Preamble to Bill of Quantities

10

amble to Bill of Quantities


This preamble shall apply to the Bill of Quantities in the Contract unless shown otherwise.

The number, quantities and measurements set out in the Bill of Quantities are approximate and their accuracy or inaccuracy shall in no way affect the validity of
the Contract based thereon. The total amount of each item set out in the Bill of Quantities are required solely for the purpose of assessment and shall not be
deemed to be the actual sums which shall be paid to the Contractor for the execution of the works. The sum to be paid to the Contractor shall (subject to the
provisions of the Contract) be determined by measuring the work actually done in accordance with the Contract and valuing it at the rates and prices inserted by
the Contractor in the Bill of Quantities.

The rates and prices entered in the Bill of Quantities shall except insofar as is otherwise provided under the Contract be deemed to cover all obligations as set out
in the Contract. Items in the Bill of Quantities against which no price is entered shall be deemed to be included in the prices or rates of other items in the Bills. All
rates and prices given in the Bill of Quantities are exclusive of IGV.

Provisional Sums and Dayworks shall be expended in whole or in part only at the direction and discretion of the Engineer. Items marked Optional shall be carried
to the Summary.
Works subjected to measurement shall be measured as stated in the Specifications. Where no rule for measurement is stated, works as executed shall be measured
in accordance with the Civil Engineering Standard Method of Measurement issued by the Institution of Civil Engineers, UK, The net measurement or weight of
the finished work in place will always be taken except where otherwise stated.

The brief descriptions of the items given in the Bill of Quantities are purely for the purpose of identification and shall in no way modify or supersede the detailed
descriptions given in the Conditions of Contract, Specifications or Drawings.

If any material is directed by the Engineer to be measured in vehicles by the cubic metre it shall be hauled in approved vehicles and measured therein at the point
of delivery. Vehicles shall be of size or type acceptable to the Engineer, provided that the body is of such shape that the volume of the contents may be readily and
accurately determined. Unless all approved vehicles are of uniform capacity, each approved vehicle must bear a plainly legible identification mark indicating the
specified approved capacity.

The rates entered by the Contractor for earthworks and pavement construction related to roadwork shall also apply when carrying out such work to accesses,
junctions and the like where these are indicated on the drawings or instructed by the Engineer.

"Authorised", "Directed" or "Approved" shall mean the authority, direction or approval by the Engineer, unless otherwise stated. Certain priced items marked as
additional work to normal shall only be accepted for payment when ordered or approved by the Engineer.

The following terms and abbreviations have been used in the Bill of Quantities:
Unit of description
Abbreviations Bill of Quantities
metre
m square metre
kg tonne (1000 kg)
t lump sum
hr man-hour
mhr litre

BoQ millimetre
m2 cubic metre
LS number
l diameter

mm
m3 hectare (10 000 m2)
no hour
D

ha kilogramme

Term
Rate
Provisional Sums

The unit price for executing the BoQ item complete in full accordance with the requirements of the Contract.
A sum provided in the BoQ for works or costs which cannot be entirely foreseen, defined or detailed.

Preamble to Bill of Quantities


1

10

amble to Bill of Quantities


Este prembulo se aplicar a la lista de cantidades en el contrato a menos que se demuestre lo contrario.

Los nmeros, cantidades y medidas establecidas en la lista de cantidades son aproximadas y su exactitud o inexactitud no ser en modo afectar a la validez del
contrato base de estos colorantes. La cantidad total de cada artculo que figura en la lista de cantidades se requiere con el nico propsito de la evaluacin y no se
considerar que las cantidades reales que se pagarn al Contratista para la ejecucin de las obras. La suma que se pagar a la Contratista (sujeto a las
disposiciones del Contrato) se determina midiendo el trabajo efectivamente realizado de conformidad con el Contrato y valorndola en las tarifas y los precios
incluidos por el contratista en la Lista de Cantidades.

Se considerar que las tasas y precios consignados en la Lista de Cantidades se salvo en lo que se disponga otra cosa en el Contrato para cubrir todas las
obligaciones establecidas en el Contrato. Los elementos de la lista de cantidades contra la que se ha introducido ningn precio se considerarn incluidos en los
precios o tarifas de otros elementos en los proyectos de ley. Todas las tarifas y precios que figuran en la lista de cantidades no incluyen el IGV.

Montos provisionales y Dayworks se utilizarn, en su totalidad o en parte slo en la direccin y la discrecin del Ingeniero. Los elementos marcados opcional se
llevar al Resumen.
Obras sometidas a medicin se medirn segn lo indicado en las especificaciones. Cuando se declar ninguna regla para la medida, funciona como ejecutado se
medir de acuerdo con la Ingeniera Civil mtodo estndar de medida emitida por la Institucin de Ingenieros Civiles, Reino Unido, la medicin neta o el peso de
la obra terminada en su lugar se dictarn siempre de excepcin donde se indique lo contrario.

Las breves descripciones de los elementos que figuran en la lista de cantidades son nicamente con fines de identificacin y no ser en modo modificar o sustituir
las descripciones detalladas que figuren en las Condiciones del contrato, las especificaciones o dibujos.

Si cualquier material es dirigido por el Ingeniero de medirse en los vehculos por el metro cbico ser transportada en vehculos habilitados y medido en el mismo
en el punto de entrega. Los vehculos debern ser de tamao o tipo aceptable para el Ingeniero, a condicin de que el cuerpo es de tal forma que el volumen de los
contenidos puede ser determinada fcilmente y con precisin. A menos que todos los vehculos aprobados son de capacidad uniforme, cada vehculo homologado,
deber llevar una marca de identificacin claramente legibles indicando la capacidad aprobada especificado.

Las tasas introducidas por el Contratista para movimiento de tierras y construccin de pavimentos relacionados con la obra vial se aplicar tambin cuando se
lleva a cabo una labor de accesos, cruces y similares cuando stas se indican en los planos o indique el Ingeniero.

"Autorizado", "Director" o "Aprobado": la autoridad, direccin o aprobacin del Ingeniero, a menos que se indique lo contrario. Ciertos artculos con precios
marcados trabajo como adicional a la normalidad slo se aceptan pagos en cuando es ordenado o aprobado por el Ingeniero.

Los siguientes trminos y abreviaturas se han utilizado en la Lista de Cantidades:


Unit of description
BoQ
metre
m2
m3

Abbreviations
millimetre
m
cubic metre
hectare (10 000 m2)
kilogramme
kg
tonne (1000 kg)
t
lump sum, suma global
LS
number
no
hour
hr
man-hour
mhr
litre
l
diameter
D

Bill of Quantities
mm
square metre
ha

Term
Tarifa

El precio unitario para la ejecucin de la partida BoQ completa de plena conformidad con los requisitos del Contrato.

Montos Provisionales

Una cantidad prevista en el BoQ para obras o gastos que no pueden ser totalmente previsibles, definidos o detallada.

CHEVES HPP
CIVIL CONTRACT

VOLUMEN 5 - SCHEDULE 1 - BILL OF QUANTITIES


04-Nov-10

DESCRIPTION

Bill No. 1 - Preliminaries and General


Bill No. 2 - Roadworks
Bill 2.1 Permanent Roads and Paved Areas
Bill 2.2 Drainage and Erosion Protection.
Bill No. 3 - The Huaura Diversion
Bill 3.1 Huaura Dam and Intake
Bill 3.2 Huaura Diversion Tunnel
Bill No. 4 - Checras Headworks
Bill 4.1 Dam, Intake and Sand Excluder
Bill
Bill
Bill
Bill
Bill

No. 5 - Headrace
5.1 Adit 1
5.2 Surgetunnel
5.3 Headrace tunnel H01 to H18
5.4 Headrace tunnel H18 to H31

Bill No. 6 - Pressure shaft - NOT USED


Bill No. 7 - Steel lined penstock, H31 to powerhouse cavern
Bill
Bill
Bill
Bill
Bill
Bill

No. 8 - Powerhouse and Access Tunnel


8.1 Access Tunnel
8.2 Construction adit to tailrace tunnel
8.3 Construction adit to Headrace tunnel
8.4 Powerhouse Cavern
8.5 Transformer Cavern and Busbar Connections

Bill No. 9 - Tailrace Tunnel


Bill No. 10 - Picunche Dam and Compensation Reservoir
Bill No. 11 - Other Works

ACCEPTED CONTRACT AMOUNT

Bill No. 12 - Dayworks


Bill No. 13 (Intentionally not used)

Bill No. 14 - Alternative Unit Price

TOTAL
PRICE (USD)
39,271,663.78

4,973,522.15
788,551.25

3,333,609.63
9,624,234.24

18,301,121.12

3,565,813.30
2,800,687.44
18,812,561.81
17,333,736.54

1,546,953.67

5,722,270.58
591,174.48
1,733,471.50
6,889,577.46
1,370,389.29
11,147,799.11
5,943,047.73
1,197,632.08

154,947,817.16

3,503,455.00

CHEVES HPP
CIVIL CONTRACT

VOLUMEN 5 - SCHEDULE 1 - BILL OF QUANTITIES


04-Nov-10

DESCRIPTION

Bill No. 1 - Preliminares y general


Bill No. 2 - Obras de carretera
Bill 2.1 Las carreteras permanentes y reas pavimentadas
Bill 2.2 El drenaje y proteccin contra la erosin.
Bill No. 3 - La desviacin Huaura
Bill 3.1 Huaura presa y toma
Bill 3.2 Huaura tnel de desviacin
Bill No. 4 - Checras obras cabecera
Bill 4.1 Presa, toma and desarenador
Bill
Bill
Bill
Bill
Bill

No. 5 - Aduccin
5.1 Adit N1 - Tnel secundario 1
5.2 Tnel de sobretensiones
5.3 Tnel de aduccin H01 to H18
5.4 Tnel de aduccin H18 to H31

Bill No. 6 - Eje de presin - NOT USED


Bill No. 7 - Tuberia forzada, H31 a caverna de casa de maquinas
Bill
Bill
Bill
Bill
Bill
Bill

No. 8 - Casa de maquina y acceso a tnel


8.1 Acceso a tnel
8.2 Construccin de Adit N1 (tunel secundario N1) a tnel de descarga
8.3 Construccin de Adit N1 ( tunel secundario N1) a tnel de aduccin
8.4 Caverna de casa de maquina
8.5 Caverna de transformadores y barra de conecciones

Bill No. 9 - Tnel de descarga


Bill No. 10 - Presa Picunche y Reservorio de compensacin
Bill No. 11 - Trabajos varios

ACCEPTED CONTRACT AMOUNT

Bill No. 12 - Dayworks


Bill No. 13 (Intentionally not used)

Bill No. 14 - Alternative Unit Price

TOTAL
PRICE (USD)
39,271,663.78

4,973,522.15
788,551.25

3,333,609.63
9,624,234.24

18,301,121.12

3,565,813.30
2,800,687.44
18,812,561.81
17,333,736.54

1,546,953.67

5,722,270.58
591,174.48
1,733,471.50
6,889,577.46
1,370,389.29
11,147,799.11
5,943,047.73
1,197,632.08

154,947,817.16

3,503,455.00

Bill No. 1 - Preliminaries and General


Item

Description

A.
A.1
A.2

PRECONSTRUCTION PHASE and EARLY WORKS COST


Preconstruction Phase
Early Works

1.1

OBLIGATIONS UNDER CONTRACT CONDITIONS (CC).


Performance Security.
Insurances to be provided by Contractor
Compliance with Clause 4.8 Safety Procedures
Compliance with Clause 4.18 Protection of the Environment and Social Mitigation
Compliance with Clause 4.24 Archaeology
Compliance with all tasks and responsibilites as Principal Contractor
Compliance with Statutes and Regulations in accordance with the Contrac
LEG-3 Insurances to be provided by Contractor

1.1.01
1.1.02
1.1.03
1.1.04
1.1.05
1.1.06
1.1.07
1.1.08
1.2
1.2.01

Unit

LS
LS

Included in
Included in
Included in
Included in
Included in
Included in
Included in
Prov. Sum

Mark-Up
Mark-Up
Mark-Up
Mark-Up
Mark-Up
Mark-Up
Mark-Up

CONTRACTOR'S MOBILISATION, TEMPORARY FACILITIES AND GENERAL ADMINISTRATION.

1.2.02

Provision of Contractor's camps, offices, workshops, stores etc


a) Mirahuay (Staff Camps, Office, Workshop)
LS
b) Pampa Libre Labour Camps
LS
c) Site Offices
LS
Provision of all temporary facilities for water supply, sewerage, communication, solid waste collection and other necessary services

1.2.03

a) Mirahuay (Staff Camps, Office, Workshop)


b) Pampa Libre Labour Camps
c) Site Offices
Provision of all temporary facilities for power generation, transmission and outlet with meters etc

LS
LS
LS
LS

1.2.04

Mobilisation of Contractor's equipment including also crushing, screening and batching


& mixing facilities

LS

1.2.05

Provision of first aid station with ambulance car and all required furniture and medical equipment.

LS

1.2.06
1.2.07
1.2.08

All temporary roadworks except Item 2.1.13


Not used
Temporary diversions, cofferdams, care of river and dewatering

1.2.08.01
1.2.08.02
1.2.08.03
1.2.08.04
1.2.08.05
1.2.09
1.2.10

Huaura Site
Checras Site
Picunche Site
Tailrace outlet
Access Tunel Site
Not used
Contractor's general survey, control of survey network, traversing, establishing of control points and bench marks

1.2.11
1.2.12

Supply of electric power to Other Contractors.


Operation and maintenance of camps, offices, workshops, stores etc.
Operation and maintenance of temporary facilities for water supply, sewerage, electricity, communication,
solid waste collection and other temporary and permanent works.

1.2.13
1.2.14

Not used
Operation and maintenance of first aid station with ambulance car, personnel and medicines

1.2.15
1.2.16
1.2.17
1.2.17.01

Contractor's supervision and administration on and off Site


Removal of all temporary works, cleaning and reinstatement of the Site.
Site Laboratory and Site Testing
Provide laboratory building and equipment for specified tests

1.2.17.02
1.2.17.03
1.2.17.04
1.2.17.05
1.2.17.06
1.2.18

Additional site testing equipment ordered by the Engineer


Contractor's overhead and profit on Item .17.02
Running of Site laboratory
Off-site laboratory testing.
Contractor's overhead and profit on Item .17.05
Deduction

1.3

Included in Mark-Up

LS
LS
LS
LS
LS
LS
kWh

LS

LS
LS
LS
LS
Prov. Sum
%
LS
Prov. Sum
%
LS

1.3.01

ASSISTANCE AND SUPPLIES TO EMPLOYER AND ENGINEER.


Establish working and storage area for Other Contractors

m2

1.3.02

Provide offices for Other Contractors

m2

1.3.03
1.3.04
1.3.05
1.3.06
1.3.07
1.3.08
1.3.09
1.3.10
1.3.11
1.3.12

Provide offices for Employer's Personnel


Provide field offices for the Engineer
Provide temporary houses for Employer's Personnel
Provide temporary hotels for Employer's Personnel
Provide permanent houses type A for Employer
Provide permanent houses type B for Employer
Maintenance and cleaning of the offices
Not used
Supply of additional furniture, equipment and various site supplies
Contractor's overhead and profit on Item 1.3.11

LS
No
No
LS
No
No
month
Prov. Sum
%

Sum

Bill No. 1 - Preliminaries and General

Bill No. 1 - Preliminaries and General


Quantity

Unit Price
USD

1 435,120.00
1 948,948.00

Total Price
USD

Item

A.
A.1
A.2

435,120.00
948,948.00

1.1

1 700,000.00

700,000.00

1.1.01
1.1.02
1.1.03
1.1.04
1.1.05
1.1.06
1.1.07
1.1.08
1.2
1.2.01

1 2,686,344.00
1 2,336,891.00
1 518,190.00

2,686,344.00
2,336,891.00
518,190.00

1
1
1
1

287,996.00
128,398.00
137,999.00
179,998.00

1.2.03

1 1,176,574.00

1,176,574.00

1.2.04

1 259,446.00

259,446.00

1.2.05

1.2.02
287,996.00
128,398.00
137,999.00
179,998.00

1.2.06
1.2.07
1.2.08
1
1
1
1
1

198,737.86
664,919.00
512,545.00
145,481.65
166,555.00

1 59,623.23
1,000,000.00
1.00

198,737.86
664,919.00
512,545.00
145,481.65
166,555.00
59,623.23

1.2.08.01
1.2.08.02
1.2.08.03
1.2.08.04
1.2.08.05
1.2.09
1.2.10

9,887,456.39

0.29 290,000.00
9,887,456.39

1.2.11
1.2.12

1 1,066,894.77

1,066,894.77

1.2.13
1.2.14

1 15,585,702.84
1 321,472.00

15,585,702.84
321,472.00

1 16,521.00

16,521.00

1.2.15
1.2.16
1.2.17
1.2.17.01

1,000.00
200
748,131.00
1,000.00
200
-1,500,000.00

1.2.17.02
1.2.17.03
1.2.17.04
1.2.17.05
1.2.17.06
1.2.18

1
20
1
1
20
1

1,000.00
1,000.00
748,131.00
1,000.00
1,000.00
-1,500,000.00

1.3
22,300.00

5.53 123,319.00

120
1
4
6
1
3
5
34

1.3.01

462

55,440.00

1.3.02

224,070.00
6,601.00
24,000.00
367,732.00
42,000.00
33,600.00
1,804.56

224,070.00
26,404.00
144,000.00
367,732.00
126,000.00
168,000.00
61,355.04

1.3.03
1.3.04
1.3.05
1.3.06
1.3.07
1.3.08
1.3.09
1.3.10
1.3.11
1.3.12

1 10,000.00
30 10,000.00

10,000.00
3,000.00

39,271,663.78

Sum

Bill No. 1 - Preliminaries and General


Description

Obras preliminares y costos iniciales- PRECONSTRUCTION PHASE and EARLY WORKS COST
Obras provicionales - Preconstruction Phase
Obras preliminares - Early Works
OBLIGACIONES EN CONDICIONES CONTRACTUALES - OBLIGATIONS UNDER CONTRACT CONDITIONS (CC).
Garanta de fiel Cumplimiento - Performance Security.
Seguros que deber prestar Contratista - Insurances to be provided by Contractor
Cumplimiento de la Clusula 4.8 Procedimientos de Seguridad
Cumplimiento de la Clusula 4.18 de Proteccin del Medio Ambiente y la Mitigacin Social
Cumplimiento de la Clusula 4.24 Arqueologa - Compliance with Clause 4.24 Archaeology
Cumplimiento de las tareas y responsabilidades como Contratista Principa
El cumplimiento de los Estatutos y Reglamentos de conformidad con el Contratista
LEG-3 Seguros a ser proporcionados por el Contratista
MOVILIZACIN DEL CONTRATISTA, INSTALACIONES TEMPORALES Y ADMINISTRACIN GENERAL.
Provisin de del Contratista campamentos, oficinas, talleres, almacenes, etc.
a) Mirahuay (Personal campamentos, oficina, taller)
b) Pampa Libre trabajos de campo.
c) Oficinas del sitio
Provisin de todas las instalaciones temporales para el suministro de agua, alcantarillado, comunicaciones, recoleccin de desechos slidos y otros servicios necesarios
a) Mirahuay (Personal campamentos, oficina, taller)
b) Pampa Libre trabajos de campo.
c) Oficinas del sitio
Provisin de todas las instalaciones temporales para la generacin de energa, la transmisin y la salida con los medidores, etc.
Movilizacin de los equipos del Contratista incluyendo tambin trituracin, cribado, dosificacin
Y preparacin de mezcla
La provisin de puesto de primeros auxilios con ambulancia y todo el mobiliario necesario y equipos mdicos.
Todas las obras viales temporales excepto Artculo 2.1.13
Not used
Desvios temporales, ataguias, cuidados en el rio en bombeo y drenaje
Huaura Sitio
Checras Sitio
Picunche Sitio
Salida de descarga
Acceso Tnel Sitio
Not used
Estudio general del Contratista, el control de redes de vigilancia, de desplazamiento, el establecimiento de puntos de control y puntos de referencia
Suministro de energa elctrica a otros contratistas.
Operacin y mantenimiento de campamentos, oficinas, talleres, almacenes, etc.
Operacin y mantenimiento de instalaciones temporales para el suministro de agua, alcantarillado, electricidad, comunicacin, recogida de residuos slidos y otras
obras temporales y permanentes.

Not used
Operacin y mantenimiento de la estacin de primeros auxilios con el coche ambulancia, personal y medicamentos
Supervisin del contratista y administracin dentro y fuera del sitio.
La eliminacin de todas las obras temporales, limpieza y restablecimiento del sitio.
Laboratorio del sitio y de Prueba
Proporcionar edificio de laboratorios y equipo para pruebas especificadas
Equipos adicionales de estudio de sitio ordenado por el Ingeniero
Los gastos generales del contratista y el beneficio sobre el punto .17.02
Ejecucin de laboratorio del Sitio
Fuera de las instalaciones de pruebas de laboratorio.
Los gastos generales del contratista y el beneficio sobre el punto .17.05
Deduccin
ASISTENCIA Y SUMINISTROS AL EMPLEADOR E INGENIEROS.
Establecer rea de trabajo y de almacenamiento para otros contratistas
Proporcionar oficinas para otros Contratistas
Proporcionar oficinas para el personal del Contratante
Proporcionar a las oficinas de campo para el Ingeniero
Proporcionar viviendas temporales para el Personal del Contratante
Proporcionar hoteles temporales para el Personal del Contratante
Proporcionar casas tipo A permanentes para el empleador
Proporcionar casas tipo B permanentes para el empleador
Mantenimiento y limpieza de las oficinas
Not used
Suministro de mobiliario adicional, equipos y diversos suministros en sitio
Los gastos generales del contratista y el beneficio sobre el punto 1.3.11

Bill No. 1 - Preliminares y general

Unit

Quantity

Glb (LS)
Glb (LS)

Included in
Included in
Included in
Included in
Included in
Included in
Included in
Prov. Sum

Unit Price
USD

Total Price
USD

1 435,120.00
1 948,948.00

435,120.00
948,948.00

1 700,000.00

700,000.00

Glb (LS)
Glb (LS)
Glb (LS)

1 2,686,344.00
1 2,336,891.00
1 518,190.00

2,686,344.00
2,336,891.00
518,190.00

Glb
Glb
Glb
Glb

1
1
1
1

287,996.00
128,398.00
137,999.00
179,998.00

Mark-Up
Mark-Up
Mark-Up
Mark-Up
Mark-Up
Mark-Up
Mark-Up

ervicios necesarios
(LS)
(LS)
(LS)
(LS)

287,996.00
128,398.00
137,999.00
179,998.00

Glb (LS)

1 1,176,574.00

1,176,574.00

Glb (LS)

1 259,446.00

259,446.00

1
1
1
1
1

198,737.86
664,919.00
512,545.00
145,481.65
166,555.00

Included in Mark-Up

Glb
Glb
Glb
Glb
Glb

(LS)
(LS)
(LS)
(LS)
(LS)

Glb (LS)
kWh
Glb (LS)

198,737.86
664,919.00
512,545.00
145,481.65
166,555.00

1 59,623.23
1,000,000.00
1.00

59,623.23

9,887,456.39

0.29 290,000.00
9,887,456.39

Glb (LS)

1 1,066,894.77

1,066,894.77

Glb
Glb
Glb
Glb

1 15,585,702.84
1 321,472.00

15,585,702.84
321,472.00

1 16,521.00

16,521.00

(LS)
(LS)
(LS)
(LS)

Prov. Sum

1
20
1
1
20
1

%
Glb (LS)
Prov. Sum
%
Glb (LS)

m2

22,300.00

m2

120

Glb (LS)
No
No
Glb (LS)
No
No
month
Prov. Sum
%

1,000.00
1,000.00
748,131.00
1,000.00
1,000.00
-1,500,000.00

1,000.00
200
748,131.00
1,000.00
200
-1,500,000.00

5.53 123,319.00
1
4
6
1
3
5
34

462

55,440.00

224,070.00
6,601.00
24,000.00
367,732.00
42,000.00
33,600.00
1,804.56

224,070.00
26,404.00
144,000.00
367,732.00
126,000.00
168,000.00
61,355.04

1 10,000.00
30 10,000.00

10,000.00
3,000.00

39,271,663.78

Bill No. 2 - Roadworks


Bill 2.1 Permanent Roads and Paved Areas
Item

Bill No. 2 - Roadworks


Bill 2.1 Permanent Roads
Description

Item

2.1.01

STRENGTHENING OF EXISTING PUBLIC ROADS


The Contractor shall, based on his detailed investigations of the road conditions, establish his needs of
strengthening and improving of existing public roads and bridges outside the Site for the purpose of
execution the Works. A Lump Sum covering the corresponding work and design shall be given together with
a detailed description of the scope and costs.

2.1.01

2.1.02
2.1.02.01
2.1.02.02
2.1.02.03
2.1.02.04
2.1.02.05
2.1.02.06
2.1.02.07
2.1.02.08
2.1.02.09
2.1.02.10

ACCESS ROAD TO HUAURA DAM AND INTAKE. Design and built.


Topsoil excavation.
Soil excavation.
Bulk rock excavation (width > 2 m).
Embankment fill.
Reinforced concrete pipe. Di = 500 mm
Subgrade preparation.
Subbase. Thickness minimum 300 mm
Base course. Thickness minimum 150 mm
Double bitumenous surface treatment
Spoiling of surplus

2.1.02
2.1.02.01
2.1.02.02
2.1.02.03
2.1.02.04
2.1.02.05
2.1.02.06
2.1.02.07
2.1.02.08
2.1.02.09
2.1.02.10

2.1.03
2.1.03.01
2.1.03.02
2.1.03.03
2.1.03.04
2.1.03.05
2.1.03.06
2.1.03.07
2.1.03.08

ACCESS ROAD TO CHECRAS DAM, INTAKE AND SAND EXCLUDER. Design and built.
Reinforced concrete pipe. Di = 500 mm
Fully cement grouted rock bolts. D= 25 mm. Depth in rock 3.0 m.
Subgrade preparation.
Subbase. Thickness minimum 300 mm
Concrete pavement as specified for access roads, thickness 200 mm
Guard rail.
Shotcrete, plain
Welded wire fabric fixed to rock bolts

2.1.03
2.1.03.01
2.1.03.02
2.1.03.03
2.1.03.04
2.1.03.05
2.1.03.06
2.1.03.07
2.1.03.08

2.1.04
2.1.04.01
2.1.04.02
2.1.04.03
2.1.04.04

ACCESS ROAD TO CONSTRUCTION ADIT NO 1. Design and built.


Topsoil excavation.
Soil excavation.
Bulk rock excavation (width > 2 m).
Embankment fill.

2.1.04
2.1.04.01
2.1.04.02
2.1.04.03
2.1.04.04

2.1.04.05
2.1.04.06
2.1.04.07
2.1.04.08
2.1.04.09
2.1.04.10
2.1.04.11

Reinforced concrete pipe. Di = 500 mm


Subgrade preparation.
Subbase. Thickness minimum 300 mm
Base course. Thickness minimum 150 mm
Gravel Wearing Course
Guard rail.
Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 2.9 m

2.1.04.05
2.1.04.06
2.1.04.07
2.1.04.08
2.1.04.09
2.1.04.10
2.1.04.11

2.1.04.12

Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 3.9 m

2.1.04.12

2.1.04.13

Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 5.9 m

2.1.04.13

2.1.04.14
2.1.04.15
2.1.04.16

Chainlinked mesh fixed to rock bolts.


Steel straps fixed to rock bolts.
Shotcrete.Fibre-reinforced.

2.1.04.14
2.1.04.15
2.1.04.16

2.1.05

ACCESS ROAD TO CONSTRUCTION ADIT NO 2 AND SURGE TUNNEL


Not used

2.1.05

2.1.06

2.1.06

2.1.06.01
2.1.06.02
2.1.06.03
2.1.06.04
2.1.06.05
2.1.06.06
2.1.06.07
2.1.06.08
2.1.06.09
2.1.06.10

ACCESS TUNNEL PORTAL, ACCESS ROAD AND REALIGNMENT OF PUBLIC ROAD.


Design and built.
Topsoil excavation.
Soil excavation.
Embankment fill.
Reinforced concrete pipe. Di = 500 mm
Subgrade preparation.
Subbase. Thickness minimum 300 mm
Gravel Wearing Course
Concrete pavement as specified for access roads, thickness 200 mm
Guard rail.
Gravel Wearing Course

2.1.07
2.1.07.01
2.1.07.02
2.1.07.03
2.1.07.04
2.1.07.05
2.1.07.06
2.1.07.07
2.1.07.08

ACCESS ROAD TO PICUNCHE DAM. Design and built.


Topsoil excavation.
Soil excavation.
Rock excavation.
Embankment fill.
Reinforced concrete pipe. Di = 500 mm
Subgrade preparation.
Subbase. Thickness minimum 300 mm
Double bitumenous surface treatment

2.1.07
2.1.07.01
2.1.07.02
2.1.07.03
2.1.07.04
2.1.07.05
2.1.07.06
2.1.07.07
2.1.07.08

2.1.06.01
2.1.06.02
2.1.06.03
2.1.06.04
2.1.06.05
2.1.06.06
2.1.06.07
2.1.06.08
2.1.06.09
2.1.06.10

2.1.07.09
2.1.07.10

Guard rail.
Spoiling of surplus

2.1.07.09
2.1.07.10

Bill No. 2 - Roadworks


Bill 2.1 Permanent Roads and Paved Areas
Description

FORTALECIMIENTO DE LOS CAMINOS PBLICOS EXISTENTES


El Contratista, en base a sus investigaciones detalladas de las condiciones de la carretera, establecer sus necesidades
de fortalecimiento y mejora de las vas pblicas y puentes existentes fuera del sitio para los fines de la ejecucin de las
Obras. Una suma global que cubre el trabajo correspondiente y el diseo ser entregada junto con una descripcin
detallada del alcance y los costos.

Unit

Quantity

LS

1.00

CAMINO DE ACCESO A LA PRESA HUAURA Y TOMA. Diseo y construccin.


Excavacin tierra vegetal.
Excavacin del suelo.
Excavacin masiva en roca (ancho > 2 m).
Relleno de terrapln.
Tubera de concreto reforzado. Di = 500 mm
Preparacin de la subrasante.
Sub-base. Espesor mnimo de 300 mm
Base. Espesor mnimo de 150 mm
Tratamiento de superficie bicapa asfaltica - Double bitumenous surface treatment
Reciclaje de excedentes - Spoiling of surplus

m3
m3
m3
m3
m
m2
m3
m3
m2
m3

CAMINO DE ACCESO A LA PRESA Checras, TOMA Y DESARENADOR. Diseo y construiccin.


Tubera de concreto reforzado. Di = 500 mm
Pernos totalmente cementados en roca, barra corrugada. D= 25 mm. Profundidad de anclaje en roca 3.0 m.
Preparacin de la subrasante.
Sub-base. Espesor mnimo de 300 mm
Pavimento de hormign que se especifican para las vas de acceso, espesor 200 mm
Guardava - Guard rail.
Hormign proyectado, en llanura
Cercado con malla empotrada a pernos de anclaje

m
no
m2
m3
m2
m
m3
m2

CAMINO DE ACCESO A LA CONSTRUCCIN ADIT NO 1 (tunel secundario). Diseo y construccin.


Excavacin tierra vegetal.
Excavacin del suelo.
Excavacin masiva en roca (ancho > 2 m).
Relleno de terrapln.

m3
m3
m3
m3

500
8,000.00
2,500.00
500

Tubera de concreto reforzado. Di = 500 mm


Preparacin de la subrasante.
Sub-base. Espesor mnimo de 300 mm
Base. Espesor mnimo de 150 mm
Grava en capa de rodadura - Gravel Wearing Course
Guardava - Guard rail.
Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 2.9 m.

m
m2
m3
m3
m3
m
no

6,000.00
1,500.00
750
2,500.00
600
125

Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 3.9 m.

no

40

Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 5.9 m.

no

10

Cercado con malla empotrada a pernos de anclaje


Soporte con barras planas de acero empotrada a pernos de ancalje - Steel fixed to rock bolts.
Hormign proyectado con fibra reforzada - Shotcrete.Fibre-reinforced.

m2
m
m3

400
2,000.00
50
300
20
1,000.00
300
140
900
2,450.00

50
100
1,000.00
300
900
200
50
100

80

250
100
20

ACCESS ROAD TO CONSTRUCTION ADIT NO 2 AND SURGE TUNNEL


Not used
ACCESO A PORTAL DE TUNEL, ACCESO A CARRETERA Y REALINEAMIENTO DE CARRETERA PUBLICA. Diseo
and construccin.
Excavacin tierra vegetal.
Excavacin del suelo.
Relleno de terrapln.
Tubera de concreto reforzado. Di = 500 mm
Preparacin de la subrasante.
Sub-base. Espesor mnimo de 300 mm
Grava en capa de rodadura - Gravel Wearing Course
Pavimento de hormign que se especifican para las vas de acceso, espesor 200 mm
Guardava - Guard rail.
Grava en capa de rodadura - Gravel Wearing Course

m3
m3
m3
m
m2
m3
m3
m2
m
m3

ACCESS ROAD TO PICUNCHE DAM. Design and built.


Excavacin tierra vegetal.
Excavacin del suelo.
Excavacin en roca - Rock excavation.
Relleno de terrapln.
Tubera de concreto reforzado. Di = 500 mm
Preparacin de la subrasante.
Sub-base. Espesor mnimo de 300 mm
Tratamiento de superficie bicapa asfaltica - Double bitumenous surface treatment

m3
m3
m3
m3
m
m2
m3
m2

50
3,500.00
12,000.00
150
3,500.00
1,250.00
300
600
500
300

600
1,500.00
500
7,500.00
50
1,500.00
450
1,300.00

Guardava - Guard rail.


Reciclaje de excedentes - Spoiling of surplus

m
m3

50
2,100.00

Unit Price
USD

Total Price
USD

615,091.00

615,091.00

5.25
5.13
32.72
24.5
334
0.88
29.25
29.25
4.37
3.73

334

2,100.00
10,260.00
1,636.00
7,350.00
6,680.00
880
8,775.00
4,095.00
3,933.00
9,138.50

16,700.00
8,891.00
880
8,775.00
52,542.00
17,890.00
17,424.00
11.65 1,165.00
88.91
0.88
29.25
58.38
89.45

348.48

5.25
5.13
32.72
24.5

2,625.00
41,040.00
81,800.00
12,250.00

0.88
29.25
29.25
20.53
89.45
47.74

26,720.00
5,280.00
43,875.00
21,937.50
51,325.00
53,670.00
5,967.50

334

54.26 2,170.40
106.5

348.48

334

1,065.00
14.48 3,620.00
42.01 4,201.00
6,969.60

5.25 262.5
5.13 17,955.00
24.5 294,000.00
50,100.00
0.88 3,080.00
29.25 36,562.50
20.53 6,159.00
58.38 35,028.00
89.45 44,725.00
20.53 6,159.00

5.25
5.13
32.72
24.5
334.02

3,150.00
7,695.00
16,360.00
183,750.00
16,701.00
0.88 1,320.00
29.25 13,162.50
4.37 5,681.00

89.44 4,472.00
3.73 7,833.00

Bill No. 2 - Roadworks


Bill 2.1 Permanent Roads and Paved Areas
Item

Description

Unit

2.1.08
2.1.08.01
2.1.08.02
2.1.08.03

ADJUSTMENT OF PUBLIC ROAD ALIGNMENT AT HUAURA DAM.


Topsoil excavation.
Soil excavation.
Bulk rock excavation (width > 2 m).

m3
m3
m3

2.1.08.04
2.1.08.06
2.1.08.07
2.1.08.08
2.1.08.09
2.1.08.10
2.1.08.11
2.1.08.12

Reinforced concrete pipe. Di = 500 mm


Subgrade preparation.
Subbase. Thickness minimum 300 mm
Base course. Thickness minimum 150 mm
Gravel Wearing Course
Guard rail.
Spoiling of surplus
Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 2.9 m

m
m2
m3
m3
m3
m
m3
no

2.1.08.13

Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 3.9 m

no

2.1.08.14

Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 5.9 m

no

2.1.08.15
2.1.08.16
2.1.08.17

Chainlinked mesh fixed to rock bolts.


Steel straps fixed to rock bolts.
Shotcrete.Fibre-reinforced.

m2
m
m3

2.1.09
2.1.09.01
2.1.09.02
2.1.09.03
2.1.09.04
2.1.09.05
2.1.09.06
2.1.09.07
2.1.09.08
2.1.09.09
2.1.09.10
2.1.09.11
2.1.09.12

NEW ALIGNMENT OF PUBLIC ROAD AT CHECRAS HEADWORKS


Topsoil excavation.
Soil excavation.
Bulk rock excavation (width > 2 m).
Embankment fill.
Reinforced concrete pipe. Di = 500 mm
Subgrade preparation.
Subbase. Thickness minimum 300 mm
Base course. Thickness minimum 150 mm
Gravel Wearing Course
Guard rail.
Spoiling of surplus
Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 2.9 m

m3
m3
m3
m3
m
m2
m3
m3
m3
m
m3
no

2.1.09.13

Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 3.9 m

no

2.1.09.14

Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 5.9 m

no

2.1.09.15
2.1.09.16
2.1.09.17

Chainlinked mesh fixed to rock bolts.


Steel straps fixed to rock bolts.
Shotcrete.Fibre-reinforced.

m2
m
m3

2.1.10
2.1.10.01
2.1.10.02
2.1.10.03
2.1.10.04
2.1.10.05
2.1.10.06

ADJUSTMENT OF PUBLIC ROAD AT TAILRACE TUNNEL OUTLET. Design and built.


Subgrade preparation.
Subbase. Thickness minimum 300 mm
Base course. Thickness minimum 150 mm
Gravel Wearing Course
Guard rail.
Temporary realignment of public road

m2
m3
m3
m3
m
LS

2.1.11
2.1.11.01

MAINTENANCE OF ROADS. Design and built.


Maintenance of roads within the Site.
Maintenance of public roads close to the Site which are used regularly by the
Contractor and Other Contractors

2.1.12
2.1.12.01
2.1.12.02
2.1.12.03

PAVED AREAS AT ACCESS TUNNEL PORTAL AND SWITCHYARD. Design and built.
Subgrade preparation.
Subbase. Thickness minimum 300 mm
Concrete pavement as specified for access roads, thickness 200 mm

Sum

Bill 2.1 Permanent Roads and Paved Areas

months

m2
m3
m2

Bill No. 2 - Roadworks


Bill 2.1 Permanent Roads and Paved Areas
Item

Description

Unit

2.1.08
2.1.08.01
2.1.08.02
2.1.08.03

AJUSTE DE LA ALINEACIN VIAL PBLICO EN PRESA HUAURA.


