Você está na página 1de 74

I

EXCAVATION WORK

S.N Description of work

No

Length

Breadth

Height

Quantity

24
1

1.90
2.79

1.90
1.50

1.50
1.50

129.96
6.28

1
2

Column(including T1)
Combined column footing(F3)

Excavation for trench wall

29.82

0.75

1.05

23.48

Excavation for trench wall at T1

0.60

0.75

0.75

1.35

Excavation for retaining wall

30.03

1.50

1.00

45.04

TOTAL EXCAVATION WORK

II

BACKFILLING WORK

S.N Description of work


1

206.11

Filling in Foundation pit


a. Volume of rectangular portion
b. Volume of trapezoidal portion
c. square portion up to GL
d. Foundation pit
Backfilling in foundation pit
Backfilling in trench wall

No

Length

Breadth

Height

Quantity

24
24
24
24

1.75
1.03
0.30
1.90

1.75
1.03
0.30
1.90

0.3
0.45
1.05
1.50

22.05
11.35
2.27
129.96
94.30

36.80

0.14

TOTAL BACKFILLING WORK

III GRAVEL SAND FILLING (40:60)

5.00
99.30

S.N Description of work


1

Gravel sand filling


TOTAL OF LAYOUT WORK

No

Length

76.02

No

Length

22.32

7.77

Breadth

Height

Quantity

0.45

34.209
34.21

Height

Quantity

2.4

53.568

IV EARTH FILLING
S.N Description of work
1

Earthfilling at T1

Earthfilling below staircase


ST1

Breadth

1.5

11.655

TOTAL OF EARTHFILLING WORK

102.68

VI PCC WORK (1:2:4)


S.N Description of work
1
2
3
4

Footing (F1)
Footing (F2)
Combined Footing(F3)
Stair 1(st1)

Toe wall
TOTAL PCC WORK (1:2:4)

VII RCC WORK (1:2:3)

No

Length

Breadth

Height

Quantity

21
2
1
1

1.90
1.75
3.19
5.97

1.90
1.75
1.90
1.50

0.08
0.08
0.08
0.08

5.69
0.46
0.48
0.67

76.02

0.60

0.75

34.21
41.51

a. RCC work below the Plinth beam including tie beam


S.N Description of work
1

Footing
Rectangular portion
Trapezoidal portion
column up to tie beam
Foundation Beam
Exterior

No

Length

Breadth

Height

Quantity

24
24
24

1.75
1.03
0.3

1.75
1.03
0.3

0.3
0.15
1.15

22.05
3.82
2.48

45.32

0.30

0.35

4.76

17.45
17.08

0.30
0.30

0.35
0.35

1.83
1.79

45.32
0.30
17.45
0.30
17.08
0.30
of plinth beam)

0.35
0.35
0.35

4.76
1.83
1.79
45.12

Interior horizontal beam


1
Interior vertical beam
1
Tie Beam
Exterior
1
Interior horizontal tie beam
1
Interior vertical beam
1
TOTAL RCC WORK (1:2:3) (upto lower part
b.RCC work for column and beams

S.N Description of work


1

Column
Up to T1 level
Up to T2 and T4 level
T2 and T4
T1
T3
Between T3 front and T2 front
Between T3 front and T1 front
Between T2 front and T1 front
Beam (excluding slab)
beam l=1.810m
beam l=2.79m

No

Length

Breadth

Height

Quantity

24
12
8
4
8
3
5
3

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

2.10
3.60
3.00
3.00
3.60
0.75
2.25
1.47

4.54
3.89
2.16
1.08
2.59
0.20
1.01
0.40

6
11

1.81
2.79

0.23
0.23

0.25
0.25

0.63
1.79

beam l=2.060
beam l=2m
beam l=2.6m
cantilever l=1.5m
beam l=3.35m
beam l=1.905m
beam at combined footing l = 0.99
beam at T1 l = 2.2
crossed beam l= 4.9

5
11
9
2
7
2
1
8

2.06
2.00
2.60
1.50
3.35
1.91
0.99
2.20

0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.60
1.28
1.36
0.17
1.36
0.22
0.06
1.02

4.9

0.23

0.23

1.03

TOTAL QUANTITY OF RCC WORK

25.40

c. RCC work for slab

S.N Description of work


1

Height

Quantity

67.10
39.90

0.13
0.13

8.52
5.07

11.56

0.13

1.47

Pyramidical roof

17.59

0.13

2.23

b. slab of T2

20.70

0.13

2.63

Pyramidical roof

27.41

0.13

3.48

c. slab of T3

35.51

0.13

4.51

Pyramidical roof

17.59

0.13

2.23

d. slab of T4

10.43

0.13

1.32

Slab
FF floor
SF floor
TF floor
a. slab of T1

No

Length

Breadth

Pyramidical roof
T1 slab
2

Staircase
waist slab
steps
waist slab
steps

2
6
2
24

17.59

0.13

2.23

8.99

0.13

1.14

0.13
0.30
0.13
0.30

0.64
0.41
3.19
1.62

1.68
0.15
8.39
0.15

1.50
1.50
1.50
1.50

QUANTITY OF RCC WORK

35.89

d.RCC work for sill and lintel

S.N
1

Sill and lintel


Lintel (for 9"wall)
lintel (for 4"wall for doors only)

No

Length

Breadth

Height

Quantity

1
1

45.32
3.345

0.23
0.1

0.08
0.08

0.78
0.03

QUANTITY OF RCC WORK

0.81

VIII REINFORCEMENT WORK


S.N Description of work
1

Footing

Column
T1
T2
T3
T4

No

Length

Breadth

Height

Quantity

24

1.75

20

840

8
8
8
8

9.88
10.1
13.43
9.725

4
8
8
4

316.16
646.4
859.52
311.20

stirrups
T1

T2
T3
T4
Tie Beam(12dia)
beam l=2.5m
beam l=5.19m
a. V
b.H
c. C
beam l=5.45m
beam l=3.65m
beam l=6.74m
beam l=6.74m
beam l=11.045m
beam l=3.090m
beam l= 3.650
8 dia stirrups
beam l=2.5m
beam l=5.19m
a. V
b.H
c. C
beam l=5.45m
beam l=3.65m
beam l=6.74m
beam l=6.74m
beam l=11.045m
beam l=3.090m
beam l= 3.650
beam l= 2.360

90

1.2

8
8
8

86
100
86

1.2
1.2
1.2

16.48

65.92

3
3
2
2
1
1
1
2
1
1

27.28
27.24
14.76
28.28
21.10
33.44
33.46
50.66
18.84
21.10

81.84
81.72
29.52
56.56
21.10
33.44
33.46
101.32
18.84
21.10

18.00

1.20

86.40

3
3
2
2
1
1
1
2
1
1
1

47.00
37.00
15.00
50.00
28.00
50.00
50.00
85.00
24.00
28.00
18.00

1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20

169.20
133.20
36.00
120.00
33.60
60.00
60.00
204.00
28.80
33.60
21.60

864
825.6
960
825.60

Foundation Beam
beam l=2.5m
beam l=5.19m
a. V
b.H
c. C
beam l=5.45m
beam l=3.65m
beam l=6.74m
beam l=6.74m
beam l=11.045m
beam l=3.090m
beam l= 3.650
8 dia stirrups
beam l=2.5m
beam l=5.19m
a. V
b.H
c. C
beam l=5.45m
beam l=3.65m
beam l=6.74m
beam l=6.74m
beam l=11.045m
beam l=3.090m
beam l= 3.650
beam l= 2.360
12 dia extra rebar
beam l=2.5m
beam l=5.19m
a. V
b.H

