Jordan Abadi

Offshore Oil & Gas

44
/
96

Rooted of history of REKIND,


Chemical and Petrochemical are
REKIND mainly core of business.
Responding the dynamics of
clients requirements and market
needs and also to optimize
internal resources to a specific
field of activity, on the companys
organizational change in 2005,
the Strategic Business Unit
Refinery & Petrochemical (SBU
R&P) was formed, in accordance
with the market segment focused
by REKIND, SBU R&P now is
one of the SBU with varied
experiences more than 32nd
years of REKIND period.

45
/
96

SBU REFINERY &


PETROCHEMICAL
BALONGAN BLUE SKY PROJECT, BALONGAN, WEST JAVA /
OWNER: PT PERTAMINA (PERSERO)

KALTIM-4 FERTILIZER PROJECT, BONTANG, EAST KALIMANTAN /


OWNER: PT PUPUK KALIMANTAN TIMUR

BIOETHANOL PLANT FOR GASOHOL PROJECT, LAMPUNG /


OWNER: PT MEDCO ETHANOL LAMPUNG

46

47

/
96

/
96

Major Fertilizer plant in Indonesia was handled


by REKIND, such as :

1.

West Java, Indonesia


(2003-2005)

PUSRI I-B Fertilizer Plant


South Sumatera, Indonesia
(1990 - 1993)

2. Urea IV Optimization Plant


East Kalimantan, Indonesia
(1996 - 1999)

3.

6. Kujang IB Fertilizer Plant

7. Sabah Ammonia/Urea (SAMUR) Plant


Sabah, Malaysia
(2011 - 2014)

8. PUSRI II-B Ammonia and Urea Plant


South Sumatera, Indonesia
(2012-2015)

NPK Optimization Plant


East Java, Indonesia

Refinery & Petrochemical become the 1st SBU in

(1998 - 1999)

REKIND which is commended and completed the

4. Kaltim-4 Fertilizer Plant

Fertilizer Plant abroad; the Fertilizer Plant was NPK


Malaysia, owned by MNFSB, located in Gurun Kedah.

East Kalimantan, Indonesia

This project were tendered in International Tender

(1999 - 2002)

Procedure. For the completion of the NPK Project,

5. N.P.K. Fertilizer Malaysia Plant

REKIND awarded ASEAN ENGINEERING AWARD


by The Federation of Engineering Institutions of

Malaysia

Southeast Asia and Pacic (FEISAP), August 2005.

(2003-2004)

REKIND has also completed in assignment on the

construction of Balongan Blue Sky Refinery owned

As a follow up of from the Presidential Instruction

by PT Pertamina (Persero), located at Balongan

No.2/2010 about the revitalization of fertilizer plant,

West Java. The Project have already launched

REKIND contributed to build the Pusri II-B plant

by the President of the Republic Indonesia, Mr.

owned by PT Pupuk Sriwidjaya Palembang. The

Susilo Bambang Yudhoyono, on August 2005. This

plant is located in Palembang and has production

Project is the 1st Refinery project commenced by

capacity 2.000 MTPD Ammonia and 2.750 MTPD

the national contractor as its main contractor and

Urea. This plant will contribute to the fulfillment of

it is 1st Project with the biggest Indonesian local

national fertilizer supply.

content. The local content of the Balongan Blue Sky


Refinery are 44%.
REKIND is currently engage in the construction of a
large scale fertilizer plant; with production capacity
of 2.100 MTPD Ammonia, 3.500 MTPD Urea
Synth, and 3.850 MTPD Urea Granule ; owned by
Petronas Chemical Group Berhard located in Sabah
Malaysia. REKINDs success in earning the trust
of an esteem global company in the regional area
is one of many proof in our competency, expertise,
and safety standards. Our final achievement priority
is committed to satisfy our client.

PROJECT PROFILE
SBU REFINERY
& PETROCHEMICAL

Blue Sky
Balongan

Blue Sky Balongan Project is a nation wide

3 Kaltim-4
Fertilizer Plant

The project was developed to increase the

programs that aims to address air pollution issues

production of urea and ammonia, the capacity

caused by motor vehicles emission for the most

installed were 1725 Metric Ton Per Day of Urea and

part by propagating the use of unleaded fuel. PT

1000 Metric Ton Per Day of Ammonia. REKIND

Pertamina (Persero) as the owner develop this

collaborate in consortium with Mitsubishi Heavy

48

project with specific objective to produce high

Industries Pte Ltd executed the EPCC Kaltim 4

49

/
96

quality unleaded fuel to be consumed by Jakarta

Project owned by PT Pupuk Kalimantan Timur

and surrounding area.

located at Bontang, East Kalimantan, Indonesia.

/
96

The project is located at Balongan, West Java,


expected to produce 52.000 Barrel daily. REKIND
taking part in a consortium group with Toyo
Engineering Corporation Japan to undertake this
project.

Kujang IB
Fertilizer Plant

In April 3rd 2006 the Pupuk Kujang 1B Plant,

Plant
2 Bioethanol
for Gasohol

Cikampek, owned by PT Pupuk Kujang has been

The current fuel crisis in Indonesia motivates PT

the first and only new plant ever built in the

Medco Ethanol Lampung (PT MEL) to produce

world utilizing the ACES 21 technology from Toyo

alternative fuel for the community. REKIND is

Engineering Corporation, as the primary contractor

undertaking EPC work for this project to construct

and REKIND in collaboration with PT Inti Karya

the one and only plant in the world which will

Persada Teknik (IKPT) as its local subcontractor.

produce fuel from a Cassava Fruit and Molasses


with the capacity of 60.000 KL per day. The plant is
located in Lampung, Indonesia.

officially put into operation. The plant produced its


first prill urea in October 24th 2005 and became

NPK Fertilizer
Plant

NPK Fertilizer production complex in Gurun Kedah,

Longkali Palm
Oil Mill

Longkali Palm Oil Mill Project is a project designated

Malaysia, was the first overseas production facility

to develop palm plantation into Crude Palm Oil,

of its kind solely engineered, procured, constructed

with a capacity of 30 tons / hour, and increasable

and commissioned by all Indonesian professionals,

up to 60 tons / hour. The project is located in

the Malaysian plant is a high point in our nations

Munggu village, Long Kali, Pasir, east Kalimantan. PT

history of EPC turn key lump sum project an

Perkebunan Nusantara XIII (PTPN XIII) is the owner,

outstanding achievement emanating from years of

and REKIND collaborated with PT Indomarine Corp.

hard work by the countrys best talent. The owner is

with EPCC scope of work.

NPK Malaysia Fertilizer, SDN, BHD.

DPPU
Hasanuddin

Hasanuddin Airport relocation project is located

6
50
/
96

Lube Oil Blending


Plant Surabaya
Modernization

at the Hasanuddin Airport, Maros Regency, South


Sulawesi. REKIND, in partnership with Skytanking
in undertaking the EPCC scope of work and Basic,
Engineering and Commissioning supervision and

Lube Oil Blending Plant (LOBP) Modernization

submitted the plant to the project owner, PT

51

Project of PT Pertamina (Persero) Surabaya is

Pertamina Directorate of Marketing and Trading.

executed at the Gresik Asphalt Area (PAG), East

In due course, the Hasanuddin DPPU Project will

/
96

Java. This PT Pertamina (Persero) project is state

have Airplane Filling Depot with a capacity of

of the art LOBP project in southeast asia. The goal

-/+400 KL per day to meet the needs of 2 (two)

of the project is to change the manual operational

large aircrafts units: 3.500 lpm and 2 small aircraft

system into the more modern one for quality

units at 1.500 lpm with 50 psi minimum pressure

consistency purposes which will lead to increase its

on the planess nozzle.

competition ability in oil business. The production is


set to meet the needs in Surabaya and other areas.