Excavacin tierra vegetal.
Excavacin del suelo.
Excavacin masiva en roca (ancho > 2 m).

m3
m3
m3

2.1.08.04
2.1.08.06
2.1.08.07
2.1.08.08
2.1.08.09
2.1.08.10
2.1.08.11
2.1.08.12

Tubera de concreto reforzado. Di = 500 mm


Preparacin de la subrasante.
Sub-base. Espesor mnimo de 300 mm
Base. Espesor mnimo de 150 mm
Grava en capa de rodadura - Gravel Wearing Course
Guardava - Guard rail.
Reciclaje de excedentes - Spoiling of surplus
Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 2.9 m.

m
m2
m3
m3
m3
m
m3
no

2.1.08.13

Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 3.9 m.

no

2.1.08.14

Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 5.9 m.

no

2.1.08.15
2.1.08.16
2.1.08.17

Cercado con malla empotrada a pernos de anclaje


Soporte con barras planas de acero empotrada a pernos de ancalje - Steel fixed to rock bolts.
Hormign proyectado con fibra reforzada - Shotcrete.Fibre-reinforced.

m2
m
m3

2.1.09
2.1.09.01
2.1.09.02
2.1.09.03
2.1.09.04
2.1.09.05
2.1.09.06
2.1.09.07
2.1.09.08
2.1.09.09
2.1.09.10
2.1.09.11
2.1.09.12

NUEVA ALINEACIN DEL CAMINO PBLICO EN CHECRAS - OBRAS CABECERA


Excavacin tierra vegetal.
Excavacin del suelo.
Excavacin masiva en roca (ancho > 2 m).
Relleno de terrapln.
Tubera de concreto reforzado. Di = 500 mm
Preparacin de la subrasante.
Sub-base. Espesor mnimo de 300 mm
Base. Espesor mnimo de 150 mm
Grava en capa de rodadura - Gravel Wearing Course
Guardava - Guard rail.
Reciclaje de excedentes - Spoiling of surplus
Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 2.9 m.

m3
m3
m3
m3
m
m2
m3
m3
m3
m
m3
no

2.1.09.13

Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 3.9 m.

no

2.1.09.14

Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 5.9 m.

no

2.1.09.15
2.1.09.16
2.1.09.17

Cercado con malla empotrada a pernos de anclaje


Soporte con barras planas de acero empotrada a pernos de ancalje - Steel fixed to rock bolts.
Hormign proyectado con fibra reforzada - Shotcrete.Fibre-reinforced.

m2
m
m3

2.1.10
2.1.10.01
2.1.10.02
2.1.10.03
2.1.10.04
2.1.10.05
2.1.10.06

AJUSTE DE CAMINO PBLICO EN SALIDA TNEL DE DESCARGA. Diseo y construcccin.


Preparacin de la subrasante.
Sub-base. Espesor mnimo de 300 mm
Base. Espesor mnimo de 150 mm
Grava en capa de rodadura - Gravel Wearing Course
Guardava - Guard rail.
Reajuste temporal de la va pblica

m2
m3
m3
m3
m
LS

2.1.11
2.1.11.01

MANTENIMIENTO DE CARRETERAS. Diseo y construcccin.


Mantenimiento de caminos dentro del Sitio. Mantenimiento de la va pblica cerca del sitio que se utilizan regularmente por el
Contratista y otros contratistas

2.1.12
2.1.12.01
2.1.12.02
2.1.12.03

ZONAS PAVIMENTADAS EN ACCESO TNEL PORTAL SUBESTACIONES TRANSFORMADORAS. Disear y construir.


Preparacin de la subrasante.
Sub-base. Espesor mnimo de 300 mm
Pavimento de hormign que se especifican para las vas de acceso, espesor 200 mm

Sum

Bill 2.1 Las carreteras permanentes y reas pavimentadas.

months

m2
m3
m2

Quantity

Unit Price
USD

160
4,000.00
4,000.00

Total Price
USD

5.25 840
5.13 20,520.00
32.72 130,880.00
50 334

400
118

0.88
29.25
29.25
20.53
89.45
3.73
47.74

53
344
40
8,160.00
300
30

54.26 1,627.80

20 106.5
1,000.00
100
50 348.48

2,600.00
11,000.00
5,000.00
1,000.00
120
6,500.00
2,000.00
900
5,600.00

2,130.00
14.48 14,480.00
42.01 4,201.00
17,424.00

5.25
5.13
32.72
24.5
334
0.88
29.25
29.25
20.53
89.45
3.73
47.74

40
12,600.00
500
70

300
50
348.48

500
147
67
430
20
1 33,188.00

34.00

750
250
650

13,650.00
56,430.00
163,600.00
24,500.00
40,080.00
5,720.00
58,500.00
26,325.00
114,968.00
3,578.00
46,998.00
23,870.00

54.26 3,798.20

30 106.5

200

16,700.00
352
3,451.50
1,550.25
7,062.32
3,578.00
30,436.80
14,322.00

59,803.32

3,195.00
14.48 4,344.00
42.01 2,100.50
69,696.00

0.88
29.25
29.25
20.53
89.45

440
4,299.75
1,959.75
8,827.90
1,789.00
33,188.00

2,033,312.88

0.88 660
29.25 7,312.50
58.38 37,947.00

4,973,522.15

Bill No. 2 - Roadworks


Bill 2.2 Drainage and Erosion Protection.
Item

Description

Unit

Bill 2.2 includes also permanent drainage and erosion protection at spoil areas
2.2.01.0
2.2.01.01
2.2.01.02
2.2.01.03
2.2.01.04
2.2.01.05
2.2.01.06

2.2.01.10
2.2.01.11
2.2.01.12

DRAINAGE AND EROSION PROTECTION


Mitre drains
Catchwater drains
Other canals and ditches
Extra over 2.2.01.01 to 2.2.01.03 for rock excavation
Slope protection with crushed rock, 5-200 mm
Rip-rap
a) 200 - 300 mm
b) 300 - 500 mm
c) Selected blocks >500 mm
d) Grouted rip-rap
Concrete lining
Scour checks
Filter fabric
a) 250 g/m2
b) 300 g/m2
Gabion mattresses
Gabion boxes
Grassing

2.2.02.0
2.2.02.01
2.2.02.02
2.2.02.03
2.2.02.04
2.2.02.05
2.2.02.06
2.2.02.07
2.2.02.08
2.2.02.09
2.2.02.10
2.2.02.11
2.2.02.12
2.2.02.13
2.2.02.14

PIPE CULVERTS AND DRAIN PIPES


Excavation for head walls, wing walls and drop inlets
Backfill at head walls, wing walls and drop inlets
Reinforced concrete pipe culverts - Diameter 600 mm
Reinforced concrete pipe culverts - Diameter 800 mm
Reinforced concrete pipe culverts - Diameter 1200 mm
PVC pipes in trench - Diameter 100 mm
PVC pipes in trench - Diameter 150 mm
PVC pipes in trench - Diameter 200 mm
Formwork Class B
Formwork Class C
Concrete Class B
Concrete class C
Reinforcement, deformed bars, 420 N/mm2
Reinforcement mesh

Sum

Bill 2.2 Drainage and Erosion Protection.

2.2.01.07
2.2.01.08
2.2.01.09

m
m
m3
m3
m3
m3
m3
m3
m3
m3
no
m2
m2
m2
m3
m2

m3
m3
m
m
m
m
m
m
m2
m2
m3
m3
t
t

Bill No. 2 - Roadworks


Bill 2.2 Drainage and Erosion Protection.
Item

Description

Unit

Bill 2.2 Incluye tambin el drenaje permanente y proteccin contra la erosin en zonas de relleno
2.2.01.0
2.2.01.01
2.2.01.02
2.2.01.03
2.2.01.04
2.2.01.05
2.2.01.06

2.2.01.10
2.2.01.11
2.2.01.12

DRENAJE Y PROTECCIN DE EROSIN


Canal de drenaje - Mitre drains
canales de coronacin - Catchwater drains
Otros canales y acequias - Other canals and ditches
Extra sobre 2.2.01.01 a 2.2.01.03 para la excavacin de roca
Proteccin de taludes con piedra triturada - Slope protection with crushed rock, 5-200 mm
Escollerado - Enrrocado - Rip-rap
a) 200 - 300 mm
b) 300 - 500 mm
c) Bloques seleccionados >500 mm
d) Enrrocado embebido en mortero - Grouted rip-rap
Revestimiento de Hormign - Concrete lining
Disipador de energa en rpidas - Scour checks
Geotextil - Filter fabric
a) 250 g/m2
b) 300 g/m2
Gavin tipo colchon reno - Gabion mattresses
Gavin tipo caja - Gabion boxes
Encespedado - Grassing

2.2.02.0
2.2.02.01
2.2.02.02
2.2.02.03
2.2.02.04
2.2.02.05
2.2.02.06
2.2.02.07
2.2.02.08
2.2.02.09
2.2.02.10
2.2.02.11
2.2.02.12
2.2.02.13
2.2.02.14

Tubos de crenaje y tuberas de desague - PIPE CULVERTS AND DRAIN PIPES


Excavacin para muros de cabeza, muros de ala y ensenadas de cada
Relleno en muros de cabeza, muros de ala y ensenadas de cada
Alcantarillas de tubo de hormign armado - Dimetro 600 mm
Alcantarillas de tubo de hormign armado - Dimetro 800 mm
Alcantarillas de tubo de hormign armado - Dimetro 1200 mm
Tubos de PVC en zanja - Dimetro 100 mm
Tubos de PVC en zanja - Dimetro 150 mm
Tubos de PVC en zanja - Dimetro 200 mm
Encofrado Clase B
Encofrado Clase C
Hormign Clase B
Hormign Clase B
Acero de refuerzo, barras corrugadas, 420 N/mm2 - Reinforcement, deformed bars, 420 N/mm2
Mallas de acero - Reinforcement mesh

Sum

Bill 2.2 Drainage and Erosion Protection.

2.2.01.07
2.2.01.08
2.2.01.09

m
m
m3
m3
m3
m3
m3
m3
m3
m3
no
m2
m2
m2
m3
m2

m3
m3
m
m
m
m
m
m
m2
m2
m3
m3
t
t

Quantity

Unit Price
USD

200
2,000.00
1,000.00
300
500

Total Price
USD

65.22
65.22
25.62
23.76
53.39

300
300
500
300
400

13,044.00
130,440.00
25,620.00
7,128.00
26,695.00

27.3
27.3
27.3
27.3
445.36
20

8,190.00
8,190.00
13,650.00
8,190.00
178,144.00
12.2 244

1,000.00
1,000.00
500
700
1,000.00

2.79
2.79
37.27
36.62
11.17

200
150
100

7.92 1,584.00
31.97 4,795.50
41,694.00
33,373.80
49,924.00
9.77 3,908.00
16.77 3,354.00
20.04 3,006.00
44.71 4,471.00
44.71 22,355.00
28,833.00
57,666.00
36,727.95
16,305.00

400
200
150
100
500
150
300

416.94
60 556.23
40 1,248.10

192.22
192.22
15 2,448.53
5 3,261.00

2,790.00
2,790.00
18,635.00
25,634.00
11,170.00

788,551.25

Bill No. 3 - The Huaura Diversion


Bill 3.1 Huaura Dam and Intake
Item

Description

Unit

Bill 3.1 includes upstream tunnel portal


3.1.01.0
3.1.01.01
3.1.01.02
3.1.01.03
3.1.01.04

3.1.01.05
3.1.01.06

3.1.01.07
3.1.01.08
3.1.02.0
3.1.02.01
3.1.02.02
3.1.02.03

3.1.03.0

EARTHWORKS
Remove usable timber
Clearing and grubbing
Topsoil excavation
Soil excavation
a) Bulk excavation, to spoil deposit
b) Excavation to stock pile (gravel, boulders)
c) Excavations for footings
Preparation of rock foundation for concreting
Fill and backfill
a) Embankment fill
i) Gravel
ii) Rock
b) Structural backfill
c) High quality rockfill
d) Backfill of trenches
e) Low permeability fill
f) Filter material, 0 - 60 mm
g) Drainage material , 50 - 100 mm
Placing of topsoil
Turfing (optional)

3.1.03.01
3.1.03.02
3.1.03.03
3.1.03.04

Rotary drilling with casing, diameter minimum 76 mm, depth 0 - 20 m


Extra over 3.1.03.01 and 3.1.03.02 for sloping holes
Water pressure testing, per packer setting, single packer, depth 0 - 20 m

3.1.03.05
3.1.03.06

Cement pressure grouting, per packer setting, depth 0-20 m


Cement grouting: Cement consumption per packer setting, Type A
a) 0 - 100 kg
b) 0 - 200 kg
c) 0 - 300 kg
d) 0 - 500 kg
e) More than 500 kg
Chemical grouting. Type of grout: Epoxy

3.1.03.08

Fully cement-grouted rock bolts. D=32mm


a) Length 2.0 m
b) Length 3.0 m
c) Length 4.0 m
d) Length 6.0 m
e) Length 8.0 m

3.1.04.0
3.1.04.01

DRAINAGE AND EROSION PROTECTION


Erosion protection with crushed rock 50 - 200 mm
Min. thickness 300 mm

3.1.04.02

Rip-rap
a) Stone size 200 - 300 mm
b) Stone size 300 - 500 mm
c) Selected blocks > 500 mm
d) Grouted Rip rap
Filter fabric
a) Minimum 180 g/m2
b) Minimum 250 g/m2
c) Minimum 300 g/m2
Drilling of weep holes, vertical or sloping holes. Diameter 51 mm

3.1.04.03

3.1.04.04
3.1.04.05
3.1.04.06

3.1.04.07

m3
m3
m3
m2

m3
m3
m3
m3
m3
m3
m3
m3
m2
m2

ROCK EXCAVATION
a) Bulk excavation
b) Trench/ditch excavation
Contour boreholes
Above ground. Rock excavation. Abnormal overbreak.

GROUND TESTING AND GROUTING, ROCK SUPPORT


Rock support at tunnel portal, incuded in bill 3.2
Percussion drilling, diameter minimum 51 mm, depth 0 - 20 m (in rock and concrete)

3.1.03.07

no
ha
m3

Excavation of permanent ditches and catchwater drains


Reinforced concrete drain pipes including bends and tees.
Internal diameter:
a) 150 mm
b) 200 mm
Prefabricated plastic mesh for slope protection.

m3
m3
m
m3

m
m
m
no
no
kg
kg
kg
kg
kg
kg

no
no
no
no
no

m3

m3
m3
m3
m3
m2
m2
m2
m
m3

m
m
m2

Bill No. 3 - Desviacin Huaura - The Huaura Diversion


Bill 3.1 Presa y bocatoma Huaura - Huaura Dam and Intake
Item

Description

Unit

Bill 3.1 Incluido portal tunel aguas arriba - includes upstream tunnel portal
3.1.01.0
3.1.01.01
3.1.01.02
3.1.01.03
3.1.01.04

3.1.01.05
3.1.01.06

3.1.01.07
3.1.01.08
3.1.02.0
3.1.02.01
3.1.02.02
3.1.02.03

3.1.03.0

MOVIMIENTOS DE TIERRA - EARTHWORKS


Retiro de madera utilizable - Remove usable timber
Limpieza e inicio de actividaddes - Clearing and grubbing
Excavacin tierra vegetal - Topsoil excavation
Excavacin de suelo - Soil excavation
a) Excavacin masiva, traslado a botadero - Bulk excavation, to spoil deposit
b) Excavacon y seleccin en cantera (gravas y canto rodado) - Excavation to stock pile (gravel, boulders)
c) Excavacin para cimientos - Excavations for footings
Preparacon de concretado en cimentacio de roca - Preparation of rock foundation for concreting
Corte y relleno - Fill and backfill
a) Relleno del terrapln - Embankment fill
i) Grava - Gravel
ii) Roca - Rock
b) Relleno estructural - Structural backfill
c) Enrocado de alta calidad - High quality rockfill
d) El relleno de las zanjas - Backfill of trenches
e) Relleno de baja permeabilidad - Low permeability fill
f) Material de filtro - Filter material, 0 - 60 mm
g) Material de drenaje - Drainage material , 50 - 100 mm
Colocacin de tierra vegetal - Placing of topsoil
Encespado - Turfing (optional)

3.1.03.01
3.1.03.02
3.1.03.03
3.1.03.04

Perforacin rotatoria con relleno, dimetro mnimo de 76 mm, profundidad de 0-20 m


Adicional sobre 3.1.03.01 y 3.1.03.02 para agujeros inclinados
Pruebas de presin de agua, por ajuste envasador, packer simple, profundidad 0-20 m

3.1.03.05
3.1.03.06

Cementado con lechada a presin, por ajuste envasador, profundidad 0-20 m


Cementado con lechada: El consumo de cemento segun ajuste envasador, Tipo A
a) 0 - 100 kg
b) 0 - 200 kg
c) 0 - 300 kg
d) 0 - 500 kg
e) Mas de 500 kg
Cementacin Qumica. Tipo lechada: Epoxico.

3.1.03.08

Pernos totalmente cementados en roca. D= 32 mm


a) Longitud 2.0 m
b) Longitud 3.0 m
c) Longitud 4.0 m
d) Longitud 6.0 m
e) Longitud 8.0 m

3.1.04.0
3.1.04.01

DRENAJE Y PROTECCIN A LA EROSIN - DRAINAGE AND EROSION PROTECTION


Proteccin contra la erosin con piedra triturada 50 - 200 mm
Min. espesor 300 mm

3.1.04.02

Enrrocado - Rip-rap
a) Tamao de piedra 200 - 300 mm
b) Tamao de piedra 300 - 500 mm
c) Bloques seleccionados >500 mm
d) Enrrocado embebido en mortero - Grouted rip-rap
Geotextil - Filter fabric
a) Mnimo 180 g/m2
b) Mnimo 250 g/m2
c) Mnimo 300 g/m2
La perforacin de agujeros de drenaje, vertical o inclinada agujeros. Dimetro 51 mm

3.1.04.03

3.1.04.04
3.1.04.05
3.1.04.06

3.1.04.07

m3
m3
m3
m2

m3
m3
m3
m3
m3
m3
m3
m3
m2
m2

EXCAVACIN EN ROCK - ROCK EXCAVATION


a) Excavacon masiva - Bulk excavation
b) Excavacon de zanjas - Trench/ditch excavation
Perforaciones (sondeos) y grficas de curvas - Contour boreholes
Excavacin masiva en suelo rocoso. Sobreexcavacin normal. - Above ground. Rock excavation. Abnormal overbreak.

PRUEBAS DE SUELO, CEMENTACIN Y SOPORTE EN ROCA - GROUND TESTING AND GROUTING, ROCK SUPPORT
Soporte en roca del Portal tnel, incluye reglamento 3.2 - Rock support at tunnel portal, incuded in bill 3.2
Perforacin por percusin, dimetro mnimo de 51 mm, profundidad 0-20 m (en roca y hormign)

3.1.03.07

no
ha
m3

Excavacin de acequias permanetes y canales de coronacin.


Tuberias de drenaje de hormigon armado incluye curvas y tees.
Diametro interior:
a) 150 mm
b) 200 mm
Malla de plstico prefabricado para proteccin de taludes.

m3
m3
m
m3

m
m
m
no
no
kg
kg
kg
kg
kg
kg

no
no
no
no
no

m3

m3
m3
m3
m3
m2
m2
m2
m
m3

m
m
m2

Quantity

Unit Price
USD

10 105.23
3 9,990.00

Total Price
USD

100

1,052.30
29,970.00
3.34 334

12,000.00
500
500
800

5.62
6.35
6.52
3.59

67,440.00
3,175.00
3,260.00
2,872.00

750
750
3,500.00
400
400
400
500
250
500
250

22.43
17.21
15.92
23.68
14.89
16.76
25.96
26.49
0.32
0.32

16,822.50
12,907.50
55,720.00
9,472.00
5,956.00
6,704.00
12,980.00
6,622.50
160

6,000.00
200
400
200

18.92
20.37
17.98
14.2

113,520.00
4,074.00
7,192.00
2,840.00

300

15.58 4,674.00

100

80

119.42

63.4 6,340.00
80.04 4,002.00
2,388.40

60 129.12

7,747.20

50
20.00

9,000.00
6,000.00
4,000.00
3,000.00
3,000.00
100

0.88
1.05
1.27
1.63
2.61
23.71

80
40
30
20 102.26
10 129.48

7,920.00
6,300.00
5,080.00
4,890.00
7,830.00
2,371.00

56.9 4,552.00
68.24 2,729.60
79.57 2,387.10
2,045.20
1,294.80

1,000.00

18.08 18,080.00

600
600
750
100

20.01 12,006.00
20.04 12,024.00
20.43 15,322.50
12,962.00

129.62

1,000.00
200
200
50
100

6,410.00
1,332.00
1,402.00
779

3.41 341

100
50
200

6.41
6.66
7.01
15.58

24.32 2,432.00
33.28 1,664.00
14.49 2,898.00

Bill No. 3 - The Huaura Diversion


Bill 3.1 Huaura Dam and Intake
Item

3.1.05.0
3.1.05.01

Bill No. 3 - Desviacin Hua


Bill 3.1 Presa y bocatoma
Description

CONCRETE WORKS
Grouted rock bolts. D = 25 mm
Length in concrete 1.5 m

Item

3.1.05.0
3.1.05.01

a) Depth in rock 2.0 m


b) Depth in rock 3.0 m
c) Depth in rock 4.0 m
Grouted rock bolts. D = 32 mm
Length in concrete 1.5 m

3.1.05.02

3.1.05.03

3.1.05.04

3.1.05.05

3.1.05.06

3.1.05.07

3.1.05.08
3.1.05.09

3.1.05.10

3.1.05.11
3.1.05.12
3.1.05.13

3.1.05.14
3.1.05.15

3.1.05.16

3.1.05.17
3.1.05.18

d) Depth in rock 2.0 m


e) Depth in rock 3.0 m
f) Depth in rock 4.0 m
g) Depth in rock 6.0 m
Formwork Class A. Plain.
a) Dam, gravity section and right abutment
b) Dam, gated section and bridge
c) Intake block and left abutment
d) Gravel trap and diversion tunnel inlet.
e) Gate house
Formwork Class A. Curved
a) Dam, gravity section and right abutment
b) Dam, gated section and bridge
c) Intake block and left abutment
d) Gravel trap and diversion tunnel inlet.
Formwork Class B Plain.
a) Dam, gravity section and right abutment
b) Dam, gated section and bridge
c) Intake block and left abutment
d) Gate house
Formwork Class C.
a) Dam, gravity section and right abutment
b) Dam, gated section and bridge
c) Intake block and left abutment
d) Gravel trap and diversion tunnel inlet.
e) Floor and foundation in gate house
f) Construction and expansion joints incl. shear keys
Grooves
a) Triangular, drip throats, 25 mm
b) Rectangular, for sealing of roofing
Rectangular voids
a) Cross-section not exceeding 0.1 m2
b) Cross-section 0.1 - 0.5 m2
c) Formwork for concreting of voids.Class according to adjacent surface
Shear keys in construction joints
PVC waterstops
a) 150 mm wide
b) 225 mm wide
c) 300 mm wide
Grouting of joints and interphases
a) Supply and installation of tubes
b) Cement grouting
c) Chemical grouting
Type proposed by tenderer:
Bituminous coating on concrete surface
Joint sealing compound.
Concrete covers of duct, w = 300 mm at at abutment and bridge including steel frames.

Preparation of contraction joints.


Reinforcement. All dimensions
a) Deformed bars, 420 N/mm2
b) Plain bars
c) Welded mesh reinforcement
Deformed steel bars of weldable quality for fixing hydraulic steelwork such as steel lining, gate guides, etc.
Length approx .2.0 m Partly embedded

a) D = 20 mm
b) D = 25 mm
c) D = 32 mm
a) Stainless steel bars. D = 32 mm
b) Stainless steel bars. D = 25 mm
Embedded PVC-pipes including bends and fixtures
a) D = 50 mm
b) D = 75 mm
c) D = 100 mm

3.1.05.02

3.1.05.03

3.1.05.04

3.1.05.05

3.1.05.06

3.1.05.07

3.1.05.08
3.1.05.09

3.1.05.10

3.1.05.11
3.1.05.12
3.1.05.13

3.1.05.14
3.1.05.15

3.1.05.16

3.1.05.17
3.1.05.18

3.1.05.19
3.1.05.20

d) D = 150 mm
e) D = 200 mm
Embedded cast-iron floor gullies with hot dip galvanized steel cover
Steel angle section 100 x 100 with anchoring c/c 300 mm, embedded in first stage concrete

3.1.05.19
3.1.05.20

Bill No. 3 - Desviacin Huaura - The Huaura Diversion


Bill 3.1 Presa y bocatoma Huaura - Huaura Dam and Intake
Description

Unit

Quantity

OBRAS DE CONCRETO - CONCRETE WORKS


Pernos de anclaje con lechada. D = 25 mm - Grouted rock bolts. D = 25 mm
Longitud de anclaje en concreto 1.5 - Length in concrete 1.5 m
a) Anclaje en roca 2.0 m - Depth in rock 2.0 m
b) Anclaje en roca 3.0 m - Depth in rock 3.0 m
c) Anclaje en roca 4.0 m -Depth in rock 4.0 m
Pernos de anclaje con lechada. D = 32 mm - Grouted rock bolts. D = 32 mm
Longitud de anclaje en concreto 1.5 - Length in concrete 1.5 m

no
no
no

d) Anclaje en roca 2.0 m - Depth in rock 2.0 m


e) Anclaje en roca 3.0 m - Depth in rock 3.0 m
f) Anclaje en roca 4.0 m - Depth in rock 4.0 m
g) Anclaje en roca 6.0 m - Depth in rock 6.0 m
Encofrado Clase A. Plano - Formwork Class A. Plain.
a)Presa seccin gravedad y estribo derecho - a) Dam, gravity section and right abutment
b)Presa, seccin compuerta y puente - Dam, gated section and bridge
c) Brida de entrada y estribo izquierdo - Intake block and left abutment
d) Trampa de grava y entrada del tnel de desvo. - Gravel trap and diversion tunnel inlet.
e) Casa de compuertas - Gate house
Encofrado Clase A. Curvo - Formwork Class A. Curved
a) Presa seccin gravedad y estribo derecho - a) Dam, gravity section and right abutment
b)Presa, seccin compuerta y puente - Dam, gated section and bridge
c) Brida de entrada y estribo izquierdo - Intake block and left abutment
d) Trampa de grava y entrada del tnel de desvo. - Gravel trap and diversion tunnel inlet.
Encofrado Clase B. Plano - Formwork Class B. Plain.
a) Presa seccin gravedad y estribo derecho - a) Dam, gravity section and right abutment
b)Presa, seccin compuerta y puente - Dam, gated section and bridge
c) Brida de entrada y estribo izquierdo - Intake block and left abutment
e) Casa de compuertas - Gate house
Encofrado Clase C.
a) Presa seccin gravedad y estribo derecho - a) Dam, gravity section and right abutment
b)Presa, seccin compuerta y puente - Dam, gated section and bridge
c) Brida de entrada y estribo izquierdo - Intake block and left abutment
d) Trampa de grava y entrada del tnel de desvo. - Gravel trap and diversion tunnel inlet.
e) Piso y fundacin de casa de la puerta - Floor and foundation in gate house
f) Construccin y juntas de dilatacin incl. Llaves de corte - Construction and expansion joints incl. shear keys
Acanaladura - Grooves
a) Triangulares, gargantas de goteo, 25 mm - Triangular, drip throats, 25 mm
b) Rectangular, para el sellado de techos - Rectangular, for sealing of roofing
Huecos rectangulares - Rectangular voids
a) Seccin transversal no exceda de 0,1 m2 - Cross-section not exceeding 0.1 m2
b) Seccin transversal desde 0,1 hasta 0,5 m2 - Cross-section 0.1 - 0.5 m2
c) Encofrado para el hormigonado de huecos. Clase de acuerdo con la superficie adyacente - Formwork for concretin
Llaves de corte en juntas de construccin - Shear keys in construction joints
PVC waterstops
a) 150 mm ancho
b) 225 mm ancho
c) 300 mm ancho
Grouting(lechada) de las juntas e interfases - Grouting of joints and interphases
a) Suministro e instalacion de tuberias - Supply and installation of tubes
b) Lechada de cemento - Cement grouting
c) lechada quimica - Chemical grouting
Escriba propuesta del licitador - Type proposed by tenderer:
Revestimiento asflato sobre superficie de hormign - Bituminous coating on concrete surface
Compuesto de sellado de juntas. - Joint sealing compound.
Recubrimiento de hormign de conducto, w = 300 mm en al pilar y el puente incluyendo marcos de
acero.Concrete covers of duct, w = 300 mm at at abutment and bridge including steel frames.

no
no
no
no

50
100
15

20
20
10
10

m2
m2
m2
m2
m2

1,000.00
700
1,000.00
1,000.00
250

m2
m2
m2
m2

200
150

m2
m2
m2
m2

300
500
400

m2
m2
m2
m2
m2
m2

600
200
900
600

50
50

50

50
400

m
m

50
15

no
no
m2
m

5
5
20
40

m
m
m

10
100
110

m
kg
l

200
150

m2
kg
m

150

Preparacin de las juntas de contraccin. - Preparation of contraction joints.


Refuerzo. todas las dimensiones - Reinforcement. All dimensions
a) barras corrugadas, 420 N/mm2
b) barras lisas
c) reforzamiento con malla electrosoldada - Welded mesh reinforcement
Barras de acero corrugadas aptas para soldadura, para fijacin de estructuras hidrulicas de acero tales como
revestimiento de concreto, guias de compuertas, etc . longitu de 2.0 metros de embebido - Deformed steel bars of
weldable quality for fixing hydraulic steelwork such as steel lining, gate guides, etc. Length approx .2.0 m Partly
embedded

m2

150

t
t
t

600

a) D = 20 mm
b) D = 25 mm
c) D = 32 mm
a) Barras de acero inoxidable - Stainless steel bars. D = 32 mm
b) Barras de acero inoxidable - Stainless steel bars. D = 25 mm
PVC-tubos empotrados, incluida curvas y accesorios - Embedded PVC-pipes including bends and fixtures
a) D = 50 mm
b) D = 75 mm
c) D = 100 mm

no
no
no
no
no

40
80
20
5
5

m
m
m

20
30
50

50

50
15

2
4

d) D = 150 mm
e) D = 200 mm
hierro fundido embebido con covertura de acero galvanizado en caliente
Seccin del ngulo de acero de 100 x 100 con anclaje c / c de 300 mm, embebido en concreto en la primera etapa.
- Steel angle section 100 x 100 with anchoring c/c 300 mm, embedded in first stage concrete

m
m
no
kg

20
20
2
120

Unit Price
USD

Total Price
USD

66.07 3,303.50
77.22 7,722.00
88.36 1,325.40

102.26
129.48

68.24 1,364.80
79.57 1,591.40
1,022.60
1,294.80
53.95
53.95
53.95
53.95
53.95

53,950.00
37,765.00
53,950.00
53,950.00
13,487.50

73.51
73.51
73.51
73.51

14,702.00
11,026.50
3,675.50
3,675.50

53.99
53.99
53.99
53.99

16,197.00
26,995.00
21,596.00
2,699.50

51.55
51.55
51.55
51.55
51.55
51.55

30,930.00
10,310.00
46,395.00
30,930.00
2,577.50
20,620.00

33.5 1,675.00
34.25 513.75
26.7
26.7
53.95
22.63

133.5
133.5
1,079.00
905.2

15.27 152.7
24.93 2,493.00
30.31 3,334.10
3.67 734
1.01 151.5
2.5 125
6.2 930
18.25 912.5
72.58 1,088.70

6.07 910.5
1,459.67
1,459.67
2,812.50

875,802.00
2,919.34
11,250.00

8.05
11.14
17.63
27.28
17.95

322
891.2
352.6
136.4

5.45 109
7.15 214.5
8.92 446

89.75

123.23

16.9 338
25.92 518.4
246.46
7.41 889.2

Bill No. 3 - The Huaura Diversion


Bill 3.1 Huaura Dam and Intake
Item

3.1.05.21
3.1.05.22
3.1.05.23

Bill No. 3 - Desviacin Hua


Bill 3.1 Presa y botoma Hu
Description

Item

Step iron partly embedded in concrete


Guides and sills for stop logs embeded in concrete
Concrete Class A
a) Dam, gravity section and right abutment
b) Intake block and left abutment
Concrete Class B
a) Gate houses
b) Culverts, ducts
Concrete Class C
a) Dam, gravity section and right abutment
b) Dam, gated section and bridge
c) Intake block and left abutment
d) Gravel trap and diversion tunnel inlet.
e) Gate house
f) Erosion protection slabs
g) Culverts, ducts
h) Retaining walls
Concrete Class E
Gate openings, floor and lower parts of piers and walls and erosion protection slab.

3.1.05.21
3.1.05.22
3.1.05.23

3.1.05.27
3.1.05.28

3.1.05.29

Concrete Class F
Finishing of unformed surfaces
a) Class UA
b) Class UB, curved surfaces
c) Class UB, plane surfaces
d) Class UC, plane surfaces
Blockout for and grouting of fence posts in concrete slabs

3.1.05.30

Grouting around hydraulic steelworks with expanding mortar. Incl. plant positioning

3.1.05.30

3.1.05.31
3.1.05.32

Not used
Grouting of construction joints with chemical-based grout as approved by the Engineer. Incl. plant
positioning.

3.1.05.31
3.1.05.32

3.1.05.33

Grouting of construction joints with cement based grout. Incl. plant positioning

3.1.05.33

3.1.05.34

Sandblasting of concrete surfaces

3.1.05.34

3.1.06.0

INTERFACE WITH H, EMBEDMENT OF HYDRAULIC STEELWORKS

3.1.06.0

3.1.05.24

3.1.05.25

3.1.05.26

3.1.05.27
3.1.05.28

3.1.05.24

3.1.05.25

3.1.05.26

3.1.05.29

Reference H-tender documents, Part D, Section 2


This item shall include all works related to forming of recesses, blockouts and the like to divide between
first and second step concreting, provision and removal of shuttering for items to be embedded, extra over
for embedment and second stage
concreting and the like, for hydraulic steelworks as listed below. The concrete volumes and concrete
reinforcement are catered for under Concrete Works.

3.1.06.01
3.1.06.02
3.1.06.03
3.1.06.04
3.1.06.05
3.1.06.06
3.1.06.07
3.1.06.08

Flood Flushing Gates


Stop Log Guides, Flushing Gates
Coarse Trash Rack
Intake Gates
Fine Trash Rack
Gravel Flushing Gate / Minimum Flow Gate
Trash Rack Cleaner
Not used

3.1.06.01
3.1.06.02
3.1.06.03
3.1.06.04
3.1.06.05
3.1.06.06
3.1.06.07
3.1.06.08

3.1.07.0
3.1.07.01

BUILDER'S WORKS
Blockwork Walling
a) 150 mm
b) 100 mm
Roofing membrane
Doors
a) Insulated single steel doors. Fire rating A60. External dimensions 1000x2100mm

3.1.07.0
3.1.07.01

3.1.07.02
3.1.07.03

3.1.07.02
3.1.07.03

b) Insulated double steel doors. Fire rating A60. External dimensions 1600x2100mm
3.1.07.04
3.1.07.05

3.1.07.06
3.1.07.07

Not used
Windows
a) Aluminium window with fixed panes Size 1000 x 1200 mm
b) Louvred aluminium ventilation grilles with aluminium frame and insect screen size
500 x 400 mm
c) Glazing 5 mm float glass and glazing in panes of any size.
Plastering on walls
Painting and decorating. Painting of:
a) Internal metalwork or steelwork
b) Galvanized metalwork

3.1.07.04
3.1.07.05

3.1.07.06
3.1.07.07

c) External surfaces of steelwork


d) External concrete surfaces

Bill No. 3 - Desviacin Huaura - The Huaura Diversion


Bill 3.1 Presa y botoma Huaura - Huaura Dam and Intake
Description

Step iron (escalera tipo gato) parte embebida en hormigon


Guias y topes de compuertas emebebidas en hormigon - Guides and sills for stop logs embeded in concrete
Concreto clase A - Concrete Class A
a)Presa seccin gravedad y estribo derecho - Dam, gravity section and right abutment
b) Brida de entrada y estribo izquierdo - Intake block and left abutment
Hormigon clase B - Concrete Class B
a) Casa de compuerta - Gate houses
b)Alcantarillas y ductos - Culverts, ducts
Hormigon clase C - Concrete Class C
a)Presa seccin gravedad y estribo derecho - Dam, gravity section and right abutment
b)Presa, seccin compuerta y puente - Dam, gated section and bridge
c) Brida de entrada y estribo izquierdo - Intake block and left abutment
d) Trampa de grava y entrada del tnel de desvo. - Gravel trap and diversion tunnel inlet.
e) Casa de compuerta - Gate houses
f) Losas de proteccin contra la erosin - Erosion protection slabs
g)Alcantarillas y ductos - Culverts, ducts
h) Muros de contencin - Retaining walls
Hormigon clase E - Concrete Class E
Recubrimiento de partes bajas de las compuerta como muros, muelles y losa - Gate openings, floor and lower parts of piers
and walls and erosion protection slab.
hormign clase F
Acabado de superficies - Finishing of unformed surfaces
a) Clase UA
b) Clase UB, superficie curva
c) Clase UB, Superficie plana
d) Clase UC, Superficie plana
Colocacin de Blockout con grouting sobre losas de hormign - Blockout for and grouting of fence posts in concrete slabs
Revestimiento de estructuras hidrulicas con mortero expansivo . Incluida instalacin - Grouting around hydraulic
steelworks with expanding mortar. Incl. plant positioning
Not used
Relleno de juntas de construccin con chemical-based grout aprobado por el ingenieros. Incluye instalacin - Grouting of
construction joints with chemical-based grout as approved by the Engineer. Incl. plant positioning.
Relleno de juntas de construccin con cement based grout. . Incluye instalacin - Grouting of construction joints with
cement based grout. Incl. plant positioning
Arenado de superficies de hormign - Sandblasting of concrete surfaces

Unit

Quantity

no
kg

300

25

m3
m3

2,500.00
400

m3
m3

45
50

m3
m3
m3
m3
m3
m3
m3
m3

1,100.00
1,060.00
1,500.00
650

m3

200

m3

150

m2
m2
m2
m2
no

1,000.00
300
800
200

15
1,460.00
40
200

60

40

20

50

m2

20

LS
LS
LS
LS
LS
LS
LS

1
1
1
1
1
1
1

m2
m2
m2

25
15
40

no

no

no
no

4
2

m2
m2

3
70

m2
m2

10
5

INTERFACE CON H, ANCLAJE DE ESTRUCTURAS HIDRULICAS- INTERFACE WITH H, EMBEDMENT OF HYDRAULIC


STEELWORKS
Reference H-tender documents, Part D, Section 2
Esta partida se incluirn todos los trabajos relacionados con la formacin de espacios, bloqueadores y similares para dividir
entre la primera y segunda etapa de hormigonado, provisin y remocin de los encofrados para elementos a ser
incorporados, sobre empotramiento y segunda etapa hormigonado y similares, para estructuras de acero hidrulicas que se
enumeran a continuacin. Los volmenes de concreto y refuerzo de concreto son atendidos bajo estructuras de concreto.