16.48

65.92

3
3
2
2
1
1
1
2
1
1

27.28
27.24
14.76
28.28
21.10
33.44
33.46
50.66
18.84
21.10

81.84
81.72
29.52
56.56
21.10
33.44
33.46
101.32
18.84
21.10

18.00

1.20

86.40

3
3
2
2
1
1
1
2
1
1
1

47.00
37.00
15.00
50.00
28.00
50.00
50.00
85.00
24.00
28.00
18.00

1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20

169.20
133.20
36.00
120.00
33.60
60.00
60.00
204.00
28.80
33.60
21.60

32.96

131.84

3
3

54.56
54.48

163.68
163.44

c. C
beam
beam
beam
beam
beam
beam
beam
beam
5

l=5.45m
l=3.65m
l=6.74m
l=6.74m
l=11.045m
l=3.090m
l= 3.650
l= 2.360

Beam
16 dia rebar
beam l=2.5m
beam l=5.19m
a. V
b.H
c. C
beam l=5.45m
beam l=3.65m
beam l=6.74m
beam l=6.74m
beam l=11.045m
beam l=3.090m
beam l= 3.650
beam l= 2.360
12 dia extra rebar
beam l=2.5m
beam l=5.19m
a. V
b.H
c. C
beam l=5.45m

2
2
1
1
1
2
1
1
1

29.52
56.56
42.20
66.88
66.92
101.32
37.68
42.20
42.20

59.04
113.12
42.20
66.88
66.92
202.64
37.68
42.20
42.20

16.48

131.84

10
9
3
2
1
1
1
2
1
4
4

Err:509
27.24
14.76
28.28
21.10
33.44
33.44
50.66
18.84
21.10
3.98

Err:509
245.16
44.28
56.56
21.10
33.44
33.44
101.32
18.84
84.40
15.92

3.32

26.56

10
9
3
2

7.93
7.93
3.90
5.25

79.25
71.33
11.71
10.49

beam
beam
beam
beam
beam
beam
beam

l=3.65m
l=6.74m
l=6.74m
l=11.045m
l=3.090m
l= 3.650
l= 2.360

8 dia stirrups
beam l=2.5m
beam l=5.19m
a. V
b.H
c. C
beam l=5.45m
beam l=3.65m
beam l=6.74m
beam l=6.74m
beam l=11.045m
beam l=3.090m
beam l= 3.650
beam l= 2.360
Slab
8 mm dia
Staircase(St2)
16 mm dia
8 mm dia
Staircase
16 mm dia
8 mm dia
Sill and lintel
12 dia re-bar

1
1
1
2
1
4
4

3.90
6.61
5.90
12.65
3.47
3.90
3.10

3.90
6.61
5.90
25.30
3.47
15.61
12.40

18.00

1.20

172.80

10
9
3
2
1
1
1
2
1
4
4

47.00
37.00
15.00
50.00
28.00
50.00
50.00
85.00
24.00
28.00
18.00

1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20

564.00
399.60
54.00
120.00
33.60
60.00
60.00
204.00
28.80
134.40
86.40
37.80

8.34
1.47
9.82
1.73
0.54

6mm dia for stirrups


Area
8 dia re-bar
12 dia re-bar
16 dia re-bar
Density of reinforcement (iron)
unit weight of reinforcement(iron)
unit weight of reinforcement(iron)
unit weight of reinforcement(iron)
Total length of 8 dia
Total length of 12 dia
Total length of 16 dia

0.10

5.0286E-005
0.000113143
0.000201143
7874
1.6
0.9
0.45
7365.60
2789.18
4577.20

16
12
8

Total quantity of reinforcement


16 dia reinforcement bar
12 dia reinforcement bar
8 dia reinforcement bar(stirrups)
6 dia reinforcement bar
Total quantity of reinforcement
Wastage and lapping 5%
Total quantity of reinforcement
IX

13821.6011

FORM WORK

S.N Description of work


1

7334.809
2510.801
3317.724
0.10
13163.43
658.1715

Footing
Footing F1
Footing F2
Footing F3
Column below plinth beam

No

Length

Breadth

Height

Quantity

20
2
1

1.75
1.5
3.19

1.75
1.5
1.9

0.375
0.375
0.375

52.5
4.5
3.8175

Column up to tie beam


Tie Beam

24

0.3

0.3

1.05

30.24

45.32

0.30

0.35

31.93

1
1

17.45
17.08

0.30
0.30

0.35
0.35

12.43
12.17

45.32

0.30

0.35

31.93

1
1

17.45
17.08

0.30
0.30

0.35
0.35

12.43
12.17

24
12
8
4

0.30
0.30
0.30
0.30

0.30
0.30
0.30
0.30

2.10
3.60
3.00
3.00

60.48
51.84
28.80
14.40

0.30

0.30

3.60

34.56

3
5
3

0.30
0.30
0.30

0.30
0.30
0.30

0.75
2.25
1.47

2.70
13.50
5.29

6
11
5
11
9

1.81
2.79
2.06
2.00
2.60

0.23
0.23
0.23
0.23
0.23

0.25
0.25
0.25
0.25
0.25

6.19
16.81
5.79
12.41
12.89

cantilever l=1.5m

1.50

0.23

0.25

1.75

beam
beam
beam
beam

7
2
1
8

3.35
1.91
0.99
2.20

0.23
0.23
0.23
0.23

0.25
0.25
0.25
0.25

12.68
2.16
0.62
9.84

Exterior

Interior horizontal tie beam


Interior vertical beam
Foundation Beam
Exterior

Interior horizontal tie beam


Interior vertical beam
Column above plinth(tie) beam
Up to T1 level
Up to T2 and T4 level
T2 and T4
T1
T3

Between T3 front and T2 front


Between T3 front and T1 front
Between T2 front and T1 front
Beam (excluding slab)
beam l=1.810m
beam l=2.79m
beam l=2.060
beam l=2m
beam l=2.6m

l=3.35m
l=1.905m
at combined footing l = 0.99
at T1 l = 2.2

crossed beam l= 4.9


7

4.9

0.23

0.23

9.40

Slab
FF floor

67.10

67.10

SF floor

39.90

39.90

11.56
17.59
20.70
27.41
35.51
17.59
10.43
17.59
8.99

11.56
17.59
20.70
27.41
35.51
17.59
10.43
17.59
8.99

TF floor
a. slab of T1
Pyramidical roof
b. slab of T2
Pyramidical roof
c. slab of T3
Pyramidical roof
d. slab of T4
Pyramidical roof
T1 slab
Staircase
waist slab
steps
waist slab
steps
Sill and lintel
Lintel (for 9"wall)
lintel (for 4"wall for doors only)

TOTAL OF FORM WORK

BRICK WORK (1:6)