10

RCC Revamping II
Pertamina Balongan

As a solution to anticipate the increase of fuel

Crude Tank
7 Cilacap
Floating Roof Type

price, PT Pertamina (Persero) is now prioritizing to

REKIND incorporation with PT Barata, executed

participating in this Pertamina initiative by working

an EPCC-scope Cilacap Crude Tank Floating Roof

with PT JGC as a consortium to revamp and expand

Type Project with a duration of 23 months. The

the Pertamina UP VI facility at Balongan, West Java.

goal of this PT Pertamina UP-IV owned project is


to increase stock of supply for a day or more with
a capacity of 2 x 600.000 barrel. It is located in
Cilacap, Central Java.

revamp and expand the existing refinery in order


to increase the production capacity. REKIND is also

TABLE OF EXPERIENCE LIST


SBU REFINERY
& PETROCHEMICAL
PROJECT SCOPE: E, P, C, C

01

02

03

04

Glenmore Sugar Plant

PUSRI II-B Ammonia and


Urea Plant, Capacity:
2.000 MTPD Ammonia,
Urea 2.750 MTPD

Phosporic Acid and By


Product Plant

Sabah Ammonia/Urea Plant


(SAMUR), Capacity: 2.100 MTPD
Ammonia, 3.500 MTPD Urea
Synth, 3.850 MTPD Urea Granule

PT Pupuk Sriwidjaja, South


Sumatra, Indonesia

2012 - 2014

PT Industri Gula Glenmore,


East Java, Indonesia
52

2013 - 2015

/
96

PT Petro Jordan Abadi (PJA)

Kaltim-4, Capacity:
Ammonia 1,000 MTPD,
Urea 1,725 MTPD
PT Pupuk Kalimantan Timur
Bontang East Kalimantan,
Indonesia

PROJECT SCOPE: E, P, C, and Supply

Ammonia Tank, Capacity:


7,500 MT Double Wall Project

Kujang IB, Capacity:


- NH3 1,000 t /day
- Urea 1,725 t / day

05

06

PT Sentana Adidaya Pratama,


Medan, North Sumatera Indonesia

PT Pupuk Kujang Cikampek West Java, Indonesia

2004 - 2005

2003 - 2005

2011 - 2014

2012 - 2015

07

Petronas Chemical
Fertilizer Sabah

PROJECT SCOPE: E, P, C, Com.

PROJECT SCOPE: E, P, C, for Tank Work

PROJECT SCOPE: E, P, C

08

09

10

11

12

Brunei Methanol Project

SWS PTM Plaju

DPPU (Aviation Filling Facility)


Hasanuddin Airport

Ammonia Tank Gresik

Brunei Methanol
Company Sdn Bhd

Pertamina RU III Plaju

Ammonium Nitrate at Bontang,


Kalimantan (Phase Site
Preparation Reclamation)

PT Petrokimia Gresik
PT Pertamina

2011 - 2013
2007 - 2009

2010 - 2011
2010 - 2012

PT Kaltim Nitrat Indonesia


(Orica Australia)
2008 - 2009

1999 - 2002

13

14

15

16

17

18

RCC of Gas to
Propylene

RCC Revamping II
Pertamina Balongan

Biodiesel Plant

Cilacap Crude Tank


Floating Roof Type

Modernisasi Lube Oil Blending


Plant UPP Surabaya

LPG Plant Lembak,


South Sumatera

PT Pertamina (Persero)

PT Pertamina (Persero)

PT Pertamina (Persero)
UP IV Cilacap

PT Pertamina (Persero)

PT Surya Eka Perkasa

2007 - 2008

2006 - 2007

PT Bakrie Rekin Bio Energy


2007 - 2008
2007

2007 - 2009
2007 - 2008

E: Engineering
P: Procurement
PM: Project Management Services

C: Construction
S: Services

C: Commissioning
F: Feasibility Study / Supervision

CM: Construction Management


O & M : Operations and Maintenance

53
/
96

19

20

21

22

23

24

Bioethanol Plant
for Gasohol

Bonna Pipe
Stabilization

N.P.K. Fertilizer Malaysia


Capasity: 917 MT / Day

Balongan BlueSky

Rimba Belian
Palm Oil Mill

Ammonia Tank - 7.500 MT


Single Wall

PT Perkebunan Nusantara
XIII (Persero) / P.T.P.N. XIII,
Pontianak West Kalimantan,
Indonesia

PT Petrokimia Gresik (Persero)


Gresik - Surabaya East Java,
Indonesia

PT Medco Ethanol Lampung

PT Kaltim Pacific Amoniak

2006 - 2007

2004 - 2006

NAFAS Bajakimia SDN. BHD,


Malaysia

PT Pertamina (Persero)
Direktorat Hilir Manajemen
Proyek Hilir Pengolahan

2003 - 2004

2002 - 2005

2002
2002 - 2003

25

26

27

28

29

30

ABI / 00403
(Modification Colomn HVU.III)

Supply Desalination
Unit-3

Rehabilitation and
Operation Flexibility of
Superphosphate Plant

Urea Bulk Storage 4

Long Kali Palm Oil Mill

DKM Air Compressor

Pertamina Unit Pengolahan V


Balikpapan - Indonesia

PT Pupuk Kalimantan Timur


Bontang East Kalimantan,
Indonesia

PT Pupuk Kalimantan Timur


Bontang East Kalimantan,
Indonesia

PT Perkebunan Nusantara XIII


(Persero) / P.T.P.N. XIII Pontianak
West Kalimantan, Indonesia

ABB Lummus Global B.V.


Singapore

2001-2002

2000 - 2001

54
/
96

2001

PT Petrokimia Gresik (Persero)


Gresik Surabaya, East Java,
Indonesia

2000

/
96

2001
2001

31

32

33

34

35

36

Ammonia Tank - 5000MT


NH3 Tank

Conveyor Urea
Granul Popka

K2 / K3 Melamine
Integration

NPK Optimization Plant,


Capacity: 1,000 MT / Day

Ammonia Plant
(AMJOS)

PT Asean Aceh Fertilizer (AAF)


Lhokseumawe North Aceh,
Sumatera, Indonesia

PT Pupuk Kalimantan Timur


Bontang East Kalimantan,
Indonesia

Pupuk Iskandar Muda-2


Project (PIM-2 Project),
Capacity: Ammonia 1,200 MTSD,

Urea 1,725 MTSD

DSM Kaltim Melamine Bontang


East Kalimantan, Indonesia

PT Petrokimia Gresik (Persero)


Surabaya East Java, Indonesia

PT Kaltim Pacific Ammonia


Bontang East Kalimantan,
Indonesia

1998 - 1999

1998 - 1999

1999 - 2000

1999 - 2000

PT Pupuk Iskandar Muda (Persero)


Lhokseumawe, Indonesia

1997 - 1999
1998 2003

37

Urea Granule-POPKA
(Urea IV Optimization Plant),
Capacity: 570,000 MTPY
PT Pupuk Kalimantan Timur,
Bontang East Kalimantan,
Indonesia

39

40

41

42

Melamine Plant
Relocation

Petronas Lube Oil Blending

Carbon Black Plant

PT Asean Aceh Fertilizer (AAF)


Lhokseumawe North Aceh,
Sumatera, Indonesia

Petronas Penapisan

PT Pupuk Kalimantan Timur


Bontang East Kalimantan

DSM Kaltim Melamine Bontang East Kalimantan, Indonesia

PT Cabot Chemical
Jakarta, Indonesia

1995

1993 - 1994

1993 - 1996

38
Kaltim I NH3
Optimization Plant

Ammonia Optimization Plant

E: Engineering
P: Procurement
PM: Project Management Services

1993 - 1994
1991 - 1992

1996 - 1999
C: Construction
S: Services

C: Commissioning
F: Feasibility Study / Supervision

CM: Construction Management


O & M : Operations and Maintenance

55

43

44

PUSRI IB Fertilizer,
Capacity : - NH3 1,300 t/day

- UREA 1,725 t/day

Kalimantan Timur III Fertilizer,


Capacity: - NH3 1,000 t/day

- Urea 1,725 t/day

PT Pupuk Sriwidjaja (Persero)