Compuerta de ductos de purga - Flood Flushing Gates


topes de guias, compuertas de purga - Stop Log Guides, Flushing Gates
Rejilla para desperdicios grandes - Coarse Trash Rack
Compuerta de bocatoma - Intake Gates
rejilla para despedicios menores - Fine Trash Rack
compuerta de purga de gravas/compuerta de flujo mnimo - Gravel Flushing Gate / Minimum Flow Gate
Limpiador de rejas - Trash Rack Cleaner
Not used
ACABADOS DE CONSTRUCCIN - BUILDER'S WORKS
Adoquines - Blockwork Walling
a) 150 mm
b) 100 mm
membrana para techo - Roofing membrane
Puertas - Doors
a) Puertas indivduales de acero aisladas. Resistencia a fuego A60. dimensin externa 1000x2100mm - Insulated single steel
doors. Fire rating A60. External dimensions 1000x2100mm
b) Puertas dobles de acero aisladas. Resistencia a fuego A60. dimensin externa 1600x2100mm - Insulated double steel
doors. Fire rating A60. External dimensions 1600x2100mm
Not used
Ventanas - Windows
a) Ventanas con marcos de aluminio, tamaos de paneles de 1000 x 1200 mm
b) persianas de rejillas con marco de aluminio, incluye malla contra insectos tamao de pantalla
500 x 400 mm
c) Colocacon de vidrio en ventanas de cualquier tamao, espesor de 5mm
Empastado de muros
Pintura y decoracin.
a) carpinteria metlica estructuras de acero - Internal metalwork or steelwork
b) carpinteria metlica galvanizada - Galvanized metalwork

c) Las superficies externas de estructuras de acero - External surfaces of steelwork


d) Concreto en superficies exteriores

m2
m2

10
90

Unit Price
USD

Total Price
USD
15.71 392.75
7.41 2,223.00

128.39
128.39

320,975.00
51,356.00

130.16
130.16

5,857.20
6,508.00

135.63
135.63
135.63
135.63
135.63
135.63
135.63
135.63

149,193.00
143,767.80
203,445.00
88,159.50
2,034.45
198,019.80
5,425.20
27,126.00

173.13

34,626.00

119.09

17,863.50
4.2
4.65
4.65
4.85
48.2

4,200.00
1,395.00
3,720.00
970
2,892.00

30.95 1,238.00

30.95 619
30.95 1,547.50
10.64 212.8

4,786.21
18,408.50
1,110.51
4,418.04
1,472.68
2,209.02
736.34

146.58

4,786.21
18,408.50
1,110.51
4,418.04
1,472.68
2,209.02
736.34

73.3 1,832.50
73.3 1,099.50
5,863.20

3,049.00

3,049.00

3,415.00

3,415.00

427.5
464

1,710.00
928

1,044.67

3,134.01
42.76 2,993.20
24.43 244.3
24.43 122.15

24.43 244.3
24.43 2,198.70

Bill No. 3 - The Huaura Diversion


Bill 3.1 Huaura Dam and Intake
Item

Bill No. 3 - Desviacin Hua


Bill 3.1 Presa y bocatoma
Description

Item

e) Internal plastered or concrete surfaces


Walls
f) Internal plastered or concrete surfaces, Ceilings
g) Concrete floors with moderate loads. Epoxy, Type proposed by tenderer:
h) Concrete floors with heavy loads, including battery rooms. Self levelling epoxy. Type proposed by
tenderer:

3.1.08.0
3.1.08.01
3.1.08.02
3.1.08.03

INVESTIGATION AND INSTRUMENTATION


Electric piezometer. Measuring device
Electric piezometer, piping
Surface settlement monuments
a)Foundation on rock
b) Foundation on soil
Surface settlement fixed point
a)Foundation on rock
b) Foundation on soil

3.1.08.0
3.1.08.01
3.1.08.02
3.1.08.03

3.1.09.0
3.1.09.01
3.1.09.02
3.1.09.03
3.1.09.04

3.1.09.05
3.1.09.06

MISCELLANEOUS WORKS
Light duty hatch cover
Light duty duct cover
Heavy duty duct cover
External railings, fixed or removable
a)Type A
b)Type B
Steel ladders
Fencing, excavation and casting of individual foundation included

3.1.09.07

Fence gates, excavation for and concreting of individual foundations included

3.1.09.07

3.1.09.08
3.1.09.09

a) Double wing gate


b) Single wing gate
Preparation of subgrade level
Subbase of crushed rock (0-75 mm) Thickness min. 200 mm

3.1.09.08
3.1.09.09

3.1.09.10

Wearing course of crushed rock (0-30 mm) Thickness min. 150 mm

3.1.09.10

3.1.09.11
3.1.09.12

Double bitumenous surface treatment


Earthing electrodes
a) 1 x 95 Cu wires
b) Earthing rods, 6 m long
c) Cadwelding of joints connections and intersections
Not used
Not used
Expanded polystyrene at bridge abutments
Thickness 50 mm

3.1.09.11
3.1.09.12

3.1.10.0
3.1.10.01

VENTILATION AND AIR CONDITIONING


Ventilation and airconditioning in the intake gate house. Design, supply and installation.

3.1.10.0
3.1.10.01

3.1.11.0

WATER SUPPLY, PLUMBING AND SANITARY INSTALLATION AND SEWERAGE

3.1.11.0

3.1.11.01

Water supply, plumbing and sanitary installation and sewerage in the intake gate house. Design, supply and installation.

3.1.11.01

3.1.12.0
3.1.12.01

FIRE FIGHTING INSTALLATIONS


Fire fighting installations and rescue equipment.

3.1.12.0
3.1.12.01

Sum

Bill 3.1 Huaura Dam and Intake

Sum

3.1.08.04

3.1.09.0
3.1.09.01
3.1.09.02
3.1.09.03
3.1.09.04

3.1.09.13
3.1.09.14
3.1.09.15

3.1.08.04

3.1.09.05
3.1.09.06

3.1.09.13
3.1.09.14
3.1.09.15

Bill No. 3 - Desviacin Huaura - The Huaura Diversion


Bill 3.1 Presa y bocatoma Huaura - Huaura Dam and Intake
Description

Unit

Quantity

e) tarrajeo interno de muros - Internal plastered or concrete surfaces


Walls

m2

f) Tarrajeo de cielo raso - Internal plastered or concrete surfaces, Ceilings

m2

35

g) Losa de concreto con cargas moderadas. Tipo de epoxy, propuesto por licitador: - Concrete floors with
moderate loads. Epoxy, Type proposed by tenderer:

m2

25

h) Losa de concreto con cargas pesadas, incluyendo salas de bateras. Auto epoxi nivelacin. Escriba
propuesto por licitador: - Concrete floors with heavy loads, including battery rooms. Self levelling epoxy.
Type proposed by tenderer:
ANALISIS E INSTRUMENTACIN - INVESTIGATION AND INSTRUMENTATION
Piezmetro elctrico. dispositivo de medicin - Electric piezometer. Measuring device
Piezmetro elctrico, tuberas - Electric piezometer, piping
Miras monumentadas en superficies - Surface settlement monuments
a)Fundacin en roca - Foundation on rock
b) Fundacin en suelo - Foundation on soil
Puntos de control de asentamiento - Surface settlement fixed point
a) Fundacin en roca - Foundation on rock
b) Fundacin en tierra - Foundation on soil
TRABAJOS VARIOS - MISCELLANEOUS WORKS
Tapa de escotilla, liviana - Light duty hatch cover
Tapa de ductos, liviana - Light duty duct cover
tapa de ductos de alta resistencia - Heavy duty duct cover
Barandas exteriores, fijas o desmontables - External railings, fixed or removable
a)Tipo A
b)Tipo B
Escaleras de acero - Steel ladders
Cerca, y la excavacin, hormigonado de fundaciones individuales incluidos - Fencing, excavation and casting
of individual foundation included

m2

120

10.00

no
m

3
60

no
no

2
3

no
no

2
4

kg
kg
kg

100
300
2,000.00

kg
kg
kg
m

500
1,000.00
150
20

Puertas de la cerca, y la excavacin, hormigonado de fundaciones individuales incluidos - Fence gates,


excavation for and concreting of individual foundations included
a) Puertas de dos cuerpos - Double wing gate
b) Puertas de un cuerpo - Single wing gate
Preparacin a nivel de subrrasante - Preparation of subgrade level
Subbase de piedra tirurada (0-75 mm) Espesor min. 200 mm

no
no
m2
m3

base de roca triturada (0-30 mm) Espesor min. 150 mm

m3

60

Tratamiento de asfalto bica en superficie de rodadura - Double bitumenous surface treatment


Puesta a tierra - Earthing electrodes
a) 1 x 95 cable de cobre
b) Varillas de puesta a tierra, 6 m de largo - Earthing rods, 6 m long
c) Juntas con soldadura en conecciones e intersecciones - Cadwelding of joints connections and intersections
Not used
Not used
Neopreno en estribos de puente espesor de 50 mm- Expanded polystyrene at bridge abutments
Thickness 50 mm

m2

70

VENTILACIN Y AIRE A CONDICIONADO - VENTILATION AND AIR CONDITIONING


Ventilacin y aire acondicionado en casa de compuerta en bocatoma. Diseo y construccin - Ventilation
and airconditioning in the intake gate house. Design, supply and installation.

m
no
no

1
1
300
70

300
5
50

m2

LS

LS

LS

SUMINISTRO DE AGUA, FONTANERIA E INSTALACION SANITARIA Y ALCANTARILLADO - WATER


SUPPLY, PLUMBING AND SANITARY INSTALLATION AND SEWERAGE
El suministro de agua, fontanera e instalacin sanitaria y alcantarillado en la casa de la compuerta de
admisin.Diseo, suministro e instalacin.
INSTALACION DE SISTEMA CONTRA INCENDIOS - FIRE FIGHTING INSTALLATIONS
Instalaciones de sistema contra incendios y equipos de rescate. - Fire fighting installations and rescue
equipment.

Bill 3.1 Huaura Dam and Intake

Unit Price
USD

Total Price
USD
24.43 2,931.60
24.43 855.05
24.43 610.75

24.43

244.30

975.67

2,927.01
9.75 585

911.3
842.95

1,822.60
2,528.85

915.86
847.51

1,831.72
3,390.04

7.01 701
7.01 2,103.00
6.34 12,680.00
7.01
7.01
7.01
85.5

4,275.00
1,832.00

3,505.00
7,010.00
1,051.50
1,710.00

4,275.00
1,832.00
0.88 264
29.25 2,047.50
29.25 1,755.00
4.37 305.9

101.2
230.3

21.34 6,402.00
506
11,515.00

8.5

25.5

2,112.01

2,112.01

14,017.73

14,017.73

2,112.01

2,112.01

3,333,609.63

Bill No. 3 -The Huaura Diversion


Bill 3.2 Huaura Diversion Tunnel
Item

Bill No. 3 -EL TUNEL DE DE


Bill 3.2 HUAURA TUNEL DE
Description

Item

Portals shall be regarded and measured as support work behind the face
3.2.01.0

EARTHWORKS
Above ground works at upstream portal, included in bill 3.1

3.2.01.0

3.2.01.01
3.2.01.02

Topsoil excavation.
Soil excavation.

3.2.01.01
3.2.01.02

3.2.02.0
3.2.02.01
3.2.02.02

ROCK EXCAVATION.
Above ground. Bulk rock excavation (width > 2 m).
Above ground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).

3.2.02.0
3.2.02.01
3.2.02.02

3.2.02.03

Above ground. Rock excavation. Abnormal overbreak.

3.2.02.03

3.2.02.04

Underground. Excavation of Diversion Tunnel. Minimum cross section, 15.9 m2 (3.80 m x 4.60 m).

3.2.02.04

3.2.02.05

Underground. Excavation of tunnel. Addition for increased cross-section.

3.2.02.05

3.2.02.06

Underground. Excavation of tunnel. Abnormal overbreak.

3.2.02.06

3.2.02.07

Underground. Excavation of tunnel. Addition for short blasting rounds.

3.2.02.07

3.2.02.08

a) Addition for 1/2 blasting rounds


b) Addition for 1/4 blasting rounds
Underground. Excavation of tunnel.
Addition for subdivision of cross-section into heading and benches.

3.2.02.08

3.2.02.09

Underground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).

3.2.02.09

3.2.02.10

Underground. Water discharge.


Pump out rate 1 - 2 m3/min. Includes also discharges for waterways and other cavities excavated from this
tunnel

3.2.02.10

3.2.02.11

Underground. Water discharge.


Pump out rate 2 - 3 m3/min. Includes also discharges for waterways and other cavities excavated from this
tunnel

3.2.02.11

3.2.02.12

Underground. Water discharge.


Pump out rate 3 - 4 m3/min. Includes also discharges for waterways and other cavities excavated from this
tunnel

3.2.02.12

3.2.02.13

Underground. Water discharge.


Pump out rate more than 4 m3/min. Includes also discharges for waterways and other cavities excavated
from this tunnel

3.2.02.13

3.2.02.14

Water measuring station

3.2.02.14

3.2.03.00
3.2.03.01

EXPLORATORY DRILLING AND GROUTING.


Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face

3.2.03.00
3.2.03.01

3.2.03.02

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face

3.2.03.02

3.2.03.03

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face

3.2.03.03

3.2.03.04

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face

3.2.03.04

3.2.03.05
3.2.03.06
3.2.03.07
3.2.03.08
3.2.03.09
3.2.03.10
3.2.03.11
3.2.03.12
3.2.03.13
3.2.03.14
3.2.03.15
3.2.03.16
3.2.03.17
3.2.03.18

Flushing between holes. At the face.


Flushing between holes. Behind the face.
Grouting. per packer setting. Depth 0-5 m. At the face
Grouting. per packer setting. Depth 0-5 m. Behind the face
Cement grouting. Type A. Cement consumption
Cement grouting. Type B. Cement consumption
Cement grouting. Type C. Cement consumption
Chemical grouting. Type D. Dry weight grout consumption
Consolidation grouting.
Flexible tubes for contact grouting.
Contact grouting. Type D.
Contact grouting. Type E.
Grouting time. At the face
Grouting time. Behind the face

3.2.03.05
3.2.03.06
3.2.03.07
3.2.03.08
3.2.03.09
3.2.03.10
3.2.03.11
3.2.03.12
3.2.03.13
3.2.03.14
3.2.03.15
3.2.03.16
3.2.03.17
3.2.03.18

Bill No. 3 -EL TUNEL DE DESVIO HUAURA - The Huaura Diversion


Bill 3.2 HUAURA TUNEL DE DESVIO - Huaura Diversion Tunnel
Description

Unit

Quantity

Trabajos de apoyo se valoran como parte del Portal de tunel - Portals shall be regarded and measured as
support work behind the face
MOVIMIENTO DE TIERRAS - EARTHWORKS
Trabajos de excavacin masiva aguas arriva del portal incluye factura 3.1 - Above ground works at upstream
portal, included in bill 3.1
Excavacin tierra vegetal - Topsoil excavation
Excavacin de suelo - Soil excavation
EXCAVACIN EN ROCA - ROCK EXCAVATION.
Excavacin masiva en suelo rocoso ( ancho > 2m) - Above ground. Bulk rock excavation (width > 2 m).
Perforacin de taladros y disparos en suelo rocoso (0.7 m profundida requerida).

m3
m3

Subterrneo. La excavacin del tnel de desvo. Seccin mnima, 15,9 m2 (3,80 mx 4,60 m).

m3

900
800.00

m3

100

Excavacin masiva en suelo rocoso. Sobreexcavacin normal. - Excavacin en suelo rocoso. Abnormal
overbreak.

10
500

2,530.00

Subterrneo. La excavacin del tnel de desvo. Adicin de una mayor seccin transversal.

m3

300

Underground. Excavation of tunnel. Sobreexcavacin normal.

m3

500

m
m

114

Subterrneo. Excavacin del tnel. Adicion de mallas de voladuras.


a) Adicion de 1/2 malla de voladura - Addition for 1/2 blasting rounds
b) Adicion de 1/4 malla de voladura -Addition for 1/4 blasting rounds
Subterrneo. Excavacin del tnel.
Adicin de corte trasnversal en rumbos y relleno . Addition for subdivision of cross-section into heading and
benches.

Perforacin de taladros y disparos en suelo rocoso (0.7 m profundida requerida).

76
50.00

300

Subterrneo. Manejo de aguas - Underground. Water discharge.


Caudales entre 1 - 2 m3/min. Incluye tambin drenaje y otras cavidades excavadas en este tnel

month

4.00

Underground. Water discharge.


Caudales entre 2 - 3 m3/min. Incluye tambin drenaje y otras cavidades excavadas en este tnel.

month

2.00

Underground. Water discharge.


Caudales entre 3 - 4 m3/min. Incluye tambin drenaje y otras cavidades excavadas en este tnel.

month

0.50

Underground. Water discharge.


Caudales entre 4 m3/min. Incluye tambin drenaje y otras cavidades excavadas en este tnel.

month

0.50

Vertederos.
Perforacin exploratoria e inyeccin.
Perforacin a percusin, diametro mnimo 50 mm. Profundidad 0 - 30 m. Directa a roca (At the face)
Perforacin a percusin, diametro mnimo 50 mm. Depth 0 - 30 m. Uso de tapon de hormigon (Behind the
face)

no

20,000.00

2,000.00

Pruebas de presin de agua. Segn resistencia de packer. Pruebas con un packer. profundidad 0-5 m. directa no
a roca

150.00

Pruebas de presin de agua. Segn resistencia de packer. Pruebas con un packer. profundidad 0-5 m. Uso de no
tapon de hormigon.

20.00

Flushing between holes. At the face.


Flushing between holes. Behind the face.
Inyeccin de lechada. Segn resistencia de packer. profundidad 0-5 m. At the face
Inyeccin de lechada. Segn resistencia de packer. profundidad 0-5 m.Behind the face
Cement grouting. Type A. Cement consumption
Cement grouting. Type B. Cement consumption
Cement grouting. Type C. Cement consumption
Chemical grouting. Type D. Dry weight grout consumption
Consolidation grouting.
Flexible tubes for contact grouting.
Contact grouting. Type D.
Contact grouting. Type E.
Grouting time. At the face
Grouting time. Behind the face

no
no
no
no
kg
kg
kg
kg
kg
m
kg
kg
hr
hr

150
10
500
80
350,000.00
140,000.00
50,000.00
100
1,000.00
120
400
400
600
60

Unit Price
USD

Total Price
USD

3.34
5.68 2,840.00

21.76

29.66 26,694.00
17,408.00
14.2 1,420.00

1,424.29

3,603,453.70

31.71 9,513.00
15.76 7,880.00

587.18
2,046.38
855.66

66,938.52
155,524.88
42,783.00

15.23 4,569.00
9,942.33

39,769.32

12,052.57

24,105.14

14,162.81

7,081.41

16,273.05

8,136.53

2,385.50

4,771.00

15.58

311,600.00

13.55

27,100.00

73.32

10,998.00

60.68

1,213.60

143.86
140.23

605
520

30.3 4,545.00
26.25 262.5
71,930.00
11,218.40
1.01 353,500.00
2.59 362,600.00
7.19 359,500.00
23.71 2,371.00
1.9 1,900.00
31.11 3,733.20
22.57 9,028.00
26.23 10,492.00
363,000.00
31,200.00

33.4

Bill No. 3 -The Huaura Diversion


Bill 3.2 Huaura Diversion Tunnel
Item

Bill No. 3 -The Huaura Div


Bill 3.2 Huaura Diversion T
Description

Item

3.2.04.0
3.2.04.01

ROCK SUPPORT tunnel and portals.


Temporary installation for rock fall protection at downstream portal. Contractors design

3.2.04.0
3.2.04.01

3.2.04.02

Temporary installation for rock fall protection at Huaura portal. Contractors design

3.2.04.02

3.2.04.03

Extra scaling. At the face.

3.2.04.03

3.2.04.04

Extra scaling. Behind the face.

3.2.04.04

3.2.04.05

Invert cleaning and scaling. Behind the face.

3.2.04.05

3.2.04.06
3.2.04.07

High pressure water flushing. Behind the face


Resin end-anchored rock bolts, deformed bar. At the face.
D=20 mm. Depth in rock 2.4 m

3.2.04.06
3.2.04.07

3.2.04.08

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

3.2.04.08

3.2.04.09

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

3.2.04.09

3.2.04.10

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

3.2.04.10

3.2.04.11

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

3.2.04.11

3.2.04.12

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

3.2.04.12

3.2.04.13

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.4 m

3.2.04.13

3.2.04.14

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

3.2.04.14

3.2.04.15

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

3.2.04.15

3.2.04.16

Fully cement-grouted rock bolts, deformed bar. At the face.


D=25 mm. Depth in rock 5.9 m

3.2.04.16

3.2.04.17

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

3.2.04.17

3.2.04.18

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

3.2.04.18

3.2.04.19

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

3.2.04.19

3.2.04.20

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 5.9 m

3.2.04.20

3.2.04.21

Chainlinked mesh fixed to rock bolts. At the face.

3.2.04.21

3.2.04.22

Chainlinked mesh fixed to rock bolts. Behind the face.

3.2.04.22

3.2.04.23

Welded wire fabric fixed to rock bolts. At the face.

3.2.04.23

3.2.04.24

Welded wire fabric fixed to rock bolts. Behind the face.

3.2.04.24

3.2.04.25

Steel straps fixed to rock bolts. At the face.

3.2.04.25

3.2.04.26

Steel straps fixed to rock bolts. Behind the face.

3.2.04.26

3.2.04.27

Shotcrete. Plain. At the face.

3.2.04.27

3.2.04.28

Shotcrete. Plain. Behind the face.

3.2.04.28

3.2.04.29

Shotcrete. Fibre-reinforced. At the face.

3.2.04.29

3.2.04.30

Shotcrete. Fibre-reinforced. Behind the face.

3.2.04.30

Bill No. 3 -The Huaura Diversion


Bill 3.2 Huaura Diversion Tunnel
Description

Unit

Quantity

ROCK SUPPORT tunnel and portals.


Temporary installation for rock fall protection at downstream portal. Contractors design

Prov. Sum

1.00

Temporary installation for rock fall protection at Huaura portal. Contractors design

Prov. Sum

1.00

Extra scaling. At the face.

hr

200

Extra scaling. Behind the face.

hr

300

Invert cleaning and scaling. Behind the face.

m2

500

m2
no

500
1,000.00

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

no

2,000.00

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

no

1,300.00

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

no

100.00

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

no

130.00

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

no

100.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.4 m

no

100.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

no

1,000.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

no

1,000.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=25 mm. Depth in rock 5.9 m

no

2,000.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

no

100.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

no

1,800.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

no

1,400.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 5.9 m

no

50.00

High pressure water flushing. Behind the face


Resin end-anchored rock bolts, deformed bar. At the face.
D=20 mm. Depth in rock 2.4 m

Chainlinked mesh fixed to rock bolts. At the face.

m2

50

Chainlinked mesh fixed to rock bolts. Behind the face.

m2

200

Welded wire fabric fixed to rock bolts. At the face.

m2

400

Welded wire fabric fixed to rock bolts. Behind the face.

m2

100

Steel straps fixed to rock bolts. At the face.

100

Steel straps fixed to rock bolts. Behind the face.

200

Shotcrete. Plain. At the face.

m3

300

Shotcrete. Plain. Behind the face.

m3

100

Shotcrete. Fibre-reinforced. At the face.

m3

3,800.00

Shotcrete. Fibre-reinforced. Behind the face.

m3

1,200.00

Unit Price
USD

Total Price
USD

25,000.00

25,000.00

25,000.00

25,000.00

87.62 17,524.00
69.96 20,988.00
24.34 12,170.00

53.27

9.06 4,530.00
53,270.00

54.35

108,700.00

65.04

84,552.00

47.72

4,772.00

52.95

6,883.50

61.32

6,132.00

49.06

4,906.00

50.65

50,650.00

61.20

61,200.00

93.00

186,000.00

43.62

4,362.00

47.74

85,932.00

54.26

75,964.00

106.50

5,325.00

14.48 724
13.1 2,620.00
10.45 4,180.00
9.51 951
42.01 4,201.00
37.89 7,578.00
300.41

90,123.00

260.72

26,072.00

363.79

1,382,402.00

315.64

378,768.00

Bill No. 3 -The Huaura Diversion


Bill 3.2 Huaura Diversion Tunnel
Item

Bill No. 3 -The Huaura Div


Bill 3.2 Huaura Diversion T
Description

Item

3.2.04.31
3.2.04.32

Supply of rebars for ribs of reinforced shotcrete .


Installation of ribs of reinforced shotcrete. At the face.

3.2.04.31
3.2.04.32

3.2.04.33

Installation of ribs of reinforced shotcrete. Behind the face.

3.2.04.33

3.2.04.34
3.2.04.35

Prefabrication and supply of lattice girders.


Installation of lattice girders for ribs of shotcrete. At the face.

3.2.04.34
3.2.04.35

3.2.04.36

Installation of lattice girders for ribs of shotcrete. Behind the face.

3.2.04.36

3.2.04.37

Concrete lining. Behind the face.

3.2.04.37

3.2.04.38

Additional concrete. Behind the face.

3.2.04.38

3.2.04.39
3.2.04.40

Formwork for concrete lining, Class C


Invert concrete. At the face.

3.2.04.39
3.2.04.40

3.2.04.41

Invert concrete. Behind the face.

3.2.04.41

3.2.04.42
3.2.04.43

Reinforcement of roof and/or walls


Reinforcement of invert. At or behind the face

3.2.04.42
3.2.04.43

3.2.05.0
3.2.05.01
3.2.05.02
3.2.05.03

INVESTIGATION AND INSTRUMENTATION.


Investigation and testing underground. Down time.
Core drilling. Set-up at each drilling location.
Core drilling, diameter minimum 76 mm. Depth 0-30 m

3.2.05.0
3.2.05.01
3.2.05.02
3.2.05.03

3.2.05.04

Core drilling, diameter minimum 76 mm. Depth 30-100 m

3.2.05.04

3.2.05.05
3.2.05.06

Core drilling. Hole stabilisation. Cement grouting.


Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m

3.2.05.05
3.2.05.06

3.2.05.07

Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m

3.2.05.07

3.2.05.08
3.2.05.09
3.2.05.10

Lugeon tests
Convergence station. Max. 3 pins.
Multipoint borehole extensometer.

3.2.05.08
3.2.05.09
3.2.05.10

3.2.06.0
3.2.06.01
3.2.06.02
3.2.06.03
3.2.06.04
3.2.06.05
3.2.06.06

CONCRETE WORKS.
Formwork Class B. Plain.
Formwork Class B. Curved.
Finishing of concrete surfaces, Class UA
Concrete Class C.
Reinforcement. Deformed bars.
Concrete pavement. Concrete Class B. Thickness minimum 150 mm. Reiforcement mesh min 6.5 kg/m2

3.2.06.0
3.2.06.01
3.2.06.02
3.2.06.03
3.2.06.04
3.2.06.05
3.2.06.06

Sum

Bill 3.2 Huaura Diversion Tunnel

Sum

Bill No. 3 -The Huaura Diversion


Bill 3.2 Huaura Diversion Tunnel
Description

Unit

Quantity

Supply of rebars for ribs of reinforced shotcrete .


Installation of ribs of reinforced shotcrete. At the face.

kg
m

27,000.00
1,100.00

Installation of ribs of reinforced shotcrete. Behind the face.

700

Prefabrication and supply of lattice girders.


Installation of lattice girders for ribs of shotcrete. At the face.

kg
m

7,500.00
200

Installation of lattice girders for ribs of shotcrete. Behind the face.

100

Concrete lining. Behind the face.

m3

320

Additional concrete. Behind the face.

m3

Formwork for concrete lining, Class C


Invert concrete. At the face.

m2
m3

500
200

Invert concrete. Behind the face.

m3

200

Reinforcement of roof and/or walls


Reinforcement of invert. At or behind the face

kg
kg

20,000.00
25,000.00

INVESTIGATION AND INSTRUMENTATION. Investigacion e instrumentacion


Investigation and testing underground. Down time.
Core drilling. Set-up at each drilling location.
Core drilling, diameter minimum 76 mm. Depth 0-30 m

hr
no
m

60
2
90

Core drilling, diameter minimum 76 mm. Depth 30-100 m

80

kg

30

Core drilling. Hole stabilisation. Cement grouting.


Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m

no

500
4.00

Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m

no

4.00

Lugeon tests
Convergence station. Max. 3 pins.
Multipoint borehole extensometer.

no
no
no

CONCRETE WORKS. OBRAS DE CONCRETO


Formwork Class B. Plain.
Formwork Class B. Curved.
Finishing of concrete surfaces, Class UA
Concrete Class C.
Reinforcement. Deformed bars.
Concrete pavement. Concrete Class B. Thickness minimum 150 mm. Reiforcement mesh min 6.5 kg/m2

m2
m2
m2
m3
t

Bill 3.2 Huaura Diversion Tunnel : TUNEL DE DESVIO O TUNEL DE DESVIACION

8
2
2

400
300
60
80
6
2,500.00

Unit Price
USD

Total Price
USD
1.8 48,600.00
18.87 20,757.00
13.7 9,590.00
3.2 24,000.00
71.17 14,234.00
59.43 5,943.00

190.04

60,812.80

190.04

5,701.20

136.53
100.41

68,265.00
20,082.00
99.56 19,912.00
2.31 46,200.00
2.4 60,000.00

605
1,108.00
125.06

36,300.00
2,216.00
11,255.40

171.84

13,747.20

115.56

1.01 505
462.24

135.56

542.24

1,440.00
3,269.62
7,612.00

11,520.00
6,539.24
15,224.00

142.91
1,459.67
138.00

67.26 26,904.00
96.29 28,887.00
4.2 252
11,432.80
8,758.02
345,000.00

9,624,234.24

Bill No. 4 - Checras Headworks


Bill 4.1. Dam, Intake and Sand Excluder
Item

Bill No. 4 - Checras Headw


Bill 4.1. Dam, Intake and S
Description

Item

Bill 4.1 includes portal of Headrace Tunnel


4.1.01.0
4.1.01.01
4.1.01.02
4.1.01.03
4.1.01.04

4.1.01.07
4.1.01.08
4.1.01.09
4.1.01.10

EARTHWORKS
Remove usable timber
Clearing and grubbing
Topsoil excavation
Soil excavation
a) Excavation to spoil deposit
b) Excavation to stockpile (gravel & sandy gravel)
c) Excavation for footings/structures
Preparation of rock foundation for concreting
Fill and backfill
a) Embankment fill
i) Gravel
ii) Rock
b) Structural backfill
c) High quality rockfill
d) Backfill of trenches
e) Low permeability fill
f) Filter material, 0 - 60 mm
g) Drainage material, 50 - 100 mm
Placing of topsoil
Turfing (optional)
Not Used.
Additional borings

4.1.02.0
4.1.02.01

SHEET PILING AND JET GROUTING


4.1.02.0
Sheet piles. Minimum resistive moment: 1800 cm3/m. Type of sheet pile proposed by tenderer:Type Larseen,weight 100 kg/m2.Adjustment
4.1.02.01
rate for other type 3.70 USD/kg

4.1.02.02
4.1.02.03

Steel pipes , 100 mm, welded on pile


Rock bolts, 40 mm and minimum length 3 m, included drilling ( 50 mm) and placement

4.1.02.02
4.1.02.03

4.1.02.04

Steel support beam, tentative type: 2 no UNP 300, weight 100 kg/m Adjustment rate for other type: 3.50 USD/kg

4.1.02.04

4.1.02.05

Self drilling soil anchor (type Ischebeck Titan 52/ 20 or similar), fully grouted

4.1.02.05

4.1.02.06

a) Number of Anchors
b) Total length of Anchors
Load testing, prestressing, fixing of steel beam and other works not covered by previous bills

4.1.02.06

4.1.03.0
4.1.03.01

ROCK EXCAVATION
Excavation of the right abutment and foundation for the intake structure, left abutment, desander and intake

4.1.03.0
4.1.03.01

4.1.03.02
4.1.03.03

a) Bulk excavation
b) Trench/ditch excavation
Contour boreholes
Above ground. Rock excavation. Abnormal overbreak.

4.1.03.02
4.1.03.03

4.1.01.05
4.1.01.06

4.1.04.0

4.1.01.0
4.1.01.01
4.1.01.02
4.1.01.03
4.1.01.04

4.1.01.05
4.1.01.06

4.1.01.07
4.1.01.08
4.1.01.09
4.1.01.10

4.1.04.01

GROUND TESTING AND GROUTING, ROCK SUPPORT


Rock support at tunnel portal Headrace Tunnel, included in bill 5.3
Percussion drilling, diameter minimum 50 mm, depths up to 30 m in rock/concrete

4.1.04.02
4.1.04.03

Rotary drilling, diameter minimum 76 mm, in rock/concrete, depths to 15 m


4.1.04.02
Rotary drilling with casing, diameter 76 mm, in soil or combined soil / rock, drilled from surface or from bottom of steel pipes welded
4.1.04.03
to the sheet pile wall

4.1.04.04
4.1.04.05
4.1.04.06
4.1.04.07

Extra over 4.1.04.01 to 4.1.04.03 for sloping holes


Water pressure testing, per packer
Cement pressure grouting, per packer setting
Cement grouting: Cement consumption per packer setting, Type B
a) 0 - 100 kg
b) 0 - 200 kg
c) 0 - 300 kg
d) 0 - 500 kg
e) More than 500 kg
f) Alkali silicate
Chemical grouting
Type of grout: Epoxy

4.1.04.04
4.1.04.05
4.1.04.06
4.1.04.07

Grouted rock bolts. D = 32 mm


a) Length 2.0 m
b) Length 3.0 m
c) Length 4.0 m
d) Length 6.0 m

4.1.04.09

4.1.04.08
4.1.04.09

4.1.04.0
4.1.04.01

4.1.04.08

e) Length 8.0 m
f) Length 10.0 m

Bill No. 4 - Checras Headworks


Bill 4.1. Dam, Intake and Sand Excluder
Description

Unit

Quantity

Bill 4.1 includes portal of Headrace Tunnel


EARTHWORKS: MOVIENTOS DE TIERRA
Remove usable timber
Clearing and grubbing
Topsoil excavation
Soil excavation
a) Excavation to spoil deposit
b) Excavation to stockpile (gravel & sandy gravel)
c) Excavation for footings/structures
Preparation of rock foundation for concreting
Fill and backfill
a) Embankment fill
i) Gravel
ii) Rock
b) Structural backfill
c) High quality rockfill
d) Backfill of trenches
e) Low permeability fill
f) Filter material, 0 - 60 mm
g) Drainage material, 50 - 100 mm
Placing of topsoil
Turfing (optional)
Not Used.
Additional borings

no
ha
m3

20
5
250

m3
m3
m3
m2

200,000.00
8,000.00
4,000.00
1,000.00

m3
m3
m3
m3
m3
m3
m3
m3
m2
m2

5,000.00
18,000.00
4,500.00
18,000.00
700
500
500
700
700
350

no

SHEET PILING AND JET GROUTING


Sheet piles. Minimum resistive moment: 1800 cm3/m. Type of sheet pile proposed by tenderer:Type Larseen,weight
m2
100 kg/m2.Adjustment
1,120.00
rate for other type 3.70 USD/kg

Steel pipes , 100 mm, welded on pile


Rock bolts, 40 mm and minimum length 3 m, included drilling ( 50 mm) and placement

m
no

Steel support beam, tentative type: 2 no UNP 300, weight 100 kg/m Adjustment rate for other type: 3.50 USD/kg

550
20
80

Self drilling soil anchor (type Ischebeck Titan 52/ 20 or similar), fully grouted
a) Number of Anchors
b) Total length of Anchors
Load testing, prestressing, fixing of steel beam and other works not covered by previous bills

no
m
LS

200

20

m3
m3
m
m3

15,000.00
400
900
800

ROCK EXCAVATION: EXCAVACION DE ROCAS


Excavation of the right abutment and foundation for the intake structure, left abutment, desander and intake
a) Bulk excavation
b) Trench/ditch excavation
Contour boreholes
Above ground. Rock excavation. Abnormal overbreak.