A] SOLING

2
6
2
24

1.68
0.15
8.39
0.15

1.50
1.50
1.50
1.50

0.13
0.30
0.13
0.30

0.81
2.97
2.51
11.88

45.32

0.23

0.08

90.64

3.345

0.1

0.08

6.69

896.09

S.N Description of work

No

Length

Breadth

24

1.9

1.9

86.64

toe wall1

29.82

0.75

22.36

2
3

stair 1 (St1)
stair3

1
1

5.97
4.85

1.50
1.5

8.96
7.28

soling at T1

17.09

Height

Quantity

foundation
footing

17.09

TOTAL SOLING

142.32

B] TOE WALL

S.N Description of work


1

toe wall
footing 1
footing 2
9" brickwall upto tie beam

No

Length

Breadth

Height

Quantity

1
1

29.82
29.82

0.56
0.46

0.17
0.17

2.84
2.33

29.82

0.23

0.405

2.78

TOTAL BRICK WORK FOR TOE WALL

7.95

C] BRICK WORK (9"wall) at floor level excluding individual temple structure)

S.N Description of work


1

Brick work for ground floor


Exterior brick work (breadth = 9")

No

Length

Breadth

Height

Quantity

22.21

0.23

3.30

16.86

Interior brick work (breadth = 9")

5.45

0.23

3.30

4.14

Exterior brick work (breadth = 9")


Interior brick work (breadth = 9")

15.60
5.20

0.23
0.23

1.77
1.77

6.35
2.12

Exterior brick work (breadth = 9")

15.60

0.23

1.89

6.80

Interior brick work (breadth = 9")

5.20

0.23

1.89

2.27

BRICK WORK IN SUPER STRUCTURE

38.52

DEDUCTION OF OPENINGS
S.N Description of work
1
2
3
4

W1
D1
D2
Opening

No

Length

Breadth

Height

Quantity

4
1
1
1

0.90
1.25
1.00
1.5

0.23
0.23
0.23
0.23

0.60
2.13
2.13
2.13

0.50
0.61
0.49
0.73485

DEDUCTION OF OPENINGS FOR BRICK WORK

2.33

BRICK WORK (4"wall)


S.N Description of work
1
2

No

Brick work for ground floor


Interior brick work (breadth = 4")
Brick work between T1 Level and T3
level along st2

BRICK WORK IN SUPER STRUCTURE

DEDUCTION OF OPENINGS

Length

Breadth

Height

Quantity

3.17

0.10

2.13

0.67

11.74

0.10

1.17
1.85

S.N Description of work


1

D3

No

Length

Breadth

Height

0.75

0.10

2.13

DEDUCTION OF OPENINGS FOR BRICK WORK

Quantity
0.16

0.16

D] BRICK WORK for individual each temple

i) BRICK WORK for T1


S.N Description of work
1

No

Length

Breadth

Height

Quantity

Ground floor brick work (breadth =


9")

8.80

0.23

1.89

3.83

First floor brick work (breadth = 9")

8.80

0.23

2.62

5.30

1.5

0.23

2.62

0.90
8.22

No

Length

Breadth

Height

Quantity

First floor brick work (breadth = 9")

13.07

0.23

2.62

7.87

Deduction for opening

1.5

0.23

2.62

0.90
6.97

No

Length

Breadth

Height

Quantity

Brick work

Deduction for opening

BRICK WORK IN TEMPLE T1

ii) BRICK WORK for T2


S.N Description of work
1

Brick work

BRICK WORK IN TEMPLE T1


iii) BRICK WORK for T3
S.N Description of work
1

Brick work

First floor brick work (breadth = 9")

21.96

0.23

3.30

16.67

Addition of brick for 300 cantilever

0.3

0.23

3.3

1.82

Deduction for opening

1.27

0.23

3.3

1.93
20.42

No

Length

Breadth

Height

Quantity

8.24

0.23

2.70

5.12

1.5

0.23

2.7

0.93
6.05

No

Length

Breadth

Height

Quantity

9.70

2.30

0.90

20.08

1
1
1

6.18
8.19
4.49

2.30
2.30
2.30

0.90
0.90
0.90

12.79
16.95
9.29

1
1

5.39
4.60

2.30
2.30

0.90
0.90

11.16
9.52
15.96

BRICK WORK IN TEMPLE T1


iv) BRICK WORK for T4
S.N Description of work
1

Brick work
First floor brick work (breadth = 9")
Deduction for opening

BRICK WORK IN TEMPLE T1


E) Parapet wall(9"wall)
S.N Description of work

Brick work
Parapet wall at T1 front

Parapet wall at T2 front


Parapet wall at T3 front
Parapet wall at T4 front
Parapet along staircase
st1
st2
Aesthetic works for parapet wall

BRICK WORK IN TEMPLE T1

95.76

XI PLASTER WORK
EXTERIOR WALL PLASTER (1:4)
S.N Description of work

No

Length

Breadth

Height

Quantity

Exterior wall Lvl: 3.75m

48.80

3.75

183.00

2
3
4

Exterior wall Lvl: 5.25m


Exterior wall Lvl: 6.25m
Temple T1
a. T1
a'. Pyramidical
a''. Cornice plaster

2
2

21.10
13.32

1.5
1.2

31.65
15.98

11.762
2.72

35.29
10.88
5.44

16.372
2.72

49.12
10.88

Temple T2
a. T2
a'. Pyramidical
a''. Cornice plaster

Temple T3
a. T3
a'. Pyramidical
a''. Cornice plaster
Temple T4
a. T4
a'. Pyramidical
a''. Cornice plaster

5.44
3.6

27.682
6.68

99.66
26.72
13.36

11.762
2.26

35.29
9.04
4.52

4
1
3

0.90
1.25
2.81

0.60
2.13

2.16
2.66
8.42

DEDUCTION FOR OPENINGS


a W1
b D1
c D4

d D5

1.27

3.60

DEDUCTION OF OPENINGS FOR PLASTER WORK

4.57

17.82

Addition for zig zag aesthetic work as 20% of total exterior wall

46.13

EXTERIOR PLASTER WORK

564.57

INTERIOR WALL PLASTER (1:6)


S.N Description of work
1

3
4

Height

Quantity

20.24
20.92
12.84
20.56

3.45
3.30
3.94
3.94

69.83
69.04
50.53
81.01

1
1

8.8
13.4

2.885
2.885

25.39
38.66

c.T3

23.402

3.485

81.56

d. T4

8.12

2.885

23.43

34.269

34.27

W1
D1
D4

4
1
3

0.90
1.25
2.81

0.60
2.13

2.16
2.66
8.42

D5

1.27

3.60

4.57

D3
D2

1
1

0.90
0.75

2.13
2.13

1.92
1.60

Ground floor
office spaces
PUJARI spaces
store
unused space
Temple
a.T1
b.T2

Parapet wall

No

Length

1
1
1
1

Breadth

DEDUCTION FOR OPENINGS

Opening besides the officespace

1.50

3.45

DEDUCTION OF OPENINGS FOR INTERIOR PLASTER WORK


INTERIOR PLASTER WORK

5.18

26.51
447.19

CEILING PLASTER (1:3)


S.N Description of work
1

No

Length

Breadth

Height

Quantity

Ground floor
office spaces
PUJARI spaces
store

1
1
1

3.50
5.32
4.97

6.62
5.14
1.45

23.17
27.34
7.21

unused space

4.00

5.14

20.56

a.T1

2.2

2.2

4.84

b.T2
c.T3
d. T4

1
1
1

3.35
5.14
2.06

3.35
5.14
2.06

11.22
26.42
4.24

Temple

CEILING PLASTER

125.01

XII SCREEDING (1:6)


S.N Description of work
1

Ground floor
office spaces
PUJARI spaces
store
unused space
Temple

No

Length

Breadth

1
1
1
1

3.50
5.32
4.97
4.00

6.62
5.14
1.45
5.14

Height

Quantity

23.17
27.34
7.21
20.56

a.T1

2.2

2.2

4.84

b.T2
c.T3
d. T4

1
1
1

3.35
5.14
2.06

3.35
5.14
2.06

11.22
26.42
4.24

TOTAL OF SCREEDING WORK

125.01

XIII PAINT WORK


S.N Description of work
1
2
3
4

No

Length

Breadth

Height

Exterior wall (Weather coat)


Interior wall (Emulsion)
Ceiling (Distemper)
Putting

Quantity
564.57
447.19
125.01
1136.76

TOTAL OF SCREEDING WORK

2398.54

XIV MARBLE WORK


S.N Description of work
1

No

Length

Breadth

Height

Quantity

Temple
a.T1
b.T2

13.6
18.2

13.6
18.2

c.T3

25.2

25.2

d.T4

12.92

12.92

MARBLE WORK INSIDE TEMPLE

69.92

ft.