Palembang - South Sumatera,
Indonesia

P.T. Pupuk Kalimantan Timur


Bontang - East Kalimantan,
Indonesia

/
96

PROJECT SCOPE: E, C

Subcontracting Work for


Detailed Engineering and
Supply Equipment

CO2 Pretreatment Unit AAF

Separex
Membrane System

PT Pupuk Kalimantan Timur


Bontang - East Kalimantan,
Indonesia

Mitsubishi Heavy Industries (MHI)


Tokyo - Japan

1991 - 1992

1991 - 1993

2000

PROJECT SCOPE: E, P

Kaltim I NH3
Optimization Plant

45

46

47

48

Asean Aceh Fertilizer (AAF)


PT Asean Aceh Fertilizer (AAF)
Lhokseumawe North Aceh
1998

1990 - 1993

1986 - 1988

PROJECT SCOPE: C, M

PROJECT SCOPE: E

50

51

52

53

54

Iskandar Muda Fertilizer,


Capacity: - Ammonia 1,000
t/day, - Urea 1,725 t/day

PFK Fertilizer Plant


De-Bottlenecking

PMS Lembah Batu


Palm Oil Plant

Gondorukem /
Terpentin Plant

Engineering SWS

EPC KPA Ammonia Pump

PT Pertamina

PT Kaltim Nitrate Indonesia

Petronas Fertilizer
Kedah, Malaysia

PTPN XIII

Perum Perhutani
2012 - 2012

2011 - 2012

2012 - 2013

2012 - 2013

49
56

PROJECT SCOPE: E, C, M

PROJECT SCOPE: E, P, C, M

PTPupuk Iskandar Muda


(Persero) Lhokseumawe,
North Aceh, Indonesia

PROJECT SCOPE: C

2008

1982 - 1984

55

PROJECT SCOPE: M

56

Biodiesel Wilmar 2 & 3,


South Sumatera

Maintenance Bone & Takalar


Sugar Plant, Makassar

PT Wilmar, Sentana

PT Perkebunan Nusantara XIV

2007 - 2008

2008 - 2009

E: Engineering
P: Procurement
PM: Project Management Services

C: Construction
S: Services

C: Commissioning
F: Feasibility Study / Supervision

CM: Construction Management


O & M : Operations and Maintenance

57
/
96

MINERAL

58
/
96

Realizing the growing demand


in cement & mineral such as
ferronickel, coal, and alumina
production, REKIND has embarked
on a mission to provide the
country with cost effective and
fast constructed mineral plants.
Our solution is to work closely with
the clients and provide them with
necessary services and technology
to achieve this goal.

59
/
96

One of our responsibility to our


customers is to develop Project
Conception as an initial tool for
customer to evaluate further
feasibility of a particular project.

SBU M.E.I. (MINERAL,


ENVIRONMENT, &
INFRASTRUCTURE)
AMMONIUM NITRATE PRILL PLANT. BONTANG, EAST KALIMANTAN /
OWNER: PT KALTIM NITRAT INDONESIA

Such concept we found to be valuable both to

In the developing Infrastructure sector, especially

us and our clients in terms of getting the most

considering the diverse availability of natural

competitive plant.

resources, REKIND has adopted regional approach


by dividing the country into three regions: the

60

Based on our extensive experiences, at the

developed region located in the western part of

present time, we are considered as the pioneer

Indonesia and developing and newly developing

in Indonesian cement & mineral engineering and

regions located in the eastern. The developed

construction industry. Such experiences, plus

region is where the economic activities are

inherent similarities with other solid handling

concentrated with high demand for infrastructure

processes, naturally have brought REKIND to

and high commercial viability. However the other

enter mineral processing industry.

two less developed regions, although having similar

ENVIRONMENTAL

/
96

demand for infrastructure, have low commercial


viability. Two less Developed Regions, although

To support and strengthen its technology capability

having similar demand for infrastructure, have low

in Mineral Processing and Infrastructure, REKIND

commercial viability.

environmental concern is the current issue and


all industries have to adapt, such as processing

The Infrastructure Projects Include but not limited

of municipal solid waste, waste water treatment,

to Power Plant, Port/Jetty, Coal Terminal, Roads,

air pollution control, flue gas desulfurization, oil

and other.

disposal, and disposal of soil provide the best


solutions to environmental problems.

Our experience is more than just to build the plant,

REKIND have a lot of experiences and technology

we provide the integrated services reflecting our

to the problem of waste industry that meets

knowledge & expertise accumulation in the effort to

environmental laws.

competitiveness enhance customer.

INFRASTRUCTURE
In-line with the one of the priorities of the five-year
development plant of the Indonesian Government
which is acceleration development through a
public private partnership and supported by the
SURALAYA COAL FIRED STEAM POWER PLANT 1 X 625 MW /
OWNER: PT PERUSAHAAN LISTRIK NEGARA (PERSERO), BANTEN

companys experience in the similar projects,


REKIND has developed the infrastructure sector.

61
/
96

PROJECT PROFILE
SBU M.E.I.

Ammonium Nitrate
Prill Plant

The plant that produce Ammonium Nitrate is owned

Tonasa Coal
Fired Plant

PT Semen Tonasa is the owner of the project that

by PT Kaltim Nitrat Indonesia (KNI), a subsidiary

is located in Pangkep, South Sulawesi. This 2 x 35

of an Australian Company, Orica. This plant has

MW power plant will produce the needed electricity

300.000 tons / year production capacity is located

to power up Tonasa Cement Plant. Once again

in Bontang Kalimantan Timur, and be the biggest

REKIND has earn the trust from PT Semen Tonasa

62

producer of Ammonium Nitrate in Asia. The end

to construct this power plant, in consortium with

63

/
96

product of this plant will be used to fulfil the mining

Kawasaki Heavy Industry for its EPCC

and fertilizer industry demand in Indonesia.

project scope.

/
96

Ferronickel
Smelting Plant 3

This project produce 15.000 metric tones of

Coal Fired Steam


Power Plant
(1x625 MW)

This project was owned by PT Perusahaan

nickel in Ferronickel per year. Located at Pomala,


South Sulawesi, this project is owned by PT Aneka
Tambang (Persero) Tbk. The scope of work was
Mechanical and Electrical and completed in
14 months.

Listrik Negara (Persero) and constructed by


the consortium consist of REKIND and 3 other
China Nationality Contractor. This steam Power
Plant project is located at Suralaya, Banten, West
Java, was built with the capacity of 625 MW and
completed in 36 months with scope of work of EPC.

Tonasa IV
Cement Plant

This project is located at Pangkep, South Sulawesi,


owned by PT Semen Tonasa. It produced 8000
tons/day of cement to distribute around East Side
Indonesia, REKIND completed this cement plant in
33 months with PMC and EPC scope of work.

