Escolar Documentos
Profissional Documentos
Cultura Documentos
CONTENTS
1 APPE
NDIX
2 FOR
M OF TENDER
3 AGR
EEMENT
4 PERF
ORMANCE GUARANTEE
APPENDIX
APPENDIX
CLAUSE
..........................................................………...
............................................................ ..........................................................………...
............................................................ ..........................................................………...
............................................................ ..........................................................………...
............................................................ ..........................................................………...
............................................................ ..........................................................………...
............................................................ ..........................................................………...
Appendix/1
D&B PSSCOC (Fourth edition December 2006)
CLAUSE
Architectural
Mechanical
Engineering
Electrical
Engineering
All in rate
LIMITATIONS ON EXTENT OF
LIABILITY FOR ANY ONE
ACCIDENT 27.1(1)(b) ..........................................................………...
Appendix/2
D&B PSSCOC (Fourth edition December 2006)
FORM OF TENDER
Appendix/3
D&B PSSCOC (Fourth edition December 2006)
FORM OF TENDER
NAME OF CONTRACT:*............................................................................................……………….…
..............................................................................................................................................……………..
TO: *.......................................................................................................................................……………
..............................................................................................................................................……………..
.............................................................................................................................................………………
Gentlemen,
for the execution of the above-named Works we the undersigned offer to design, execute and complete
the Works and remedy any defects therein in conformity with the Employer’s Requirements, the
Agreement, the Conditions of Contract, Specifications, Drawings, Bills of Quantities/Schedule of
Rates* and Addend for the Sum of:
..................................................................................................……………................................…
......................................................................................................................……………................
….................................................................................................................................……………..
(.........................................................................................……………..........................................)
2. We undertake if our Tender is accepted to commence the Works on the date or dates specified in the
Employer's Letter of Acceptance and if there is no such date or dates then as soon as is reasonably
possible after the receipt of an order to that effect from the Superintending Officer and to complete the
whole of the Works comprised within the Contract by the Time for Completion or Times for
Completion stated in the Appendix.
Tender/1
D&B PSSCOC (Fourth edition December 2006)
3. In consideration of your considering this Tender we agree to abide by this Tender for the period of
*............................. days from the date fixed for receiving the same and it shall remain binding upon us
and may be accepted at any time before the expiration of that period.
4. Unless and until a formal Agreement is prepared and executed this Tender together with your written
acceptance thereof shall constitute a binding Contract between us.
5. We understand that you are not bound to accept the lowest or any tender you may receive.
Address:.....................................…………….................................................................................……
.......................................................................................……………......................................…………
..........................................................................................................…………….....................………..
Witness: …………...........................................................................................................................…...
Address: …….................................................................................………………………………………..
…………………………………………………………………………………………………………..
Occupation: ..............................……………..................................................................................…....
6. Our Service Address (as referred in Clause 36.2(1) of the Standard Conditions) is ………...................
.......................................................................................……………............................................……..
.........................................................................................................……………..........................
…………………………………………………………………………………………………………
……..
Our telephone number is...........................……………...................................................................……
Our cable/telex number is...........................……………..................................................................……
Our facsimile number is...........................…………….................................................................………
(Note: All details marked * shall be inserted before issue of Tender Documents or deleted as
appropriate).
Tender/2
D&B PSSCOC (Fourth edition December 2006)
AGREEMENT
AGREEMENT
Whereas
Recitals
First the Employer is desirous of obtaining the construction of [the following works] [a]
……………………………………………………………………………… (hereinafter called `the Works') at
……………………………………………………………………………………………………………………....
…...………………………………………………………………………………………………………………….
for which he has issued to the Contractor his requirements (hereinafter referred to as "Employer's
Requirements").
Second the Contractor has submitted his developed design documents for carrying out the
Works [works referred to in the First recital] (hereinafter referred to as "the Contractor's Proposals") which
includes the statement of the sum which he will require for carrying out that which is necessary for completing all
the Works in accordance with the Conditions [(which is the Contract Sum stated in Article 3)] .
Third the Employer has relied on the Contractor in the development of the Contractor's
Proposals to fully meet the suitability, adequacy, integrity, durability and practically of the Employer’s
Requirements and having examined the Contractor's Proposals and, subject to the Conditions, is satisfied that they
meet the Employer’s Requirements.
For the avoidance of doubt, it is expressly agreed that the giving of any consent or approval by
or on behalf of the Superintending Officer shall not in any way relieve the Contractor of any of his obligations
under the Contract or his duty to ensure the correctness, accuracy or suitability of the matter or this which is the
subject of the consent or approval.
Agreement/1
D&B PSSCOC (Fourth edition December 2006)
Fourth, the Employer has accordingly accepted a Tender by the Contractor for the design
execution and completion of such Works and remedying any defects therein.
Article 1 Contract
1. In this Agreement words and expression shall have the same meaning as are respectively assigned to them
in the Conditions of Contract herein after referred to.
2. For the consideration mentioned in Article 3 the Contractor hereby covenants with the Employer to both
complete the design for the Works and execute and complete the construction of the Works and remedy any
defects therein in conformity in all respects with the provisions of the Contract.