GROUND TESTING AND GROUTING, ROCK SUPPORT: PRUEBAS DE SUELO, CEMENTACIN Y SOPORTE EN ROCA
Rock support at tunnel portal Headrace Tunnel, included in bill 5.3
Percussion drilling, diameter minimum 50 mm, depths up to 30 m in rock/concrete
m

600

Rotary drilling, diameter minimum 76 mm, in rock/concrete, depths to 15 m


m
350
Rotary drilling with casing, diameter 76 mm, in soil or combined soil / rock, drilled from surface or from bottom
mof steel pipes welded
800.00 to the sheet pile wall

Extra over 4.1.04.01 to 4.1.04.03 for sloping holes


Water pressure testing, per packer
Cement pressure grouting, per packer setting
Cement grouting: Cement consumption per packer setting, Type B
a) 0 - 100 kg
b) 0 - 200 kg
c) 0 - 300 kg
d) 0 - 500 kg
e) More than 500 kg
f) Alkali silicate
Chemical grouting
Type of grout: Epoxy
Grouted rock bolts. D = 32 mm
a) Length 2.0 m
b) Length 3.0 m
c) Length 4.0 m
d) Length 6.0 m

m
no
no

100

kg
kg
kg
kg
kg
l
l

9,000.00
6,000.00
4,000.00
4,000.00
3,000.00
500
200

no
no
no
no

130

30
130

80
60
40

e) Length 8.0 m
f) Length 10.0 m

no
no

20
20

Unit Price
USD

105.23
9,990.00

Total Price
USD

2,104.60
49,950.00
3.34 835
3.38
3.38
3.38
3.59

676,000.00
27,040.00
13,520.00
3,590.00

22.43
17.21
15.92
23.68
14.89
16.76
25.96
26.49
0.32
0.32

112,150.00
309,780.00
71,640.00
426,240.00
10,423.00
8,380.00
12,980.00
18,543.00
224
112

8,653.00

34,612.00

689.07

771,758.40

161.85

54.35 29,892.50
3,237.00

716.48

57,318.40

131.27

2,625.40
3.1 620
12,214.00

12,214.00

18.92
20.37
17.98
14.2

283,800.00
8,148.00
16,182.00
11,360.00

15.58 9,348.00

63.40

63.4 22,190.00
50,720.00

119.42
129.12

63.4 6,340.00
3,582.60
16,785.60
0.88
1.05
1.27
1.63
2.61
2.5
23.71

102.26

7,920.00
6,300.00
5,080.00
6,520.00
7,830.00
1,250.00
4,742.00

56.9 7,397.00
68.24 5,459.20
79.57 4,774.20
4,090.40

129.48
161.85

2,589.60
3,237.00

Bill No. 4 - Checras Headworks


Bill 4.1. Dam, Intake and Sand Excluder
Item

Bill No. 4 - Checras Headw


Bill 4.1. Dam, Intake and S
Description

Item

4.1.05.0
4.1.05.01

DRAINAGE AND EROSION PROTECTION


Erosion protection with crushed rock 50 - 200 mm
Min. thickness 300 mm

4.1.05.0
4.1.05.01

4.1.05.02

Rip-rap
a) Stone size 150 - 300 mm
b) Stone size 300 - 600 mm
c) Selected blocks > 600 mm
d) Grouted Rip rap
Filter fabric
a) Minimum 180 g/m2
b) Minimum 250 g/m2
c) Minimum 300 g/m2
Drilling of weep holes, vertical or sloping holes. Diameter min. 51 mm

4.1.05.02

Excavation of permanent ditches and catchwater drains


Reinforced concrete drain pipes including bends and tees. Internal diameter:
a) 150 mm
b) 200 mm
Prefabricated plastic mesh for slope protection.

4.1.05.05
4.1.05.06

CONCRETE WORKS
Grouted rock bolts. D = 25 mm
Length in concrete 1.5 m

4.1.06.0
4.1.06.01

4.1.05.03

4.1.05.04
4.1.05.05
4.1.05.06

4.1.05.07
4.1.06.0
4.1.06.01

4.1.06.02

4.1.06.03

4.1.06.04

4.1.06.05

4.1.06.06

4.1.06.07

4.1.06.08

4.1.06.09
4.1.06.10

a) Depth in rock 2.0 m


b) Depth in rock 3.0 m
c) Depth in rock 4.0 m
Grouted rock bolts. D = 32 mm
Length in concrete 1.5 m
a) Depth in rock 2.0 m
b) Depth in rock 3.0 m
c) Depth in rock 4.0 m
d) Depth in rock 6.0 m
Formwork Class A. Plain.
a) Diversion tunnel outlet structure,
b) Dam, gravity section and right abutment
c) Dam, gate section
d) Intake block and left abutment
e) Sand Excluders
f) Forebay and headrace intake
g) Gate houses
h) Bridge piers and deck
Formwork Class A. Curved
a) Diversion tunnel outlet structure, overflow section
b) Dam, gravity section, spillway, bridge pilars
c) Dam, gate section, piers, flapgate
d) Intake block,
e) Forebay and headrace intake
Formwork Class B. Plain.
a) Diversion tunnel outlet structure,
b) Dam, gravity section and right abutment
c) Dam, gate section
d) Intake block and left abutment
e) Sand Excluders
f) Forebay and headrace intake
g) Gate houses
h) Bridge piers and deck
Formwork Class C.
a) Diversion tunnel outlet structure,
b) Diversion canal between diversion tunnel and gravity dam
c) Dam, gravity section and right abutment
d) Dam, gate section
e) Intake block and left abutment
f) Sand Excluders
g) Forebay and headrace intake
h) Construction and expansion joints incl. shear keys
i) Culverts, ducts
Grooves
a) Triangular, drip throats, 25 mm
b) Rectangular, for sealing of roofing
Rectangular voids
a) Cross-section not exceeding 0.1 m2
b) Cross-section 0.1 - 0.5 m2
c) Formwork for concreting of voids. Class according to adjacent surface
Shear keys in construction joints
PVC waterstops

4.1.05.03

4.1.05.04

4.1.05.07

4.1.06.02

4.1.06.03

4.1.06.04

4.1.06.05

4.1.06.06

4.1.06.07

4.1.06.08

4.1.06.09
4.1.06.10

4.1.06.11

a) 150 mm wide
b) 225 mm wide
c) 300 mm wide
d) 500 mm wide
Grouting of joints and interphases
a) Supply and installation of tubes

4.1.06.11

Bill No. 4 - Checras Headworks


Bill 4.1. Dam, Intake and Sand Excluder
Description

DRAINAGE AND EROSION PROTECTION DRENAJE Y PROTECCIN A LA EROSIN


Erosion protection with crushed rock 50 - 200 mm
Min. thickness 300 mm

Unit

Quantity

m3

1,700.00

m3
m3
m3
m3

1,800.00
2,100.00
2,100.00
200

m2
m2
m2
m

3,400.00
700
500
300

m3

200

m
m
m2

300
100
400

a) Depth in rock 2.0 m


b) Depth in rock 3.0 m
c) Depth in rock 4.0 m
Grouted rock bolts. D = 32 mm
Length in concrete 1.5 m

no
no
no

150
150

a) Depth in rock 2.0 m


b) Depth in rock 3.0 m
c) Depth in rock 4.0 m
d) Depth in rock 6.0 m
Formwork Class A. Plain.
a) Diversion tunnel outlet structure,
b) Dam, gravity section and right abutment
c) Dam, gate section
d) Intake block and left abutment
e) Sand Excluders
f) Forebay and headrace intake
g) Gate houses
h) Bridge piers and deck
Formwork Class A. Curved
a) Diversion tunnel outlet structure, overflow section
b) Dam, gravity section, spillway, bridge pilars
c) Dam, gate section, piers, flapgate
d) Intake block,
e) Forebay and headrace intake
Formwork Class B. Plain.
a) Diversion tunnel outlet structure,
b) Dam, gravity section and right abutment
c) Dam, gate section
d) Intake block and left abutment
e) Sand Excluders
f) Forebay and headrace intake
g) Gate houses
h) Bridge piers and deck
Formwork Class C.
a) Diversion tunnel outlet structure,
b) Diversion canal between diversion tunnel and gravity dam
c) Dam, gravity section and right abutment
d) Dam, gate section
e) Intake block and left abutment
f) Sand Excluders
g) Forebay and headrace intake
h) Construction and expansion joints incl. shear keys
i) Culverts, ducts
Grooves
a) Triangular, drip throats, 25 mm
b) Rectangular, for sealing of roofing
Rectangular voids
a) Cross-section not exceeding 0.1 m2
b) Cross-section 0.1 - 0.5 m2
c) Formwork for concreting of voids. Class according to adjacent surface
Shear keys in construction joints
PVC waterstops

no
no
no
no

100
150

m2
m2
m2
m2
m2
m2
m2
m2

800
2,300.00
3,000.00
1,000.00
2,000.00
600
250
400

m2
m2
m2
m2
m2

100
680
300

m2
m2
m2
m2
m2
m2
m2
m2

900
2,700.00
700
900
7,500.00
1,300.00
280
470

m2
m2
m2
m2
m2
m2
m2
m2
m2

110
440
4,000.00
2,900.00
1,360.00
4,460.00
1,500.00
730
530

Rip-rap
a) Stone size 150 - 300 mm
b) Stone size 300 - 600 mm
c) Selected blocks > 600 mm
d) Grouted Rip rap
Filter fabric
a) Minimum 180 g/m2
b) Minimum 250 g/m2
c) Minimum 300 g/m2
Drilling of weep holes, vertical or sloping holes. Diameter min. 51 mm
Excavation of permanent ditches and catchwater drains
Reinforced concrete drain pipes including bends and tees. Internal diameter:
a) 150 mm
b) 200 mm
Prefabricated plastic mesh for slope protection.
CONCRETE WORKS OBRAS DE CONCRETO
Grouted rock bolts. D = 25 mm
Length in concrete 1.5 m

m
m
no
no
m2
m

30

20
20

50
10

500
50
15
30
20
200

a) 150 mm wide
b) 225 mm wide
c) 300 mm wide
d) 500 mm wide
Grouting of joints and interphases
a) Supply and installation of tubes

m
m
m
m

200
2,100.00
100
100

500

Unit Price
USD

Total Price
USD

18.08 30,736.00

129.62

20.01 36,018.00
20.04 42,084.00
20.43 42,903.00
25,924.00
6.41
6.66
7.01
15.58

21,794.00
4,662.00
3,505.00
4,674.00

3.41 682
24.32 7,296.00
33.28 3,328.00
14.49 5,796.00

66.07 9,910.50
77.22 11,583.00
88.36 2,650.80

102.26
129.48

68.24 6,824.00
79.57 11,935.50
2,045.20
2,589.60
53.95
53.95
53.95
53.95
53.95
53.95
53.95
53.95

43,160.00
124,085.00
161,850.00
53,950.00
107,900.00
32,370.00
13,487.50
21,580.00

73.51
73.51
73.51
73.51
73.51

7,351.00
49,986.80
22,053.00
3,675.50
735.1

53.99
53.99
53.99
53.99
53.99
53.99
53.99
53.99

48,591.00
145,773.00
37,793.00
48,591.00
404,925.00
70,187.00
15,117.20
25,375.30

51.55
51.55
51.55
51.55
51.55
51.55
51.55
51.55
51.55

5,670.50
22,682.00
206,200.00
149,495.00
70,108.00
229,913.00
77,325.00
37,631.50
27,321.50

33.5 16,750.00
34.25 1,712.50
26.7
26.7
53.95
22.63

400.5
801
1,079.00
4,526.00

15.27
24.93
30.31
47.44

3,054.00
52,353.00
3,031.00
4,744.00

3.67 1,835.00

Bill No. 4 - Checras Headworks


Bill 4.1. Dam, Intake and Sand Excluder
Item

4.1.06.12
4.1.06.13
4.1.06.14
4.1.06.15
4.1.06.16

4.1.06.17

Bill No. 4 - Checras Headw


Bill 4.1. Dam, Intake and S
Description

b) Cement grouting
c) Chemical grouting
Type proposed by tenderer:
Bituminous coating on concrete surface
Joint sealing compound.
Steel details in bridge expansion joints (dam piers). Hot dip galvanized.
Preparation of contraction joints.
Reinforcement. All dimensions
a) Deformed bars, 420 N/mm2
b) Plain bars
c) Welded mesh reinforcement
Deformed steel bars of weldable quality for fixing hydraulic steelwork such as steel lining, gate guides, etc.
Length approx .2.0 m Partly embedded

4.1.06.20
4.1.06.21

a) D = 20 mm
b) D = 25 mm
c) D = 32 mm
a) Stainless steel bars. D = 32 mm
b) Stainless steel bars. D = 25 mm
Embedded PVC-pipes including bends and fixtures
a) D = 50 mm
b) D = 75 mm
c) D = 100 mm
d) D = 150 mm
e) D = 200 mm
Embedded cast-iron floor gullies with hot dip galvanized steel cover
Steel angle section 100 x 100 with anchoring c/c 300 mm, embedded in first stage concrete

4.1.06.22
4.1.06.23
4.1.06.24

Step iron partly embedded in concrete


Guides and sills for stop logs embeded in concrete
Neoprene bridge bearings max. vertical load 1,500 kN

4.1.06.18
4.1.06.19

4.1.06.25

4.1.06.26

4.1.06.27

4.1.06.28
4.1.06.29

4.1.06.30
4.1.06.31

Type and details to be proposed by Contractor:


Concrete Class A
a) Dam, gravity section and right abutment
b) Dam, gate section
c) Intake block and left abutment
Concrete Class B
a) Gate houses
b) Culverts, ducts
Concrete Class C
a) Diversion tunnel outlet structure,
b) Diversion canal between diversion structure and main dam
c) Dam, gravity section and right abutment
d) Dam, gate section
e) Intake block and left abutment
f) Sand Excluders
g) Forebay and headrace intake
h) Gate houses
i) Bridge piers
j) Erosion protection slabs
k) Culverts, ducts
l) Retaining walls
Concrete Class D
a) Bridge deck
Concrete Class E
Gate openings, floor and lower parts of piers and walls and erosion protection slab.

Item

4.1.06.12
4.1.06.13
4.1.06.14
4.1.06.15
4.1.06.16

4.1.06.17

4.1.06.18
4.1.06.19

4.1.06.20
4.1.06.21
4.1.06.22
4.1.06.23
4.1.06.24

4.1.06.25

4.1.06.26

4.1.06.27

4.1.06.28
4.1.06.29

4.1.06.30
4.1.06.31

4.1.06.32
4.1.06.33

Concrete Class F
Finishing of unformed surfaces
a) Class UA
b) Class UB, curved surfaces
c) Class UB, plane surfaces
d) Class UC
Blockout for and grouting of fence posts in concrete slabs
Grouting around hydraulic steelworks with expanding mortar. Incl. plant positioning

4.1.06.34

Grouting of construction joints with chemical-based grout as approved by the Engineer. Incl. plant positioning.

4.1.06.34

4.1.06.35

Grouting of construction joints with cement based grout. Incl. plant positioning

4.1.06.35

4.1.06.36

Sandblasting of concrete surfaces

4.1.06.36

4.1.06.32
4.1.06.33

Bill No. 4 - Checras Headworks


Bill 4.1. Dam, Intake and Sand Excluder
Description

Unit

b) Cement grouting
c) Chemical grouting
Type proposed by tenderer:
Bituminous coating on concrete surface
Joint sealing compound.
Steel details in bridge expansion joints (dam piers). Hot dip galvanized.
Preparation of contraction joints.
Reinforcement. All dimensions
a) Deformed bars, 420 N/mm2
b) Plain bars
c) Welded mesh reinforcement
Deformed steel bars of weldable quality for fixing hydraulic steelwork such as steel lining, gate guides, etc.
Length approx .2.0 m Partly embedded

Quantity

kg
l

500
200

m2
kg
kg
m2

300
400
550
1,200.00

t
t
t

2,900.00
2
5

a) D = 20 mm
b) D = 25 mm
c) D = 32 mm
a) Stainless steel bars. D = 32 mm
b) Stainless steel bars. D = 25 mm
Embedded PVC-pipes including bends and fixtures
a) D = 50 mm
b) D = 75 mm
c) D = 100 mm
d) D = 150 mm
e) D = 200 mm
Embedded cast-iron floor gullies with hot dip galvanized steel cover
Steel angle section 100 x 100 with anchoring c/c 300 mm, embedded in first stage concrete

no
no
no
no
no

Step iron partly embedded in concrete


Guides and sills for stop logs embeded in concrete
Neoprene bridge bearings max. vertical load 1,500 kN

no
kg
no

500

m3
m3
m3

15,000.00
2,000.00
1,000.00

m3
m3

350

Type and details to be proposed by Contractor:


Concrete Class A
a) Dam, gravity section and right abutment
b) Dam, gate section
c) Intake block and left abutment
Concrete Class B
a) Gate houses
b) Culverts, ducts
Concrete Class C
a) Diversion tunnel outlet structure,
b) Diversion canal between diversion structure and main dam
c) Dam, gravity section and right abutment
d) Dam, gate section
e) Intake block and left abutment
f) Sand Excluders
g) Forebay and headrace intake
h) Gate houses
i) Bridge piers
j) Erosion protection slabs
k) Culverts, ducts
l) Retaining walls
Concrete Class D
a) Bridge deck
Concrete Class E
Gate openings, floor and lower parts of piers and walls and erosion protection slab.
Concrete Class F
Finishing of unformed surfaces
a) Class UA
b) Class UB, curved surfaces
c) Class UB, plane surfaces
d) Class UC
Blockout for and grouting of fence posts in concrete slabs
Grouting around hydraulic steelworks with expanding mortar. Incl. plant positioning

m
m
m
m
m
no
kg

50
300
200
30
40
50
50
100
50
50
4
300
50
16

90

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

315
1,050.00
11,700.00
5,900.00
4,800.00
9,120.00
2,370.00

m3

110

m3

780

m3

400

m2
m2
m2
m2
no
l

5,000.00
600
4,000.00
500
140
100

30
250
4,100.00
240
1,000.00

Grouting of construction joints with chemical-based grout as approved by the Engineer. Incl. plant positioning.

Grouting of construction joints with cement based grout. Incl. plant positioning

200

m2

100

Sandblasting of concrete surfaces

50

Unit Price
USD

Total Price
USD
1.01 505
2.5 500
6.2
18.25
10.52
6.07

1,459.67
1,459.67
2,812.50

1,860.00
7,300.00
5,786.00
7,284.00
4,233,043.00
2,919.34
14,062.50

8.05
11.14
17.63
27.28
17.95

402.5
3,342.00
3,526.00
818.4
718

5.45
7.15
8.92
16.9
25.92
123.23

856.23

272.5
357.5
892
845
1,296.00
492.92
7.41 2,223.00

15.71 785.5
7.41 3,705.00
13,699.68

117.83
117.83
117.83

1,767,450.00
235,660.00
117,830.00

124.99
124.99

11,249.10
43,746.50

127.78
127.78
127.78
127.78
127.78
127.78
127.78
127.78
127.78
127.78
127.78
127.78

40,250.70
134,169.00
1,495,026.00
753,902.00
613,344.00
1,165,353.60
302,838.60
3,833.40
31,945.00
523,898.00
30,667.20
127,780.00

160.77

17,684.70

163.15

127,257.00

133.53

53,412.00
4.2
4.65
4.65
4.85
48.2
30.95

21,000.00
2,790.00
18,600.00
2,425.00
6,748.00
3,095.00

30.95 1,547.50
30.95 6,190.00
10.64 1,064.00

Bill No. 4 - Checras Headworks


Bill 4.1. Dam, Intake and Sand Excluder
Item

4.1.07.0

Bill No. 4 - Checras Headw


Bill 4.1. Dam, Intake and S
Description

INTERFACE WITH H, EMBEDMENT OF HYDRAULIC STEELWORKS

Item

4.1.07.0

Reference H-tender documents, Part D, Section 2


This item shall include all works related to forming of recesses, blockouts and the like to divide between
first and second step concreting, provision and removal of shuttering for items to be embedded, extra over
for embedment and second stage
concreting and the like, for hydraulic steelworks as listed below. The concrete volumes and concrete
reinforcement are catered for under Concrete Works.

4.1.07.01
4.1.07.02
4.1.07.03
4.1.07.04
4.1.07.05
4.1.07.06
4.1.07.07
4.1.07.08
4.1.07.09
4.1.07.10
4.1.07.11
4.1.07.12
4.1.07.13
4.1.07.14
4.1.07.15

Diversion Tunnel Outlet Gate


Coarse Trash Rack, Inlet of Diversion Duct
Flood Flushing Gates
Stop Logs, Flood Flushing Gates
Trash Flushing Gate
Intake Trash Rack
Trash Rack Cleaner
Intake Gates
Under-sluicing Gates / Minimum Flow Gates and Steel Linings
Diversion Conduite Gates
Flow Tranquilizers
Sand Excluder Flushing Gates
Sand Excluder Outlet Gates
Coarse Trash Rack, Headrace Tunnel Inlet
Stop Log Guides Tunnel Entrance

4.1.07.01
4.1.07.02
4.1.07.03
4.1.07.04
4.1.07.05
4.1.07.06
4.1.07.07
4.1.07.08
4.1.07.09
4.1.07.10
4.1.07.11
4.1.07.12
4.1.07.13
4.1.07.14
4.1.07.15

4.1.08.0
4.1.08.01

BUILDER'S WORKS
Blockwork Walling
a) 150 mm
b) 100 mm
Roofing membrane
Doors
a) Insulated single steel doors. Fire rating A60. External dimensions 1000x2100mm

4.1.08.0
4.1.08.01

4.1.08.02
4.1.08.03

4.1.08.02
4.1.08.03

b) Insulated double steel doors. Fire rating A60. External dimensions 1600x2100mm
c) Insulated double steel doors. Fire rating A60. External dimensions 2200x2200mm

4.1.08.04

4.1.08.05

4.1.08.06

d) Single interior timber doors. External opening 900 x 2100 mm


Windows
a) Aluminium window with fixed panes Size 1000 x 1200 mm
b) Louvred aluminium ventilation grilles with aluminium frame and insect screen size
500 x 400 mm
c) Glazing 5 mm float glass and glazing in panes of any size.
Floor, Wall and Ceiling Finishes
a) Ceramic floor tiles
b) Ceramic wall tiles
c) Vinyl floor
d) Plastering on walls
Painting and decorating. Painting of:
a) Internal metalwork or steelwork
b) Galvanized metalwork
c) External surfaces of steelwork
d) External concrete surfaces
e) Internal plastered or concrete surfaces
Walls

4.1.08.04

4.1.08.05

4.1.08.06

f) Internal plastered or concrete surfaces, Ceilings


g) Concrete floors with moderate loads. Epoxy,Type Sherwin Williams poly-cote 4685
h) Concrete floors with heavy loads, including battery rooms. Self levelling epoxy,Type
Sherwin Williams poly-cote 4685
4.1.09.0
4.1.09.01
4.1.09.02
4.1.09.03

4.1.09.04

4.1.10.0
4.1.10.01

INVESTIGATION AND INSTRUMENTATION


Electric piezometer. Measuring device
Electric piezometer, piping
Surface settlement monuments
a)Foundation on rock
b) Foundation on soil
Surface settlement fixed point
a)Foundation on rock
b) Foundation on soil

4.1.09.0
4.1.09.01
4.1.09.02
4.1.09.03

MISCELLANEOUS WORKS
Light duty hatch cover

4.1.10.0
4.1.10.01

4.1.09.04

4.1.10.02

Heavy duty hatch cover incl. fittings with concrete, Class C and surface finishing

4.1.10.02

4.1.10.03
4.1.10.04
4.1.10.05

Heavy duty cast iron grating for drainage gutters


Light duty duct cover
Heavy duty duct cover

4.1.10.03
4.1.10.04
4.1.10.05

Bill No. 4 - Checras Headworks


Bill 4.1. Dam, Intake and Sand Excluder
Description

Unit

Quantity

INTERFACE WITH H, EMBEDMENT OF HYDRAULIC STEELWORKS SISTEMA DE COMUNICACIN CON H, INTEGRACION DE ESTRUCCTURAS HIDRAULICAS DE ACERO.
Reference H-tender documents, Part D, Section 2
This item shall include all works related to forming of recesses, blockouts and the like to divide between
first and second step concreting, provision and removal of shuttering for items to be embedded, extra over
for embedment and second stage
concreting and the like, for hydraulic steelworks as listed below. The concrete volumes and concrete
reinforcement are catered for under Concrete Works.

Diversion Tunnel Outlet Gate


Coarse Trash Rack, Inlet of Diversion Duct
Flood Flushing Gates
Stop Logs, Flood Flushing Gates
Trash Flushing Gate
Intake Trash Rack
Trash Rack Cleaner
Intake Gates
Under-sluicing Gates / Minimum Flow Gates and Steel Linings
Diversion Conduite Gates
Flow Tranquilizers
Sand Excluder Flushing Gates
Sand Excluder Outlet Gates
Coarse Trash Rack, Headrace Tunnel Inlet
Stop Log Guides Tunnel Entrance

LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

BUILDER'S WORKS: ACABADOS DE CONSTRUCCION


Blockwork Walling
a) 150 mm
b) 100 mm
Roofing membrane
Doors
a) Insulated single steel doors. Fire rating A60. External dimensions 1000x2100mm

m2
m2
m2

90
30

no

b) Insulated double steel doors. Fire rating A60. External dimensions 1600x2100mm

no

c) Insulated double steel doors. Fire rating A60. External dimensions 2200x2200mm

no

d) Single interior timber doors. External opening 900 x 2100 mm


Windows
a) Aluminium window with fixed panes Size 1000 x 1200 mm
b) Louvred aluminium ventilation grilles with aluminium frame and insect screen size
500 x 400 mm

no

no
no

6
5

c) Glazing 5 mm float glass and glazing in panes of any size.


Floor, Wall and Ceiling Finishes
a) Ceramic floor tiles
b) Ceramic wall tiles
c) Vinyl floor
d) Plastering on walls
Painting and decorating. Painting of:
a) Internal metalwork or steelwork
b) Galvanized metalwork
c) External surfaces of steelwork
d) External concrete surfaces
e) Internal plastered or concrete surfaces
Walls

m2

m2
m2
m2
m2

30
30
15

m2
m2
m2
m2
m2

200
340

f) Internal plastered or concrete surfaces, Ceilings

m2

150

g) Concrete floors with moderate loads. Epoxy,Type Sherwin Williams poly-cote 4685

m2

100

h) Concrete floors with heavy loads, including battery rooms. Self levelling epoxy,Type
Sherwin Williams poly-cote 4685

m2

INVESTIGATION AND INSTRUMENTATION: INVESTIGACION E INSTRUMENTACION


Electric piezometer. Measuring device
Electric piezometer, piping
Surface settlement monuments
a)Foundation on rock
b) Foundation on soil
Surface settlement fixed point
a)Foundation on rock
b) Foundation on soil
MISCELLANEOUS WORKS: OBRAS DIVERSAS
Light duty hatch cover

no
m

155

200
40
10
40

40

10
250

no
no

4
6

no
no

3
4

kg

100

Heavy duty hatch cover incl. fittings with concrete, Class C and surface finishing

kg

500

Heavy duty cast iron grating for drainage gutters


Light duty duct cover
Heavy duty duct cover

kg
kg
kg

150
400
15,000.00

Unit Price
USD

Total Price
USD

ESTRUCCTURAS HIDRAULICAS DE ACERO.

3,681.70
2,577.19
13,990.46
12,149.61
1,104.51
6,258.89
736.34
12,149.61
1,840.85
6,258.89
13,622.29
8,099.74
5,890.72
1,472.68
20,617.52

146.58

3,681.70
2,577.19
13,990.46
12,149.61
1,104.51
6,258.89
736.34
12,149.61
1,840.85
6,258.89
13,622.29
8,099.74
5,890.72
1,472.68
20,617.52

73.3 6,597.00
73.3 2,199.00
22,719.90

3,049.00

9,147.00

3,415.00

3,415.00

5,542.00

5,542.00

1,044.67

3,134.01

427.5
464

2,565.00
2,320.00

1,044.67

5,223.35
28.43
28.43
70.98
42.76

852.9
852.9
1,064.70
8,552.00

24.43
24.43
24.43
24.43
24.43

977.2
244.3
977.2
4,886.00
8,306.20

24.43 3,664.50
24.43 2,443.00
24.43 977.2

975.67

9,756.70
9.75 2,437.50

911.3
842.95

3,645.20
5,057.70

915.86
847.51

2,747.58
3,390.04

7.01 701

6.34 3,170.00
6.34 951
7.01 2,804.00
6.34 95,100.00

Bill No. 4 - Checras Headworks


Bill 4.1. Dam, Intake and Sand Excluder
Item

4.1.10.06

Bill No. 4 - Checras Headw


Bill 4.1. Dam, Intake and S
Description

Item

4.1.10.06

4.1.10.10
4.1.10.11

External railings, fixed or removable,


a) Type A
b) Type B
c) Type C
Steel ladders
Fencing, excavation and casting of individual foundation included
Fence gates, excavation for and concreting of individual foundations included
a) Double wing gate
b) Single wing gate
Preparation of subgrade level
Subbase of crushed rock (0-75 mm) Thickness min. 200 mm

4.1.10.12

Wearing course of crushed rock (0-30 mm) Thickness min. 150 mm

4.1.10.12

4.1.10.13
4.1.10.14

Double bitumenous surface treatment


Earthing electrodes
a) 1 x 95 Cu wires
b) Earthing rods, 6 m long
c) Cadwelding of joints, connections and intersections
Expanded polystyrene at bridge abutments
Thickness 50 mm

4.1.10.13
4.1.10.14

4.1.11.0
4.1.11.1

VENTILATION AND AIR CONDITIONING


Ventilation and airconditioning in the intake gate houses. Design, supply and installation.

4.1.11.0
4.1.11.1

4.1.12.0
4.1.12.1

WATER SUPPLY, PLUMBING AND SANITARY INSTALLATION AND SEWERAGE


Water supply, plumbing and sanitary installation and sewerage in the intake gate house. Design, supply and installation.

4.1.12.0
4.1.12.1

4.1.13.0
4.1.13.01

FIRE FIGHTING INSTALLATIONS


Fire fighting installations and rescue equipment.

4.1.13.0
4.1.13.01

Sum

Bill 4.1. Dam, Intake and Sand Excluder

Sum

4.1.10.07
4.1.10.08
4.1.10.09

4.1.10.15

4.1.10.07
4.1.10.08
4.1.10.09

4.1.10.10
4.1.10.11

4.1.10.15

Bill No. 4 - Checras Headworks


Bill 4.1. Dam, Intake and Sand Excluder
Description

Unit

Quantity

External railings, fixed or removable,


a) Type A
b) Type B
c) Type C
Steel ladders
Fencing, excavation and casting of individual foundation included
Fence gates, excavation for and concreting of individual foundations included
a) Double wing gate
b) Single wing gate
Preparation of subgrade level
Subbase of crushed rock (0-75 mm) Thickness min. 200 mm

no
no
m2
m3

1,450.00
290

Wearing course of crushed rock (0-30 mm) Thickness min. 150 mm

m3

220

Double bitumenous surface treatment


Earthing electrodes
a) 1 x 95 Cu wires
b) Earthing rods, 6 m long
c) Cadwelding of joints, connections and intersections
Expanded polystyrene at bridge abutments
Thickness 50 mm

m2

1,450.00

m
no
no
m2

600

VENTILATION AND AIR CONDITIONING: VENTILACION Y AIRE ACONDICIONADO


Ventilation and airconditioning in the intake gate houses. Design, supply and installation.

kg
kg
kg
kg
m

LS

10,000.00
5,000.00
1,000.00
400
150
1
1

10
80
5

WATER SUPPLY, PLUMBING AND SANITARY INSTALLATION AND SEWERAGE: SUMINISTRO DE AGUA, FONTANERIA E INSTALACION SANITARIA Y ALCANTARILLADO
Water supply, plumbing and sanitary installation and sewerage in the intake gate house. Design, supply and installation.
LS
1

FIRE FIGHTING INSTALLATIONS: INSTALACIONES CONTRA INCENDIOS


Fire fighting installations and rescue equipment.

Bill 4.1. Dam, Intake and Sand Excluder :

LS

Unit Price
USD

Total Price
USD

7.01
7.01
7.01
7.01
85.5
4,275.00
1,832.00

70,100.00
35,050.00
7,010.00
2,804.00
12,825.00

4,275.00
1,832.00
0.88 1,276.00
29.25 8,482.50
29.25 6,435.00
4.37 6,336.50

101.2
230.3

5,841.00

21.34 12,804.00
1,012.00
18,424.00
8.5

5,841.00

ALACION SANITARIA Y ALCANTARILLADO


12,922.00
12,922.00

5,841.00

5,841.00

18,301,121.12

42.5

Bill No. 5 - Headrace


Bill 5.1 Adit 1
Item

Bill No. 5 - Headrace


Bill 5.1 Adit 1
Description

Item

Rock support at portal shall be regarded and measured as support work behind the face

5.1.01.0
5.1.01.01

EARTH WORKS AND ROAD WORKS.


Gravel wearing course in tunnel and platform outside the tunnel. Thickness minimum
100 mm

5.1.01.0
5.1.01.01

5.1.02.0
5.1.02.01
5.1.02.02

5.1.02.0
5.1.02.01
5.1.02.02

5.1.02.04

EARTH WORKS.
Topsoil excavation.
Soil excavation
a) Excavation to spoil deposit
b) Excavation to stockpile (gravel & sandy gravel)
c) Excavation for footings/structures
Fill and backfill
a) Embankment fill
b) Structural backfill
c) High quality rockfill
d) Backfill of trenches
Preparation of rock foundation for concreting

5.1.03.00
5.1.03.01
5.1.03.02

ROCK EXCAVATION.
Above ground. Bulk rock excavation (width > 2 m).
Above ground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).

5.1.03.00
5.1.03.01
5.1.03.02

5.1.03.03

Above ground. Rock excavation. Abnormal overbreak.

5.1.03.03

5.1.03.04

Underground. Excavation of tunnel. Minimum cross section 30,1 m2, (6m x 5.50m)

5.1.03.04

5.1.03.05

Underground. Excavation of tunnel. Addition for increased cross-section.

5.1.03.05

5.1.03.06

Underground. Excavation of tunnel. Abnormal overbreak.

5.1.03.06

5.1.03.07

Underground. Excavation of tunnel. Addition for short blasting rounds.

5.1.03.07

5.1.02.03

5.1.03.08

a) Addition for 1/2 blasting rounds


b) Addition for 1/4 blasting rounds
Underground. Excavation of tunnel.
Addition for subdivision of cross-section into heading and benches.

5.1.02.03

5.1.02.04

5.1.03.08

5.1.03.09

Water measuring station

5.1.03.09

5.1.04.0
5.1.04.01

EXPLORATORY DRILLING AND GROUTING.


Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face

5.1.04.0
5.1.04.01

5.1.04.02

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face

5.1.04.02

5.1.04.03

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face

5.1.04.03

5.1.04.04

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face

5.1.04.04

5.1.04.05

Flushing between holes. At the face.

5.1.04.05

5.1.04.06

Flushing between holes. Behind the face.

5.1.04.06

5.1.04.07

Grouting. per packer setting. Depth 0-5 m. At the face

5.1.04.07

5.1.04.08

Grouting. per packer setting. Depth 0-5 m. Behind the face

5.1.04.08

5.1.04.09
5.1.04.10
5.1.04.11
5.1.04.12
5.1.04.13
5.1.04.14
5.1.04.15
5.1.04.16
5.1.04.17

Cement grouting. Type A. Cement consumption


Cement grouting. Type B. Cement consumption
Cement grouting. Type C. Cement consumption
Consolidation grouting.
Flexible tubes for contact grouting.
Contact grouting. Type D.
Contact grouting. Type E.
Grouting time. At the face
Grouting time. Behind the face

5.1.04.09
5.1.04.10
5.1.04.11
5.1.04.12
5.1.04.13
5.1.04.14
5.1.04.15
5.1.04.16
5.1.04.17

5.1.05.00

ROCK SUPPORT tunnel and portal.

5.1.05.00

5.1.05.01

Temporary installation for rock fall protection at portal. Contractors design

5.1.05.01

5.1.05.02

Extra scaling. At the face.

5.1.05.02

5.1.05.03

Extra scaling. Behind the face.

5.1.05.03

5.1.05.04

Invert cleaning and scaling. Behind the face.

5.1.05.04

5.1.05.05

High pressure water flushing. Behind the face

5.1.05.05

Bill No. 5 - Headrace


Bill 5.1 Adit 1
Description

Unit

Quantity

Rock support at portal shall be regarded and measured as support work behind the face

EARTH WORKS AND ROAD WORKS. OBRAS DE TIERRA Y OBRAS VIALES


Gravel wearing course in tunnel and platform outside the tunnel. Thickness minimum
100 mm

m3

EARTH WORKS: OBRAS DE TIERRA


Topsoil excavation.
Soil excavation
a) Excavation to spoil deposit
b) Excavation to stockpile (gravel & sandy gravel)
c) Excavation for footings/structures
Fill and backfill
a) Embankment fill
b) Structural backfill
c) High quality rockfill
d) Backfill of trenches
Preparation of rock foundation for concreting

450

m3

50

m3
m3
m3

200
150

m3
m3
m3
m3
m2

800
150

m3

1,000.00
400.00

m3

100

893

Underground. Excavation of tunnel. Addition for increased cross-section.

m3

100

Underground. Excavation of tunnel. Abnormal overbreak.

m3

200

ROCK EXCAVATION. EXCAVACION DE ROCA


Above ground. Bulk rock excavation (width > 2 m).
Above ground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).

Above ground. Rock excavation. Abnormal overbreak.


Underground. Excavation of tunnel. Minimum cross section 30,1 m2, (6m x 5.50m)

40

50
200
50

Underground. Excavation of tunnel. Addition for short blasting rounds.


a) Addition for 1/2 blasting rounds
b) Addition for 1/4 blasting rounds
Underground. Excavation of tunnel.
Addition for subdivision of cross-section into heading and benches.

m
m
m

60
25
20

Water measuring station

no

EXPLORATORY DRILLING AND GROUTING. PERFORACION DE EXPLORACION E INYECCION DELECHADA


Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face

1,250.00

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face

1,000.00

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face

no

10

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face

no

40

Flushing between holes. At the face.

no

10

Flushing between holes. Behind the face.

no

20

Grouting. per packer setting. Depth 0-5 m. At the face

no

20

Grouting. per packer setting. Depth 0-5 m. Behind the face

no

60

Cement grouting. Type A. Cement consumption


Cement grouting. Type B. Cement consumption
Cement grouting. Type C. Cement consumption
Consolidation grouting.
Flexible tubes for contact grouting.
Contact grouting. Type D.
Contact grouting. Type E.
Grouting time. At the face
Grouting time. Behind the face

kg
kg
kg
kg
m
kg
kg
hr
hr

22,000.00
18,000.00
5,000.00
2,000.00
250
1,000.00
1,500.00
45
50

ROCK SUPPORT tunnel and portal.SOPORTE DE ROCA TUNEL Y PORTAL


Temporary installation for rock fall protection at portal. Contractors design
Extra scaling. At the face.

Prov. Sum
hr

1
80

Extra scaling. Behind the face.

hr

80

Invert cleaning and scaling. Behind the face.

m2

500

High pressure water flushing. Behind the face

m2

500

Unit Price
USD

Total Price
USD

29.25 13,162.50

3.34 167
3.7 740
3.7 555
3.7 148
16.76
15.92
23.68
14.89
3.59

21.76

13,408.00
2,388.00
1,184.00
2,978.00
179.5

29.66 29,660.00
8,704.00
14.2 1,420.00

2,020.93

1,804,690.49
31.71 3,171.00
15.76 3,152.00

615.83
2,204.10
855.66

36,949.80
55,102.50
17,113.20

2,385.50

2,385.50

15.58 19,475.00
13.55 13,550.00
73.32 733.2
60.68 2,427.20
30.3 303
26.25 525
143.86

2,877.20

140.23

8,413.80
1.01
2.59
7.19
1.9
31.11
22.57
26.23

605
520

22,220.00
46,620.00
35,950.00
3,800.00
7,777.50
22,570.00
39,345.00
27,225.00
26,000.00

25,000.00

25,000.00
87.62 7,009.60

69.96 5,596.80
24.34 12,170.00
9.06 4,530.00

Bill No. 5 - Headrace


Bill 5.1 Adit 1
Item

Bill No. 5 - Headrace


Bill 5.1 Adit 1
Description

Item

5.1.05.06

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.4 m

5.1.05.06

5.1.05.07

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

5.1.05.07

5.1.05.08

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

5.1.05.08

5.1.05.09

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

5.1.05.09

5.1.05.10

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

5.1.05.10

5.1.05.11

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

5.1.05.11

5.1.05.12

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.4 m

5.1.05.12

5.1.05.13

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

5.1.05.13

5.1.05.14

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

5.1.05.14

5.1.05.15

Fully cement-grouted rock bolts, deformed bar. At the face.