69.92

XV TILE WORK
S.N Description of work
1

Floor tile

No

Length

Breadth

Height

Quantity

T1 front

16.37

20.962

16.37

T2 front
T3 front
T4 front

9.388
6.72
18.22

14.44
12.2
23.05

9.39
6.72
18.22

Staircase
steps
steps

22
22
12

0.15
0.3
0.15

1.5
1.5
1.5

2.98
13.16
4.269

4.95
9.90
2.70

12

0.3

1.5

4.269

5.40

95.33

65.55

TERRACE TILE WORK

XVI WOODEN DOORS


DOOR FRAMES
S.N Description of work
1
2
3

D1
D2
D3

No

Length

Breadth

Height

Quantity

1
1
1

6.76
5.76
6.26

0.10
0.10
0.10

0.10
0.10
0.10

1.35
1.15
1.25

WOOD WORK

3.76

DOOR SHUTTERS
S.N Description of work
1
2
3

D1
D2
D3

WOOD WORK

No

Length

1
1
1

1.25
0.75
1.00

Breadth

Height

Quantity

2.13
2.13
2.13

5.32
3.20
4.26

12.78

XVII WOODEN WINDOWS


WINDOW FRAMES
S.N Description of work
1
2

W1
W2

No

Length

Breadth

Height

Quantity

1
1

3.00
2.58

0.10
0.10

0.10
0.10

0.60
0.52

WOOD WORK

1.12

WINDOW SHUTTERS
S.N Description of work
1
2

W1
W2

No

Length

1
1

0.90
0.39

Breadth

Height

Quantity

0.60
0.60

1.08
0.47

WOOD WORK

1.55

XVIII EXTERIOR AESTHETIC STONE WORK


OUTER AESTHETIC WORKS(WITH STONE OR BRICK)
S.N Description of work
1

Total length of perimeter

STONE WORK

No

Length

Breadth

Height

Quantity

58.78

0.60

3.60

423.22

423.22

Remarks(Explanation)

(Total length of centre line)L= 0.21x2 + 1x4 + 0.4x4 +


3.3+1.65 + 1.051 + 1.19x7 + 0.455x3 + 1.75x4+
2x0.55
(Total length of centre line)L= 10.392 + 1.72 + 0.13
+3.87 + 5.69 +3.1 + 5.13
cu.m.

Remarks(Explanation)
[Refer to foundation drawing]
length = breadth = (1.75+0.3)/2

[Refer to trench wall drawing] Breadth = area of cross


section of filling i.e. area of trench - area of trench wall =
0.45X0.75 - (0.56X0.17 + 0.46X0.17 + 0.23X0.105)
cu.m.

Remarks(Explanation)
Area of filling = length
cu.m.

Remarks(Explanation)
see the ground floor plan and sectional dwg at YY and
length = area of earthfilling
7.77 is the area of cross section in sq.m. and see the
section at XX
cu.m.

Remarks(Explanation)

total length of centreline: length from excavation work +


63X0.8 + 4X0.6 - 24X0.3where 63 is no. of times of 0.8
around column and 4 is no. of times of 0.6 around 1.75
column
cu.m.

Remarks(Explanation)

Length = 2.6X2 + 2X2 + 1.8X2 + 2.79X4 + 2.06 +


3.35X2 + 1.9X2 + 2.2X4
Length = 2.6X3 +2X3 + 0.3 at crossed beam + 3.35
Length = 1.8 +2.79X4 + 2.06X2

cu.m.

Remarks(Explanation)

Refer the sectional at Z-Z drawings

Refer to structural sectional beam drawings

Refer to structural secondary sectional beam drawings


cu.m.

Remarks(Explanation)

length = area of slab


length = area of slab
Length = lateral surface area of pyramid where as
quantities area calculated by multiplying thickness of
slab
length = area of slab
Length = lateral surface area of pyramid where as
quantities area calculated by multiplying thickness of
slab
length = area of slab
Length = lateral surface area of pyramid where as
quantities area calculated by multiplying thickness of
slab
length = area of slab

Length = lateral surface area of pyramid where as


quantities area calculated by multiplying thickness of
slab
length = area of slab

Remarks(Explanation)

Remarks(Explanation)
breadth refers to the number of reinforcement requird
breadth refers to the number of reinforcement requird

breadth refers to length of stirrups whereas length refers to the


number of stirrups required

kg

kg
kg
kg
kg
kg

kg

Remarks(Explanation)

Length = 2.6X2 + 2X2 + 1.8X2 + 2.79X4 + 2.06 +


3.35X2 + 1.9X2 + 2.2X4
Length = 2.6X3 +2X3 + 0.3 at crossed beam + 3.35
Length = 1.8 +2.79X4 + 2.06X2
Length = 2.6X2 + 2X2 + 1.8X2 + 2.79X4 + 2.06 +
3.35X2 + 1.9X2 + 2.2X4
Length = 2.6X3 +2X3 + 0.3 at crossed beam + 3.35
Length = 1.8 +2.79X4 + 2.06X2

Refer the sectional at Z-Z drawings

Refer to structural sectional beam drawings

Refer to structural secondary sectional beam drawings

length = area of slab

length = area of slab


Length = lateral surface
length = area of slab
Length = lateral surface
length = area of slab
Length = lateral surface
length = area of slab
Length = lateral surface
length = area of slab

Sq.m.

area of pyramid
area of pyramid
area of pyramid
area of pyramid

Remarks(Explanation)

considering a combined footing as two isolated column


Length of toe wall is derived from the excavation work
table above

Remarks(Explanation)

Remarks(Explanation)

L = 2.94 X2 + 2.29 + 2.55 + 2.9 + 1.29 + 3.65 + 3.65

L= 2.36 + 3.090
L = 3.090X2 + 2.110X2 + 2.3 + 2.9
L = 2.9 + 2.3
L = 3.090X2 + 2.110X2 + 2.3 + 2.9 ( brickwork between
T1 level and T3 level
L = 2.9 + 2.3 ( brickwork between T1 level and T3 level)

Remarks(Explanation)
check the drawings for details

Remarks(Explanation)

length= area of cross section ( 8.23 + 2.25X1.558) and


see the section at Y-Y

Remarks(Explanation)

Remarks(Explanation)