TABLE OF EXPERIENCE LIST


SBU M.E.I.
FERRONICKEL SMELTING PLANT 3, POMALA, SOUTH SULAWESI /
OWNER: PT ANEKA TAMBANG (PERSERO)
PROJECT SCOPE: E, P, C, C

PROJECT SCOPE: E, P, C

01

02

03

Boiler & STG Batubara


Pusri Palembang,
2x240 T/H Steam, 1x32 MW

INCO Services 2

Tonasa Coal Fired


Power Plant

PT Pusri Palembang

2010 - 2012

PT INCO Sorowako
PT Semen Tonasa

64
/
96

65

2010 - 2012

/
96

2013 - 2015

04

05

06

Ammonium Nitrate
Orica Project at Bontang

Boral Cement Terminal Project

Suralaya Coal Fired


Power Plant 1 x 625 MW

PT Kaltim Nitrat Indonesia

PT Rocla Persada,
Jakarta Indonesia

2009 - 2011

2007 2008

PT PLN ( Persero ),
Jakarta Indonesia
2007 2010

07

08

09

10

11

12

Semen Kupang-2, Kupang

Semen Kupang-2
Capacity: 300,000 MTPY

Calcium
Carbonate Plant

Cement Tuban III

Tonasa Steam Power Plant Boiler


Turbine Generator 2 x 25 MW

PT Semen Kupang (Persero)


Kupang East Nusa Tenggara,
Indonesia

PT Camco Omya Indonesia


Jakarta - Indonesia

Dome Semen
Indarung - V

PT Semen Padang (Persero)
Padang West Sumatera,
Indonesia

PT Semen Kupang (Persero)


Kupang East Nusa Tenggara
2000 - 2001

E: Engineering
P: Procurement
PM: Project Management Services

C: Construction
S: Services

1996 - 1997
C: Commissioning
F: Feasibility Study / Supervision

CM: Construction Management


O & M : Operations and Maintenance

PT Semen Tonasa (Persero)


Pangkep - South Sulawesi,
Indonesia

1996 - 1998

1996 - 1997
1997 - 1999

PT Semen Gresik (Persero)


Tuban Gresik, East Java,
Indonesia

1993 1995

BORAL CEMENT TERMINAL, JAKARTA INDONESIA /


OWNER: PT ROCLA PERSADA
PROJECT SCOPE: E, P

PROJECT SCOPE: E, C

13

14

15

Dome Clinker Storage of


Tonasa-IV Plant
Capacity: 80,000 ton

Tonasa IV Cement Plant


Capacity: 8.000 t/day

Cement Plant Baturaja

Cement Tuban II

PT Semen Baturaja (Persero)


Palembang - South Sumatera,
Indonesia

PT Semen Gresik (Persero)


Tuban Gresik, East Java,
Indonesia

1992

1995

PT Semen Tonasa (Persero)


Pangkep South Sulawesi,
Indonesia

PT Semen Tonasa (Persero)


Pangkep South Sulawesi,
Indonesia

16

1990 - 1994
1993 - 1994

66

17

18

Copper Smelter
Plant Phase-I
Lurgi AG Jakarta Indonesia

19

20

Cilacap Spinning
Mill Renovation

Ferronickel Smelting
Plant No. 3 (FeNi - 3)

Construction of Steel Silo and


Conveyors for Indokodeco
Cement Plant Batulicin

PT Industri Sandang II
Jakarta-Indonesia

PT Aneka Tambang

1992 1993

/
96

PROJECT SCOPE: P, C

2004 - 2005
1988 - 1990

UBE Industries Limited


Banjarmasin South Kalimantan,
Indonesia
2000

21

22

Civil Works and Supply of


Lines for Vertical Shafts
Pongkor Gold Mine

Petro Jaya Boral


Plasterboard

PT Aneka Tambang (Persero)


& PT Murray and Robert,
Jakarta, Indonesia

PT Petro Jaya Boral Plasterboard


Cilegon West Java, Indonesia
1997

PROJECT SCOPE: C

25

26

Cement Gombong

INCO Services
Soroako, Sulawesi
PT International Nickel Indonesia
(PT INCO)

1997 - 2000
2007 - 2008

E: Engineering
P: Procurement
PM: Project Management Services

C: Construction
S: Services

C: Commissioning
F: Feasibility Study / Supervision

CM: Construction Management


O & M : Operations and Maintenance

PROJECT SCOPE: E

Pomala Expansion

Palapa Tyre

PTAneka Tambang (Persero)


Jakarta Indonesia

PT INCO

23

24

2007
1993

1999

PT Semen Gombong
Jakarta, Indonesia

PROJECT SCOPE: C, P

67
/
96

REKIND serves various private


domestic and foreign Customers
in numerous business of areas,
including Gas and Energy Sector
Customers.

68
/
96

Fully dedicated to cater the


specific need of the Customers, the
Business Unit Gas was established
1995. The advantage to the
Customers is in having a team of
dedicated professionals with an
unsurpassed level of expertise,
competently managing all aspect
of any Grass-Root, Revamp,
Expansion and Relocation Projects.

69
/
96

SBU ONSHORE
OIL & GAS
DC-1/CGPX DEBOTTLENECK PROJECT, SOUTH SUMATERA /
OWNER: CONOCOPHILLIPS (GRISSIK) LTD. (COPI)

DC-1/CGPX DEBOTTLENECK PROJECT, SOUTH SUMATERA /


OWNER: CONOCOPHILLIPS (GRISSIK) LTD. (COPI)

GAS FACILITY STATION PROJECT, SUMATERA-JAVA /


OWNER: PT PERTAMINA (PERSERO)

70

71

/
96

/
96

Ammonia Plants consist of the Pretreatment

high Pressure (150-180 Bar). In Refrigeration

line for Pertamina, and various Gas Processing

As an EPC company with global expertise, REKIND

Section, Front End Section, Synthesis Gas Section

Section, the Ammonia produced will be knocked

facilities project of engineering, procurement, and

has successfully undertaken several offshore mega

and Refrigeration Section. The Pretreatment Section

down from gas to liquid by utilizing the circuit of

construction services, etc.

projects, both in the national and regional scope,

of the Ammonia Plants is very similar, if not identical

Refrigeration Compressor.

to the gas treatment Plant Gas Industries. Such

giving the best contribution in the development


REKIND has developed its skills and competence

section consist of the H2S Removal, Mercaptan

The above illustration shows proving the capabilities

on onshore project executions by directly involved

Removal, Glycol Dehydration Unit and also CO2

of REKINDs engineers working with High Pressure

in the development of EPC Dayung Compression

Removal Unit.

Gas Processing Plant, Compression System, very

and Central Gas Plant Debottleneck owned by

low temperature process (refrigeration system)

Conoco Phillips Ltd. The project aimed to enhance

In front End Section of Ammonia Unit, the Cleaned

which is very valuable in developing REKINDs

sweet gas production by reduce CO2 and H2S level

Natural Gas will be processed to produce synthesis

competencies in Gas Industries.

in CGP facility, and built to enhance the capacity of

gas and the by product CO2 Removal Unit within

CGP production facility from 310 MMSCFD to 460

the Front End Section and it will be sent to the Urea

REKIND has successfully completed some Gas

MMSCFD. In addition to that, Infrastructure facilities

Plant as the feed gas. The synthesis gas, mainly

Project, such as PGN Gas Booster Station and

Banyu Urip EPC 5 owned by Mobil Cepu Ltd and

consist of Hydrogen is very explosive. In Synthesis

CO2 Removal Project for Pertamina, EPC of the

Matindok Gas Facility Station of Donggi owned by

Section, the synthesis gas will be converted to

Badak LNG Condensate Floating Roof Tanks,

Pertamina EP are also underway.

Ammonia within the Ammonia Converter in very

Gas Gathering Station Musi Barat including flow

of the nation in the future.

PROJECT PROFILE
SBU ONSHORE
OIL & GAS

72

Gas Booster
Station

Dayung CCGP
Debottleneck

The location of these projects are Sakernan (Jambi

The project aimed to enhance sweet gas production

Province) and Belilas (Riau Province), owned by

by reduce CO2 and H2S level in CGP facility. And

PT Perusahaan Gas Negara (Persero) Tbk and built

built to enhance the capacity of CGP production

to enhance the capacity of gas supply channelling

facility from 310 MMSCFD to 460 MMSCFD. This

through Booster Station increasing from 200

project located in Dayung and Grissik, between

MMSCFD to 360 MMSCFD.

Jambi and Palembang, Sumatra Selatan.