D=25 mm. Depth in rock 5.9 m

5.1.05.15

5.1.05.16

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

5.1.05.16

5.1.05.17

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

5.1.05.17

5.1.05.18

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

5.1.05.18

5.1.05.19

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 5.9 m

5.1.05.19

5.1.05.20

Chainlinked mesh fixed to rock bolts. At the face.

5.1.05.20

5.1.05.21

Chainlinked mesh fixed to rock bolts. Behind the face.

5.1.05.21

5.1.05.22

Welded wire fabric fixed to rock bolts. At the face.

5.1.05.22

5.1.05.23

Welded wire fabric fixed to rock bolts. Behind the face.

5.1.05.23

5.1.05.24

Steel straps fixed to rock bolts. At the face.

5.1.05.24

5.1.05.25

Steel straps fixed to rock bolts. Behind the face.

5.1.05.25

5.1.05.26

Shotcrete. Plain. At the face.

5.1.05.26

5.1.05.27

Shotcrete. Plain. Behind the face.

5.1.05.27

5.1.05.28

Shotcrete. Fibre-reinforced. At the face.

5.1.05.28

5.1.05.29

Shotcrete. Fibre-reinforced. Behind the face.

5.1.05.29

5.1.05.30
5.1.05.31

Supply of rebars for ribs of reinforced shotcrete .


Installation of ribs of reinforced shotcrete. At the face.

5.1.05.30
5.1.05.31

5.1.05.32

Installation of ribs of reinforced shotcrete. Behind the face.

5.1.05.32

5.1.05.33
5.1.05.34

Prefabrication and supply of lattice girders.


Installation of lattice girders for ribs of shotcrete. At the face.

5.1.05.33
5.1.05.34

5.1.05.35

Installation of lattice girders for ribs of shotcrete. Behind the face.

5.1.05.35

5.1.05.36

Concrete lining. Behind the face.

5.1.05.36

5.1.05.37

Additional concrete. Behind the face.

5.1.05.37

5.1.05.38
5.1.05.39

Formwork for concrete lining, Class C


Invert concrete. At the face.

5.1.05.38
5.1.05.39

Bill No. 5 - Headrace


Bill 5.1 Adit 1
Description

Unit

Quantity

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.4 m

no

80.00

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

no

550.00

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

no

550.00

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

no

30.00

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

no

30.00

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

no

30.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.4 m

no

30.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

no

300.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

no

300.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=25 mm. Depth in rock 5.9 m

no

500.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

no

80.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

no

600.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

no

500.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 5.9 m

no

100.00

Chainlinked mesh fixed to rock bolts. At the face.

m2

100

Chainlinked mesh fixed to rock bolts. Behind the face.

m2

200

Welded wire fabric fixed to rock bolts. At the face.

m2

80

Welded wire fabric fixed to rock bolts. Behind the face.

m2

80

Steel straps fixed to rock bolts. At the face.

50

Steel straps fixed to rock bolts. Behind the face.

100

Shotcrete. Plain. At the face.

m3

80

Shotcrete. Plain. Behind the face.

m3

60

Shotcrete. Fibre-reinforced. At the face.

m3

850

Shotcrete. Fibre-reinforced. Behind the face.

m3

500

Supply of rebars for ribs of reinforced shotcrete .


Installation of ribs of reinforced shotcrete. At the face.

kg
m

3,400.00
140

Installation of ribs of reinforced shotcrete. Behind the face.

Prefabrication and supply of lattice girders.


Installation of lattice girders for ribs of shotcrete. At the face.

kg
m

Installation of lattice girders for ribs of shotcrete. Behind the face.

60

m3

35

Concrete lining. Behind the face.

90
2,300.00
90

Additional concrete. Behind the face.

m3

Formwork for concrete lining, Class C


Invert concrete. At the face.

m2
m3

10
175
80

Unit Price
USD

Total Price
USD

53.27

4,261.60

54.35

29,892.50

65.04

35,772.00

47.72

1,431.60

52.95

1,588.50

61.32

1,839.60

49.06

1,471.80

50.65

15,195.00

61.20

18,360.00

93.00

46,500.00

43.62

3,489.60

47.74

28,644.00

54.26

27,130.00

106.50

10,650.00

14.48 1,448.00
13.1 2,620.00
10.45 836
9.51 760.8
42.01 2,100.50
37.89 3,789.00
300.41

24,032.80

260.72

15,643.20

363.79

309,221.50

315.64

157,820.00
1.8 6,120.00
18.87 2,641.80
13.7 1,233.00
3.2 7,360.00
71.17 6,405.30
59.43 3,565.80

190.04

6,651.40

190.04

1,900.40

136.53
100.41

23,892.75
8,032.80

Bill No. 5 - Headrace


Bill 5.1 Adit 1
Item

Bill No. 5 - Headrace


Bill 5.1 Adit 1
Description

Item

5.1.05.40

Invert concrete. Behind the face.

5.1.05.40

5.1.05.41
5.1.05.42

Reinforcement of roof and/or walls


Reinforcement of invert. At or behind the face

5.1.05.41
5.1.05.42

5.1.06.00
5.1.06.01
5.1.06.02
5.1.06.03

INVESTIGATION AND INSTRUMENTATION.


Investigation and testing underground. Down time.
Core drilling. Set-up at each drilling location.
Core drilling, diameter minimum 76 mm. Depth 0-30 m

5.1.06.00
5.1.06.01
5.1.06.02
5.1.06.03

5.1.06.04

Core drilling, diameter minimum 76 mm. Depth 30-100 m

5.1.06.04

5.1.06.05
5.1.06.06

Core drilling. Hole stabilisation. Cement grouting.


Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m

5.1.06.05
5.1.06.06

5.1.06.07

Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m

5.1.06.07

5.1.06.08
5.1.06.09

Lugeon tests
Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests

5.1.06.08
5.1.06.09

5.1.06.10
5.1.06.11
5.1.06.12

Number of hydrofracture or hydraulic jacking tests


Convergence station. Max. 3 pins.
Multipoint borehole extensometer.

5.1.06.10
5.1.06.11
5.1.06.12

5.1.07.00
5.1.07.01
5.1.07.02
5.1.07.03
5.1.07.04
5.1.07.05
5.1.07.06
5.1.07.07
5.1.07.08
5.1.07.09

CONCRETE WORKS.
Not used
Formwork Class A, Plain
Formwork Class B. Plain.
Formwork Class B. Curved.
Finishing of unformed surfaces, Class UA.
Finishing of unformed surfaces, Class UB.
Concrete Class C.
Reinforcement. Deformed bars.
Reinforcement. Welded mesh

5.1.07.00
5.1.07.01
5.1.07.02
5.1.07.03
5.1.07.04
5.1.07.05
5.1.07.06
5.1.07.07
5.1.07.08
5.1.07.09

5.1.08.00
5.1.08.01

PIPE CULVERTS AND DRAIN PIPES


PVC pipe D = 300 mm, diversion of headrace tunnel. Incl. excavation and backfill of trench

5.1.08.00
5.1.08.01

5.1.08.02
5.1.08.03
5.1.08.04

Rock excavation trench, over item 5.1.08.01


Backfill of headwalls, wingwalls etc
Drainpipes PVC D=100 mm including access pipes each 60 m, joints, excavation and backfill

5.1.08.02
5.1.08.03
5.1.08.04

5.1.09.00
5.1.09.01
5.1.09.02

METAL WORKS.
Bar-gate with steel frame and lock at tunnel entrance 4m x 4 m.
Steeldoor, 1m x 2m at entrance of tunnel

5.1.09.00
5.1.09.01
5.1.09.02

5.1.10.00
5.1.10.01
5.1.10.02

5.1.10.00
5.1.10.01
5.1.10.02

5.1.10.03

PARTICULAR WORKS FOR INSTALLATION OF ADIT GATE


Preparation of rock surface for concreting.
Grouted rock bolts of weldable quality for fixing of gate, D = 25 mm.
a) Length 3 m, depth in rock 2.0 m
b) Length 2 m, depth in rock 1.0 m
PVC Waterstop in construction joints. Width 200 mm

5.1.10.04

PVC pipes for grouting of voids between concrete and rock before contact grouting and for contact grouting. Placed through formwork.
5.1.10.04
Dimension in accordance with cont

5.1.10.05
5.1.10.06
5.1.10.07

Groove, rectangular. W x H = 100 x 100 mm


Shear keys in construction joints
Interface with Contract H, embedment of adit gate in tunnel. Reference H-tender documents, Part D, Section
2. This item shall include works related to preparation for, and embedment in concrete and the like, for the
adit gate that may not be included in other items, coordinating with the H-Contractor in his transport and
work, etc. Scaling, formwork, reinforcement, concreting and grouting is cater for elsewhere.

Bill 5.1 Adit 1

5.1.10.03

5.1.10.05
5.1.10.06
5.1.10.07

Bill No. 5 - Headrace


Bill 5.1 Adit 1
Description

Unit

Quantity

Invert concrete. Behind the face.

m3

30

Reinforcement of roof and/or walls


Reinforcement of invert. At or behind the face

kg
kg

2,000.00
5,500.00

INVESTIGATION AND INSTRUMENTATION.: INVESTIGACION E INSTRUMENTACION


Investigation and testing underground. Down time.
Core drilling. Set-up at each drilling location.
Core drilling, diameter minimum 76 mm. Depth 0-30 m

hr
no
m

200

Core drilling, diameter minimum 76 mm. Depth 30-100 m

100

kg

2
180

Core drilling. Hole stabilisation. Cement grouting.


Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m

no

800
6.00

Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m

no

6.00

Lugeon tests
Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests

no
no

12
2

Number of hydrofracture or hydraulic jacking tests


Convergence station. Max. 3 pins.
Multipoint borehole extensometer.

no
no
no

6
2
2

CONCRETE WORKS. OBRAS DE CONCRETO


Not used
Formwork Class A, Plain
Formwork Class B. Plain.
Formwork Class B. Curved.
Finishing of unformed surfaces, Class UA.
Finishing of unformed surfaces, Class UB.
Concrete Class C.
Reinforcement. Deformed bars.
Reinforcement. Welded mesh

m2
m2
m2
m2
m2
m3
t
t

PIPE CULVERTS AND DRAIN PIPES


PVC pipe D = 300 mm, diversion of headrace tunnel. Incl. excavation and backfill of trench

50
200
50
15
35
350
9
0.5

830

Rock excavation trench, over item 5.1.08.01


Backfill of headwalls, wingwalls etc
Drainpipes PVC D=100 mm including access pipes each 60 m, joints, excavation and backfill

m3
m3
m

120

METAL WORKS. ESTRUCTURAS METALICAS


Bar-gate with steel frame and lock at tunnel entrance 4m x 4 m.
Steeldoor, 1m x 2m at entrance of tunnel

kg
no

400

50
1,600.00

PARTICULAR WORKS FOR INSTALLATION OF ADIT GATE:OBRAS PARTICULARES PARA LA INSTALACIN DE PUERTA DE TUNEL O LA PUERTA DE ENTRADA.
Preparation of rock surface for concreting.
m2
200
Grouted rock bolts of weldable quality for fixing of gate, D = 25 mm.
a) Length 3 m, depth in rock 2.0 m
no
25
b) Length 2 m, depth in rock 1.0 m
no
30
PVC Waterstop in construction joints. Width 200 mm
m
20

PVC pipes for grouting of voids between concrete and rock before contact grouting and for contact grouting. Placed
no
through formwork.
25.00
Dimension in accordance with contractors grouting

Groove, rectangular. W x H = 100 x 100 mm


Shear keys in construction joints
Interface with Contract H, embedment of adit gate in tunnel. Reference H-tender documents, Part D, Section LS
2. This item shall include works related to preparation for, and embedment in concrete and the like, for the
adit gate that may not be included in other items, coordinating with the H-Contractor in his transport and
work, etc. Scaling, formwork, reinforcement, concreting and grouting is cater for elsewhere.

Bill 5.1 Adit 1

m
m

10
20
1.00

Unit Price
USD

Total Price
USD
99.56 2,986.80
2.31 4,620.00
2.4 13,200.00

605
1,108.00
125.06

121,000.00
2,216.00
22,510.80

171.84

17,184.00

115.56

1.9 1,520.00
693.36

135.56

813.36

1,440.00
1,140.23

17,280.00
2,280.46

961.56
3,269.62
7,612.00

5,769.36
6,539.24
15,224.00

67.26
67.26
96.29
4.2
4.65
142.91
1,459.67
2,812.50

3,363.00
13,452.00
4,814.50
63
162.75
50,018.50
13,137.03
1,406.25

43.34 35,972.20
20.37 2,444.40
28.89 1,444.50
8.92 14,272.00

1,832.00

7.01 2,804.00
1,832.00

TUNEL O LA PUERTA DE ENTRADA.


3.59 718
88.36 2,209.00
66.07 1,982.10
24.93 498.6
150.21

33,135.00

3,755.25

36.12 361.2
22.63 452.6
33,135.00

3,565,813.30

Bill No. 5 - Headrace


Bill 5.2 Surgetunnel
Item

Bill No. 5 - Headrace


Bill 5.2 Surgetunnel
Description

Item

Portal shall be regarded and measured as support work behind the face
5.2.01.00
5.2.01.01
5.2.01.02

ROCK EXCAVATION.
Above ground. Bulk rock excavation (width > 2 m).
Above ground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).

5.2.01.00
5.2.01.01
5.2.01.02

5.2.01.03

Above ground. Rock excavation. Abnormal overbreak.

5.2.01.03

5.2.01.04

Underground. Excavation of tunnel. Minimum cross section 30,1 m2, (6m x 5.50m)

5.2.01.04

5.2.01.05

Underground. Excavation of tunnel. Addition for increased cross-section.

5.2.01.05

5.2.01.06

Underground. Excavation of tunnel. Abnormal overbreak.

5.2.01.06

5.2.01.07

Underground. Excavation of tunnel. Addition for short blasting rounds.

5.2.01.07

5.2.01.08

a) Addition for 1/2 blasting rounds


b) Addition for 1/4 blasting rounds
Underground. Excavation of tunnel.
Addition for subdivision of cross-section into heading and benches.

5.2.01.08

5.2.01.10

Water measuring station

5.2.01.10

5.2.02.00
5.2.02.01

EXPLORATORY DRILLING AND GROUTING.


Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face

5.2.02.00
5.2.02.01

5.2.02.02

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face

5.2.02.02

5.2.02.03

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face

5.2.02.03

5.2.02.04

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face

5.2.02.04

5.2.02.05

Flushing between holes. At the face.

5.2.02.05

5.2.02.06

Flushing between holes. Behind the face.

5.2.02.06

5.2.02.07
5.2.02.08
5.2.02.09

Grouting. per packer setting. Depth 0-5 m. At the face


Grouting. per packer setting. Depth 0-5 m. Behind the face
Cement grouting. Type A. Cement consumption

5.2.02.07
5.2.02.08
5.2.02.09

5.2.02.10
5.2.02.11

Cement grouting. Type B. Cement consumption


Cement grouting. Type C. Cement consumption

5.2.02.10
5.2.02.11

5.2.02.12

Chemical grouting. Type D. Dry weight grout consumption

5.2.02.12

5.2.02.13
5.2.02.14

Grouting time. At the face


Grouting time. Behind the face

5.2.02.13
5.2.02.14

5.2.03.00

ROCK SUPPORT tunnel and portal.

5.2.03.00

5.2.03.01

Extra scaling. At the face.

5.2.03.01

5.2.03.02

Extra scaling. Behind the face.

5.2.03.02

5.2.03.03

Invert cleaning and scaling. Behind the face.

5.2.03.03

5.2.03.04
5.2.03.05

High pressure water flushing. Behind the face


Resin end-anchored rock bolts, deformed bar. At the face.
D=20 mm. Depth in rock 2.4 m

5.2.03.04
5.2.03.05

5.2.03.06

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

5.2.03.06

5.2.03.07

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

5.2.03.07

5.2.03.08

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

5.2.03.08

5.2.03.09

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

5.2.03.09

5.2.03.10

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

5.2.03.10

5.2.03.11

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.4 m

5.2.03.11

5.2.03.12

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

5.2.03.12

5.2.01.09

5.2.01.09

Bill No. 5 - Headrace


Bill 5.2 Surgetunnel
Description

Unit

Quantity

Portal shall be regarded and measured as support work behind the face
ROCK EXCAVATION. EXCAVACION DE ROCA
Above ground. Bulk rock excavation (width > 2 m).
Above ground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).

m3
m

1,500.00
500

Above ground. Rock excavation. Abnormal overbreak.

m3

100

Underground. Excavation of tunnel. Minimum cross section 30,1 m2, (6m x 5.50m)

702.00

Underground. Excavation of tunnel. Addition for increased cross-section.

m3

Underground. Excavation of tunnel. Abnormal overbreak.

m3

70
210

Underground. Excavation of tunnel. Addition for short blasting rounds.


a) Addition for 1/2 blasting rounds
b) Addition for 1/4 blasting rounds
Underground. Excavation of tunnel.
Addition for subdivision of cross-section into heading and benches.

m
m
m

50
20
15

Water measuring station

no

EXPLORATORY DRILLING AND GROUTING.PERFORACIN EXPLORATORIA Y INYECCION


Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face

1,000.00

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face

100.00

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face

no

10.00

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face

no

Flushing between holes. At the face.

no

10

Grouting. per packer setting. Depth 0-5 m. At the face


Grouting. per packer setting. Depth 0-5 m. Behind the face
Cement grouting. Type A. Cement consumption

no
no
kg

15
2
12,000.00

Cement grouting. Type B. Cement consumption


Cement grouting. Type C. Cement consumption

kg
kg

8,000.00
3,000.00

Chemical grouting. Type D. Dry weight grout consumption

kg

200

Grouting time. At the face


Grouting time. Behind the face

hr
hr

30
8

Extra scaling. At the face.

hr

60

Extra scaling. Behind the face.

hr

60

Invert cleaning and scaling. Behind the face.

m2

50

Flushing between holes. Behind the face.

ROCK SUPPORT tunnel and portal. SOPORTE DE ROCA TUNEL Y PORTAL

High pressure water flushing. Behind the face


Resin end-anchored rock bolts, deformed bar. At the face.
D=20 mm. Depth in rock 2.4 m

no

m2

100
70.00

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

no

450.00

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

no

500.00

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

no

25.00

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

no

30.00

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

no

25.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.4 m

no

25.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

no

250.00

Unit Price
USD

Total Price
USD

29.66 44,490.00
21.76 10,880.00
14.2 1,420.00
2,223.27

1,560,735.54
31.71 2,219.70
15.76 3,309.60

706.07
2,576.71
855.66

35,303.50
51,534.20
12,834.90

2,385.50

2,385.50

15.58 15,580.00
13.55

1,355.00

73.32

733.20
60.68

60.68

30.3 303
26.25
143.86
140.23

26.25

2,157.90
280.46
1.01 12,120.00
2.59 20,720.00
7.19 21,570.00
23.71 4,742.00

605
520

18,150.00
4,160.00

87.62 5,257.20
69.96 4,197.60
24.34 1,217.00

53.27

9.06 906
3,728.90

54.35

24,457.50

65.04

32,520.00

47.72

1,193.00

52.95

1,588.50

61.32

1,533.00

49.06

1,226.50

50.65

12,662.50

Bill No. 5 - Headrace


Bill 5.2 Surgetunnel
Item

Bill No. 5 - Headrace


Bill 5.2 Surgetunnel
Description

Item

5.2.03.13

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

5.2.03.13

5.2.03.14

Fully cement-grouted rock bolts, deformed bar. At the face.


D=25 mm. Depth in rock 5.9 m

5.2.03.14

5.2.03.15

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

5.2.03.15

5.2.03.16

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

5.2.03.16

5.2.03.17

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

5.2.03.17

5.2.03.18

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 5.9 m

5.2.03.18

5.2.03.19

Chainlinked mesh fixed to rock bolts. At the face.

5.2.03.19

5.2.03.20

Chainlinked mesh fixed to rock bolts. Behind the face.

5.2.03.20

5.2.03.21

Welded wire fabric fixed to rock bolts. At the face.

5.2.03.21

5.2.03.22

Welded wire fabric fixed to rock bolts. Behind the face.

5.2.03.22

5.2.03.23

Steel straps fixed to rock bolts. At the face.

5.2.03.23

5.2.03.24

Steel straps fixed to rock bolts. Behind the face.

5.2.03.24

5.2.03.25

Shotcrete. Plain. At the face.

5.2.03.25

5.2.03.26

Shotcrete. Plain. Behind the face.

5.2.03.26

5.2.03.27

Shotcrete. Fibre-reinforced. At the face.

5.2.03.27

5.2.03.28

Shotcrete. Fibre-reinforced. Behind the face.

5.2.03.28

5.2.03.29

Supply of rebars for ribs of reinforced shotcrete.

5.2.03.29

5.2.03.30

Installation of ribs of reinforced shotcrete. At the face.

5.2.03.30

5.2.03.31

Installation of ribs of reinforced shotcrete. Behind the face.

5.2.03.31

5.2.03.32

Prefabrication and supply of lattice girders.

5.2.03.32

5.2.03.33

Installation of lattice girders for ribs of shotcrete. At the face.

5.2.03.33

5.2.03.34

Installation of lattice girders for ribs of shotcrete. Behind the face.

5.2.03.34

5.2.03.35

Concrete lining. Behind the face.

5.2.03.35

5.2.03.36

5.2.03.36

5.2.03.37

Additional concrete.
Behind the face.
Formwork for concrete lining, Class C

5.2.03.38

Invert concrete. At the face.

5.2.03.38

5.2.03.39

Invert concrete. Behind the face.

5.2.03.39

5.2.03.40

Reinforcement of roof and/or walls

5.2.03.40

5.2.03.41

Reinforcement of invert. At or behind the face

5.2.03.41

5.2.04.00
5.2.04.01

INVESTIGATION AND INSTRUMENTATION.


Investigation and testing underground. Down time.

5.2.04.00
5.2.04.01

5.2.04.02

Core drilling. Set-up at each drilling location.

5.2.04.02

5.2.04.03

Core drilling, diameter minimum 76 mm. Depth 0-30 m

5.2.04.03

5.2.04.04

Core drilling, diameter minimum 76 mm. Depth 30-100 m

5.2.04.04

5.2.03.37

5.2.04.05
5.2.04.06

Core drilling. Hole stabilisation. Cement grouting.


Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m

5.2.04.05
5.2.04.06

Bill No. 5 - Headrace


Bill 5.2 Surgetunnel
Description

Unit

Quantity

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

no

250.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=25 mm. Depth in rock 5.9 m

no

300.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

no

25.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

no

500.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

no

500.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 5.9 m

no

10.00

Chainlinked mesh fixed to rock bolts. At the face.

m2

Chainlinked mesh fixed to rock bolts. Behind the face.

m2

Welded wire fabric fixed to rock bolts. At the face.

m2

50
200
50

Welded wire fabric fixed to rock bolts. Behind the face.

m2

50.00

Steel straps fixed to rock bolts. At the face.

50.00

Steel straps fixed to rock bolts. Behind the face.

100.00

Shotcrete. Plain. At the face.

m3

60

Shotcrete. Plain. Behind the face.

m3

50.00

Shotcrete. Fibre-reinforced. At the face.

m3

700.00

Shotcrete. Fibre-reinforced. Behind the face.

m3

350.00

Supply of rebars for ribs of reinforced shotcrete.

kg

2,800.00

Installation of ribs of reinforced shotcrete. At the face.

110.00

Installation of ribs of reinforced shotcrete. Behind the face.

Prefabrication and supply of lattice girders.

kg

Installation of lattice girders for ribs of shotcrete. At the face.

70

Installation of lattice girders for ribs of shotcrete. Behind the face.

50

Concrete lining. Behind the face.

m3

30

Additional concrete.
Behind the face.
Formwork for concrete lining, Class C

m3

Invert concrete. At the face.

m3

Invert concrete. Behind the face.

m2

m3

80
1,800.00

150
60
30.00

Reinforcement of roof and/or walls

kg

1,600.00

Reinforcement of invert. At or behind the face

kg

4,000.00

INVESTIGATION AND INSTRUMENTATION. INVESTIGACION E INSTRUMENTACION


Investigation and testing underground. Down time.

hr

Core drilling. Set-up at each drilling location.

no

Core drilling, diameter minimum 76 mm. Depth 0-30 m


Core drilling, diameter minimum 76 mm. Depth 30-100 m

60
2
90.00

100

Core drilling. Hole stabilisation. Cement grouting.


Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m

kg
no

500
20.00

Unit Price
USD

Total Price
USD

61.20

15,300.00

93.00

27,900.00

43.62

1,090.50

47.74

23,870.00

54.26

27,130.00

106.50

1,065.00

14.48 724
13.1 2,620.00
10.45 522.5
9.51

475.50

42.01

2,100.50

37.89

3,789.00

300.41

18,024.60

260.72

13,036.00

363.79

254,653.00

315.64

110,474.00

1.80

5,040.00

18.87

2,075.70
13.7 1,096.00
3.2 5,760.00
71.17 4,981.90
59.43 2,971.50

190.04

5,701.20

190.04

950.2

136.53

20,479.50

100.41

6,024.60

99.56

2,986.80
2.31 3,696.00
2.4 9,600.00

605

36,300.00

1,108.00

2,216.00

125.06

11,255.40

171.84

17,184.00

115.56

1.9 950
2,311.20

Bill No. 5 - Headrace


Bill 5.2 Surgetunnel
Item

Bill No. 5 - Headrace


Bill 5.2 Surgetunnel
Description

Item

5.2.04.07

Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m

5.2.04.07

5.2.04.08
5.2.04.09
5.2.04.10

Lugeon tests
Convergence station. Max. 3 pins.
Multipoint borehole extensometer.

5.2.04.08
5.2.04.09
5.2.04.10

5.2.05.00
5.2.05.01
5.2.05.02
5.2.05.03
5.2.05.04
5.2.05.05
5.2.05.06
5.2.05.07
5.2.05.08

CONCRETE WORKS.
Formwork Class B. Plain..
Formwork Class B. Curved.
Finishing of unformed surfaces, Class UC.
Concrete Class C.
Reinforcement. Deformed bars.
Reinforcement. Welded mesh
Not used
Grouted rock bolts for concrete walls D = 25 mm, depth in rock 1.5 m depth in concrete
1m

5.2.05.00
5.2.05.01
5.2.05.02
5.2.05.03
5.2.05.04
5.2.05.05
5.2.05.06
5.2.05.07
5.2.05.08

5.2.05.09

Concrete pavement.Concrete Class B. Thickness minimum 150 mm. Reinforcement mesh min 6.5 kg/m2

5.2.05.09

5.2.06.00
5.2.06.01
5.2.06.02

METAL WORKS.
Steel ventilation grating
Steel door with lock, 1m x 2m at entrance of tunne

5.2.06.00
5.2.06.01
5.2.06.02

Sum

Bill 5.2 Surgetunnel

Sum

Bill No. 5 - Headrace


Bill 5.2 Surgetunnel
Description

Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m

Lugeon tests
Convergence station. Max. 3 pins.
Multipoint borehole extensometer.
CONCRETE WORKS. OBRAS DE CONCRETO
Formwork Class B. Plain..
Formwork Class B. Curved.
Finishing of unformed surfaces, Class UC.
Concrete Class C.
Reinforcement. Deformed bars.
Reinforcement. Welded mesh
Not used
Grouted rock bolts for concrete walls D = 25 mm, depth in rock 1.5 m depth in concrete
1m

Unit

Quantity

no

10.00

no
no
no

m2
m2
m2
m3
t
t

30
2
2

250
80
50
90
5
1

no

60

Concrete pavement.Concrete Class B. Thickness minimum 150 mm. Reinforcement mesh min 6.5 kg/m2

697

METAL WORKS. ESTRUCTURAS METALICAS


Steel ventilation grating
Steel door with lock, 1m x 2m at entrance of tunne

kg
no

150

Bill 5.2 Surgetunnel

Unit Price
USD

Total Price
USD

135.56

1,355.60

1,440.00
3,269.62
7,612.00

43,200.00
6,539.24
15,224.00

142.91
1,459.67
2,812.50

67.26 16,815.00
96.29 7,703.20
4.85 242.5
12,861.90
7,298.35
2,812.50
66.07 3,964.20

169.26

1,832.00

117,974.22

6.34 951
1,832.00

2,800,687.44

Bill No. 5 - Headrace


Bill 5.3 Headrace tunnel H01 to H18

Item

Bill No. 5 - Headrace


Bill 5.3 Headrace tunnel H01 to H1

Description

Item

Rock support at portal shall be regarded and measured as support work behind the face

5.3.01.0

ROCK EXCAVATION.
Above ground works included in Bill 4, except for rock support and temporary rock fall protection as included below

5.3.01.0

5.3.01.01

Underground. Excavation of tunnel, minimum net cross section 22.6 m2, (4.50m x
5.50m)

5.3.01.01

5.3.01.02

Underground. Excavation of tunnel. Addition for increased cross-section.

5.3.01.02

5.3.01.03

Underground. Excavation of tunnel. Abnormal overbreak.

5.3.01.03

5.3.01.04

Underground. Excavation of tunnel with cross section 22.6 m2. Addition for short blasting rounds.

5.3.01.04

5.3.01.05

a) Addition for 1/2 blasting rounds


b) Addition for 1/4 blasting rounds
Underground. Excavation of tunnel.
Addition for subdivision of cross-section into heading and benches.

5.3.01.05

5.3.01.06

Underground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).

5.3.01.06

5.3.01.07

Underground. Water discharge.


Pump out rate 1 - 2 m3/min. Includes the part of the tunnel excavated from Checras and the part of the
tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

5.3.01.07

5.3.01.08

Underground. Water discharge.


Pump out rate 2 - 3 m3/min. Includes the part of the tunnel excavated from Checras and the part of the
tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

5.3.01.08

5.3.01.09

Underground. Water discharge.


Pump out rate 3 - 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of the
tunnel excavated from Adit 1 downstream the surgetunnel.Measured on each front

5.3.01.09

5.3.01.10

Underground. Water discharge.


Pump out rate more than 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of
the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

5.3.01.10

5.3.01.11

Water measuring station

5.3.01.11

5.3.02.00
5.3.02.01

EXPLORATORY DRILLING AND GROUTING.


Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face

5.3.02.00
5.3.02.01

5.3.02.02

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face

5.3.02.02

5.3.02.03

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face

5.3.02.03

5.3.02.04

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face

5.3.02.04

5.3.02.05
5.3.02.06
5.3.02.07
5.3.02.08
5.3.02.09
5.3.02.10
5.3.02.11
5.3.02.12
5.3.02.13
5.3.02.14
5.3.02.15
5.3.02.16
5.3.02.17

Flushing between holes. At the face.


Flushing between holes. Behind the face.
Grouting. per packer setting. Depth 0-5 m. At the face
Grouting. per packer setting. Depth 0-5 m. Behind the face
Cement grouting. Type A. Cement consumption
Cement grouting. Type B. Cement consumption
Cement grouting. Type C. Cement consumption
Consolidation grouting.
Flexible tubes for contact grouting.
Contact grouting. Type D.
Contact grouting. Type E.
Grouting time. At the face
Grouting time. Behind the face

5.3.02.05
5.3.02.06
5.3.02.07
5.3.02.08
5.3.02.09
5.3.02.10
5.3.02.11
5.3.02.12
5.3.02.13
5.3.02.14
5.3.02.15
5.3.02.16
5.3.02.17

5.3.03.00
5.3.03.01

ROCK SUPPORT
Temporary installation for rock fall protection at Checras portal. See also Bill 4
Contractors design

5.3.03.00
5.3.03.01

5.3.03.02

Extra scaling. At the face.

5.3.03.02

5.3.03.03

Extra scaling. Behind the face.

5.3.03.03

5.3.03.04

Invert cleaning and scaling. Behind the face.

5.3.03.04

5.3.03.05
5.3.03.06

High pressure water flushing. Behind the face


Resin end-anchored rock bolts, deformed bar. At the face.
D=20 mm. Depth in rock 2.4 m

5.3.03.05
5.3.03.06

Bill No. 5 - Headrace


Bill 5.3 Headrace tunnel H01 to H18

Description

Unit

Quantity

Rock support at portal shall be regarded and measured as support work behind the face

ROCK EXCAVATION. EXCAVACIN DE ROCA


Above ground works included in Bill 4, except for rock support and temporary rock fall protection as included below
Underground. Excavation of tunnel, minimum net cross section 22.6 m2, (4.50m x
5.50m)

5,668.00

Underground. Excavation of tunnel. Addition for increased cross-section.

m3

1,000.00

Underground. Excavation of tunnel. Abnormal overbreak.

m3

1,200.00

Underground. Excavation of tunnel with cross section 22.6 m2. Addition for short blasting rounds.
a) Addition for 1/2 blasting rounds
b) Addition for 1/4 blasting rounds
Underground. Excavation of tunnel.
Addition for subdivision of cross-section into heading and benches.

m
m
m

400
200
120

Underground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).

1,000.00

Underground. Water discharge.


Pump out rate 1 - 2 m3/min. Includes the part of the tunnel excavated from Checras and the part of the
tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

month

8.00

Underground. Water discharge.


Pump out rate 2 - 3 m3/min. Includes the part of the tunnel excavated from Checras and the part of the
tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

month

4.00

Underground. Water discharge.


Pump out rate 3 - 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of the
tunnel excavated from Adit 1 downstream the surgetunnel.Measured on each front

month

2.00

Underground. Water discharge.


Pump out rate more than 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of
the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

month

1.00

Water measuring station

no

EXPLORATORY DRILLING AND GROUTING.PERFORACIN EXPLORATORIA E INYECCION


Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face

12,000.00

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face

2,000.00

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face

no

120.00

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face

no

50.00

Flushing between holes. At the face.


Flushing between holes. Behind the face.
Grouting. per packer setting. Depth 0-5 m. At the face
Grouting. per packer setting. Depth 0-5 m. Behind the face
Cement grouting. Type A. Cement consumption
Cement grouting. Type B. Cement consumption
Cement grouting. Type C. Cement consumption
Consolidation grouting.
Flexible tubes for contact grouting.
Contact grouting. Type D.
Contact grouting. Type E.
Grouting time. At the face
Grouting time. Behind the face
ROCK SUPPORT SOPORTE DE ROCA
Temporary installation for rock fall protection at Checras portal. See also Bill 4
Contractors design

no

120

no
no
kg
kg
kg
kg
m
kg
kg
hr
hr

350

10

Prov. Sum

80
155,000.00
100,000.00
40,000.00
1,000.00
120
400
400
450
60

1.00

Extra scaling. At the face.

hr

300

Extra scaling. Behind the face.

hr

600

Invert cleaning and scaling. Behind the face.

m2

500

High pressure water flushing. Behind the face


Resin end-anchored rock bolts, deformed bar. At the face.
D=20 mm. Depth in rock 2.4 m

m2
no

500
1,200.00

Unit Price
USD

Total Price
USD

1,694.09

9,602,102.12
31.71 31,710.00
15.76 18,912.00

710.88
2,461.12
855.66

284,352.00
492,224.00
102,679.20
15.23 15,230.00

9,942.33

79,538.64

12,052.57

48,210.28

14,162.81

28,325.62

16,273.05

16,273.05

2,385.50

7,156.50

15.58

186,960.00

13.55

27,100.00

73.32

8,798.40

60.68

3,034.00

143.86
140.23

605
520

25,000.00

30.3 3,636.00
26.25 262.5
50,351.00
11,218.40
1.01 156,550.00
2.59 259,000.00
7.19 287,600.00
1.9 1,900.00
31.11 3,733.20
22.57 9,028.00
26.23 10,492.00
272,250.00
31,200.00

25,000.00

87.62 26,286.00
69.96 41,976.00
24.34 12,170.00

53.27

9.06 4,530.00
63,924.00

Bill No. 5 - Headrace


Bill 5.3 Headrace tunnel H01 to H18

Item

Bill No. 5 - Headrace


Bill 5.3 Headrace tunnel H01 to H1

Description

Item

5.3.03.07

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

5.3.03.07

5.3.03.08

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

5.3.03.08

5.3.03.09

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

5.3.03.09

5.3.03.10

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

5.3.03.10

5.3.03.11

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

5.3.03.11

5.3.03.12

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.4 m

5.3.03.12

5.3.03.13

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

5.3.03.13

5.3.03.14

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

5.3.03.14

5.3.03.15

Fully cement-grouted rock bolts, deformed bar. At the face.


D=25 mm. Depth in rock 5.9 m

5.3.03.15

5.3.03.16

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

5.3.03.16

5.3.03.17

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

5.3.03.17

5.3.03.18

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

5.3.03.18

5.3.03.19

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 5.9 m

5.3.03.19

5.3.03.20

Chainlinked mesh fixed to rock bolts. At the face.

5.3.03.20

5.3.03.21

Chainlinked mesh fixed to rock bolts. Behind the face.

5.3.03.21

5.3.03.22

Welded wire fabric fixed to rock bolts. At the face.

5.3.03.22

5.3.03.23

Welded wire fabric fixed to rock bolts. Behind the face.

5.3.03.23

5.3.03.24

Steel straps fixed to rock bolts. At the face.

5.3.03.24

5.3.03.25

Steel straps fixed to rock bolts. Behind the face.

5.3.03.25

5.3.03.26

Shotcrete. Plain. At the face.

5.3.03.26

5.3.03.27

Shotcrete. Plain. Behind the face.

5.3.03.27

5.3.03.28

Shotcrete. Fibre-reinforced. At the face.

5.3.03.28

5.3.03.29

Shotcrete. Fibre-reinforced. Behind the face.

5.3.03.29

5.3.03.30
5.3.03.31

Supply of rebars for ribs of reinforced shotcrete.


Installation of ribs of reinforced shotcrete. At the face.

5.3.03.30
5.3.03.31

5.3.03.32

Installation of ribs of reinforced shotcrete. Behind the face.