L = 4X 2.2 ( column to column for creating box effects


L = 4X 2.2 neglecting niches on wall around the temple

Remarks(Explanation)
L = 4X 3.267 excluding the column

Remarks(Explanation)

L = 4X 5.49 excluding the column


considering aesthetic look of main temple T3

Remarks(Explanation)

L = 4X 2.06 excluding the column

Remarks(Explanation)

9" brickwork for parpet wall inorder to derive the


aesthetic look of mountain shape as per elevation
L
L
L
L

=
=
=
=

2.5X3 + 2.2
2 X 3.09
1.97 + 2.110 + 3.090 + 1.02
3.09 + 1.04

L= length of stringer of staircase


L= length of stringer of staircase
considering as 20% of total

Remarks(Explanation)
L = overall length of stone faade around the temple

L = perimeter of exterior faade portion

L = perimeter of exterior faade portion

L = perimeter of exterior faade portion

L = perimeter of exterior faade portion

Remarks(Explanation)

Length=
Length=
Length=
Length=

perimeter
perimeter
perimeter
perimeter

of
of
of
of

internal
internal
internal
internal

wall=
wall=
wall=
wall=

2(3.5 + 6.62)
2(5.32 + 5.14)
2(4.97 + 1.45)
4 X 5.14

Length= perimeter of internal wall= 4 X 2.2


Length= perimeter of internal wall= 4 X 3.35
Length= perimeter of internal wall= 4X 5.2 + edges of
column
Length= perimeter of internal wall= 4 X 2.03
L =1.401+2.789*2+15.35+11.94

Remarks(Explanation)

Remarks(Explanation)

Remarks(Explanation)

Remarks(Explanation)
marble work in interior floor of temple

Remarks(Explanation)

tile work on outside the each temple or in ciculation

tile work on outside the each temple or in ciculation


route in order to prevent from slipping during wet season
and also skirting is also provided since circulation along
temple is open Length = perimeter of each open area of
each temple front and staircase area.

Remarks(Explanation)

Remarks(Explanation)

Remarks(Explanation)

Remarks(Explanation)

Remarks(Explanation)
height is considered from maximum height
cu.m

Analysis Sheet
Job descriptions:- Site clearance works including
cutting grass and levelling the surface
6
A4

Sources
Labour

Description
unskilled

unit: 1 sq.m.
Quantity
unit
0.01
m.d.

Rate per sq.m.


Rs.
4.77

10
B1

Job descriptions:- Earth work in excavation in soft clay and silty soil including
disposal upto 10 m lead and 1.5 m lift.
unit: 1 cu.m.
Sources
Description
Quantity
unit
Labour
unskilled
0.70
m.d.
Equipments
3% of labour cost

Rate per cu.m.


Rs.
344.09

Job descriptions:- Earth work in filling . (Spreading soil in layer of 15/15 cm, spraying wa
13
B2

Sources
Labour
Materials

Description
unskilled
Clay
Water

unit: 1 cu.m.
Quantity
unit
0.50
m.d.
1.50
cu.m.
5.00
litre

Rate per cu.m.


Rs.
619.56

Job descriptions:- sand filling work . (supplying of sand from quarry and spreading in lay
water and compact sand) including hullage upto 10 m.

15
B3

Sources
Labour

Description
unskilled

unit: 1 cu.m.
Quantity
unit
0.7
m.d.

Materials

sand
Water

1.1
5.00

cu.m.
litre

Rate per cu.m.


Rs.
2524.20

Job descriptions:- Gravelling works in foundation along with compaction including hulag
Sources
Labour
Material

16
B3

Rs.

Description
unskilled
Gravel

unit: 1 cu.m.
Quantity
unit
0.75
m.d.
1.1
cu.m.

Rate per cu.m.


1831.95

Job descriptions:- Flat brick soling (including hulage up to 30 m.)


Norms - 11(15)-b - page 65
Unit :- 10 M2
Sources
Description
Quantity
Labours
Skilled
m.d.
Unskilled
m.d.
Materials
Brick
Nos
Sand
M3
Sub-total
15 % Contractor's profit and overhead
Total
Rate
per

32
C2
5 (2) A

unit
0.50
1.00
420.00
0.71

M3

Job descriptions:- First class brick work in 1:6 cement sand mortar in ground floor
(Supplying of brick, cement sand and preparation of mortar including 3
unit: 1 cu.m.
Sources
Description
Quantity
unit
a) Skilled
m.d.
1.50
Labours
m.d.
b) Unskilled
2.20
c) unskilled(scaffolding)
m.d.
0.20
Nos
Brick
560
MT
Cement
0.07
M3
Materials
River sand
0.30
water
100.00
Lt.
3 % of labour cost of
Scaffoldong
scafolding
Rate per cu.m.

Rs.

33
C2
5 (2) B

9113.68

Job descriptions:- First class brick work in 1:6 cement sand mortar above ground floor
(Supplying of brick, cement sand and preparation of mortar including 3
unit: 1 cu.m.
Sources
Description
Quantity
unit
a) Skilled
m.d.
1.50
Labours
m.d.
b) Unskilled
2.20
c) unskilled(scaffolding)
m.d.
0.70
Brick
560
Nos
Cement
0.07
MT
Materials
M3
River sand
0.30
water
100.00
Lt.
3 % of labour cost of
Scaffoldong
scafolding

Rate per cu.m.


Rs.
9359.45

Job descriptions:- Random Rubble Stone masonry work in 1:4 cement sand mortar
(Supplying of stone, cement, sand and preparation of mortar including 3
unit: 1 cu.m.
Sources
Description
Quantity
unit
a) Skilled
1.50
m.d.
Labours
b) Unskilled
5.00
m.d.
cement
0
MT
M3
sand
0.45

38
C6

Materials

Block stone

1.00

M3

Bond stone

0.10
100

M3

Water

Rs.

Lt.

Rate per cu.m.


9197.13

Job descriptions:- Cement concrete (1:2:4) work in foundation and wall including supply
to 30 m.
47
D1

Sources
Labours

Materials

Description
a) Skilled
b) Unskilled
cement

unit: 1 cu.m.
Quantity
unit
1.00
m.d.
4.00
m.d.
0.32
MT

Materials

40 mm crushed stone aggregate

0.52

20 mm crushed stone aggregate

0.22

10 mm stone aggregate
sand
water

0.11
0.445
150

M3
M3
M3
M3
Lt.

Rate per cu.m.


Rs.
10754.31

49
D2

Job descriptions:- Cement concrete (1:1.5:3) work in superstructure deck slab and beam
materials and hulage up to 30 m.
unit: 1 cu.m.
Sources
Description
Quantity
unit
a) Skilled
0.80
m.d.
Labours
b) Unskilled
7.00
m.d.
cement
0.40
MT

Materials

M3

20 mm crushed stone aggregate

0.57

10 mm stone aggregate

0.29

M3

sand

0.43
200

M3

water

M3

Rate per cu.m.


Rs.
13366.49

58
D9

Job descriptions:- Cutting, bending,placing as per drawing and binding of reinforcement


supply of all materials and hulage up to 30 m.
unit: 1 cu.m.
Sources
Description
Quantity
unit
a) Skilled
m.d.
12.00
Labours
m.d.
b) Unskilled
12.00
MT
TMT rod
1.05
Materials
kg
Binding wire
10.00
Rate per cu.m.
Rs.
112147.65

Job descriptions:- Construction of wooden form for RCC slab including supply of all mat
up to 30 m.
unit: 10 cu.m.