/
96

73
/
96

CO2 Removal
Subang

Banyu Urip
EPC 5

The location of these project are Cepu Area,

The project aimed to reduce CO2 level in natural gas

Bojonegoro, Jawa Timur, owned by Mobil Cepu

produced by wells around Subang, West Java. The

Ltd (MCL). This project will be completed in 36

separation process made use of aMDEA solution

months with scope of work civil engineering and

licensed from BASF, Germany. With majority of the

infrastructure. This project will support production

components from domestic production, the project

of 165.00 barrels of oil / day from the overall 5 pack

was entirely a work of Indonesias finest. This

MCL project located in Cepu.

project was owned by PT Pertamina (Persero).

PPGS (Gas
Facility Station)

The outcome of the project will be Gas Collection

Matindok Gas Facility


Station of Donggi

The outcome of the project will be sweet gas

Facility for South Sumatra Region. This Station

with capacity 60 MMSCFD, and will be processed

will supply the gas to Sumatera-Java Gas Piping

into LNG and distributed to PLN for the needs of

to cater The Power Plant Industry, Domestic Gas

the Power Plant and other industrial needs. The

Usage, and others gas based utilization. This project

project is located at Sulawesi Tengah, owned by PT

is owned by PT Pertamina (Persero).

Pertamina EP. This project will be completed in 26


months with scope of work EPC.

TABLE OF
EXPERIENCE LIST
SBU ONSHORE
OIL & GAS

PROJECT SCOPE: E, P, C, C

PROJECT SCOPE: E, P, C

01

02

03

04

Dayung CCGP Debottleneck

Labuhan Maringgai - Tanjung


Karang Pipeline(CP-7)

Banyu Urip EPC 5


Mobil Cepu Ltd

Modification and
Completion of Merbau Gas
Collecting Station

2011 - 2014

PT Pertamina (Persero)

ConocoPhillips (Grissik) Ltd.


(COPI)

PT Perusahaan Gas Negara

2011 - 2013

2013-2015
2011 - 2012

74
/
96

05

06

07

08

09

10

EPC Pipeline System for Gas


Production Facility Jambi
Merang Development

South Sumatera West Java


Phase 2 Facility Station

Mutiara LP Gas
Compression

Gasoline Tankage

CO2 Removal Subang

Grissik Operations Support


Contract GGCJ-2815

PT Perusahaan Gas Negara,


West Jakarta - Indonesia

Vico Indonesia
Jakarta - Indonesia

Pertamina U.P V Refinery


Balikpapan East Kalimantan,
Indonesia

PERTAMINA D.O.H. CIREBON,


Cirebon West Java, Indonesia

2005 - 2008

2003- 2004

2002-2003

11

12

13

14

15

16

Gas Booster Station


Project No.015/064/59020/
PLPBJ-ST1/2001

Installation of Gelam Gas


Compression Equipment

Installation of Gas
Pre-Treatment Equipment

Additional New Condensate,


Storage Tank 20D-6

Humpuss Aromatic

Tank Erection Mutiara

Gulf Indonesia Resources,


Jakarta - Indonesia

Gulf Resources (Grissik) LTD


Jakarta - Indonesia

PT Badak NGL Company,


Bontang East Kalimantan

PT Humpuss Aromatik,
Jakarta Indonesia

VICO Indonesia,
Jakarta - Indonesia

1996

1995

2001

1999 - 2000

1996 - 1997

PROJECT SCOPE: O & M

PROJECT SCOPE: C

PT Pertamina Hess
Jambi Merang

Gulf Indonesia Resources,


Jakarta - Indonesia
75

2002-2003
2002

2007 2008

PT Perusahaan Gas Negara,


West Jakarta - Indonesia
2002

17
Pagerungan Island
Refrigeration

PROJECT SCOPE: E, C

18

19

EPC ARUN LNG

Engineering & Construction


Management (ECM)

20

Matindok Gas Facility


Station of Donggi

Perta Arun Gas


ARCO Indonesia,
Jakarta - Indonesia

Chevron Pacific Indonesia

22

Operation & Maintenance


Support Services (OMSS)
Gunung Salak

North Duri
Backbone Piping

PT Pertamina EP

2013-2015

PT Caltex Pacific Indonesia


Chevron Geothermal Salak Ltd

2012 - 2017

2012-2017

2000
2010 2010

1995 - 1996

E: Engineering
P: Procurement
PM: Project Management Services

21

C: Construction
S: Services

C: Commissioning
F: Feasibility Study / Supervision

CM: Construction Management


O & M : Operations and Maintenance

/
96

76
/
96

Geothermal is one of a renewable


energy that is being driven
recently by many people around
the world to be utilized due to its
sustainability and environmentally
friendly. Indonesia has the biggest
geothermal potential, which is
estimated at the amount of 29 GW
or accounted about 40% of the
world total. REKIND has enhanced
the companys global engineering
capability owned by Government
which has developed and provided
technology for these purpose.

77
/
96

SBU GEOTHERMAL
& POWER
LAHENDONG 4 GEOTHERMAL POWER PLANT PROJECT 1 X 20 MW,
TOMOHON, NORTH SULAWESI / OWNER: PT PERUSAHAAN LISTRIK NEGARA (PERSERO)

ULUBELU GEOTHERMAL POWER PLANT PROJECT 2 X 55 MW, LAMPUNG /


OWNER: PT PERUSAHAAN LISTRIK NEGARA (PERSERO), JAKARTA

the partners which responsible to take the full

By this integrity REKIND also being prepared to

turnkey EPC responsibility for Lahendong II (1x20

enter and support by along their experiences the

MW) Project owned by PT Perusahaan Listrik

new Government National Energy policy which to

Negara (Persero).

concentrate build the renewable energy resources


in next coming future and contributing also to

78

One year after, REKIND also awarded for

save the world nature and environment by special

Kamojang 4 Project as a main contractor, owned

contribution reducing the global warming issues

by PT Pertamina (Persero) by the International

for the better life of the world community.


79

bidding process. The construction had been

/
96

successfully completed and the power plant has

In future, REKIND looks forward to become as

been commercially operated ahead from the

an Independent Power Producer (IPP) or having

committed schedule and meet and satisfy the

ownership for Geothermal Power Plant, through

highest quality objectives of our customers. Those

a consortium or joint operation with local and/or

two projects were inaugurated by President of

International Companies to develop and explore

Republic Indonesia on December 2007. REKIND

Geothermal Working Area.including Feasilbility

also has completed other Geothermal Power Plant

Study (FS), Surveying, Drilling, and EPCC Power

project such as Lahendong III (1x20 MW) project

Plant and Steam Field, up to producing the feasible

(2007-2009) owned by PT Perusahaan Listrik

steam and sell the electricity power to PLN through

Negara (Persero), Wayang Windu II as an expansion

Long Term Power Purchase Agreement/Energy

project of existing unit I (1x110 MW) project (2007-

Sales Contract or alternatively sell the electricity

2009) owned by SEG (Star Energy Geothermal),

to the industrial captive consumers.

consortium with Japan contractor, Lahendong IV


(1 x 20 MW) project (2009 2011) owned by PT

REKIND has also participated in development of

The Geothermal competencies of REKIND is

Perusahaan Listrik Negara (Persero) and Ulubelu

Non-Geothermal Power Plant project that scatter

of the Clients, the Strategic Business Unit (SBU)

built through years of EPC experience in several

Unit 1 & 2 (2x55 MW) project (2010 2012) owned

in Indonesia, which is some of them are Coal Fire

of Geothermal was established in January 2005.

Geothermal Steam Field and Power Plant project.

by PT Perusahaan Listrik Negara. Total involvement

Steam Turbine Power Plant and CNG facilities for

We build and develop our expertise to establish

Such as Gunung Salak, Lahendong, Wayang Windu,

of REKIND in Geothermal development has reached

Peaker Power Plant in Sumatera Island.

customer satisfaction. In the year 2008 we

Dieng, Ulubelu, and others in recent years. REKIND

around 727 MW or more than 50% of Geothermal

enhance our capabilities and transformed our

has competency in Engineering, Procurement,

Power Plant built in Indonesia.