5.3.03.32

5.3.03.33
5.3.03.34

Prefabrication and supply of lattice girders.


Installation of lattice girders for ribs of shotcrete. At the face.

5.3.03.33
5.3.03.34

5.3.03.35

Installation of lattice girders for ribs of shotcrete. Behind the face.

5.3.03.35

5.3.03.36

Concrete lining. Behind the face.

5.3.03.36

5.3.03.37

Additional concrete. Behind the face.

5.3.03.37

5.3.03.38

Formwork for concrete lining, Class C

5.3.03.38

5.3.03.39

Invert concrete. At the face.

5.3.03.39

5.3.03.40

Invert concrete. Behind the face.

5.3.03.40

5.3.03.41

Reinforcement of roof and/or walls

5.3.03.41

Bill No. 5 - Headrace


Bill 5.3 Headrace tunnel H01 to H18

Description

Unit

Quantity

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

no

4,500.00

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

no

4,000.00

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

no

200.00

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

no

200.00

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

no

200.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.4 m

no

200.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

no

500.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

no

1,000.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=25 mm. Depth in rock 5.9 m

no

3,300.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

no

200.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

no

4,500.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

no

3,600.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 5.9 m

no

400.00

Chainlinked mesh fixed to rock bolts. At the face.

m2

150

Chainlinked mesh fixed to rock bolts. Behind the face.

m2

500

Welded wire fabric fixed to rock bolts. At the face.

m2

600

Welded wire fabric fixed to rock bolts. Behind the face.

m2

500

Steel straps fixed to rock bolts. At the face.

400

Steel straps fixed to rock bolts. Behind the face.

400

Shotcrete. Plain. At the face.

m3

500

Shotcrete. Plain. Behind the face.

m3

500

Shotcrete. Fibre-reinforced. At the face.

m3

5,700.00

Shotcrete. Fibre-reinforced. Behind the face.

m3

3,000.00

Supply of rebars for ribs of reinforced shotcrete.


Installation of ribs of reinforced shotcrete. At the face.

kg
m

27,000.00
1,100.00

Installation of ribs of reinforced shotcrete. Behind the face.

700

Prefabrication and supply of lattice girders.


Installation of lattice girders for ribs of shotcrete. At the face.

kg
m

18,000.00
700

Installation of lattice girders for ribs of shotcrete. Behind the face.

500

Concrete lining. Behind the face.

m3

310

Additional concrete. Behind the face.

m3

Formwork for concrete lining, Class C

m2

30
1,400.00

Invert concrete. At the face.

m3

600

Invert concrete. Behind the face.

m3

200

Reinforcement of roof and/or walls

kg

16,500.00

Unit Price
USD

Total Price
USD

54.35

244,575.00

65.04

260,160.00

47.72

9,544.00

52.95

10,590.00

61.32

12,264.00

49.06

9,812.00

50.65

25,325.00

61.20

61,200.00

93.00

306,900.00

43.62

8,724.00

47.74

214,830.00

54.26

195,336.00

106.50

42,600.00

14.48 2,172.00
13.1 6,550.00
10.45 6,270.00
9.51 4,755.00
42.01 16,804.00
37.89 15,156.00
300.41

150,205.00

260.72

130,360.00

363.79

2,073,603.00

315.64

946,920.00
1.8 48,600.00
18.87 20,757.00
13.7 9,590.00
3.2 57,600.00
71.17 49,819.00
59.43 29,715.00

190.04

58,912.40

190.04

5,701.20

136.53

191,142.00

100.41

60,246.00
99.56 19,912.00
2.31 38,115.00

Bill No. 5 - Headrace


Bill 5.3 Headrace tunnel H01 to H18

Item

Bill No. 5 - Headrace


Bill 5.3 Headrace tunnel H01 to H1

Description

Item

5.3.03.42

Reinforcement of invert. At or behind the face

5.3.03.42

5.3.04.00
5.3.04.01
5.3.04.02
5.3.04.03

INVESTIGATION AND INSTRUMENTATION.


Investigation and testing underground. Down time.
Core drilling. Set-up at each drilling location.
Core drilling, diameter minimum 76 mm. Depth 0-30 m

5.3.04.00
5.3.04.01
5.3.04.02
5.3.04.03

5.3.04.04

Core drilling, diameter minimum 76 mm. Depth 30-100 m

5.3.04.04

5.3.04.05
5.3.04.06

Core drilling. Hole stabilisation. Cement grouting.


Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m

5.3.04.05
5.3.04.06

5.3.04.07

Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m

5.3.04.07

5.3.04.08
5.3.04.09

Lugeon tests
Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests

5.3.04.08
5.3.04.09

5.3.04.10
5.3.04.11
5.3.04.12

Number of hydrofracture or hydraulic jacking tests


Convergence station. Max. 3 pins.
Multipoint borehole extensometer.

5.3.04.10
5.3.04.11
5.3.04.12

5.3.05.0
5.3.05.01

CONCRETE WORKS.
Concrete pavement. Concrete Class B. Thickness minimum 150 mm. Reinforcement mesh min 6.5 kg/m2

5.3.05.0
5.3.05.01

Sum

Bill 5.3 Headrace tunnel H01 to H18

Sum

Bill No. 5 - Headrace


Bill 5.3 Headrace tunnel H01 to H18

Description

Unit

Quantity

Reinforcement of invert. At or behind the face

kg

40,000.00

INVESTIGATION AND INSTRUMENTATION.


Investigation and testing underground. Down time.
Core drilling. Set-up at each drilling location.
Core drilling, diameter minimum 76 mm. Depth 0-30 m

hr
no
m

200

Core drilling, diameter minimum 76 mm. Depth 30-100 m

100

kg

1
120

Core drilling. Hole stabilisation. Cement grouting.


Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m

no

800
6.00

Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m

no

6.00

Lugeon tests
Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests

no

no

Number of hydrofracture or hydraulic jacking tests


Convergence station. Max. 3 pins.
Multipoint borehole extensometer.
CONCRETE WORKS.
Concrete pavement. Concrete Class B. Thickness minimum 150 mm. Reinforcement mesh min 6.5 kg/m2

Bill 5.3 Headrace tunnel H01 to H18

12
2.00

no
no
no

6
2
2

5,668.00

Unit Price
USD

Total Price
USD
2.4 96,000.00

605
1,108.00
125.06

121,000.00
1,108.00
15,007.20

171.84

17,184.00

115.56

1.9 1,520.00
693.36

135.56

813.36

1,440.00
1,140.23

17,280.00
2,280.46

961.56
3,269.62
7,612.00

5,769.36
6,539.24
15,224.00

166.49

943,665.32

18,812,561.81

Bill No. 5 - Headrace


Bill 5.4 Headrace tunnel H18 to H31

Item

Bill No. 5 - Headrace


Bill 5.4 Headrace tunnel H18 to H31

Description

Item

5.4.01.0
5.4.01.01

ROCK EXCAVATION.
Underground. Excavation of tunnel, minimum net cross section 30.1 m2, (6m x 5.50m)

5.4.01.0
5.4.01.01

5.4.01.02

Underground. Excavation of tunnel. Addition for increased cross-section.

5.4.01.02

5.4.01.03

Underground. Excavation of tunnel. Abnormal overbreak.

5.4.01.03

5.4.01.04

Underground. Excavation of tunnel with cross section 30.1 m2. Addition for short blasting rounds.

5.4.01.04

5.4.01.05

a) Addition for 1/2 blasting rounds


b) Addition for 1/4 blasting rounds
Underground. Excavation of tunnel.
Addition for subdivision of cross-section into heading and benches.

5.4.01.05

5.4.01.06

Underground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).

5.4.01.06

5.4.01.07

Underground. Excavation of tunnel. Addition for excavation of rock trap.

5.4.01.07

5.4.01.08

Underground. Water discharge.


Pump out rate 1 - 2 m3/min. Includes the part of the tunnel excavated from Checras and the part of the
tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

5.4.01.08

5.4.01.09

Underground. Water discharge.


Pump out rate 2 - 3 m3/min. Includes the part of the tunnel excavated from Checras and the part of the
tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

5.4.01.09

5.4.01.10

Underground. Water discharge.


Pump out rate 3 - 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of the
tunnel excavated from Adit 1 downstream the surgetunnel.Measured on each front

5.4.01.10

5.4.01.11

Underground. Water discharge.


Pump out rate more than 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of
the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

5.4.01.11

5.4.01.12

Water measuring station

5.4.01.12

5.4.02.00
5.4.02.01

EXPLORATORY DRILLING AND GROUTING.


Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face

5.4.02.00
5.4.02.01

5.4.02.02

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face

5.4.02.02

5.4.02.03

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face

5.4.02.03

5.4.02.04

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face

5.4.02.04

5.4.02.05
5.4.02.06
5.4.02.07
5.4.02.08
5.4.02.09
5.4.02.10
5.4.02.11
5.4.02.12
5.4.02.13
5.4.02.14

Flushing between holes. At the face.


Flushing between holes. Behind the face.
Grouting. per packer setting. Depth 0-5 m. At the face
Grouting. per packer setting. Depth 0-5 m. Behind the face
Cement grouting. Type A. Cement consumption
Cement grouting. Type B. Cement consumption
Cement grouting. Type C. Cement consumption
Contact grouting. Type D.
Grouting time. At the face
Grouting time. Behind the face

5.4.02.05
5.4.02.06
5.4.02.07
5.4.02.08
5.4.02.09
5.4.02.10
5.4.02.11
5.4.02.12
5.4.02.13
5.4.02.14

5.4.03.00
5.4.03.01

ROCK SUPPORT tunnel and portal


Extra scaling. At the face.

5.4.03.00
5.4.03.01

5.4.03.02

Extra scaling. Behind the face.

5.4.03.02

5.4.03.03

Invert cleaning and scaling. Behind the face.

5.4.03.03

5.4.03.04
5.4.03.05

High pressure water flushing. Behind the face


Resin end-anchored rock bolts, deformed bar. At the face.
D=20 mm. Depth in rock 2.4 m

5.4.03.04
5.4.03.05

5.4.03.06

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

5.4.03.06

5.4.03.07

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

5.4.03.07

Bill No. 5 - Headrace


Bill 5.4 Headrace tunnel H18 to H31

Description

Unit

Quantity

ROCK EXCAVATION. EXCAVACION DE ROCA


Underground. Excavation of tunnel, minimum net cross section 30.1 m2, (6m x 5.50m)

4,215.00

Underground. Excavation of tunnel. Addition for increased cross-section.

m3

500

Underground. Excavation of tunnel. Abnormal overbreak.

m3

1,200.00

Underground. Excavation of tunnel with cross section 30.1 m2. Addition for short blasting rounds.

a) Addition for 1/2 blasting rounds


b) Addition for 1/4 blasting rounds
Underground. Excavation of tunnel.
Addition for subdivision of cross-section into heading and benches.

m
m
m

Underground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).

Underground. Excavation of tunnel. Addition for excavation of rock trap.

300
150
80
1,000.00

m3

600

Underground. Water discharge.


Pump out rate 1 - 2 m3/min. Includes the part of the tunnel excavated from Checras and the part of the
tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

month

8.00

Underground. Water discharge.


Pump out rate 2 - 3 m3/min. Includes the part of the tunnel excavated from Checras and the part of the
tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

month

4.00

Underground. Water discharge.


Pump out rate 3 - 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of the
tunnel excavated from Adit 1 downstream the surgetunnel.Measured on each front

month

2.00

Underground. Water discharge.


Pump out rate more than 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of
the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

month

1.00

Water measuring station

no

EXPLORATORY DRILLING AND GROUTING.PERFORACIN EXPLORATORIA E INYECCION


Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face

12,000.00

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face

1,200.00

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face

no

120.00

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face

no

15.00

Flushing between holes. At the face.


Flushing between holes. Behind the face.
Grouting. per packer setting. Depth 0-5 m. At the face
Grouting. per packer setting. Depth 0-5 m. Behind the face
Cement grouting. Type A. Cement consumption
Cement grouting. Type B. Cement consumption
Cement grouting. Type C. Cement consumption
Contact grouting. Type D.
Grouting time. At the face
Grouting time. Behind the face

no

130

no
no
kg
kg
kg
kg
hr
hr

400

ROCK SUPPORT tunnel and portal SOPORTE DE ROCA TUNEL Y PORTAL


Extra scaling. At the face.

hr

500

Extra scaling. Behind the face.

hr

1,000.00

Invert cleaning and scaling. Behind the face.

m2

100

m2
no

100
1,100.00

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

no

4,000.00

Resin end-anchored rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

no

3,500.00

High pressure water flushing. Behind the face


Resin end-anchored rock bolts, deformed bar. At the face.
D=20 mm. Depth in rock 2.4 m

15
40
150,000.00
100,000.00
40,000.00
200
400
40

Unit Price
USD

Total Price
USD

2,121.98

8,944,145.70
31.71 15,855.00
15.76 18,912.00

655.17
2,306.34
855.66

196,551.00
345,951.00
68,452.80

15.23

15,230.00
31.71 19,026.00

9,942.33

79,538.64

12,052.57

48,210.28

14,162.81

28,325.62

16,273.05

16,273.05

2,385.50

7,156.50

15.58

186,960.00

13.55

16,260.00

73.32

8,798.40

60.68

910.20

143.86
140.23

605
520

30.3 3,939.00
26.25 393.75
57,544.00
5,609.20
1.01 151,500.00
2.59 259,000.00
7.19 287,600.00
22.57 4,514.00
242,000.00
20,800.00

87.62 43,810.00
69.96 69,960.00
24.34 2,434.00

53.27

9.06 906
58,597.00

54.35

217,400.00

65.04

227,640.00

Bill No. 5 - Headrace


Bill 5.4 Headrace tunnel H18 to H31

Item

Bill No. 5 - Headrace


Bill 5.4 Headrace tunnel H18 to H31

Description

Item

5.4.03.08

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

5.4.03.08

5.4.03.09

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

5.4.03.09

5.4.03.10

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

5.4.03.10

5.4.03.11

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.4 m

5.4.03.11

5.4.03.12

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

5.4.03.12

5.4.03.13

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

5.4.03.13

5.4.03.14

Fully cement-grouted rock bolts, deformed bar. At the face.


D=25 mm. Depth in rock 5.9 m

5.4.03.14

5.4.03.15

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

5.4.03.15

5.4.03.16

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

5.4.03.16

5.4.03.17

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

5.4.03.17

5.4.03.18

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 5.9 m

5.4.03.18

5.4.03.19

Chainlinked mesh fixed to rock bolts. At the face.

5.4.03.19

5.4.03.20

Welded wire fabric fixed to rock bolts. At the face.

5.4.03.20

5.4.03.21

Welded wire fabric fixed to rock bolts. Behind the face.

5.4.03.21

5.4.03.22

Steel straps fixed to rock bolts. At the face.

5.4.03.22

5.4.03.23

Steel straps fixed to rock bolts. Behind the face.

5.4.03.23

5.4.03.24

Shotcrete. Plain. At the face.

5.4.03.24

5.4.03.25

Shotcrete. Plain. Behind the face.

5.4.03.25

5.4.03.26

Shotcrete. Fibre-reinforced. At the face.

5.4.03.26

5.4.03.27

Shotcrete. Fibre-reinforced. Behind the face.

5.4.03.27

5.4.03.28
5.4.03.29

Supply of rebars for ribs of reinforced shotcrete.


Installation of ribs of reinforced shotcrete. At the face.

5.4.03.28
5.4.03.29

5.4.03.30

Installation of ribs of reinforced shotcrete. Behind the face.

5.4.03.30

5.4.03.31
5.4.03.32

Prefabrication and supply of lattice girders.


Installation of lattice girders for ribs of shotcrete. At the face.

5.4.03.31
5.4.03.32

5.4.03.33

Installation of lattice girders for ribs of shotcrete. Behind the face.

5.4.03.33

5.4.03.34

Concrete lining. Behind the face.

5.4.03.34

5.4.03.35

Additional concrete. Behind the face.

5.4.03.35

5.4.03.36
5.4.03.37

Formwork for concrete lining, Class C


Invert concrete. At the face.

5.4.03.36
5.4.03.37

5.4.03.38

Invert concrete. Behind the face.

5.4.03.38

5.4.03.39
5.4.03.40

Reinforcement of roof and/or walls


Reinforcement of invert. At or behind the face

5.4.03.39
5.4.03.40

5.4.04.00
5.4.04.01

INVESTIGATION AND INSTRUMENTATION.


Investigation and testing underground. Down time.

5.4.04.00
5.4.04.01

5.4.04.02

Core drilling. Set-up at each drilling location.

5.4.04.02

Bill No. 5 - Headrace


Bill 5.4 Headrace tunnel H18 to H31

Description

Unit

Quantity

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

no

200.00

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

no

200.00

Resin end-anchored rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

no

200.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.4 m

no

200.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 2.9 m

no

450.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=20 mm. Depth in rock 3.9 m

no

1,000.00

Fully cement-grouted rock bolts, deformed bar. At the face.


D=25 mm. Depth in rock 5.9 m

no

3,000.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.4 m

no

300.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 2.9 m

no

4,000.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 3.9 m

no

3,200.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.


D=20 mm. Depth in rock 5.9 m

no

250.00

Chainlinked mesh fixed to rock bolts. At the face.

m2

150

Welded wire fabric fixed to rock bolts. At the face.

m2

500

Welded wire fabric fixed to rock bolts. Behind the face.

m2

500

Steel straps fixed to rock bolts. At the face.

400

Steel straps fixed to rock bolts. Behind the face.

200

Shotcrete. Plain. At the face.

m3

500

Shotcrete. Plain. Behind the face.

m3

500

Shotcrete. Fibre-reinforced. At the face.

m3

5,600.00

Shotcrete. Fibre-reinforced. Behind the face.

m3

2,800.00

Supply of rebars for ribs of reinforced shotcrete.


Installation of ribs of reinforced shotcrete. At the face.

kg
m

22,500.00
900

Installation of ribs of reinforced shotcrete. Behind the face.

600

Prefabrication and supply of lattice girders.


Installation of lattice girders for ribs of shotcrete. At the face.

kg
m

15,000.00
600

Installation of lattice girders for ribs of shotcrete. Behind the face.

400

Concrete lining. Behind the face.

m3

200

Additional concrete. Behind the face.

m3

Formwork for concrete lining, Class C


Invert concrete. At the face.

m2
m3

850
600

Invert concrete. Behind the face.

m3

250

Reinforcement of roof and/or walls


Reinforcement of invert. At or behind the face

kg
kg

10,000.00
40,000.00

INVESTIGATION AND INSTRUMENTATION. INVESTIGACION E INSTRUMENTACION


Investigation and testing underground. Down time.

hr

200

20

Core drilling. Set-up at each drilling location.

no

Unit Price
USD

Total Price
USD

47.72

9,544.00

52.95

10,590.00

61.32

12,264.00

49.06

9,812.00

50.65

22,792.50

61.20

61,200.00

93.00

279,000.00

43.62

13,086.00

47.74

190,960.00

54.26

173,632.00

106.50

26,625.00

14.48 2,172.00
10.45 5,225.00
9.51 4,755.00
42.01 16,804.00
37.89 7,578.00
300.41

150,205.00

260.72

130,360.00

363.79

2,037,224.00

315.64

883,792.00
1.8 40,500.00
18.87 16,983.00
13.7 8,220.00
3.2 48,000.00
71.17 42,702.00
59.43 23,772.00

190.04

38,008.00

190.04

3,800.80

136.53
100.41

116,050.50
60,246.00
99.56 24,890.00
2.31 23,100.00
2.4 96,000.00

605

121,000.00

1,108.00

1,108.00

Bill No. 5 - Headrace


Bill 5.4 Headrace tunnel H18 to H31

Item

Bill No. 5 - Headrace


Bill 5.4 Headrace tunnel H18 to H31

Description

Item

5.4.04.03

Core drilling, diameter minimum 76 mm. Depth 0-30 m

5.4.04.03

5.4.04.04

Core drilling, diameter minimum 76 mm. Depth 30-100 m

5.4.04.04

5.4.04.05
5.4.04.06

Core drilling. Hole stabilisation. Cement grouting.


Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m

5.4.04.05
5.4.04.06

5.4.04.07

Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m

5.4.04.07

5.4.04.08
5.4.04.09

Lugeon tests
Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests

5.4.04.08
5.4.04.09

5.4.04.10
5.4.04.11
5.4.04.12

Number of hydrofracture or hydraulic jacking tests


Convergence station. Max. 3 pins.
Multipoint borehole extensometer.

5.4.04.10
5.4.04.11
5.4.04.12

5.4.05.0
5.4.05.01
5.4.05.02
5.4.05.03
5.4.05.04
5.4.05.05

CONCRETE WORKS.
Formwork Class B. Plain. Lining from rocktrap to cone including transissions
Concrete Class C.
Reinforcement. Deformed bars.
Reinforcement. Welded mesh
Grouted rock bolts D = 25 mm, depth in rock 2.5 m depth in concrete 1 m

5.4.05.0
5.4.05.01
5.4.05.02
5.4.05.03
5.4.05.04
5.4.05.05

5.4.05.06

Concrete pavement. Concrete Class B. Thickness minimum 150 mm. Reinforcement


mesh min 6.5 kg/m2

5.4.05.06

Sum

Bill 5.4 Headrace tunnel H18 to H31

Sum

Bill No. 5 - Headrace


Bill 5.4 Headrace tunnel H18 to H31

Description

Unit

Quantity

Core drilling, diameter minimum 76 mm. Depth 0-30 m

120

Core drilling, diameter minimum 76 mm. Depth 30-100 m

100

kg

Core drilling. Hole stabilisation. Cement grouting.


Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m

no

800
6.00

Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m

no

6.00

Lugeon tests
Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests

no

no

Number of hydrofracture or hydraulic jacking tests


Convergence station. Max. 3 pins.
Multipoint borehole extensometer.

no
no
no

CONCRETE WORKS. OBRAS DE CONCRETO


Formwork Class B. Plain. Lining from rocktrap to cone including transissions
Concrete Class C.
Reinforcement. Deformed bars.
Reinforcement. Welded mesh
Grouted rock bolts D = 25 mm, depth in rock 2.5 m depth in concrete 1 m

m2
m3
t
t
no

Concrete pavement. Concrete Class B. Thickness minimum 150 mm. Reinforcement


mesh min 6.5 kg/m2

Bill 5.4 Headrace tunnel H18 to H31

12
1.00

3
2
2

900
560
14
0.5
80
4,215.00

Unit Price
USD

Total Price
USD

125.06

15,007.20

171.84

17,184.00

115.56

1.9 1,520.00
693.36

135.56

813.36

1,440.00
1,140.23

17,280.00
1,140.23

961.56
3,269.62
7,612.00

2,884.68
6,539.24
15,224.00

142.91
1,459.67
2,812.50

67.26 60,534.00
80,029.60
20,435.38
1,406.25
77.22 6,177.60

167.18

704,663.70

17,333,736.54

Proyecto de LeyNo. 7 - acero forrado tubera forzada, H31 como Powerhouse caverna
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

DLAR
ESTADOUNIDENSE

7.1.01.0

ROCA EXCAVACIN.

7.1.01.01

Underground.La
excavacin del
tnel.De dimetro de
acero forro entre el
cono de admisin y
bifurcacin 2,4 m,
dimetro de acero de
revestimiento entre la
bifurcacin y entrada
de la turbina tubo de
2,0 m.Seccin
transversal de la
excavacin para ser
recomendado por
contracto r.Tasa
independiente de la
subdivisin de corte
transversal.

7.1.01.02

Underground.La
excavacin del tnel.
La adicin de una
mayor seccin
transversal.

m3

50

31.71 1,585.50

7.1.01.03

Underground.La
excavacin del tnel.
Desmonte excesivo
anormal.

m3

25

15.76 394

7.1.01.04

Underground.La
descarga de agua.

101

3,623.00

365,923.00

mes

9,942.33

9,942.33

mes

0.5

12,052.57

6,026.29

mes

0.5

14,162.81

7,081.41

Bombear tasa de 1 -. 2
m3 / min Incluye
tambin se descarga
de las vas fluviales y
otras cavidades
excavadas en este
tnel
7.1.01.05

Underground.La
descarga de agua.
Bombear tasa. 2 - 3 m3
/ min Incluye tambin
se descarga de las vas
fluviales y otras
cavidades excavadas
en este tnel

7.1.01.06

Underground.La
descarga de agua.
Bombear tasa. 3 - 4 m3
/ min Incluye tambin
se descarga de las vas
fluviales y otras
cavidades excavadas
en este tnel

7.1.01.07

Estacin de medicin
de agua

no

2 2,385.50

4,771.00

7.1.02.00

La perforacin
exploratoria e
inyeccin.

7.1.02.01

Perforacindepercusi
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
en la cara.

300

15.58 4,674.00

7.1.02.02

Perforacindepercusi
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
Detrs de la cara.

1,100.00

13.55 14,905.00

7.1.02.03

Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m. En
la cara

no

10

73.32 733.2

7.1.02.04

Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m.
Detrs de la cara

no

40

60.68 2,427.20

7.1.02.05

El lavado entre los


agujeros.En la cara.

no

10

30.3 303

7.1.02.06

El lavado entre los


agujeros.Detrs de la
cara.

20

26.25 525

7.1.02.07

Lechada.Por valor de
empacador.Profundida
d 0-5 m.En la cara

no

15 143.86

2,157.90

7.1.02.08

Lechada.Por valor de
empacador.Profundida
d 0-5 m.Detrs de la
cara

no

60 140.23

8,413.80

7.1.02.09

Lechada de
cemento.Tipo de
consumo A. Cemento

kg

10,000.00

1.01 10,100.00

7.1.02.10

Lechada de
cemento.Tipo consumo
B. Cemento

kg

9,000.00

2.59 23,310.00

7.1.02.11

Lechada de
cemento.Escriba C. El
consumo de cemento

kg

2,000.00

7.19 14,380.00

7.1.02.12

Inyecciones de
consolidacin.

kg

3,000.00

1.9 5,700.00

7.1.02.13

Tubos flexibles para


contacto lechada.

250

31.11 7,777.50

7.1.02.14

Contacto
mampostera.Escriba
D.

kg

1,000.00

22.57 22,570.00

7.1.02.15

Contacto
mampostera.Tipo E.

kg

1,500.00

26.23 39,345.00

7.1.02.16

Tiempo de la
lechada.En la cara

hr

20 605

12,100.00

7.1.02.17

Tiempo de la
lechada.Detrs de la
cara

hr

50 520

26,000.00

7.1.03.00

APOYO DEL ROCK

7.1.03.01

Escalamiento Extra. En
la cara.

hr

10

87.62 876.2

7.1.03.02

Escalamiento Extra.
Detrs de la cara.

hr

10

69.96 699.6

7.1.03.03

Inviertalimpieza y
escalamiento. Detrs
de la cara.

m2

350

24.34 8,519.00

7.1.03.04

Alta presin de
descarga de
agua.Detrs de la cara

m2

500

9.06 4,530.00

7.1.03.05

Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.

no

60

53.27

3,196.20

no

50

54.35

2,717.50

D = 20 mm. De
profundidad en la roca
2,4 m
7.1.03.06

Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.

7.1.03.06

no

50

54.35

2,717.50

no

10

65.04

650.4

Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.

10

47.72

477.2

10

52.95

529.5

61.32

306.6

49.06

245.3

D = 20 mm. De
profundidad en la roca
2,9 m
7.1.03.07

Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
D = 20 mm. De
profundidad en la roca
3,9 m

7.1.03.08

D = 20 mm. De
profundidad en la roca
2,4 m
7.1.03.09

Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
2,9 m

7.1.03.10

Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
3,9 m

7.1.03.11

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
2,4 m

Proyecto de LeyNo. 7 - acero forrado tubera forzada, H31 como Powerhouse caverna
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario
DLAR
ESTADOUNIDENSE

7.1.03.12

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.

Precio total
DLAR
ESTADOUNIDENSE

50.65

253.25

20

61.2

1,224.00

50

93

4,650.00

55

43.62

2,399.10

D = 20 mm. De
profundidad en la roca
2,9 m
7.1.03.13

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
3,9 m

7.1.03.14

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 25 mm. De
profundidad en la roca
5,9 m

7.1.03.15

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
2,4 m

7.1.03.16

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.

50

47.74

2,387.00

54.26

271.3

106.5

532.5

D = 20 mm. De
profundidad en la roca
2,9 m
7.1.03.17

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
3,9 m

7.1.03.18

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
5,9 m

7.1.03.19

MallaChainlinkedfijado
para el rock pernos. En
la cara.

m2

50

7.1.03.20

MallaChainlinkedfijado
para el rock pernos.
Detrs de la cara.

m2

7.1.03.21

Mallazo fija a pernos de


anclaje. En la cara.

m2

10

7.1.03.22

Mallazo fija a pernos de


anclaje. Detrs de la
cara.

m2

10

7.1.03.23

Correasde
acerofijados a pernos
de anclaje. En la cara.

10

42.01 420.1

7.1.03.24

Correasde
acerofijados a pernos
de anclaje. Detrs de la
cara.

10

37.89 378.9

7.1.03.25

El hormign
proyectado.Plain. En la
cara.

m3

10 300.41

3,004.10

7.1.03.26

El hormign
proyectado.Plain.
Detrs de la cara.

m3

10 260.72

2,607.20

7.1.03.27

El hormign
proyectado.De fibra
reforzada. En la cara.

m3

80 363.79

29,103.20

7.1.03.28

El hormign
proyectado.De fibra
reforzada. Detrs de la
cara.

m3

25 315.64

7,891.00

7.1.03.29

Suministro de barras de
refuerzo para las
costillas de hormign
proyectado reforzado.

kg

7.1.03.30

La instalacinde las
costillas de hormign
proyectado reforzado.
En la cara.

12

7.1.03.31

La instalacinde las
costillas de hormign
proyectado reforzado.
Detrs de la cara.

7.1.03.32

Prefabricacin y
suministro de vigas de
celosa.

kg

7.1.03.33

La instalacinde vigas
de celosa para
costillas de hormign
proyectado. En la cara.

300

14.48 724

10.45 104.5

9.51

95.1

1.8 540

200

18.87 226.44

13.7 109.6

3.2 640

71.17 569.36

7.1.03.34

La instalacinde vigas
de celosa para
costillas de hormign
proyectado. Detrs de
la cara.

59.43 297.15

7.1.03.35

Inviertaconcreto. En la
cara.

m3

7.1.03.36

Refuerzo de
invertido.En o detrs
de la cara

kg

7.1.04.00

INVESTIGACIN E
INSTRUMENTACIN.

7.1.04.01

Investigacin y pruebas
subterrneas.Tiempo
de inactividad.

hr

7.1.04.02

Perforacin de
base.Puesta en
marcha en cada lugar
de perforacin.

no

7.1.04.03

Perforacin de base,
dimetro mnimo de 76
mm. De profundidad de
0-30 m

90 125.06

11,255.40

7.1.04.04

Perforacin de base,
dimetro mnimo de 76
mm. De profundidad
30-100 m

80 171.84

13,747.20

7.1.04.05

Perforacin de
base.Estabilizacin
Hole.Lechada de
cemento.

kg

7.1.04.06

AjustePackerpara la
prueba de presin de
agua. Prueba
concurrente con la
perforacin (single
envasador).
Profundidad 0-100 m

no

115.56

462.24

7.1.04.07

AjustePackerpara la
no
prueba de presin de
agua. Prueba de
perforacin despus de
completado (doble
packer). Profundidad 0100 m

135.56

542.24

7.1.04.08

Pruebas Lugeon

no

8 1,440.00

11,520.00

7.1.04.09

Estacin de
Convergencia.Max.3
pines.

no

2 3,269.62

6,539.24

7.1.04.10

Multipunto
extensmetro pozo.

no

2 7,612.00

15,224.00

10 100.41
500

1,004.10
2.4 1,200.00

60 605

36,300.00

2 1,108.00

500

2,216.00

1.01 505

Proyecto de LeyNo. 7 - acero forrado tubera forzada, H31 como Powerhouse caverna
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario
DLAR
ESTADOUNIDENSE

7.1.05.00

OBRAS DE
CONCRETO.

7.1.05.01

Encofrado Clase B.
Plain.Cono de entrada

m2

7.1.05.02

Encofrado Clase B.
curvada.Cono de
entrada

m2

7.1.05.03

Clase de hormign C.
Cono Inlet

m3

7.1.05.04

Refuerzo.Barras
corrugadas.

100

136.53

60 136.53

100

142.91
2 1,459.67

Precio total
DLAR
ESTADOUNIDENSE

13,653.00

8,191.80

14,291.00
2,919.34

7.1.05.05

Penstockempotramient m
o revestimiento,

47

7,305.90

343,377.30

54 5,844.72

315,614.88

tnel con tubo de D =


2,4 m. Hormign Clase
C
7.1.05.06

Penstockempotramient
o revestimiento,

tnel con tubo de D =


2,0 m. Hormign Clase
C

7.1.06.00

ACCIONES PARA LA
INSTALACIN DE
FORRO DE ACERO Y
REJUNTADO DE REA
DEL CONO

7.1.06.01

Preparacin de
superficie de la roca
para el hormigonado
en el rea del cono

7.1.06.02

Lechadapernos de
anclaje para el anclaje
de apoyo concreto, D =
25 mm. Longitud en
concreto

m2

100

3.59 359

1,0 m
7.1.06.03

a) La profundidad en la
roca 3,0 m

no

30

77.22 2,316.60

7.1.06.04

b) Profundidad en la
roca 4,0 m

no

10

88.36 883.6

7.1.06.05

Pernos de anclaje con


lechada de calidad
soldable para la fijacin
del revestimiento
tubera forzada
a) D = 25 mm,
profundidad en la roca
1,0 m

no

b) D = 25 mm,
profundidad en la roca
2,0 m

no

60

11.14 668,4

c) D = 32 mm,
profundidad en la roca
2,0 m

no

50

17.63 881.5

7.1.06.06

Instalacin del estante


de piedra delante de
cono de entrada,
aprox.(Alto x ancho)
1,0 mx 4,5 m

LS

7.1.06.07

Interfazcon H en el
LS
montaje de la tubera
de carga en el tnel. Se
hace referencia a los
documentos H-tiernas.

En esta partida se
incluyen los trabajos
relacionados con el
montaje de la tubera
de carga en el tnel
que no estn incluidos
en otras partidas, en
coordinacin con la Hcontratista en su
transporte y el trabajo,
etc.

100

6.66 666

1 4,025.40

66,270.00

4,025.40

66,270.00

Suma

Proyecto de Ley No.


7 - acero forrado
tubera forzada, H31
como Powerhouse
caverna

1,546,953.67

Proyecto de LeyNo. 8 - Casa de Mquinas y Acceso Tnel


Bill 8.1 Acceso Tnel
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

DLAR
ESTADOUNIDENSE

El apoyode la rocaen
el portal se considerar
y se mide como el
trabajo de apoyo
detrs de la cara

8.1.01.0

TIERRA DE OBRAS.

8.1.01.01

Compensacin y
arranque

8.1.01.02

Excavacin del suelo

ja

1 9,990.00

1,500.00

9,990.00

a) Excavacin para
estropear depsito

m3

6.14 9,210.00

b) La excavacin de
zapatas / estructuras

m3

50

6.14 307

8.1.01.03

Preparacin de la
fundacin de la roca
para el hormigonado

m2

50

3.59 179.5

8.1.01.04

Llenar y rellenar
a) No se utiliza
b) relleno estructural

m3

200

15.92 3,184.00

c) Alta calidad de
escollera

m3

200

23.68 4,736.00

d) El relleno de las
zanjas

m3

100

14.89 1,489.00

8.1.01.05

Encespado (opcional)

m2

200

8.1.02.0

OBRAS VIALES.

8.1.02.01

Concretopavimento en m2
tnel, el tipo de
hormign C, espesor
mnimo de 200 mm,
tratamiento de
superficies UB, refuerzo
min 12,0 kg / m2

8.1.02.02

Placa de conexin por


debajo del pavimento
de hormign, espesor
100 mm

8.1.03.0

ROCA EXCAVACIN.

8.1.03.01

8.1.03.02

3,800.00

0.32

46.04

64

174,952.00

m3

800

9.37 7,496.00

En latierra. Excavacin
a granel roca
(anchura>2m).

m3

200

29.66 5,932.00

En latierra. Barrenos
de contorno perimetral
para voladuras
(cuandomenosde 0,7
m

150

21.76 3,264.00

8.1.03.02

150

21.76 3,264.00

Se requiere distancia).
8.1.03.03

En latierra. Roca
excavacin.

m3

20

14.2 284

Desmonte excesivo
anormal.
8.1.03.04

Underground.La
excavacin del
tnel.Seccin
transversal 41 m2,
(7.30m 6.00mx), zanja
incl

960

8.1.03.05

8.1.03.06

2,582.81

2,479,497.60

Underground.La
excavacin del tnel.
La adicin de una
mayor seccin
transversal.

m3

150

31.71 4,756.50

Underground.La
excavacin del tnel.

m3

300

15.76 4,728.00

Desmonte excesivo
anormal.
8.1.03.07

Underground.La
excavacin del tnel.
La adicin de rondas de
voladura cortos.
a) Adicin de medio
rondas de voladura

60 727.4

43,644.00

b) Adicin de cuarta
rondas de voladura

40 2,502.70

100,108.00

8.1.03.08

Adems para la
subdivisin de la
seccin transversal en
el rumbo y bancos

20 855.66

17,113.20

8.1.03.09

Subterrneas.Perforaci
ones contorno
perimetral para
voladuras
(cuandomenosde 0,7
m de distancia

200

15.23 3,046.00

se requiere).
8.1.03.10

Underground.La
descarga de agua.

mes

12

9,942.33

119,307.96

mes

12,052.57

48,210.28

mes

14,162.81

28,325.62

mes

16,273.05

16,273.05

Bombear tasa de 1 - 2
m3 / min.Incluye las
descargas de las vas
fluviales y otras
cavidades excavadas
en este tnel (incluido,
pero no limitado a,
casa de mquinas,
tnel de presin y

8.1.03.11

Underground.La
descarga de agua.
Bombear tasa de 2-3
m3 / min Incluye altas
por vas fluviales y
otras cavidades
excavadas en este
tnel.

8.1.03.12

Underground.La
descarga de agua.
Bombear tasa de 3-4
m3 / min Incluye altas
por vas fluviales y
otras cavidades
excavadas en este
tnel.

8.1.03.13

Underground.La
descarga de agua.
Bombear tasa de ms
de 4 m3 / min.Includes
descarga de las vas
fluviales y otras
cavidades excavadas
en este tnel

8.1.03.14

Estacin de medicin
de agua

no

4 2,385.50

9,542.00

8.1.04.00

La perforacin
exploratoria e
inyeccin.