59

Sources
Labours
Materials
rate per sq.m.
5412.49
10

60
E1

Description

Quantity
1.72
2.57
0.07
2.50

a) Skilled
b) Unskilled
soft wood
screw, nails

Rs.

unit
m.d.
m.d.
cu.m.
kg

541.24

Job descriptions:- Construction of wooden form for RCC column including supply of all m
hulage up to 30 m.
unit: 10 cu.m.
Sources
Description
Quantity
unit
a) Skilled
m.d.
3.75
Labours
m.d.
b) Unskilled
5.62
soft wood
0.07
cu.m.
Materials
screw, nails
2.50
kg
rate per sq.m.
8268.38
10

Rs.

826.83

Job descriptions:- Construction of formwork for RCC slab using metal pipe, plyboard incl
dismantling and hulage up to 30 m.
61
E2

Sources
Labours

Materials

rate per sq.m.


66273.47
100

63

unit: 100
Quantity
17.20
25.70
16.50
0.23
4.40
25.00

Description
a) Skilled
b) Unskilled
19 mm Board
softwood
Metal pipe(NMB 50-M)
screw, nails

Rs.

cu.m.
unit
m.d.
m.d.
cu.m.
cu.m.
No.
kg

662.73

Job descriptions:- Construction of formwork for RCC beam (depth from 0.3 m to 0.80)us
including supply of all materials, dismantling and hulage up to 30 m.
unit: 10 cu.m.
Sources
Description
Quantity
unit

E4

Labours
Materials
rate per sq.m.
6750.46
10

a) Skilled
b) Unskilled
softwood
screw, nails

2.67
4.00
0.07
2.50

Rs.

m.d.
m.d.
cu.m.
kg

675.04

Job descriptions:- Construction and fitting of sal wood frame for door and window (frame
door of size 900mm*2100mm is taken for rate analysis)
unit: 1 cu.m.
88
F21

Sources
Labours
Materials

Rs

a) Skilled
b) Unskilled
Sal wood
Holdfast
screw nail

Quantity
34.00
3.40
1.10
92.00
184.00

unit
m.d.
m.d.
cu.m.
no.
no.

rate per sq.m.


210315.97

Job descriptions:- Construction and fitting of 38 mm thick panel door shutter of sal wood
m is taken for rate analysis)
Unit :- 2.114 sqm
Sources
Description
Quantity
unit
a) Skilled
m.d.
10.00
Labours
m.d.
b) Unskilled
1.00
M3
Sal wood
0.08
Materials
100mm Hinge
6.00
Nos
150mm tower bolt
1.00
Nos
300mm tower bolt
1.00
Nos
Mortice luck
1.00
Nos
Handle 150mm
2.00
Nos
screw, nails
L.S.

89
G2

Rs

91

Description

rate per sq.m.


23595.42
2.114

Rs
= 11161.50

Job descriptions:- Construction and fitting of 38*75 mm glaze window shutter of sal woo
(shutter size =1.829 m *1.22 m is taken for rate analysis)
Unit :- 2.23 sqm
Sources
Description
Quantity
unit

G3

Labours

Materials

a) Skilled
b) Unskilled

9.00
0.90

Sal wood
5 mm glass
75mm hinge
100 mm tower bolt
normal handle
screw, nails

0.05
1.09
8.00
4.00
2.00
L.S.

rate per sq.m.


16195.38
2.23

m.d.
m.d.
M3
sq.m.
Nos
Nos
Nos

Rs
= 7262.50

Job descriptions:- Construction and fitting flush door shutter of 38 mm thick sal wood fr
teak plywood in both side (shutter size =1.092 m *2.058 m is taken for rate analysis)
Sources

94
G4

Labours

Materials

Rs.

150
G4

Unit :- 2.245 sqm


Quantity
unit
m.d.
7.00
0.70
m.d.
M3
0.03460
sq. m.
4.65
3.00
Nos
2.00
Nos
1.00
Nos
L.S.

Description
a) Skilled
b) Unskilled
Sal wood
4mm teak plywood
100 mm Hinge
150 mm tower bolt
Mortis lock
screw, nails

rate per sq.m.


15000.24
2.245

6681.62

Job descriptions:- 300 X 300 mm with 25 mm thick antislip cement tile flooring on ceme
Unit: 10 sq.m.
Sources
Description
Quantity
unit
a) Skilled
1.50
m.d.
Labours
b) Unskilled
1.50
m.d.
sq.m.
Antislip cement tile
11.00000
M3
Materials
cement
0.08
sand
rate per sq.m.
14411.63
10

0.22

Rs.

1441.16

M3

159
I1

Job descriptions:- 12.5 mm thick cement sand (1:3) plaster work (ceilings)
Unit :- 100 sqm
Sources
Description
Quantity
unit
a) Skilled
m.d.
15.00
Labours
m.d.
b) Unskilled
20.00
MT
Cement
0.62500
Materials
cu.m.
sand
1.28
rate per sq.m.
32734.33
100

162
I11

Rs.

253.31

Job descriptions:- 20 mm thick cement sand (1:4) plaster work (exterior)


Unit :- 100 sqm
Sources
Description
Quantity
unit
a) Skilled
m.d.
14.00
Labours
m.d.
b) Unskilled
19.00
MT
Cement
0.81000
Materials
cu.m.
sand
2.20
rate per sq.m.
36444.20
100

180
I17

327.34

Job descriptions:- 12.5 mm thick cement sand (1:6) plaster work (interior)
Unit :- 100 sqm
Sources
Description
Quantity
unit
a) Skilled
12.00
m.d.
Labours
b) Unskilled
16.00
m.d.
Cement
0.38200
MT
Materials
sand
1.57
cu.m.
rate per sq.m.
25330.62
100

166
I14

Rs.

Rs.

364.44

Job descriptions:- 2mm plain cement white putty on wall and ceiling
unit=10 sq.m.
Sources
Description
Quantity
unit
a) Skilled
1.00
m.d.
Labours
m.d.
b) Unskilled
1.00
Materials
kg
White putty
10.64
rate per sq.m.
1913.64

Rs.

191.36

10

189
J4

Job descriptions:- Two coat water proof cement paint work


unit=100 sq.m.
Sources
Description
Quantity
unit
a) Skilled
m.d.
5.00
Labours
m.d.
b) Unskilled
5.00
Materials
kg
cement paint
48.50
rate per sq.m.
9182.75
100

190
J5

91.83

Job descriptions:- Two coat ready made enamel paint work after application of one coat
unit=100 sq.m.
Sources
Description
Quantity
unit
a) Skilled
8.00
m.d.
Labours
b) Unskilled
5.00
m.d.
cement paint
8.10
ltr
Materials
ltr
ready paint
9.00
rate per sq.m.
15632.52
100

231
K2

Rs.

Rs.

156.33

Job descriptions:- 3.8 cm thick cement concrete (1:2:4) DPC


unit=10 sq.m.
Sources
Description
Quantity
a) Skilled
1.00
Labours
b) Unskilled
2.00
cement
0.12
Sand
0.17
Materials
water proof compund
2.88
12 mm aggregates
0.34
rate per sq.m.
4745.85
10

Rs.