SBU into Geothermal & Power. The advantage to

Construction and Commissioning of Geothermal

the Customer is in having a team of dedicated

Plant that has been acknowledged by the player

professionals with in unsurpassed level of expertise,

of Geothermal Industries. As evidence of its

competently managing all aspect of any Grass Root,

expertise and the belief of the client, REKIND is

Expansion and Relocation Projects.

appointed by tender process together along with

With fully dedicated to cater the specific need

/
96

PROJECT PROFILE
SBU GEOTHERMAL
& POWER

Dieng - 1 Geothermal
Power Plant

Dieng-1 Re-commissioning Geothermal Power Plant

Wayang Windu 2
Geothermal
Power Plant

Project the capacity of 60 MW, located in Central

As an expansion project of existing Wayang Windu

Java. This Project was the first EPC Geothermal

Unit I (1x110 MW) and in order to fill electricity

project of REKIND in 2002. The project owner is

demand, Wayang Windu Unit 2 Geothermal Power

Himpurna California Energy Ltd.

Plant Project was built with capacity of 110 MW. This

80

project is owned by PT Star Energy and finished

81

/
96

one month earlier from determined schedule.

/
96

The Kamojang -4
Geothermal
Power Plant

This project is the first geothermal power plant


project in Indonesia financed by local bank which

Lahendong 4
Geothermal
Power Plant

was a historical breakthrough. With the project

As continuing development of Lahendong-2 & 3

REKIND provides another solution to overcome the

Project, Lahendong 4 Geothermal Power

energy crisis in Indonesia. PT Pertamina (Persero)

Plant Project has extended with capacity of

as the owner of this project and its located at the

20 MW in North Sulawesi. All projects has been

border between Bandung and Garut Regencies,

completed on 2012.

West Java.

Lahendong 2 & 3
Geothermal
Power Plant

This project has successfully completed reliability

Ulubelu Geothermal
Power Plant

test run and in mid of June 2007 has been handed

This project is the biggest geothermal power plant

over to PT Perusahaan Listrik Negara (Persero)

in Sumatra, Indonesia with capacity of 2x55 MW.

as the owner of this project (1 day earlier from

This project is owned by PT Perusahaan Listrik

the determined schedule). REKIND executed

Negara (Persero). The scope work was Engineering,

Lahendong-3 Geothermal Power Plant Project

Procurement, Construction, Commissioning and

which has the same capacity as Lahendong-2

completed in 32 month.

Project, 1 X 20 MW. This project is located at


Tomohon, North Sulawesi.

WAYANG WINDU GEOTHERMAL UNIT 2 PROJECT 1 X 117 MW, WEST JAVA /


OWNER: PT STAR ENERGY HOLDING Ltd

TABLE OF EXPERIENCE LIST


SBU GEOTHERMAL & POWER
PROJECT SCOPE: E, P, C, C

01

02

03

Total Geothermal Power Plant


Kamojang-5 1x35 MW

CNG Plant For Peaking


Generation (80MW)
Sei Gelam, Jambi

Coal Fired Steam Power Plant


Riau 2 x 110 MW, Riau

PT Pertamina Geothermal Energy,


Jakarta Indonesia
82
/
96

PT PLN (Persero)
Jakarta Indonesia

PT PLN (Persero)
Jakarta Indonesia
83
/
96

2010 - 2013

2013 - 2015
2012 - 2013

PROJECT SCOPE: E, P, C

04

05

06

07

08

09

Coal Fired Steam Power Plant


Sumatera Barat 2 x 112 MW,
West Sumatera

Wayang Windu Unit 2


Geothermal Power Plant,
1 X 117 MW Pengalengan,
West Java

Total Geothermal Power Plant


Kamojang - 4, 1 X 60 MW
West Java

Ulubelu Geothermal Power Plant


2 x 55 MW, Lampung

Lahendong 4 Geothermal Power


Plant 1 x 20 MW,
Tomohon, North Sulawesi

Lahendong 3 Geothermal Power


Plant 1 X 20 MW,
Tomohon North Sulawesi

PT Persahaan Listrik
Negara (Persero)
Jakarta Indonesia

PT Persahaan Listrik
Negara (Persero)
Jakarta Indonesia

2009 - 2011

2007 2009

PT PLN (Persero)
Jakarta, Indonesia

PT PERTAMINA DIT HULU


PT Star Energy
Holding Limited

PT Persahaan Listrik
Negara (Persero)
Jakarta Indonesia

2006 2008
2010 - 2012

2008 2011
2007 2009
PROJECT SCOPE: E, C

PROJECT SCOPE: E

PROJECT SCOPE: C

10

11

12

13

14

15

Lahendong 2 Geothermal
Power Plant 1 x 20 MW,
North Sulawesi

Dieng 1 Geothermal Power


Plant 1 x 60 MW,
Central Java

Wayang Windu Geothermal


Unit 1 1 x 110 MW,
West Java

Lahendong Geothermal
Pipe Line North Sulawesi

Sarulla Unocal Project


North Sumatera

Gunung Salak Geothermal Power


Plant, West Java

PT PLN (Persero)
Jakarta Indonesia

Badan Pengelola Dieng Patuha /


Himpurna California Energy Ltd.
Jakarta - Indonesia

PT Mandala Nusantara Ltd. and


Sumitomo Corporation
Jakarta Indonesia

B U D Engineering Pte. Ltd.


Lok Yang Way - Singapore

PERTAMINA (UNOCAL
Geothermal of Indonesia)
Jakarta - Indonesia

1994 - 1995

UNOCAL Geothermal of
Indonesia Ltd Jakarta - Indonesia

2002

1997 2000

2005 - 2007
E: Engineering
P: Procurement
PM: Project Management Services

C: Construction
S: Services

C: Commissioning
F: Feasibility Study / Supervision

CM: Construction Management


O & M : Operations and Maintenance

1998 - 1999

1993

84
/
96

Responding the clients requirement


and market needs and also to
specific field of activity, in 2012,
REKIND has divided Strategic
Business Unit Gas into Strategic
Business Unit Onshore Oil & Gas and
Strategic Business Unit Offshore
Oil & Gas. REKIND has established
Strategic Business Unit Offshore
Oil and Gas (SBU Offshore Oil and
Gas) in order to expanding the
market in the Offshore Oil & Gas
sector. SBU Offshore Oil and Gas
is one of Strategic Business Unit
in REKIND that offers a variety
of offshore services including
EPCI (Engineering, Procurement,
Construction, Installation) Contract
for Subsea Pipeline, Offshore
Platform and Subsea Cable.

85
/
96

SBU OFFSHORE
OIL & GAS
SOUTH SUMATERA WEST JAVA - 2, PIPELINE CONSTRUCTION CONTRACT FOR OFFSHORE GAS
TRANSMISSION PIPELINE, SUMATERA-JAVA / OWNER: PT PERUSAHAAN GAS NEGARA

The qualifications and our experience coupled with

undersea. In addition to that, EPC offshore pipeline

the complementary skills of our offshore officer

Oyong phase-2 are also underway, this project

enables to offer the wide range of integrated

owned by Santos (Sampang) Pty.Ltd. In 2010,

services which centres around Engineering,

REKIND successfully acquired the Engineering,

Procurement, Construction, and Installation

Procurement, Construction, Installation, and

services. The advantages to the customers are in

Commissioning Onshore Receiving Facility (EPCIC

having integrated and professional team work and

ORF) project in Muara Karang owned by PT

competency to managing all offshore aspect.