3. The Employer hereby covenants to pay the Contractor in consideration of the design execution and
completion of the Works and the remedying of defects therein, the Lump-Sum of
……………………………………………………………………………………………………………
………..
……………………………………………………………………………………………………….
(Singapore Dollars ………………………. ) (hereinafter referred to as `the Contract Sum') or such other
sum as shall become payable hereunder at the times and in the manner specified by the Contract.
4. The Employer's Requirements and the Contractor's Proposals have been signed by the parties and are
identified in an appendix to the Conditions.
Article 5
5. The following documents shall be deemed to form and be read and construed as part of the Agreement.
viz:-
Agreement/2
D&B PSSCOC (Fourth edition December 2006)
(a) the Public Sector Standard Condition of Contract for Design and Build;
(b) the Particular Conditions;
(c) the Appendix;
(4) The Specifications (if applicable);
(5) The Drawings (if applicable);
(6) The Bills of Quantities/Contract Sum Analysis/Schedule of Rates (if applicable);
(7) The Employer's Requirements;
(8) The Contractor's Proposals
(9) The Addenda Nos.............................................
There aforesaid documents shall be read and construed as a whole and no special priority other than that
accorded by law or expressly provided in the Contract documents and shall apply to any one document or group
of documents nor shall the contra proferentum rule apply to this Agreement.
Agreement/3
D&B PSSCOC (Fourth edition December 2006)
IN WITNESS WHEREOF
the day and year first above written
(hand of the Employer has been hereunto set )
the* ( )
(Common Seal of the Employer has been hereunto affixed )
.................................................................................
................................................................................. .......................................................
Signature
*The Common Seal of
.................................................................................
.................................................................................
Name........................................................................
Address.....................................................................
.................................................................................
Description...............................................................
.................................................................................
................................................................................. .......................................................
Signature
* The Common Seal of
.................................................................................
.................................................................................
Name........................................................................
Address.....................................................................
..........................................................................…....
Description................................................................
* Delete as appropriate
Agreement/4
D&B PSSCOC (Fourth edition December 2006)
PERFORMANCE GUARANTEE
PERFORMANCE GUARANTEE
(FOR NON-FIXED PERIOD CONTRACTS)
To: ___________________________ and his successors in office for and on behalf of the
Government of the Republic of Singapore (hereinafter called "the Employer").
And Whereas the Contractor is required under the Contract to pay ___ per cent of
the total value of the Contract as a Security Deposit for the performance of his obligations
under the Contract.
Now in consideration of the Employer not insisting on the Contractor paying ___ per
cent of the total value of the Contract as a security deposit for the said Contract, we (at the
request of the Contractor) hereby agree as follows:
1 In the event of the Contractor failing to fulfil any of the terms and conditions of the
said contract, we shall indemnify the Employer against all losses, damages, costs, expenses
or otherwise sustained by the Employer thereby up to the sum of Singapore Dollars
_________ (S$ _______ ) ("the Guaranteed Sum") upon receiving your written notice of
claim for payment made pursuant to Clause 4 hereof.
3 Our liability under this guarantee shall continue and this guarantee shall remain in full
force and effect from [insert effective date: _____________] until [insert initial expiry
date:_________ ] [insert if expiry date is subject to automatic extention: provided always
that the expiry date of this guarantee and our liability thereunder shall be automatically
extended for successive periods of [specify duration of each extension: _______ days /
months] unless we give you 90 days' written notice prior to the expiry of our liability of our
intention not to extend this guarantee in respect of any future extension and provided further
that you shall be entitled, upon receiving such notice of our intention (and within the period
specified in Clause 4 hereof), either to:
Performance Guarantee/1
D&B PSSCOC (Fourth edition December 2006)
(c) direct us to extend the validity of this guarantee for a further period not
exceeding ________ days / months (and this guarantee shall then expire at the
end of such further period)].
4 This guarantee is conditional upon a claim or direction as specified herein being made
by you by way of a notice in writing addressed to us and the same being received by us at
[insert address of Bank’s notification office: ___________________ ] within 90 days from
the expiry of this guarantee. Thereafter this guarantee shall become null and void
notwithstanding that this guarantee is not returned us for cancellation except for any claim(s)
or direction submitted to us in writing not later than 90 days from the expiry of this
guarantee.
5 We shall be obliged to effect the payment required under such a claim or direction
within 30 business days of our receipt thereof. We shall be under no duty to inquire into the
reasons, circumstances or authenticity of the grounds for such claim or direction and shall be
entitled to rely upon any written notice thereof received by us (within the period specified in
Clause 4 hereof) as final and conclusive.
6 The Employer may make more than one claim on, or direction under, this guarantee
so long as the claims or directions are made pursuant to Clause 4 hereof and within the
period specified therein and the aggregate amount specified in all such claims and directions
does not exceed the Guaranteed Sum.
7 This guarantee is issued subject to the laws of the Republic of Singapore and the
jurisdiction of the Singapore courts.
________________________________ _____________________
(Name of **Bank/Insurance Company) (Signature)
in the presence of
Name ___________________
Performance Guarantee/2
D&B PSSCOC (Fourth edition December 2006)