474.59

unit
m.d.
m.d.
MT
Cu.m.
kg
cu.m.

heet

q.m.
U.Rate
Amount
415.00
4.15
Sub-total
15% contract overhead
Total contract rate

Total amount
4.15
4.15
0.62
4.77

u.m.
U.Rate
415.00

Amount
290.50

Sub-total
15% contract overhead
Total contract rate

Total amount
290.50
8.71
299.21
44.88
344.09

15 cm, spraying water and compact soil) including hullage upto 10 m.

u.m.
U.Rate
Amount
415.00
207.50
220.00
330.00
0.25
1.25
Sub-total
15% contract overhead
Total contract rate

Total amount
207.50
331.25
538.75
80.81
619.56

and spreading in layer of 15/15 cm, spraying

u.m.
U.Rate
415.00

Amount
290.50

Total amount
290.50

1730.19
1903.21
0.25
1.25
Sub-total
15% contract overhead
Total contract rate

1904.46
2194.96
329.24
2524.20

ion including hulage of 10 m

u.m.
U.Rate
Amount
415.00
311.25
1165.23
1281.75
Sub-total
15% contract overhead
Total contract rate

U.Rate
600.00
415.00
22.00
1730.19

Amount

Total amount

300.00
415.00
9240.00
1228.43
11183.43
1677.52
12860.95
1286.10

ground floor
mortar including 30 m hulage)
u.m.
U.Rate
Amount
600.00
900.00
415.00
913.00
415.00
83.00
8.00
4480.00
14320.00
1002.40
1730.19
0.25

Total amount
311.25
1281.75
1593.00
238.95
1831.95

519.05
25.00

Sub-total
15% contract overhead

Total amount

1896.00

6026.45
2.49
7924.94
1188.74

Total contract rate

9113.68

bove ground floor


mortar including 30 m hulage)
u.m.
U.Rate
Amount
600.00
900.00
415.00
913.00
415.00
290.50
8.00
4480.00
14320.00
1002.40
1730.19
0.25

519.05
25.00

Sub-total
15% contract overhead
Total contract rate

nt sand mortar
f mortar including 30 m hulage)
u.m.
U.Rate
Amount
600.00
900.00
415.00
2075.00
14320.00
2276.88
1730.19

778.58

1765.50

1765.50

1765.50

176.55

0.25
25.00
Sub-total
15% contract overhead
Total contract rate

Total amount

2103.50

6026.45
8.71
8138.66
1220.79
9359.45

Total amount
2975.00

5022.51
7997.51
1199.62
9197.13

all including supply of all materials and hulage up

u.m.
U.Rate
600.00
415.00
14320.00

Amount
600.00
1660.00
4582.40

Total amount
2260.00

1942.05

1009.86

2012.67

442.78

1836.12

201.97

1836.12
817.07
0.25
37.50
Sub-total
15% contract overhead
Total contract rate

7091.58
9351.58
1402.73
10754.31

deck slab and beam including supply of all

u.m.
U.Rate
600.00
415.00
14320.00

Amount
480.00
2905.00
5728.00

2012.67

1147.22

1836.12

532.47

1836.12

780.35

0.25
50.00
Sub-total
15% contract overhead
Total contract rate

ng of reinforcement bar for RCC work including


u.m.
U.Rate
Amount
600.00
7200.00
415.00
4980.00
80450.00
84472.50
86.72
867.20
Sub-total
15% contract overhead
Total contract rate

ng supply of all materials, dismantling and hulage

cu.m.

Total amount
3385.00

8238.04
11623.04
1743.45
13366.49

Total amount
12180.00
85339.70
97519.70
14627.95
112147.65

U.Rate
Amount
600.00
1032.00
415.00
1066.55
33721.05
2360.47
99.00
247.50
Sub-total
15% contract overhead
Total contract rate

Total amount
2098.55
2607.97
4706.52
705.97
5412.49

uding supply of all materials, dismantling and

cu.m.
U.Rate
Amount
600.00
2248.80
415.00
2333.13
33721.05
2360.47
99.00
247.50
Sub-total
15% contract overhead
Total contract rate

Total amount
4581.93
2607.97
7189.90
1078.48
8268.38

l pipe, plyboard including supply of all materials,

cu.m.
U.Rate
Amount
600.00
10320.00
415.00
10665.50
1124.42
18552.93
33721.05
7823.28
1771.00
7792.40
99.00
2475.00
Sub-total
15% contract overhead
Total contract rate

Total amount
20985.50

36643.61
57629.11
8644.36
66273.47

m 0.3 m to 0.80)using metal pipe, plyboard

cu.m.
U.Rate

Amount

Total amount

600.00
1602.00
415.00
1660.00
33721.05
2360.47
99.00
247.50
Sub-total
15% contract overhead
Total contract rate

3262.00
2607.97
5869.97
880.49
6750.46

and window (frame size =100mm*75mm and


U.Rate
Amount
600.00
20400.00
415.00
1411.00
144771.00
159248.10
15.71
1445.32
2.06
379.04
Sub-total
15% contract overhead
Total contract rate

Total amount
21811.00

161072.46
182883.46
27432.51
210315.97

shutter of sal wood (shutter size =1.07 m *1.982

U.Rate
600.00
415.00

Amount
6000.00
415.00

144771.00
26.00
59.00
94.00
1532.00
28.00

12160.76
156.00
59.00
94.00
1532.00
56.00

Total amount
6415.00

45.00
Sub-total
15% contract overhead
Total contract rate

14102.76
20517.76
3077.66
23595.42

w shutter of sal wood with 5 mm thick glass

U.Rate

Amount

Total amount

600.00
415.00

5400.00
373.50

144771.00
804.31
14.00
35.00
28.00

7093.77
872.67
112.00
140.00
56.00
35.00

Sub-total
15% contract overhead
Total contract rate

5773.50

8309.44
14082.94
2112.44
16195.38

m thick sal wood frame with fixing 4mm thick


rate analysis)
U.Rate
600.00
415.00

Amount
4200.00
290.50

144771.00
591.80
26.00
59.00
551.25

5009.07
2751.87
78.00
118.00
551.25
45.00

Sub-total
15% contract overhead
Total contract rate

Total amount
4490.50

8553.19
13043.69
1956.55
15000.24

le flooring on cement sand ratio of 1:4


U.Rate
600.00
415.00
860.80

Amount
900.00
622.50
9468.80

14320.00
1159.92
1730.19
380.64
Sub-total
15% contract overhead
Total contract rate

Total amount
1522.50

11009.36
12531.86
1879.77
14411.63

lings)
U.Rate
Amount
600.00
9000.00
415.00
8300.00
14320.00
8950.00
1730.19
2214.64
Sub-total
15% contract overhead
Total contract rate

Total amount

U.Rate
Amount
600.00
7200.00
415.00
6640.00
14320.00
5470.24
1730.19
2716.39
Sub-total
15% contract overhead
Total contract rate

Total amount

U.Rate
Amount
600.00
8400.00
415.00
7885.00
14320.00
11599.20
1730.19
3806.41
Sub-total
15% contract overhead
Total contract rate

Total amount

U.Rate
Amount
600.00
600.00
415.00
415.00
61.00
649.04
Sub-total
15% contract overhead
Total contract rate

Total amount

17300.00
11164.64
28464.64
4269.69
32734.33

erior)

13840.00
8186.63
22026.63
3303.99
25330.62

rior)