Nusantara Regas. In November 2011, REKIND was


commence EPC 3 Banyu Urip Mooring Tower &

86

REKIND has successfully completed Offshore

Offshore Pipeline that owned by Mobil Cepu Ltd /

Project in Indonesia, such as:

Exxon Mobil. One year after, REKIND also awarded

1.

/
96

Lampung LNG FSRU Project that owned by PT


SSWJ 2 Offshore Pipeline

Perusahaan Gas Negara (Persero) Tbk. By 2013


REKIND also have been awarded Project called

2. EPCI Offshore Pipeline Oyong Phase 2


3. EPCIC Subsea Pipeline and
ORF Muara Karang FLNG West Java

4. Oyong Maleo Underwater


Inspection Service
REKIND has undergone a transformation,
developing its skills and competence on offshore
project executions by directly involved in the
development of offshore pipeline and station facility
at SSWJ-2 (South Sumatera West Java) owned
by PT Perusahaan Gas Negara. In those projects,
REKIND set a 168 km line of pipes along the

SUBSEA PIPELINE AND ORF MUARA KARANG FLNG WEST JAVA, WEST JAVA /
OWNER: PT NUSANTARA REGAS

16' Offshore Pipeline Relocation West Madura


Offshore owned by PHE WMO.
The experience and the collaboration with global
companies have given REKIND what it takes to
improve its competence in the offshore industry.

87
/
96

PROJECT PROFILE
SBU OFFSHORE
OIL & GAS

Subsea Pipeline and


ORF Muara Karang
FLNG West Java

The location of these projects are Muara KarangJakarta Bay. The scope of work are EPCIC subsea
pipeline, 24" 16 km including Onshore Receiving
Facility (ORF) and built to transport gas from FSRU
(Floating Storage & Regasification Unit) to ORF
88

through subsea pipeline with send out rate up to

/
96

maximum 500 mmscfd. The gas will transport from

TABLE OF
EXPERIENCE LIST
SBU OFFSHORE
OIL & GAS
PROJECT SCOPE: E, P, C, I

PROJECT SCOPE: E, P, C, I, C

01

Lampung LNG FSRU


PT Perusahaan Gas Negara
2012 - 2014

02

03

04

EPCIC Subsea Pipeline and


ORF Muara Karang FLNG
West Java

16' Offshore Pipeline Relocation


West Madura Offshore

EPC 3 Banyu Urip Mooring


Tower & Offshore Pipeline

PT Pertamina Hulu Energi West


Madura Offshore (PHE WMO)

Mobil Cepu Ltd.

PT Nusantara Regas
2011 - 2012

2013 - 2014

2011 - 2014

ORF to Muara Karang Power Plant.

Pipeline
2 Offshore
Oyong Phase 2

This project owned by Santos (Sampang) Pty.Ltd.


consist of Installation of 14 diameter gas offshore
pipeline from the Wellhead Platform to Grati, with
56 km of length and water depth vary from 0-56m,

Modification; Subsea Tie-In; Flexible Jumper

07

05

06

EPCI Offshore Pipeline


Oyong Phase 2

Oyong and Maleo Underwater


Inspection Services

Santos (Sampang) Pty Ltd.

South Sumatera West Java - 2,


Pipeline Construction Contract
for Offshore Gas Transmission
Pipeline

2008 - 2009

PT Perusahaan Gas Negara

2011 - 2012

complete with pig launcher and receiver; Installation


mini jacket for crossing support; WHP Platform

PROJECT SCOPE: Inspection

Santos (Sampang) Pty Ltd.

Installation; Riser Installation; Above Water Tie-In


2005 - 2006

and Pre-Commissioning.

South Sumatera West


Java 2 Offshore Pipeline

SSWJ 2 Project is a project of installation of 168


km pipes in 20 - 85 meters depth beneath the
sea, distributing gas from and connecting Labuan
Maringgai Station (in South Sumatera) and (Muara
Bekasi Station) in West Java in order to handle
shortage of gas supply in Java South SumateraWest Java. This project is owned by PT Perusahaan
Gas Negara (Persero) Tbk as one of the stated
owned enterprises companies.
E: Engineering
P: Procurement
PM: Project Management Services

C: Construction
S: Services

C: Commissioning
F: Feasibility Study / Supervision

CM: Construction Management


O & M : Operations and Maintenance

89
/
96

THERE ARE

PORTFOLIO
UNIT

NO SECRETS TO
SUCCESS. IT IS
90
/
96

T H E R E S U LT O F
P R E PA R AT I O N ,
HARD WORK,
AND LEARNING
F R O M F A I L U R E ."

TAKING THE FINAL DECISION FOR DEVELOPMENT


ON INVESTMENT OPPORTUNITY

Business Unit Portfolio originally manages all local

REKIND is focusing its investment business on

and overseas subsidiaries and affiliate companies

renewable energy resources sector and other

for support REKIND as an EPC Company. There

industries which are environmentally friendly

are four subsidiaries of REKIND: PT Yasa Industri

and also pursuing the projects related to Clean

Nusantara (YIN), PT Rekayasa Engineering (RE),

Development Mechanism (CDM). Several investment

PT Tracon Industri (Tracon), and PT Puspetindo.

projects currently developed by REKIND, are:

REKIND also have 2 overseas affiliate companies

Bio-Diesel Project, Bio-Ethanol Project, Geothermal

i.e. Rekayasa Industri Malaysia Sdn. Bhd (REKMAL)

Projects and Coal Steam Power Project. Those

in Malaysia, Comspain XXI SA in Spain, and some

which are all in-line with the mission of the company

local affiliate companies in Indonesia. Other than

to provide the solution for the nation in energy

managing the affiliate companies, since 2005,

sector as well as in other sectors related to the

REKIND has started its business as the project

new technology.

developer and Business Unit Portfolio responsible


for analizing, providing the recommendation to

Portfolio Business Unit as the Project Developer

the top management in taking the final decision

is expected to contribute significant revenue and

for development on investment opportunity and

maintain sustainable profit to the company in the

coordinating all projects related to the investment.

short coming future and thus expected could be


support REKIND Consolidation Performance.

91
/
96

OFFICE
FACILITIES

06

92
/
96

REKINDs office facilities consist of 4-storey

by Mrs. Erry Chandra Widodo. Employees needs

buildings, which function as corporate operational

of good health is also supported with the existence

rooms, a few offices of existing project

of a Policlinic and a selected physician practicing

representatives and subsidiaries, namely: PT Tracon

3 times a week, a standby ambulance unit for

Industri and PT Rekayasa Engineering.

emergency, a fitness center fully equipped with


modern gadgets, and a sports center which can be

In addiction to all that is Ulul Albab Mosque,

used for Futsal, Basket, Tennis, and Gymnastics. In

inaugurated on February 2006 by the famous

early year 2008, the extension of REKIND office

Abdullah Gymnatiar widely known as AA Gym. The

land, Integrated Facilities Services Division built

mosque is built to meet the daily needs of Moslem

two more temporary buildings for the on going

employees and local people for spiritual purposes.

projects. To make it all more comfortable, more

Designed 2 floors up and constructed on 660 m

parking space is also provided inside REKINDs

land, it facilities as many as 600 prayers. In order

offices area.

to expand its employees knowledge and as media


to keep companys important documents, REKIND
owns a library named Chandra Widodo Library,
after a former Director of Operations who passed
away on September 2005. It was formerly opened

AWARDS &
CERTIFICATES

The starting point of all achievement


is desire and optimism is essential to
achievement which also the foundation
of courage and true progress."

93
/
96

AWARDS
BUMN INNOVATION
AWARD 2013
Awarded by Ministry of State
Owned Enterprise as The Best
Corporate Innovation Culture &
Management.

94
/
96

PII AWARD 2013


Awarded by PII (Indonesian
Engineers Association) as
"Company With The Most PII
Members", "Company With
The Most Professional
Engineers", and "Company
With The Most Associate
Professional Engineers ".