8.1.04.01

Perforacindepercusi m
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
en la cara.

1,600.00

15.58

24,928.00

8.1.04.02

Perforacindepercusi m
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
Detrs de la cara.

200

13.55

2,710.00

8.1.04.03

Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m. En
la cara

no

16

73.32

1,173.12

8.1.04.04

Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m.
Detrs de la cara

no

60.68

121.36

8.1.04.05

El lavado entre los


agujeros.En la cara.

no

16

8.1.04.06

El lavado entre los


agujeros.Detrs de la
cara.

no

8.1.04.07

Lechada.Por valor de
empacador.Profundida
d 0-5 m.En la cara

no

30 143.86

8.1.04.08

Lechada.Por valor de
empacador.Profundida
d 0-5 m.Detrs de la
cara

no

5 140.23

8.1.04.09

Lechada de
cemento.Tipo de
consumo A. Cemento

kg

20,000.00

1.01 20,200.00

8.1.04.10

Lechada de
cemento.Tipo consumo
B. Cemento

kg

10,000.00

2.59 25,900.00

8.1.04.11

Lechada de
cemento.Escriba C. El
consumo de cemento

kg

5,000.00

7.19 35,950.00

8.1.04.12

Lechada
qumica.Escriba D.
consumo lechada peso
seco

kg

100

8.1.04.13

Inyecciones de
consolidacin.

kg

1,000.00

8.1.04.14

Tiempo de la
lechada.En la cara

hr

50 605

30,250.00

8.1.04.15

Tiempo de la
lechada.Detrs de la
cara

hr

10 520

5,200.00

30.3 484.8
26.25

52.5

4,315.80

701.15

23.71 2,371.00

1.9 1,900.00

Proyecto de LeyNo. 8 - Casa de Mquinas y Acceso Tnel


Bill 8.1 Acceso Tnel
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario
DLAR
ESTADOUNIDENSE

8.1.05.00

ROCA tnel APOYO y


portal

Precio total
DLAR
ESTADOUNIDENSE

8.1.05.01

Instalacintemporalde Prov.Suma
proteccin contra
cadas de roca en el
portal. Diseo
Contratistas

1 100,000.00

100,000.00

8.1.05.02

Escalamiento Extra. En
la cara.

hr

100

87.62 8,762.00

8.1.05.03

Escalamiento Extra.
Detrs de la cara.

hr

150

69.96 10,494.00

8.1.05.04

Inviertalimpieza y
escalamiento. Detrs
de la cara.

m2

200

24.34 4,868.00

8.1.05.05

Alta presin de
descarga de
agua.Detrs de la cara

m2

500

9.06 4,530.00

8.1.05.06

Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.

no

800

54.35

43,480.00

no

800

65.04

52,032.00

no

150

80.22

12,033.00

50

52.95

2,647.50

60

61.32

3,679.20

40

73.74

2,949.60

50

50.65

2,532.50

300

61.2

18,360.00

300

71.44

21,432.00

D = 20 mm. De
profundidad en la roca
2,9 m
8.1.05.07

Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
D = 20 mm. De
profundidad en la roca
3,9 m

8.1.05.08

Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
D = 20 mm. De
profundidad en la roca
4,9 m

8.1.05.09

Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en roca
2.9m

8.1.05.10

Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
3,9 m

8.1.05.11

Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
4,9 m

8.1.05.12

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
2,9 m

8.1.05.13

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
3,9 m

8.1.05.14

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.

8.1.05.14

no

300

71.44

21,432.00

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.

600

93

55,800.00

700

47.74

33,418.00

800

54.26

43,408.00

500

67.87

33,935.00

50

106.5

5,325.00

D = 20 mm. De
profundidad en la roca
4,9 m
8.1.05.15

D = 25 mm. De
profundidad en la roca
5,9 m
8.1.05.16

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
2,9 m

8.1.05.17

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
3,9 m

8.1.05.18

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
4,9 m

8.1.05.19

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
5,9 m

8.1.05.20

MallaChainlinkedfijado
para el rock pernos. En
la cara.

m2

50

14.48 724

8.1.05.21

MallaChainlinkedfijado
para el rock pernos.
Detrs de la cara.

m2

500

13.1 6,550.00

8.1.05.22

Mallazo fija a pernos de


anclaje. En la cara.

m2

100

10.45 1,045.00

8.1.05.23

Mallazo fija a pernos de


anclaje. Detrs de la
cara.

m2

100

8.1.05.24

Correasde
acerofijados a pernos
de anclaje. En la cara.

100

42.01 4,201.00

8.1.05.25

Correasde
acerofijados a pernos
de anclaje. Detrs de la
cara.

500

37.89 18,945.00

8.1.05.26

El hormign
proyectado.Plain. En la
cara.

m3

70 300.41

21,028.70

8.1.05.27

El hormign
proyectado.Plain.
Detrs de la cara.

m3

40 260.72

10,428.80

8.1.05.28

El hormign
proyectado.De fibra
reforzada. En la cara.

m3

1,400.00

363.79

509,306.00

8.1.05.29

El hormign
proyectado.De fibra
reforzada. Detrs de la
cara.

m3

700

315.64

220,948.00

8.1.05.30

Suministro de barras de
refuerzo para las
costillas de hormign
proyectado reforzado.

kg

5,000.00

9.51 951

1.8 9,000.00

8.1.05.31

La instalacinde las
costillas de hormign
proyectado reforzado.
En la cara.

200

18.87 3,774.00

8.1.05.32

La instalacinde las
costillas de hormign
proyectado reforzado.
Detrs de la cara.

100

13.7 1,370.00

8.1.05.33

Prefabricacin y
suministro de vigas de
celosa.

kg

3,300.00

8.1.05.34

La instalacinde vigas
de celosa para
costillas de hormign
proyectado. En la cara.

120

71.17 8,540.40

8.1.05.35

La instalacinde vigas
de celosa para
costillas de hormign
proyectado. Detrs de
la cara.

100

59.43 5,943.00

8.1.05.36

Revestimientodehormi
gn. Detrs de la cara.

m3

50 190.04

8.1.05.37

Hormign adicional.
Detrs de la cara.

m3

5 190.04

8.1.05.38

Encofrado para
revestimiento de
hormign, Clase C

m2

8.1.05.39

Hormign Invertir.

m3

3.2 10,560.00

230

9,502.00

950.2

136.53

31,401.90

80 100.41

8,032.80

En la cara.

Proyecto de LeyNo. 8 - Casa de Mquinas y Acceso Tnel


Bill 8.1 Acceso Tnel
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

40

DLAR
ESTADOUNIDENSE

8.1.05.40

Inviertaconcreto.
Detrs de la cara.

m3

99.56 3,982.40

8.1.05.41

Refuerzo del techo y / o


paredes

kg

2,500.00

8.1.05.42

Refuerzo de
invertido.En o detrs
de la cara

kg

6,000.00

8.1.06.00

INVESTIGACIN E
INSTRUMENTACIN.

8.1.06.01

Investigacin y pruebas
subterrneas.Tiempo
de inactividad.

hr

300

8.1.06.02

Perforacin de
base.Puesta en
marcha en cada lugar
de perforacin.

no

8.1.06.03

Perforacin de base,
dimetro mnimo de 76
mm. De profundidad de
0-30 m

420

125.06

52,525.20

8.1.06.04

Perforacin de base,
dimetro mnimo de 76
mm. De profundidad
30-100 m

140

171.84

24,057.60

8.1.06.05

Perforacin de
base.Estabilizacin
Hole.Lechada de
cemento.

kg

2,500.00

2.31 5,775.00
2.4 14.400,00

605

6 1,108.00

181,500.00

6,648.00

1.9 4,750.00

8.1.06.06

AjustePackerpara la
prueba de presin de
agua. Prueba
concurrente con la
perforacin (single
envasador).
Profundidad 0-100 m

no

8.1.06.07

AjustePackerpara la
no
prueba de presin de
agua. Prueba de
perforacin despus de
completado (doble
packer). Profundidad 0100 m

8.1.06.08

Pruebas Lugeon

8.1.06.09

Movilizacin /
no
desmovilizacinde
expertos y equipo para
mediciones de tensin
en 3 dimensiones

8.1.06.10

Movilizacin /
desmovilizacinde
expertos y equipo a
hydrofracture y
pruebas de gato
hidrulico

8.1.06.11

100

115.56

11,556.00

10

135.56

1,355.60

no

70 1,440.00
2

100,800.00

1,210.56

2,421.12

no

3 1,140.23

3,420.69

Nmero de mediciones
de tensin en 3
dimensiones

no

4 5,160.00

20,640.00

8.1.06.12

Nmero de
hydrofracture o
pruebas de gato
hidrulico

no

8.1.06.13

Estacin de
Convergencia.Max.3
pines.

no

6 3,269.62

19,617.72

8.1.06.14

Multipunto
extensmetro pozo.

no

5 7,612.00

38,060.00

8.1.07.0

ALCANTARILLAS
tubera y tubos de
desage.

8.1.07.01

DrainpipePVC, D = 100
mm en tnel, incl.
Tubos de acceso cada
60 m, articulaciones,
excavacin y relleno.

8.1.08.0

OBRAS DE
CONCRETO.

16 961.56

15,384.96

2,000.00

8.92 17,840.00

1,500.00

67.26 100,890.00

Estructura de entrada,
conductos y
alcantarillas cable.
8.1.08.01

Encofrado Clase B.
Plain.Inclinada o
vertical.

m2

8.1.08.02

Encofrado Clase B.
curvada.

m2

8.1.08.03

El acabado de
superficies no
formadas, UB Clase.

m2

8.1.08.04

El acabado de
superficies no
formadas, clase UC.

m2

8.1.08.05

Hormign Clase C.

m3

8.1.08.06

Refuerzo.Barras
corrugadas.

50 1,459.67

8.1.08.07

Refuerzo.Mallas
soldadas

0.5 2,812.50

50

96.29 4,814.50

350

4.65 1,627.50

60

650

4.85 291

142.91

92,891.50
72,983.50
1,406.25

8.1.08.08

Pernos de anclajecon
lechadapara muros de
hormign D = 25 mm,
profundidad en la roca
1,5 m departamento en
concreto

no

30

77.22 2,316.60

1m
8.1.08.09

Cablede alcantarillas, m
conductos
prefabricados de
hormign con
recubrimiento de
hormign desmontable
con carga de diseo de
15 kN / m2, incluyendo
ganchos de elevacin y
relleno.

970

183.22

177,723.40

8.1.09.0

METAL WORKS.

8.1.09.01

Para trabajo pesado


fundido y de hierro
para alcantarilla de
drenaje

kg

2,000.00

6.34 12,680.00

8.1.09.02

Cubierta del conducto


de alta resistencia para
alcantarilla cable

kg

2,000.00

6.34 12,680.00

8.1.09.03

Los pernos de anclaje


para escaleras de
cable, rallado, aptos
para soldadura,
longitud de 2 m, 1 m
de roca.

no

1,200.00

27.28 32,736.00

8.1.09.04

Escaleras de acero.

kg

300

8.1.09.05

Puertas de acero
individuales.Dimension
es externas
1000x2100mm

no

1 6,108.00

6,108.00

8.1.09.06

Puerta de entrada,
doble, lado bisagras de
puerta plegable de
aluminio, 5,5 mx 5,5 m

no

1 4,275.00

4,275.00

8.1.10.0

OBRAS CIVILES
VARIOS

8.1.10.01

Tomas de tierra
enterrados.Hilos de
cobre 1 x 95 mm2.En
el tnel

2,000.00

8.1.10.02

Cadwelding de juntas,
conexiones e
intersecciones

no

150

Suma

Bill 8.1 Acceso Tnel

7.01 2,103.00

21.34 42,680.00

230.3

34,545.00

5,722,270.58

Proyecto de LeyNo. 8 - Casa de Mquinas y Acceso Tnel


Bill 8,2 socavn Construccin de tnel de descarga
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario
DLAR
ESTADOUNIDENSE

8.2.01.0

ROCA EXCAVACIN.

Precio total
DLAR
ESTADOUNIDENSE

8.2.01.01

Underground.La
excavacin del
tnel.Seccin mnima
de 22,6 m2.

150

1,533.80

230,070.00

8.2.01.02

Underground.La
excavacin del tnel.

m3

50

31.71 1,585.50

m3

30

15.76 472.8

Adems de una mayor


seccin transversal.
8.2.01.03

Underground.La
excavacin del tnel.
Desmonte excesivo
anormal.

8.2.01.04

Underground.La
excavacin del tnel.
La adicin de rondas de
voladura cortos.

8.2.01.05

a) Adicin de medio
rondas de voladura

10 363.92

3,639.20

b) incoporacion por
cuarta rondas de
voladura

10 1,766.92

17,669.20

Underground.La
descarga de agua.

mes

9,942.33

39,769.32

mes

12,052.57

24,105.14

mes

14,162.81

14,162.81

mes

16,273.05

16,273.05

Bombear tasa de 1 -. 2
m3 / min Incluye
tambin se descarga
de las vas fluviales y
otras cavidades
excavadas en este
tnel
8.2.01.06

Underground.La
descarga de agua.
Bombear tasa. 2 - 3 m3
/ min Incluye tambin
se descarga de las vas
fluviales y otras
cavidades excavadas
en este tnel

8.2.01.07

Underground.La
descarga de agua.
Bombear tasa. 3 - 4 m3
/ min Incluye tambin
se descarga de las vas
fluviales y otras
cavidades excavadas
en este tnel

8.2.01.08

Underground.La
descarga de agua.
Bombear tasa de ms
de 4 m3 / min. Incluye
tambin se descarga
de las vas fluviales y
otras cavidades
excavadas en este
tnel

8.2.01.09

Estacin de medicin
de agua

no

1 2,385.50

8.2.02.00

La perforacin
exploratoria e
inyeccin.

8.2.02.01

Perforacindepercusi
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
en la cara.

8.2.02.02

Perforacindepercusi
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
Detrs de la cara.

50

8.2.02.03

Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m. En
la cara

no

250

2,385.50

15.58 3,895.00

13.55 677.5

73.32 219.96

8.2.02.04

Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m.
Detrs de la cara

no

60.68

60.68

8.2.02.05

El lavado entre los


agujeros.En la cara.

no

30.3

90.9

8.2.02.06

El lavado entre los


agujeros.Detrs de la
cara.

26.25

26.25

8.2.02.07

Lechada.Por valor de
empacador.Profundida
d 0-5 m.En la cara

no

10 143.86

8.2.02.08

Lechada.Por valor de
empacador.Profundida
d 0-5 m.Detrs de la
cara

no

5 140.23

8.2.02.09

Lechada de
cemento.Tipo de
consumo A. Cemento

kg

3,000.00

1.01 3,030.00

8.2.02.10

Lechada de
cemento.Tipo consumo
B. Cemento

kg

2,000.00

2.59 5,180.00

8.2.02.11

Lechada de
cemento.Escriba C. El
consumo de cemento

kg

1,000.00

7.19 7,190.00

8.2.02.12

Lechada
qumica.Escriba D.
consumo lechada peso
seco

kg

100

8.2.02.13

Tiempo de la
lechada.En la cara

hr

10 605

6,050.00

8.2.02.14

Tiempo de la
lechada.Detrs de la
cara

hr

10 520

5,200.00

8.2.03.00

APOYO DEL ROCK

8.2.03.01

Escalamiento Extra. En
la cara.

hr

10

87.62 876.2

8.2.03.02

Escalamiento Extra.
Detrs de la cara.

hr

10

69.96 699.6

8.2.03.03

Inviertalimpieza y
escalamiento. Detrs
de la cara.

m2

100

8.2.03.04

Alta presin de
descarga de
agua.Detrs de la cara

m2

100

8.2.03.05

Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.

1,438.60

701.15

23.71 2,371.00

24.34 2,434.00

9.06 906

no

80

53.27

4,261.60

no

90

54.35

4,891.50

no

50

65.04

3,252.00

D = 20 mm. De
profundidad en la roca
2,4 m
8.2.03.06

Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
D = 20 mm. De
profundidad en la roca
2,9 m

8.2.03.07

Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
D = 20 mm. De
profundidad en la roca
3,9 m

8.2.03.08

Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.

10

47.72

477.2

10

52.95

529.5

61.32

306.6

49.06

245.3

Precio Unitario

Precio total

D = 20 mm. De
profundidad en la roca
2,4 m
8.2.03.09

Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
2,9 m

8.2.03.10

Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
3,9 m

8.2.03.11

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
2,4 m

Proyecto de LeyNo. 8 - Casa de Mquinas y Acceso Tnel


Bill 8,2 socavn Construccin de tnel de descarga
Artculo

Descripcin

Unidad

Cantidad

DLAR
ESTADOUNIDENSE

8.2.03.12

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.

DLAR
ESTADOUNIDENSE

60

50.65

3,039.00

60

61.2

3,672.00

90

93

8,370.00

43.62

218.1

120

47.74

5,728.80

D = 20 mm. De
profundidad en la roca
2,9 m
8.2.03.13

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
3,9 m

8.2.03.14

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 25 mm. De
profundidad en la roca
5,9 m

8.2.03.15

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
2,4 m

8.2.03.16

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
2,9 m

8.2.03.17

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.

100

54.26

5,426.00

106.5

532.5

D = 20 mm. De
profundidad en la roca
3,9 m
8.2.03.18

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
5,9 m

8.2.03.19

MallaChainlinkedfijado
para el rock pernos. En
la cara.

m2

50

14.48 724

8.2.03.20

Mallazo fija a pernos de


anclaje. En la cara.

m2

15

10.45 156.75

8.2.03.21

Mallazo fija a pernos de


anclaje. Detrs de la
cara.

m2

15

9.51 142.65

8.2.03.22

Correasde
acerofijados a pernos
de anclaje. En la cara.

15

42.01 630.15

8.2.03.23

Correasde
acerofijados a pernos
de anclaje. Detrs de la
cara.

37.89 189.45

8.2.03.24

El hormign
proyectado.Plain. En la
cara.

m3

15 300.41

4,506.15

8.2.03.25

El hormign
proyectado.Plain.
Detrs de la cara.

m3

15 260.72

3,910.80

8.2.03.26

El hormign
proyectado.De fibra
reforzada. En la cara.

m3

8.2.03.27

El hormign
proyectado.De fibra
reforzada. Detrs de la
cara.

m3

8.2.03.28

Suministro de barras de
refuerzo para las
costillas de hormign
proyectado reforzado.

kg

8.2.03.29

La instalacinde las
costillas de hormign
proyectado reforzado.
En la cara.

30

18.87 566.1

8.2.03.30

La instalacinde las
costillas de hormign
proyectado reforzado.
Detrs de la cara.

18

13.7 246.6

8.2.03.31

Prefabricacin y
suministro de vigas de
celosa.

kg

8.2.03.32

La instalacinde vigas
de celosa para
costillas de hormign
proyectado. En la cara.

20

71.17 1,423.40

8.2.03.33

La instalacinde vigas
de celosa para
costillas de hormign
proyectado. Detrs de
la cara.

10

59.43 594.3

8.2.03.34

Inviertaconcreto. En la
cara.

m3

8.2.03.35

Refuerzo de
invertido.En o detrs
de la cara

kg

220

363.79

80,033.80

50 315.64

15,782.00

700

1.8 1,260.00

400

3.2 1,280.00

14 100.41
600

1,405.74
2.4 1,440.00

8.2.04.00

INVESTIGACIN E
INSTRUMENTACIN.

8.2.04.01

Estacin de
Convergencia.Max.3
pines.

8.2.05.00

OBRAS DE
CONCRETO.

8.2.05.01

Encofrado Clase B.
Plain.

m2

60

8.2.05.02

Hormign Clase C.

m3

15 142.91

8.2.05.03

Refuerzo.Barras
corrugadas.

8.2.05.04

Pernos de anclajecon
lechadapara muros de
hormign D = 25 mm,
profundidad en la roca
1,5 m dept en
hormign de 1 m

no

8.2.05.05

HormignClase B.
pavement.Concrete
espesor mnimo de 150
mm. De malla de
refuerzo min 6,5 kg /
m2

160

8.2.06.00

METAL WORKS.

8.2.06.01

Steeldoor,2 alas con


cerradura W x H = 3,0
m x 3,0 m en el
extremo superior del
tnel. La presin de
diseo de 0,1 bar
ambos lados

kg

300

Suma

Bill 8,2 socavn


Construccin de
tnel de descarga

no

2 3,269.62

6,539.24

67.26 4,035.60
2,143.65

0.5 1,459.67
30

729.84
77.22 2,316.60

169.72

27,155.20

6.11 1,833.00

591,174.48

Proyecto de LeyNo. 8 - Casa de Mquinas y Acceso Tnel


Bill socavn 8.3 Construccin de tnel de aduccin
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

DLAR
ESTADOUNIDENSE

8.3.01.0

ROCA EXCAVACIN.

8.3.01.01

Underground.La
excavacin del tnel
socavn de tnel de
aduccin y socavn a
la habitacin
ventilacin.Seccin
mnima de 22,6 m2.

8.3.01.02

Underground.La
excavacin del tnel.
La adicin de una
mayor seccin
transversal.

m3

50

31.71 1,585.50

8.3.01.03

Underground.La
excavacin del tnel.
Desmonte excesivo
anormal.

m3

50

15.76 788

8.3.01.04

Underground.La
excavacin del tnel.
La adicin de rondas de
voladura cortos.
a) Adicin de medio
rondas de voladura

285

1,521.55

433,641.75

20 359.56

7,191.20

b) Adicin de cuarta
rondas de voladura

10 1,744.84

17,448.40

8.3.01.05

Subterrneas.Perforaci m
ones contorno
perimetral para
voladuras
(cuandomenosque se
requiere 0,7 m de
distancia).

70

15.23

1,066.10

8.3.02.00

La perforacin
exploratoria e
inyeccin.

8.3.02.01

Perforacindepercusi m
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
en la cara.

1,500.00

15.58

23,370.00

8.3.02.02

Perforacindepercusi
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
Detrs de la cara.

8.3.02.03

Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m. En
la cara

no

15

73.32 1,099.80

8.3.02.04

Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m.
Detrs de la cara

no

40

60.68 2,427.20

8.3.02.05

El lavado entre los


agujeros.En la cara.

no

15

30.3 454.5

8.3.02.06

El lavado entre los


agujeros.Detrs de la
cara.

10

26.25 262.5

8.3.02.07

Lechada.Por valor de
empacador.Profundida
d 0-5 m.En la cara

no

60 143.86

8,631.60

8.3.02.08

Lechada.Por valor de
empacador.Profundida
d 0-5 m.Detrs de la
cara

no

70 140.23

9,816.10

8.3.02.09

Lechada de
cemento.Tipo de
consumo A. Cemento

kg

24,000.00

1.01 24,240.00

8.3.02.10

Lechada de
cemento.Tipo consumo
B. Cemento

kg

20,000.00

2.59 51,800.00

8.3.02.11

Lechada de
cemento.Escriba C. El
consumo de cemento

kg

5,000.00

7.19 35,950.00

8.3.02.12

Inyecciones de
consolidacin.

kg

2,000.00

1.9 3,800.00

8.3.02.13

Tubos flexibles para


contacto lechada.

250

31.11 7,777.50

8.3.02.14

Contacto
mampostera.Escriba
D.

kg

1,000.00

22.57 22,570.00

8.3.02.15

Contacto
mampostera.Tipo E.

kg

1,500.00

26.23 39,345.00

8.3.02.16

Tiempo de la
lechada.En la cara

hr

50 605

30,250.00

8.3.02.17

Tiempo de la
lechada.Detrs de la
cara

hr

50 520

26,000.00

8.3.03.00

APOYO DEL ROCK

1,200.00

13.55 16,260.00

8.3.03.01

Escalamiento Extra. En
la cara.

hr

20

87.62 1,752.40

8.3.03.02

Escalamiento Extra.
Detrs de la cara.

hr

20

69.96 1,399.20

8.3.03.03

Inviertalimpieza y
escalamiento. Detrs
de la cara.

m2

500

24.34 12,170.00

8.3.03.04

Alta presin de
descarga de
agua.Detrs de la cara

m2

500

9.06 4,530.00

8.3.03.05

Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.

no

100

53.27

5,327.00

no

170

54.35

9,239.50

no

100

65.04

6,504.00

15

47.72

715.8

15

52.95

794.25

15

61.32

919.8

15

49.06

735.9

120

50.65

6,078.00

100

61.2

6,120.00

D = 20 mm. De
profundidad en la roca
2,4 m
8.3.03.06

Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
D = 20 mm. De
profundidad en la roca
2,9 m

8.3.03.07

Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
D = 20 mm. De
profundidad en la roca
3,9 m

8.3.03.08

Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
2,4 m

8.3.03.09

Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
2,9 m

8.3.03.10

Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
3,9 m

8.3.03.11

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
2,4 m

8.3.03.12

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
2,9 m

8.3.03.13

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
3,9 m

8.3.03.14

Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.

150

93

13,950.00

Precio Unitario

Precio total

D = 25 mm. De
profundidad en la roca
5,9 m

Proyecto de LeyNo. 8 - Casa de Mquinas y Acceso Tnel


Bill socavn 8.3 Construccin de tnel de aduccin
Artculo

Descripcin

Unidad

Cantidad

DLAR
ESTADOUNIDENSE

8.3.03.15

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.

DLAR
ESTADOUNIDENSE

10

43.62

436.2

300

47.74

14,322.00

200

54.26

10,852.00

106.5

532.5

D = 20 mm. De
profundidad en la roca
2,4 m
8.3.03.16

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
2,9 m

8.3.03.17

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
3,9 m

8.3.03.18

Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
5,9 m

8.3.03.19

MallaChainlinkedfijado
para el rock pernos. En
la cara.

m2

50

14.48 724

8.3.03.20

Mallazo fija a pernos de


anclaje. En la cara.

m2

30

10.45 313.5

8.3.03.21

Mallazo fija a pernos de


anclaje. Detrs de la
cara.

m2

30

9.51 285.3

8.3.03.22

Correasde
acerofijados a pernos
de anclaje. En la cara.

30

42.01 1,260.30

8.3.03.23

Correasde
acerofijados a pernos
de anclaje. Detrs de la
cara.

30

37.89 1,136.70

8.3.03.24

El hormign
proyectado.Plain. En la
cara.

m3

30 297.33

8,919.90

8.3.03.25

El hormign
proyectado.Plain.
Detrs de la cara.

m3

30 257.64

7,729.20

8.3.03.26

El hormign
proyectado.De fibra
reforzada. En la cara.

m3

400

360.71

144,284.00

8.3.03.27

El hormign
proyectado.De fibra
reforzada. Detrs de la
cara.

m3

100

312.56

31,256.00

8.3.03.28

Suministro de barras de
refuerzo para las
costillas de hormign
proyectado reforzado.

kg

8.3.03.29

La instalacinde las
costillas de hormign
proyectado reforzado.
En la cara.

50

18.87 943.5

8.3.03.30

La instalacinde las
costillas de hormign
proyectado reforzado.
Detrs de la cara.

40

13.7 548

8.3.03.31

Prefabricacin y
suministro de vigas de
celosa.

kg

8.3.03.32

La instalacinde vigas
de celosa para
costillas de hormign
proyectado. En la cara.

30

71.17 2,135.10

8.3.03.33

La instalacinde vigas
de celosa para
costillas de hormign
proyectado. Detrs de
la cara.

20

59.43 1,188.60

8.3.03.34

Inviertaconcreto. En la
cara.

m3

8.3.03.35

Refuerzo de
invertido.En o detrs
de la cara

kg

1,300.00

8.3.04.00

INVESTIGACIN E
INSTRUMENTACIN.

8.3.04.01

Investigacin y pruebas
subterrneas.Tiempo
de inactividad.

hr

300

8.3.04.02

Perforacin de
base.Puesta en
marcha en cada lugar
de perforacin.

no

8.3.04.03

Perforacin de base,
dimetro mnimo de 76
mm. De profundidad de
0-30 m

420

125.06

52,525.20

8.3.04.04

Perforacin de base,
dimetro mnimo de 76
mm. De profundidad
30-100 m

140

171.84

24,057.60

8.3.04.05

Perforacin de
base.Estabilizacin
Hole.Lechada de
cemento.

kg

2,500.00

8.3.04.06

AjustePackerpara la
prueba de presin de
agua. Prueba
concurrente con la
perforacin (single
envasador).
Profundidad 0-100 m

8.3.04.07

AjustePackerpara la
no
prueba de presin de
agua. Prueba de
perforacin despus de
completado (doble
packer). Profundidad 0100 m

8.3.04.08

Pruebas Lugeon

no

no

1,300.00

1.8 2,340.00

800

3.2 2,560.00

30 100.41

3,012.30
2.4 3,120.00

605

6 1,108.00

181,500.00

6,648.00

1.9 4,750.00

100

115.56

11,556.00

10

135.56

1,355.60

70 1,440.00

100,800.00

8.3.04.09

Movilizacin /
desmovilizacinde
expertos y equipo a
hydrofracture y
pruebas de gato
hidrulico

no

1,210.56

8.3.04.10

Nmero de
hydrofracture o
pruebas de gato
hidrulico

no

12 1,140.23

13,682.76

8.3.04.11

Estacin de
Convergencia.Max.3
pines.

no

6 3,269.62

19,617.72

8.3.04.12

Multipunto
extensmetro pozo.

no

5 7,612.00

38,060.00

8.3.05.0

OBRAS DE
CONCRETO.

8.3.05.01

Encofrado Clase B.
Plain.Inclinada o
vertical.

m2

8.3.05.02

Encofrado Clase B.
curvada.Transicin
Forro

m2

8.3.05.03

Hormign Clase C.

m3

8.3.05.04

Refuerzo.Barras
corrugadas.

8.3.05.05

Preparacin de
superficie de la roca
para el hormigonado

m2

8.3.05.06

Acabado de superficies
sin forma, UB Clase

m2

50

4.65 232.5

8.3.05.07

Ranuras, rectangulares
100 x 100 mm

10

36.12 361.2

8.3.05.08

Teclas cortantes en
juntas de construccin

20

22.63 452.6

8.3.05.09

HormignClase
pavement.Concrete C.
espesor mnimo de 150
mm. De malla de
refuerzo min 6,5 kg /
m2

225

67.26 15,133.50

10

500

2,421.12

96.29 962.9

139.83

69,915.00

10 1,459.67
450

14,596.70
3.59 1,615.50

180

163.15

29,367.00

Precio Unitario

Precio total

Proyecto de LeyNo. 8 - Casa de Mquinas y Acceso Tnel


Bill socavn 8.3 Construccin de tnel de aduccin
Artculo

Descripcin

Unidad

Cantidad

DLAR
ESTADOUNIDENSE

8.3.06.0

ACCIONES PARA LA
INSTALACIN DE
MAMPARO

8.3.06.01

Pernos de anclaje con


lechada de calidad
weldble para la fijacin
de la puerta, D = 25
mm.

8.3.06.02

DLAR
ESTADOUNIDENSE

a) Longitud 3 m,
profundidad en la roca
2,0 m

no

30

88.36 2,650.80

b) Longitud 2 m,
profundidad en la roca
1,0 m

no

30

66.07 1,982.10

PVC Waterstop en
juntas de construccin,
200 mm de ancho

100

24.93 2,493.00

8.3.06.03

PVCtuberas para
inyeccin de huecos
entre hormign y roca
para contactar
lechada.Colocado a
travs
encofrado.Dimensin
de acuerdo con el
equipo de contratistas
rejuntado

no

8.3.06.04

Interfazcon H,
LS
empotramiento y
rejuntado de
mamparo.Documentos
de referencia H-tierno,
Parte D, Seccin 2. Esta
partida incluir obras
relacionadas con la
preparacin para, y
empotramiento en el
hormign y similares
para el cierre, que
puede no estar incluida
en otros artculos, la
coordinacin con la Hcontratista en su
transporte y trabajo
Scaling, encofrado,
armadura, hormign y
mampostera es
atender a otros
lugares.

8.3.07.0

DRENAJE

8.3.07.01

Perforacindel agujero
dos drenaje para tnel
de descarga D = min
120 mm, longitud de
cada hoyo 35 m, todo
incluido.

8.3.07.02

Tuberade PVCD = 300


mm, en la trinchera de
cierre, incluyendo la
excavacin de la zanja
y relleno.

8.3.07.03

Roca excavacin de
zanja, sobre artculo
8.3.07.02

m3

8.3.07.04

Drainpipe, PVC, D =
100 mm con acceso
tubera cada 60 m

8.3.07.05

Tubera de PE fija al
techo del tnel para
areation 50 mm

20

24.2

484

44,180.00

44,180.00

70

63.4 4,438.00

180

43.34 7,801.20

70

31.71 2,219.70

360

8.92 3,211.20

90

5.45 490.5

Bill socavn 8.3


Construccin de
tnel de aduccin

1,733,471.50

Proyecto de LeyNo. 8 - Casa de Mquinas y Acceso Tnel


Bill 8.4 de Powerhouse Caverna
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario
DLAR
ESTADOUNIDENSE

Precio total
DLAR
ESTADOUNIDENSE

Caverna se considerar
y se mide por el trabajo
de apoyo detrs de la
cara

8.4.01.0

ROCA EXCAVACIN.

8.4.01.01

Underground.La
excavacin de la
caverna. Independiente
de la subdivisin de la
seccin transversal.
Aplicable para Top
Rubro

m3

6,600.00

8.4.01.02

Underground.La
excavacin de la
caverna. Independiente
de la subdivisin de la
seccin transversal.
Aplicable para Bancos

m3

18,250.00

8.4.01.03

Subterrneos.Perforaci m
ones contorno
perimetral para
voladuras (cuando se
requiere menos de 0,7
m de distancia).

8.4.02.0

La perforacin
exploratoria e
inyeccin.

8.4.02.01

Perforacindepercusi
n, dimetro mnimo de
50 mm de profundidad
0 -. 30 m.

8.4.02.02

Pruebas de presin de
agua.Ajuste
Packer.Las pruebas con
solo
empacador.Profundida
d 0-5 m

no

73.32 366.6

8.4.02.03

Lavado entre agujeros

no

30.3 151.5

8.4.02.04

Lechada por ajuste


empacador.Profundida
d 0-5 m

no

8.4.02.05

Lechada de
cemento.Tipo A ..

kg

3,000.00

1.01 3,030.00

8.4.02.06

Lechada de
cemento.Tipo consumo
B. Cemento

kg

6,000.00

2.59 15,540.00

8.4.02.07

Lechada de
cemento.Escriba C. El
consumo de cemento

kg

1,000.00

7.19 7,190.00

8.4.02.08

Lechada.Tiempo de
inactividad.

hr

20 605

8.4.03.0

APOYO DEL ROCK.

8.4.03.01

Escalamiento Extra.

hr

70

68.62 452,892.00

41.2 751,900.00

300

15.23

450

4,569.00

15.58 7,011.00

25 143.86

3,596.50

12,100.00

87.62 6,133.40

Aplicable para la
central elctrica de Top
Rumbo y Bancos
8.4.03.02

Invierta limpieza y
escalamiento.

m2

1,000.00

24.34 24,340.00

8.4.03.03

Cincel escalado / vigas


de gra

m2

200

38.42 7,684.00

8.4.03.04

Alta presin de
descarga de agua.

m2

500

9.06 4,530.00

8.4.03.05

Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 2,9 m

no

400

54.35 21,740.00

8.4.03.06

Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 3,9 m

no

500

65.04 32,520.00

8.4.03.07

Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 4,9 m

no

400

80.22 32,088.00

8.4.03.08

Totalmentepernos de
anclaje con lechada de
cemento, barra
corrugada.D = 20
mm.Profundidad en la
roca 2,9 m

no

300

52.95 15,885.00

8.4.03.09

Totalmentepernos de
anclaje con lechada de
cemento, barra
corrugada.D = 20
mm.Profundidad en la
roca 3,9 m

no

500

61.32 30,660.00

8.4.03.10

Totalmentepernos de
anclaje con lechada de
cemento, barra
corrugada.D = 25
mm.Profundidad en la
roca 4,9 m

no

400

73.74 29,496.00

8.4.03.11

Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.D = 25
mm.Profundidad en la
roca 5,9 mpernos
spiling as como pernos
radiales

200

93

18,600.00

8.4.03.12

Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.D = 32
mm.Profundidad en la
roca 6,9 mpernos
spiling as como pernos
radiales

100

116.21

11,621.00

8.4.03.13

Chainlinked malla fija


para el rock pernos.

m2

100

14.48 1,448.00

8.4.03.14

Mallazo fija a pernos de


anclaje.

m2

1,000.00

10.45 10,450.00

8.4.03.15

Correas de acero
fijados para el rock
pernos.

100

42.01 4,201.00

8.4.03.16

Suministrode la barra
de tendones (activos)
anclajes de
roca.Longitud 10 m

no

5 210.3

1,051.50

8.4.03.17

Suministrode la barra
de tendones (activos)
anclajes de
roca.Longitud 15 m

no

5 252.36

1,261.80

8.4.03.18

Suministrode hebra
tendn (pasivo)
anclajes de
roca.Longitud 10 m

no

10 189.27

1,892.70

8.4.03.19

Suministrode hebra
tendn (pasivo)
anclajes de
roca.Longitud 15 m

no

10 227.12

2,271.20

8.4.03.20

La perforacin de
agujero para bar /
hebra anclas ..

375

8.4.03.21

Re-perforacin despus
de la lechada para bar /
hebra anclas ..

100

8.4.03.22

Instalacinde la barra
de tendones (activos)
anclajes de
roca.Longitud 10 m

no

30.4 11,400.00

18.98 1,898.00

5 315.46

1,577.30

8.4.03.23

Instalacinde la barra
de tendones (activos)
anclajes de
roca.Longitud 15 m

no

5 378.54

1,892.70

8.4.03.24

Instalacinde hebra
tendn (pasivo)
anclajes de
roca.Longitud 10 m

no

10 283.91

2,839.10

8.4.03.25

Instalacinde hebra
tendn (pasivo)
anclajes de
roca.Longitud 15 m

no

10 340.69

3,406.90

8.4.03.26

El hormign
proyectado.Plain.

m3

150

300.41

45,061.50

8.4.03.27

El hormign
proyectado.Reforzado
con fibra.

m3

1,200.00

363.79

436,548.00

8.4.03.28

Suministro de barras de
refuerzo para las
costillas de hormign
proyectado reforzado
(RRS).Aplicable para la
central elctrica

kg

11,000.00

8.4.03.29

Instalacinde costillas
de hormign
proyectado reforzado
(RRS).En la
cara.Aplicable para la
central elctrica

750

8.4.04.0

INVESTIGACIN E
INSTRUMENTACIN.