16285.00
15405.61
31690.61
4753.59
36444.20

1015.00
649.04
1664.04
249.60
1913.64

U.Rate
Amount
600.00
3000.00
415.00
2075.00
60.00
2910.00
Sub-total
15% contract overhead
Total contract rate

Total amount
5075.00
2910.00
7985.00
1197.75
9182.75

ication of one coat primer


U.Rate
Amount
600.00
4800.00
415.00
2075.00
315.00
2551.50
463.00
4167.00
Sub-total
15% contract overhead
Total contract rate

Total amount

U.Rate
Amount
600.00
600.00
415.00
830.00
14320.00
1718.40
1730.19
294.13
0.00
0.00
2012.67
684.30
Sub-total
15% contract overhead
Total contract rate

Total amount

6875.00
6718.50
13593.50
2039.02
15632.52

1430.00

2696.83
4126.83
619.02
4745.85

beam
Primary beam

centreline
main16
Extra12

LD
5.19

0.96

0.25L
width of column
0.5275
0.3
0.7725

Secondary beam

main
extra

0.96

0.5275

0.3

0.7725

Primary beam

main
Extra

5.2

0.96

0.575

0.3

0.725

Secondary beam

main
extra

0.96

0.575

0.3

0.725

cantilever

main16

Primary beam

main16
Extra12

5.45

0.96

0.59

0.3

0.7725

Primary beam

main16
Extra12

6.745

0.96

0.91625

0.3

0.7725

Primary beam

main16
Extra12

3.655

0.96

0.91625

0.3

Primary beam

main16
Extra12

11.045

0.96

0.575

0.3

0.725

0.9125
0.54875

Primary beam

main16
Extra12

6.74

0.96

0.7725

0.3

0.59
0.3225
Primary beam

main16
Extra12

2.5

0.96

3.75
3.75
3.4
3.375

2.38
2.6
3.9
2.6

0.625

0.3

foundation footings
12 dia
20 in each footings

T1
T2
T3
T4

3.75
3.75
3.75
3.75

2.38

9.88
10.1
13.43
9.725

number of rod

number of stirrups @ centre


4
1

4
1

4
1

4
1

number of stirrups @ end

13
1.5625
1.75
1.8075

24

1.5625
1.6
1.8825
2.88

13
1.61
1.75
1.76

24

1.61
1.6
1.835
2.88
total

6
4
1

14
1.625
1.8125
1.8075

26

4
1

18
1.95125
2.13875
1.8075

32

4
1

10
3.9025

18

4
1

31
1.61
1.75
1.76

54

2.0875
1.9475
1.91125
1.58375
4
1

16
1.8075
1.8125
1.625
1.3625

24

4
1

6
3.32

12
total Length of 16 dia bar

35
35
35
35

34
30
30
30

21
21
35
21

length of rod
total length unit
6.81
27.24 m
5.12 m

6.81

27.24
7.925 m

6.82

27.28 m
5.12 m

6.82

27.28
7.925 m

2.46

109.04 m
14.76 m

7.07

28.28 m
5.245 m

8.365

33.46 m
5.8975 m

5.275

21.1 m
3.9025 m

12.665

50.66 m
12.65 m

8.36

33.44 m
6.6075 m

4.12

20

16.48 m
3.32 m

Main temple Estimation


Cost calculation
S.N. Descriptions of items

UniteQuantity Rate

Earthwork in excavation Works : Earth work


excavation for drain and trenches including
struting, bracing sheeting & disposal upto
10m & lift upto 1.5m all complete as per site m3
condition and specification.

Earth filling Works: Providing and filling in


foundation and floors with pit gravel of
approved quality and size packed with sand
including
watering,
hammering
and m3
compaction as specified

Gravel and sand filling Works: Providing and


filling in plinth floors with pit gravel of
approved quality and size packed with sand
including
watering,
hammering
and m3
compaction as specified
Brick Soling Works: Stone soling work in
foundation & leveling it also including 30 m
m3
lead
P.C.C. Works(1:3:6):
Providing & placing
manually mixed non structural cement
concrete
1:3:6
(cement:sand:aggregate)
including compaction curing, testing &lead
30m etc all complete as per specification & m3
drawing

Providing and placing Reinforced cement


concrete (1:1.5:3) work
m3
Formworks for P.C.C.: Providing , Preparation
& Installing form work including necessary
supports & removing after completion, lead
30m etc all complete as per specification & Sqm
drawing

206.11

344.09

236.19

619.56

34.21

2524.20

142.32

1286.10

41.51

10754.31

107.22

13366.49

896.09

675.04

Stone Masonry Works: Providing & laying


Random rubble masonry in cement mortar
1:4 (cement:sand)
including scaffolding
curing, preparation of mortar etc complete
mason height 0-5m lead 30m (manual m3
mixing) mortar 35%

423.22

9197.13

183.40

9359.45

Reinforcement Works: Providing & laying


Reinforcement including cutting, bending,
binding, fixing in position & lead 30m etc all
Mt.
complete as per specification & drawing

13.82

112147.65

10

supply and installation of Sal wood work for


frame of door & window m3

4.87

210315.97

11

supply and installation of 38 mm thick panel


door shutter
Sqm

12.78

11161.50

1.55

7262.50

447.19

253.31

125.01

327.34

12

13

14

Brick Masonry Works (1:4) :First class fair


face brick work in wall with chimney made
bricks in cement sand mortar (1:4) in perfect
line, level and finishing, lead 30m as per m3
specification.

supply and installation of 38 mm thick


glazed window shutter with 5mm thick glass

Sqm

Plaster works: Providing & applying 12 mm


thick
cement plaster (cement:sand) 1:6
including mortar mixing, scaffolding, curing
etc complete as per specification lead 30m Sqm
(manual mixing)
Plaster works: Providing & applying 12 mm
thick
cement plaster (cement:sand) 1:3
including mortar mixing, scaffolding, curing
etc complete as per specification lead 30m Sqm
(manual mixing)

15

Plaster works: Providing & applying 20mm


thick
cement plaster (cement:sand) 1:4
including mortar mixing, scaffolding, curing
etc complete as per specification lead 30m Sqm
(manual mixing)

564.57

253.31

16

2mm plain cement white putty on wall and


Sqm
ceiling

564.57

191.36

17

Two coat water proof cement (weather coat)


painting after application of one coat white Sqm
cement

572.20

156.33

18

Two coat enamel painting after application of


one coat wood primer
Sqm

19.20

156.33

17

300 X 300 mm with 25 mm thick antislip


cement tile flooring on cement sand ratio
Sqm
and skirting with same cutting tiles

135.47

1441.16

18

3.8mm thick roof water proofing with 1:1.5:3


cement concrete with water proofing
Sqm
compound

125.01

474.59
Total
Vat @ 13%
Total

Note: Analysis of Rate is based on the Kathmandu valley 2070/71


Above rate used in cost estimation doesnot include the cost of aesthetic such as cornice, decor
etc since it depends on workmanship of labour and locally as well as other factors

ion

Amount

70,920.77

146,331.71

86,350.32

183,040.32

446,418.18

1,433,150.22

604,896.67

Remarks

3,892,372.57

1,716,566.96

1,550,104.82

1,024,491.15

142,599.16

11,242.35

113,275.74

40,920.20

143,008.70

108,038.09

89,448.65

3,000.69

195,231.47

59,326.45
12,060,735.20
1,567,895.58
13,628,630.77

etic such as cornice, decorating materials, gajur,


other factors

Você também pode gostar