THE BEST PR OFFICER


BUMN 2013
Awarded by Ministry of State
Owned Enterprises to assess
the implementation of public
relations and increasing
competence in public relations to
meet the challenges of business
& corporation.
BUMN MARKETING AWARD
2013 & 2012
Awarded by BUMN Track
Magazine. Rekind won the Silver
Winner of 3 Aspects which are
: Strategic (Brand, product,
customer engangement), Tactical
(Communication, sales, service),
and Special Award (marketing
3.0 marketing and new wave).

CERTIFICATES
OHSAS 18001 : 2007
CERTIFICATION

SMK3 2011
Certification

ISO 14001:2004 certification for

Achievement for SMK3LL

Occupational Healthy & Safety

(Occupational Health and

Management System acquired

Safety Environmental Protection

on 20 May 2011 and valid up to 3

Management System) from

years after issued.

Department of Labor with gold

OHSAS 14001 : 2004


CERTIFICATION

flag as the highest rank.

ISO 18001:2007 certification for


Occupational Healthy & Safety
Management System acquired on
29 November 2007 and valid up
to 28 November 2013.

MBNQA (MALCOLM BALDRIDGE


NATIONAL QUALITY AWARD)
2012, 2009
Awarded by the Indonesian
National Quality Award
Foundation.MBNQA is an award
to support quality improvement
in the business world. In 2012,
Rekind has reached a better
level as Early Improvement from
previous level as Early Result.
FROST & SULLIVAN
AWARD 2011
Awarded by Frost & Sullivan
Indonesia as a Oil & Gas EPC
Company of the Year.
KMI AWARD 2011
Awarded by Indonesian Oil and
Gas Committee. The Award was
given to President Director of
Rekind, as Outstanding Figures
in Supporting Industries.

PII AWARD 2009


Awarded by the Indonesian
Engineers Association
(PII).Rekind won category of
sustainable engineering for
achievements of development
Geothermal in Indonesia.
ANNUAL REPORT AWARD
2009, 2006, & 2005
Rekind became the 3rd winner
of the Annual Report Award in
the Non Finance State Owned
Enterprises Non Listed Company
category.
MOST ADMIRE KNOWLEDGE
ENTERPRISE (MAKE)
AWARD 2008
Awarded by Dunamis as a
result of the development of
Knowledge Management REKIND.

TOP BEST IT SYSTEM & THE


BEST E-CORP 2007 AWARD
Awarded by SWA Magazine as
the best IT system Implements
and The 10 Best IT Teams.
TECHNOLOGY AWARD 2006
Awarded by Dunamis as a
result of the development of
Knowledge Management REKIND.

ASIA ENGINEERING
AWARD 2005
Awarded by The Federation
of Engineering Institutions of
Southeast Asia and Pacific
(FEISAP) to the achievement of
development REKIND in NPK
fertilizer plant located in Kedah,
Malaysia.

ADHIKARA 2005
Awarded by the Indonesian
Engineers Association (PII) to
REKIND as a accomplishment of
NPK fertilizer plant construction,
in Kedah, Malaysia.

COMPETENCY AWARD 2009


Awarded by the National Board
for Professional Certification
(BNSP). This award is a mark
of the commitment REKIND
in developing quality and
competency of human resources.

6,000,000
Safety Man-hours
Without Medical
Treatment Injury

10,000,000
Man-hours Without
Lost Time Injury

12,000,000
Man-hours Without
Lost Time Injury

22,500,000 Man
Hours Without
Lost Time Injury

PT Kaltim Nitrate Indonesia

Awarded by Department of

REKINDs achievement in

Orica Australia Pte Ltd as the

as the owner of the project

Manpower & Transmigration,

implementing Health, Safety &

owner of Ammonium Nitrate

gave 10,000,000 Man Hours

Banten Province, as a result of

Environment (HSE) program has

Prill Plant project located in

Without a Lost Time Injury

12.000.000 man-hours without

reached a result when in April

PT Kalimantan Timur Industrial

(LTI) award to REKIND in Prill

Lost Time Injury in Suralaya Coal

2012 REKIND achieved the total

Estate, Bontang, East Kalimantan

Ammonium Nitrate Plant project

Fired Power Plant 1x625 MW

of 22,500,000 man hours without

rewarding 6,000,000 safety man

development which located in PT

Project.

lost time injury throughout

hours without Medical Treatment

Kaltim Industrial Estate, Bontang,

Injury (MTI) to REKIND.

East Kalimantan.

project activities.

95
/
96

CONTACT US
HEAD OFFICE

AFFILIATES

PT REKAYASA INDUSTRI

PT REKAYASA INDUSTRI

REKAYASA INDUSTRI MALAYSIA SDN, BHD, KUALA LUMPUR, MALAYSIA

KUALA LUMPUR REPRESENTATIVE

ENGINEERING, PROCUREMENT, CONSTRUCTION COMPANY FOR


SOUTH EAST ASIA REGION

96
/
96

Jl. Kalibata Timur I, No.36

12th Floor, Menara Perak 24, Jl. Perak 50430

Kalibata, Jakarta 12740, Indonesia

Kuala Lumpur - Malaysia

www.rekayasa.com, e-mail: corpsec@rekayasa.co.id


97

COMSPAIN S.A - MADRID, SPAIN


Phone: +62-21-7988700 / 7988707

Phone: +60-3-22645555

MANUFACTURING AND TRADING COMPANY FOR EUROPE, SOUTH

Fax:

Fax:

AMERICA, MIDDLE EAST, AND NORTH AFRICA REGION

+62-21-7988701 / 7988702

+60-3-321643932

www.comspain.com, e-mail: comspain@comspain.com


e-mail: corpsec@rekayasa.co.id

e-mail: corpsec@rekayasa.co.id

www.rekayasa.com

www.rekayasa.com

PT MEGA ELTRA
COMMODITY TRADING COMPANY

SUBSIDIARIES

www.megaeltra.com, e-mail: pr@megaeltra.com


PT PUSPETINDO - SURABAYA EQUIPMENT FABRICATION

PT YASA INDUSTRI NUSANTARA

PT REKAYASA ENGINEERING

PT TRACON INDUSTRI

CONSTRUCTION COMPANY

DETAIL ENGINEERING

CONSULTANCY AND

COMPANY

PROCUREMENT SERVICES

Jl.Raya Pasar Minggu Pertani 1,

Jl. Kalibata Timur I, No.36

Jl. Kalibata Timur I, No.36

1st floor.

Kalibata, Jakarta 12740, Indonesia

Kalibata, Jakarta 12740, Indonesia

Phone: +62-21-798 78 00

Phone: +62-21-798 87 00 /

Phone: +62-21-798 87 00 /

Fax:

+62-21-794 20 30

e-mail: yinews@yin.rekayasa.co.id
www.rekayasa-yin.com

798 87 07

798 87 07

Fax:

+62-21-798 87 01 /

Fax:

+62-21-798 87 01 /

798 87 02

798 87 02

e-mail: marketing@

re.rekayasa.co.id

e-mail: tracon@rekayasa.co.id
www.traconid.com

http://re.rekayasa.com

www.puspetindo.com, e-mail: info@puspetindo.com


PT REKADAYA ELEKTRIKA
EPCC SPECIALIZED IN POWER PLANT INDUSTRY
www.rekayasa.com, e-mail: corpsec@rekayasa.co.id
PT BAKRIE REKIN BIO ENERGY
BIODIESEL PRODUCER COMPANY
www.bakriesumatra.com, http://mail.bakriesumatra.com
www.rekayasa.com, e-mail: corpsec@rekayasa.co.id
PT JABAR REKIND GEOTHERMAL
CONCESSION HOLDER OF CISOLOK SUKARAME
GEOTHERMAL WORKING AREA
e-mail: corpsec@rekayasa.co.id

/
96

98

99

/
96

/
96

Você também pode gostar