8.4.04.01

Estacin de
Convergencia.Max.3
pines.

no

1.8 19.800,00

18.87 14,152.50

3 3,269.62

9,808.86

BillNo.8 - Casa de Mquinas y Acceso TnelBill 8.4 de Powerhouse Caverna


Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

DLAR
ESTADOUNIDENSE

8.4.04.02

Estacin de
Convergencia.Max.5
pines.

no

3 3,339.62

10,018.86

8.4.04.03

Multipunto
extensmetro pozo.

no

8 7,612.00

60,896.00

8.4.04.04

Investigacin e
instrumentacin.Tiemp
o de inactividad.

hr

8.4.05.0

ALCANTARILLAS
tubera y tubos de
desage.

8.4.05.01

De desage de PVCpipe.Incluyendo curvas


y
accesorios.Complete.
D = 100 mm

8.4.05.02

Compactado roca
triturada 8-16 mm a lo
largo de las tuberas de
drenaje.

m3

30

8.4.05.03

Compactado roca
triturada 8-11 mm
alrededor del tanque
de recogida.

m3

8.4.05.04

Compactado roca
triturada 16-32 mm
como supuesto Base de
losa de hormign

m3

10 605

150

100

6,050.00

8.92 1,338.00

22.24 667.2

22.61 113.05

23.1 2,310.00

8.4.06.0

OBRAS DE
CONCRETO.

8.4.06.01

Encofrado Clase A.
Llano.Inclinada o
vertical.Por encima de
la elevacin 1569.0

m2

8.4.06.02

Encofrado Clase A.
Llano.Horizontal.Por
encima de la elevacin
1569.0

m2

50

84.01 4,200.50

8.4.06.03

Encofrado Clase A.
curvas.Por encima de
la elevacin 1569.0

m2

20

81.12 1,622.40

8.4.06.04

Encofrado Clase B.
Plain.Inclinada o
vertical.Por debajo de
la elevacin 1561.3

m2

1,650.00

67.26 110,979.00

8.4.06.05

Encofrado Clase B.
Plain.Inclinada o
vertical.De elevacin
1.561,3 1.565,0 a la
elevacin

m2

2,150.00

75.33 161,959.50

8.4.06.06

Encofrado Clase B.
Plain.Inclinada o
vertical.De elevacin
1.565,0 1.569,0 a la
elevacin

m2

2,400.00

82.86 198,864.00

8.4.06.07

Encofrado Clase B.
Plain.Inclinada o
vertical.Por encima de
la elevacin 1569.0

m2

1,850.00

92.8 171,680.00

8.4.06.08

Encofrado Clase B.
Plain.Horizontal.Por
debajo de la elevacin
1561.30

m2

500

68.51 34,255.00

8.4.06.09

Encofrado Clase B.
Plain.Horizontal.De
elevacin 1.561,3
1.565,0 a la elevacin

m2

750

76.73 57,547.50

8.4.06.10

Encofrado Clase B.
Plain.Horizontal.De
elevacin 1.565,0
1.569,0 a la elevacin

m2

850

84.4 71,740.00

8.4.06.11

Encofrado Clase B.
Plain.Horizontal.Por
encima de la elevacin
1569.0

m2

350

92.84 32,494.00

8.4.06.12

Encofrado Clase C.
Plain.Inclinada o
vertical.Por debajo de
la elevacin 1561.3

m2

100

72.31 7,231.00

8.4.06.13

Encofrado Clase C.
Plain.Horizontal.Por
debajo de la elevacin
1561.3

m2

100

80.98 8,098.00

8.4.06.14

Encofrado
articulaciones Clase C.
Construccin.Por
debajo de la elevacin
1569.0

m2

300

73.21 21,963.00

8.4.06.15

Encofrado
articulaciones Clase C.
Construccin.Por
encima de la elevacin
1569.0

m2

100

85.12 8,512.00

8.4.06.16

Encofrado.Clase A.
gra Vigas y Columnas

m2

1,000.00

8.4.06.17

Vaco rectangular, de
hasta 0,1 m2.

no

30

26.7 801

8.4.06.18

Vaco rectangular, 0,1 a


0,5 m2.

no

30

26.7 801

250

69.43 17,357.50

156.65

156,650.00

8.4.06.19

Sin efecto la Circular,


hasta 0,35 m de
dimetro.

no

20

41.2 824

8.4.06.20

Sin efecto la Circular,


0,35 a 0,9 m de
dimetro.

no

10

41.2 412

8.4.06.21

Groove, triangular
garganta goteo 25 mm.

200

33.5 6,700.00

8.4.06.22

Groove, rectangular.W
x H = 100 x 100 mm

100

36.12 3,612.00

8.4.06.23

Groove, rectangular.W
x H = 200 x 200 mm

200

37.23 7,446.00

8.4.06.24

Teclas cortantes en
juntas de construccin

200

22.63 4,526.00

8.4.06.25

Encofrado.Ranura de
drenaje a lo largo de
las paredes de roca

700

42.12 29,484.00

8.4.06.26

Refuerzo.Barras
corrugadas.

385

8.4.06.27

Refuerzo.Las barras
lisas.

3 1,459.67

4,379.01

8.4.06.28

Refuerzo.Mallazo.

2 2,812.50

5,625.00

8.4.06.29

Lechadabarras
corrugadas.D = 20
mm.Longitud total 2,0
m.Profundidad en la
roca 1,0 m

no

20

66.07 1,321.40

8.4.06.30

Lechadabarras
corrugadas.D = 25
mm.Longitud en
concreto 1,0
m.Profundidad en la
roca 1,5 m

no

50

66.07 3,303.50

8.4.06.31

Lechadabarras
corrugadas.D = 32
mm.Longitud de
hormign de 1,5
m.Profundidad en la
roca 2,0 m

no

20

66.07 1,321.40

8.4.06.32

Lechadabarras
corrugadas.D = 32
mm.Longitud de
hormign de 1,5
m.Profundidad en la
roca 6,0 m.Gra Vigas
y Columnas

no

54 129.48

8.4.06.33

Lechadabarras
corrugadas.D = 25
mm.Longitud de
hormign de 1,5
m.Profundidad en la
roca 5,0 m.Gra Vigas
y Columnas

no

8.4.06.34

Deformadosbares.D = no
25 mm.Longitud:
2,0m.Longitud de
hormign de 1,0 m.de
calidad soldable para la
fijacin de acera
hidrulicas, equipos
electromecnicos etc.
parcialmente
embutidos.

8.4.06.35

Preparacin de
superficie de la roca
para el hormigonado.

m2

700

8.4.06.36

Clase de hormign B. A
continuacin elevacin
1561.30

m3

700

137.15

96,005.00

8.4.06.37

Clase de hormign C. A
continuacin elevacin
1561.30

m3

1,550.00

142.91

221,510.50

8.4.06.38

Clase de hormign C.
De elevacin 1.561,3
1.569,0 a la elevacin

m3

1,550.00

142.91

221,510.50

1,459.67

561,972.95

6,991.92

160

129.48

20,716.80

100

66.07

6,607.00

3.59 2,513.00

8.4.06.39

Clase de hormign C.
Por encima de la
elevacin 1569.0

m3

370

142.91

52,876.70

8.4.06.40

Hormign Clase C.
Crane Vigas y
Columnas

m3

300

142.91

42,873.00

8.4.06.41

Lechadabajo carriles
para viajar gras con la
expansin de
mortero.Rails sern
suministrados por
otros.

400

2.5 1,000.00

8.4.06.42

El acabado de
superficies no
formadas, Clase UA.

m2

600

4.2 2,520.00

8.4.06.43

El acabado de
superficies no
formadas, UB Clase.

m2

2,700.00

4.65 12,555.00

8.4.06.44

El acabado de
superficies no
formadas, clase UC.

m2

300

4.85 1,455.00

8.4.06.45

Waterstop PVC, 150


mm de ancho.

200

15.27 3,054.00

8.4.06.46

Waterstop PVC, 200


mm de ancho.

100

24.93 2,493.00

8.4.06.47

Ganchos de
elevacin.Barras de
acero inoxidable.D =
25 mm

no

10

97.35 973.5

8.4.06.48

Hierros
Paso.Parcialmente
incrustado en el
hormign.

no

20

15.71 314.2

8.4.06.49

Inoxidabletubos de
acero.Parcialmente
incrustado en concreto,
inlcuyendo flexin y
accesorios.Diam. =
100mm.

20

40.08 801.6

8.4.06.50

Inoxidabletubos de
acero.Parcialmente
embebido en el
hormign, incluyendo
doblarse y
accesorios.Diam. =
150mm.

20

78.18 1,563.60

8.4.06.51

Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 50 mm

100

8.92 892

8.4.06.52

Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 100 mm

100

8.92 892

8.4.06.53

Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 150 mm

100

8.92 892

BillNo.8 - Casa de Mquinas y Acceso TnelBill 8.4 de Powerhouse Caverna


Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

8.4.06.54

Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 200 mm

8.4.06.55

Hinchazn banda
arcilla

50

100

DLAR
ESTADOUNIDENSE

43.34 2,167.00

110.2

11,020.00

8.4.06.56

Compuesto de sellado
de juntas.

kg

20

18.25 365

8.4.06.57

Tubo de neopreno
Sellado de juntas.

kg

20

31.35 627

8.4.06.58

Sellado de juntas.Tubo
de inyeccin.

50

52.32 2,616.00

8.4.06.59

Sellado de juntas.La
inyeccin de tubos de
inyeccin con epoxi.

kg

10

18.25 182.5

8.4.06.60

Selladoalrededor de
LS
tuberas, cables,
conductos, etc., en
bloqueadores con
masilla resistente al
fuego para satisfacer
clase A60 fuego.Varios
espesor de las
paredes.El trabajo que
se lleva a cabo despus
de la instalacin de los
equipos.

8.4.06.61

Segundaetapa en
concreto bloqueadores
con mortero.Varios
espesor de las
paredes.El trabajo que
se lleva a cabo despus
de la instalacin de los
equipos.

8.4.07.0

CONSTRUCTORES DE
TRABAJO

8.4.07.01

Piso solado de
hormign, 50 mm de
espesor.

m2

50

17.02 851

8.4.07.02

Baldosas de cermica.

m2

30

28.43 852.9

8.4.07.03

Los pisos de vinilo.

m2

40

70.98 2,839.20

8.4.07.04

Suelos de terrazo.

m2

30

59.57 1,787.10

8.4.07.05

Sistema de suelo
elevado.

m2

40 522.8

8.4.07.06

Mampostera de
bloques de
hormign.Espesor
nominal.

m2

40

73.3 2,932.00

8.4.07.07

Enyesado, interno.

m2

80

42.76 3,420.80

8.4.07.08

Rendering, llano,
externo.

m2

50

17.1 855

8.4.07.09

Rendering, teido,
externo.

m2

50

17.1 855

8.4.07.10

Azulejo cermico.

m2

8.4.07.11

Pared Luz particin


(perfiles de acero /
placas de yeso).

m2

50

55.9 2,795.00

8.4.07.12

Suspendido del techo.

m2

40

27.35 1,094.00

8.4.07.13

Tubera por debajo de


la viga de la gra para
drenar fosa.

200

18.58 3,716.00

8.4.07.14

De altadensidad de la
lana mineral.Espesor
100 mm

m2

200

6.67 1,334.00

8.4.07.15

Aisladospuertas de
acero
individuales.Clasificaci
n fuego
A60.Dimensiones
externas
1000x2100mm

no

LS

18,627.10

18,627.10

1 12,873.10

12,873.10

130

20,912.00

28.43 3,695.90

26 3,049.00

79,274.00

8.4.07.16

Aisladospuertas de
no
acero
individuales.Clasificaci
n fuego
A60.Dimensiones
externas
1000x2100mmpresin
de explosin de ambos
lados: 10 kN / m2.

3,049.00

12,196.00

8.4.07.17

Aisladospuertas de
no
acero
individuales.Clasificaci
n fuego
A60.Dimensiones
externas
1100x2500mm

4,505.00

18,020.00

8.4.07.18

Puertas de acero de
doble
aislamiento.Clasificaci
n fuego
A60.Dimensiones
externas
1600x2200mm

no

6 5,542.00

33,252.00

8.4.07.19

Puertas de acero de
doble
aislamiento.Clasificaci
n fuego
A60.Dimensiones
externas
2000x2500mm

no

6 5,542.00

33,252.00

8.4.07.20

Puertas de madera
interiores
individuales.Ranura
aire
Inclusiv.Dimensiones
externas 900x2100
mm.

no

3 1,044.67

3,134.01

8.4.07.21

Principalpuerta de
entrada a sala de
mquinas.Aluminio
compuerta
rodante.Dimensin
exterior4500x5500mm
.

no

1 9,874.02

9,874.02

8.4.07.22

Pintura del suelo con


epoxi.

m2

2,000.00

24.43 48,860.00

8.4.07.23

Pintura del suelo con


epoxi
autonivelante.Mquina
piso Hall.

m2

900

24.43 21,987.00

8.4.07.24

Pintura de paredes de
hormign.

m2

8,500.00

24.43 207,655.00

8.4.07.25

Acabado de superficies
de hormign
proyectado en casa
caverna con rociado de
pintura de hormign
blanco.

m2

1,500.00

24.43 36,645.00

8.4.07.26

La pintura de las
puertas de acero, solo

no

34

8.4.07.27

La pintura de las
puertas de acero, doble

no

12 119.5

8.4.07.28

Pintura de puertas de
madera interiores

no

8.4.08.0

ACERO
ESTRUCTURAL DE
OBRAS.

8.4.08.01

Arcode techo.Pernos
m2
completos incluido
roca, abrazaderas de
cables, estructura de
soporte y cinta
cncava leve lminas
de techo de
acero.Canalones y
tubos de drenaje hacia
abajo a la viga de la
gra tambin se
incluirn.

61.12 2,078.08

1,000.00

1,434.00

34 102

293.55

293,550.00

8.4.09.0

HVAC,SANITARIAS Y
DE LUCHA CONTRA
INCENDIOS
INSTALACIONES.PAR
A TNEL DE ACCESO,
central elctrica,
TNELES BARRAS,
TRANSFORMADOR
HALL Y CABLE DEL
TNEL

8.4.09.01

Aireacondicionado y
Prov.Suma
sistemas de
ventilacin.En sala de
mquinas de un hall de
transformador.Diseo
deempleador.

1 600,000.00

600,000.00

8.4.09.02

Aireacondicionado y
sistemas de
ventilacin.En el
edificio de oficinas de
la sala de
mquinas.Diseo por
el empleador.

Prov.Suma

1 110,000.00

110,000.00

8.4.09.03

Sistema de agua
helada.Diseo por el
empleador.

Prov.Suma

1 25,000.00

25,000.00

8.4.09.04

Alcantarillado,instalaci LS
ones de fontanera y
sanitarios, con planta
de tratamiento de agua
potable y alcantarillado
del tanque de volumen
mnimo 6.000 l, etc.

71,530.00

71,530.00

8.4.09.05

Instalaciones de lucha
contra incendios y
equipos de
rescate.Diseo por el
empleador.

Prov.Suma

1 80,000.00

80,000.00

8.4.09.06

Piezas de repuesto que Prov.Suma


se especifican en la
lista de piezas de
repuesto.

1 14,000.00

14,000.00

8.4.10.0

METAL WORKS.

8.4.10.01

Tapa de la escotilla de
poca potencia.

kg

4.000,00

7.01 28,040.00

8.4.10.02

Tapa de la escotilla de
servicio pesado.

kg

35,000.00

6.34 221,900.00

8.4.10.03

Cubierta del conducto


de poca potencia.

kg

1,000.00

7.01 7,010.00

BillNo.8 - Casa de Mquinas y Acceso TnelBill 8.4 de Powerhouse Caverna


Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

DLAR
ESTADOUNIDENSE

8.4.10.04

Cubierta del conducto


de alta resistencia.

kg

100

6.34 634

8.4.10.05

Rejilla de poca
potencia.

kg

1,000.00

7.01 7,010.00

8.4.10.06

Rejilla de alta
resistencia.

kg

1,000.00

6.34 6,340.00

8.4.10.07

Barandilla desmontable
alrededor del cascarn.

kg

1,000.00

6.34 6,340.00

8.4.10.08

Barandilla de la
escalera interna.
a) Tipo 1

kg

2,000.00

7.01 14,020.00

b) Tipo 2

kg

1,000.00

7.01 7,010.00

a) Tipo A

kg

400

7.01 2,804.00

b) Tipo B

kg

100

7.01 701

8.4.10.10

Escaleras de acero.

kg

2,000.00

7.01 14,020.00

8.4.10.11

Escalas de acero.

kg

1,000.00

7.01 7,010.00

8.4.10.12

Elevador

LS

1 36,644.00

8.4.10.13

Piezas de recambio
para ascensor por
cinco (5) aos, tal
como recomiendan la
fabricacin

LS

8.4.10.14

Guas y alfizares de
las trozas de
parada.Incrustado en
concreto.

kg

100

7.03 703

8.4.10.15

Deje de
registros.Acero.

kg

200

6.34 1,268.00

8.4.11.0

Interfazcon E:. M,
empotramiento de
equipos
electromecnicosEsta
partida incluir todos
los trabajos
relacionados con la
preparacin para, y
imbedment en
hormign y similares,
de electro relevante equipo mecnico
(incluyendo, pero no
limitado a, el proyecto
de turbina de tubo y
otras partes de la
turbina, generador de
los mecanismos de
apoyo, etc.)

8.4.11.1

La formacinde
rebajes, bloqueadores
y similares, para devide
entre las diferentes
etapas de hormigonado

8.4.11.2

Provisiny remocin de LS
encofrados para
elementos a ser
incorporados, extra
ms para
empotramiento y
encofrado.

8.4.12.0

OBRAS CIVILES
VARIOS

8.4.12.01

Tierraelectrodos,
contra la roca o fijado
al refuerzo.Hilos de
cobre 1 x 95 mm2.En
caverna central
elctrica.

300

21.34 6,402.00

8.4.12.02

Tierraelectrodos,
contra la roca o fijos a
los cables
reinforcementCu 2 x 95
mm2.En caverna
central elctrica.

200

21.34 4,268.00

8.4.10.09

Carril interno mano.

LS

36,644.00
0

1 73,089.60

73,089.60

67,416.00

67,416.00

8.4.12.03

Varillas de puesta a
tierra en los agujeros
perforados, min 6 m de
largo

no

10 101.2

8.4.12.04

Varillas de puesta a
tierra en los agujeros
perforados, mnimo 10
m de largo

no

4 101.2

8.4.12.05

Cadwelding de juntas,
conexiones e
intersecciones

no

80 230.3

8.4.12.06

Plataforma temporal en
la cota 1569,0 para la
descarga de los
distribuidores y los
tubos de entrada

LS

1,012.00

404.8

18,424.00

1 14,155.20

14,155.20

Bill 8.4 de
Powerhouse Caverna

6,889,577.46

BillNo.8 - Casa de Mquinas y Acceso Tnel


Bill8.5 Transformador Cavern y embarrado Conexiones
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

DLAR
ESTADOUNIDENSE

Embarradoconexiones
y caverna se
considerarn y se
miden para el trabajo
de apoyo detrs de la
cara

8.5.01.0

ROCA EXCAVACIN.

8.5.01.01

Underground.La
excavacin del
tnel.Seccin
transversal14.2m2

40

2,226.50

89,060.00

Aplicable para
embarrado Tneles e
independiente de la
subdivisin de la
seccin transversal
8.5.01.02

Underground.La
excavacin del
tnel.Desmonte
excesivo anormal.

m3

8.5.01.03

Underground.La
m3
excavacin de la
caverna.Independiente
de la subdivisin de la
seccin
transversal.Aplicable
para el transformador
Saln Top Rubro

3,200.00

76.61

245,152.00

8.5.01.04

Underground.La
m3
excavacin de la
caverna.Independiente
de la subdivisin de la
seccin
transversal.Aplicable
para Transformer
Ayuntamiento Bancos

1,200.00

63.49

76,188.00

8.5.01.05

Subterrneos.perforaci
ones contorno
perimetral para
voladuras (cuando se
requiere menos de 0,7
m de distancia).

25

100

15.76 394

15.23 1,523.00

8.5.01.06

Tubo de drenaje del


pozo al tanque del
transformador al
botton de potencia
a) Las movilizaciones /
desmovilizacin de los
equipos de perforacin

LS

1 26,712.25

26,712.25

b) Perforacin de
excavacin de al
menos 300 mm de
dimetro

25

c) lechada de presin
para la estabilizacin
del agujero

25

85.76 2,144.00

d) re-perforacin
despus de la lechada

25

18.98 474.5

e) Suministro e
instalacin de tubera
de acero de 200 mm de
dimetro, con
empotramiento

25

60.75 1,518.75

30.4 760

8.5.02.0

La perforacin
exploratoria e
inyeccin.

8.5.02.01

Percusinperforacin,
dimetro mnimo de 50
mm.de profundidad 0 30 m.

8.5.02.02

Pruebas de presin de
agua.Ajuste
Packer.Las pruebas con
solo
empacador.Profundida
d 0-5 m

no

73.32 366.6

8.5.02.03

Lavado entre agujeros

no

30.3 151.5

8.5.02.04

Lechada por ajuste


empacador.Profundida
d 0-5 m

no

8.5.02.05

Lechada de
cemento.Tipo A ..

kg

3,000.00

1.01 3,030.00

8.5.02.06

Lechada de
cemento.Tipo consumo
B. Cemento

kg

6,000.00

2.59 15,540.00

8.5.02.07

Lechada de
cemento.Escriba C. El
consumo de cemento

kg

1,000.00

7.19 7,190.00

8.5.02.08

Lechada.Tiempo de
inactividad.

hr

8.5.03.0

APOYO DEL ROCK

8.5.03.01

Extrade
hr
escala.Aplicable para
el transformador Saln
Top Rubro y bancos, as
como de embarrado
Tneles

8.5.03.02

Invierta limpieza y
escalamiento.

m2

8.5.03.03

Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 1,9 m

no

70

53.27 3,728.90

8.5.03.04

Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 2,4 m

no

30

53.27 1,598.10

450

15.58 7,011.00

25 143.86

20 605

60

87.62

500

3,596.50

12,100.00

5,257.20

24.34 12,170.00

8.5.03.05

Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 2,9 m

no

50

54.35 2,717.50

8.5.03.06

Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 3,9 m

no

8.5.03.07

Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 4,9 m

no

70

80.22 5,615.40

8.5.03.08

Totalmentepernos de
anclaje con lechada de
cemento, barra
corrugada.D = 20
mm.Profundidad en la
roca 1,9 m

no

40

49.06 1,962.40

8.5.03.09

Totalmentepernos de
anclaje con lechada de
cemento, barra
corrugada.D = 20
mm.Profundidad en la
roca.2,4 m

no

40

49.06 1,962.40

8.5.03.10

Totalmentepernos de
anclaje con lechada de
cemento, barra
corrugada.D = 20
mm.Profundidad en la
roca 2,9 m

no

50

50.65 2,532.50

8.5.03.11

Totalmentepernos de
anclaje con lechada de
cemento, barra
corrugada.D = 20
mm.Profundidad en la
roca 3,9 m

no

70

61.2 4,284.00

8.5.03.12

Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.D = 25
mm.Profundidad en la
roca 4,9 mpernos
spiling as como pernos
radiales.

70

93

6,510.00

8.5.03.13

Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.D = 25
mm.Profundidad en la
roca 5,9 mpernos
spiling as como pernos
radiales.

70

93

6,510.00

8.5.03.14

Chainlinked malla fija


para el rock pernos.

m2

8.5.03.15

Mallazo fija a pernos de


anclaje.

m2

250

10.45 2,612.50

8.5.03.16

Correas de acero
fijados para el rock
pernos.

100

42.01 4,201.00

8.5.03.17

El hormign
proyectado.Plain.

m3

8.5.03.18

El hormign
proyectado.Reforzado
con fibra.

m3

350

8.5.03.19

Suministro de barras de
refuerzo para las
costillas de hormign
proyectado reforzado
(RRS).

kg

1,300.00

100

65.04 6,504.00

50

14.48 724

20 300.41
363.79

6,008.20
127,326.50

1.8 2,340.00

8.5.03.20

La instalacin de las
costillas de hormign
proyectado reforzado
(RRS).

8.5.04.0

INVESTIGACIN E
INSTRUMENTACIN.

8.5.04.01

Estacin de
Convergencia.Max.3
pines.

90

no

18.87 1,698.30

2 3,269.62

6,539.24

BillNo.8 - Casa de Mquinas y Acceso Tnel


Bill8.5 Transformador Cavern y embarrado Conexiones
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

DLAR
ESTADOUNIDENSE

8.5.04.02

Estacin de
Convergencia.Max.5
pines.

no

2 3,339.62

6,679.24

8.5.04.03

Multipunto
extensmetro pozo.

no

2 7,612.00

15,224.00

8.5.04.04

Investigacin e
instrumentacin.Tiemp
o de inactividad.

hr

10 605

8.5.05.0

ALCANTARILLAS
tubera y tubos de
desage.

8.5.05.01

Escurrir PVC tubera,


incluyendo curvas y
accesorios, completo,
D = 100 mm

30

8.92 267.6

8.5.05.02

Compactado roca
triturada 8-16 mm a lo
largo de las tuberas de
desage

m3

15

22.24 333.6

8.5.05.03

Compactado roca
triturada 16-32 mm
como capa de base
para la losa de
hormign

m3

20

23.1 462

8.5.06.0

OBRAS DE
CONCRETO.

8.5.06.01

Encofrado Clase B.
Plain.Inclinada o
vertical.

m2

1,200.00

8.5.06.02

Encofrado Clase B.
Plain.Horizontal.

m2

320

92.84 29,708.80

8.5.06.03

Encofrado Clase C.
Plain.Inclinada o
vertical.

m2

100

72.31 7,231.00

8.5.06.04

Encofrado Clase C.
Plain.Horizontal.

m2

10

80.98 809.8

8.5.06.05

Encofrado
articulaciones Clase C.
Construccin.

m2

20

73.21 1,464.20

8.5.06.06

Encofrado Clase B.
Suelo y escaleras en
los tneles de barras

m2

25 102.2

8.5.06.07

Vaco rectangular, de
hasta 0,1 m2.

no

26.7

80.1

8.5.06.08

Vaco rectangular, 0,1 a


0,5 m2.

no

26.7

80.1

8.5.06.09

Sin efecto la Circular,


hasta 0,35 m de
dimetro.

no

41.2 206

8.5.06.10

Sin efecto la Circular,


0,35 a 0,9 m de
dimetro.

no

41.2

6,050.00

92.8 111,360.00

2,555.00

82.4

8.5.06.11

Groove, triangular
garganta goteo 25 mm.

100

33.5 3,350.00

8.5.06.12

Groove, rectangular.W
x H = 100 x 100 mm

10

36.12 361.2

8.5.06.13

Groove, rectangular.W
x H = 200 x 200 mm

30

37.23 1,116.90

8.5.06.14

Teclas cortantes en
juntas de construccin

100

22.63 2,263.00

8.5.06.15

Encofrado.Ranura de
drenaje a lo largo de
las paredes de roca

140

42.12 5,896.80

8.5.06.16

Refuerzo.Barras
corrugadas.

40 1,459.67

8.5.06.17

Refuerzo.Las barras
lisas.

1 1,459.67

8.5.06.18

Lechadabarras
corrugadas.D = 20
mm.Longitud 2,0
m.Profundidad en la
roca 1,0 m

no

60

66.07 3,964.20

8.5.06.19

Lechadabarras
corrugadas.D = 25
mm.Longitud en
concreto 1,0
m.Profundidad en la
roca 1,5 m

no

40

66.07 2,642.80

8.5.06.20

Lechadabarras
corrugadas.D = 32
mm.Longitud en
concreto 1,0
m.Profundidad en la
roca 2,5 m

no

20

68.24 1,364.80

8.5.06.21

Bares.D = 20
mm.Longitud: 1,0 m
Longitud de hormign
de 0,6 m.Parcialmente
roscado para la fijacin
de los equipos.

no

20

66.07 1,321.40

8.5.06.22

Preparacin de
superficie de la roca
para el hormigonado.

m2

200

8.5.06.23

Hormign Clase C.

m3

500

8.5.06.24

El acabado de
superficies no
formadas, Clase UA.

m2

8.5.06.25

El acabado de
superficies no
formadas, UB Clase.

m2

600

4.65 2,790.00

8.5.06.26

El acabado de
superficies no
formadas, clase UC.

m2

100

4.85 485

8.5.06.27

Waterstop PVC, 150


mm de ancho.

60

15.27 916.2

8.5.06.28

Ganchos de
elevacin.Barras de
acero inoxidable.D =
25 mm, L = 4,0 M

no

16

77.22 1,235.52

8.5.06.29

Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 50 mm

10

8.92

89.2

8.5.06.30

Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 100 mm

10

8.92

89.2

8.5.06.31

Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 150 mm

50

58,386.80
1,459.67

3.59 718

142.91
10

71,455.00
4.2

43.34 2,167.00

42

8.5.06.32

Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 200 mm

10

43.34 433.4

8.5.06.33

Compuesto de sellado
de juntas.

kg

10

18.25 182.5

8.5.06.34

Tubo de neopreno
Sellado de juntas.

kg

10

31.35 313.5

8.5.06.35

Sellado de juntas.Tubo
de inyeccin.

50

52.32 2,616.00

8.5.06.36

Sellado de juntas.La
inyeccin de tubos de
inyeccin con epoxi.

kg

8.5.06.37

Reforzadosvigas de
hormign delante de
transformadores.BxHx
L=
aprox.300x400x7000m
m

no

24 683.06

8.5.06.38

Galvanizadotirando
ganchos para
transformator en
paredes de
hormign.Steelplate
con pernos de anclaje
parcialmente
incrustado.

kg

60

8.5.06.39

Galvanizadotirando
kg
ganchos para
transformator en
paredes de
roca.Steelplate
soldada a bulones A25
lechada.pernos Rock:
Profundidad en 2.5m
roca.

8.5.07.0

CONSTRUCTORES DE
OBRAS.

8.5.07.01

Aisladopuerta de acero no
individual.Clasificacin
fuego
A60.1000x2100mm
externa de
apertura.presin de
explosin de ambos
lados: 50 kN / m2.

8.5.07.02

Aluminiocompuerta
rodante.La apertura al
exterior 3500 x 4500
mm

no

8.5.07.03

Pinturadel suelo con


epoxi.Tipo:

m2

600

24.43 14,658.00

8.5.07.04

Pintura de paredes.

m2

400

24.43 9,772.00

8.5.07.05

La pintura de las
puertas de acero, solo

no

8.5.08.0

ACERO
ESTRUCTURAL DE
OBRAS.

8.5.08.01

Arcode techo.Pernos
completos incluido
roca, abrazaderas de
cables, estructura de
soporte y acanalada de
acero suave
revestimiento de
tejados y bajantes.

8.5.09.0

METAL WORKS.

8.5.09.01

Tapa de la escotilla de
poca potencia.

18.25

91.25

16,393.44

12.9 774

100

12.9

1,290.00

3,049.00

12,196.00

1 9,874.00

m2

350

kg

100

9,874.00

61.12 244.48

293.55

102,742.50

7.01 701

8.5.09.02

Tapa de la escotilla de
servicio pesado.

kg

10,000.00

6.34 63,400.00

8.5.09.03

Cubierta del conducto


de poca potencia.

kg

500

7.01 3,505.00

BillNo.8 - Casa de Mquinas y Acceso Tnel


Bill8.5 Transformador Cavern y embarrado Conexiones
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

DLAR
ESTADOUNIDENSE

8.5.09.04

Cubierta del conducto


de alta resistencia.

kg

100

6.34 634

8.5.09.05

Rejilla de poca
potencia.

kg

100

7.01 701

8.5.09.06

Acero resistente rejilla


en las bahas de
transformador.

kg

2,500.00

6.34 15,850.00

8.5.09.07

Embedded
Transformador Rail 35
kg.

kg

3,500.00

6.34 22,190.00

8.5.09.08

Barandilla desmontable
alrededor del cascarn.

kg

500

6.34 3.170,00

8.5.09.09

Escalera de
caracol.Incl.barandilla
.Diam .: Aprox: 0.9m

kg

1,000.00

6.34 6,340.00

8.5.09.10

Guas y alfizares de
las trozas de
parada.Incrustado en
concreto.

kg

500

6.34 3.170,00

8.5.09.11

Filtro de grava en las


bahas de
transformador, D = 6090 mm, bien limpia

m3

8.5.10.0

OBRAS CIVILES
VARIOS

8.5.10.01

Tierraelectrodos,
contra la roca o fijado
al refuerzo.Hilos de
cobre 1 x 95 mm2.En
caverna transformador
y la conexin de barras
colectoras

300

21.34 6,402.00

8.5.10.02

Tierraelectrodos,
contra la roca o fijados
a los cables de refuerzo
de Cu 2 x 95 mm2.En
caverna transformador
y la conexin de barras
colectoras

100

21.34 2,134.00

8.5.10.03

Varillas de puesta a
tierra en los agujeros
perforados, min 6 m de
largo

no

4 101.2

404.8

8.5.10.04

Varillas de puesta a
tierra en los agujeros
perforados, mnimo 10
m de largo

no

2 101.2

202.4

8.5.10.05

Cadwelding de jonts,
conexiones e
intersecciones

no

80 230.3

8.5.10.06

Filtro de grava en las


bahas de
transformador.D = 60
a 90 mm.Bien
limpiado.

m3

25

25

22.88 572

18,424.00

23.41 585.25

Bill 8.5
Transformador
Cavern y embarrado
Conexiones

1,370,389.29

BillNo.9 - Tailrace tnel


Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

DLAR
ESTADOUNIDENSE

Portales se
considerarn y valoran
como trabajo de apoyo
detrs de la cara

9.1.01.0

TIERRA DE OBRAS.

9.1.01.01

Excavacin tierra
vegetal.

9.1.01.02

Excavacin del suelo


a) de excavacin a
granel

9.1.01.03

m3

3.34

5,000.00

16.7

10.05 50,250.00

Preparacin de la
fundacin de la roca
a) Para el hormigonado

9.1.01.04

m3

m2

50

3.59 179.5

Llenar y rellenar
a) relleno estructural

m3

3,500.00

15.92 55,720.00

m3

500

29.66 14,830.00

150

21.76 3,264.00

9.1.02.0

ROCA EXCAVACIN.

9.1.02.01

Por encimadel
suelo.Excavacin de
roca a granel
(anchura>2m).

9.1.02.02

Por encimadel
suelo.Pozos de
contorno perimetral
para voladuras
(cuandomenosque se
requiere 0,7 m de
distancia).

9.1.02.03

Por encimadel
suelo.Excavacin de la
roca.Desmonte
excesivo anormal.

m3

9.1.02.04

Underground.La
excavacin del tnel
incluyendo tneles a
ambas
unidades.Seccin
mnima de 24,9 m2,
(5.70m 4.80mx)

9.1.02.05

Tnel de descarga,
ramas a la Unidad 1 y
2. Cross.section mnimo
de 3,50 mx 5,70 m

9.1.02.06

Adicionalexcavacin
en transicin entre
tnel de descarga y
ramas a la Unidad 1 y

20

3,250.00

14.2 284

1,785.53

60 1,658.30

5,802,972.50

99,498.00

m3

400

31.71 12,684.00

m3

500

31.71 15,855.00

2
9.1.02.07

Underground.La
excavacin del
tnel.Adems de una
mayor seccin
transversal.

9.1.02.08

Underground.La
excavacin del
tnel.Desmonte
excesivo anormal.

m3

700

9.1.02.09

Underground.La
excavacin del
tnel.Adems para las
rondas de voladura
cortos.

15.76 11,032.00

a) Adicin de medio
rondas blastning

200

575.83

115,166.00

b) Adicin de cuarta
rondas de voladura

120

2,009.16

241,099.20

9.1.02.10

Underground.La
excavacin del
tnel.La adicin de
subdivisin de la
seccin transversal en
el rumbo y bancos.

9.1.02.11

Subterrneas.perforaci
ones contorno
perimetral para
voladuras
(cuandomenosque se
requiere 0,7 m de
distancia).

9.1.02.12

Underground.La
mes
descarga de
agua.Bombear tasa de
1 - 2 m3 / min.Incluye
tambin los vertidos de
las vas fluviales y
otras cavidades
excavadas en este
tnel

9,942.33

39,769.32

9.1.02.13

Underground.La
mes
descarga de
agua.Bombear tasa de
2-3 m3 / min.Incluye
tambin los vertidos de
las vas fluviales y
otras cavidades
excavadas en este
tnel

12,052.57

24,105.14

9.1.02.14

Underground.La
mes
descarga de
agua.Bombear tasa de
3-4 m3 / min.Incluye
tambin los vertidos de
las vas fluviales y
otras cavidades
excavadas en este
tnel

14,162.81

14,162.81

9.1.02.15

Underground.La
mes
descarga de
agua.Bombear tasa de
ms de 4 m3 /
min.Incluye tambin
los vertidos de las vas
fluviales y otras
cavidades excavadas
en este tnel

16,273.05

16,273.05

9.1.02.16

Estacin de medicin
de agua

9.1.03.00

La perforacin
exploratoria e
inyeccin.

9.1.03.01

Percusinde
perforacin, con un
dimetro de 50
mm.Profundidad 0 - 30
m.En la cara

4,500.00

15.58 70,110.00

9.1.03.02

Percusinde
perforacin, con un
dimetro de 50
mm.Profundidad 0 - 30
m.Detrs de la cara

500

13.55 6,775.00

70 855.66

500

no

59,896.20

15.23 7,615.00

1 2,385.50

2,385.50

9.1.03.03

Aguaprueba de
presin.Por valor de
empacador.Las
pruebas con solo
empacador.Profundida
d 0-5 m.En la cara

no

45

73.32 3,299.40

9.1.03.04

Aguaprueba de
presin.Por valor de
empacador.Las
pruebas con solo
empacador.Profundida
d 0-5 m.Detrs de la
cara

no

9.1.03.05

El lavado entre los


agujeros.En la cara.

no

45

9.1.03.06

El lavado entre los


agujeros.Detrs de la
cara.

9.1.03.07

Lechada.Por valor de
empacador.Profundida
d 0-5 m.En la cara

no

60 143.86

8,631.60

9.1.03.08

Lechada.Por valor de
empacador.Profundida
d 0-5 m.Detrs de la
cara

no

10 140.23

1,402.30

9.1.03.09

Lechada de
cemento.Tipo de
consumo A. Cemento

kg

55,000.00

1.01 55,550.00

9.1.03.10

Lechada de
cemento.Tipo consumo
B. Cemento

kg

35,000.00

2.59 90,650.00

9.1.03.11

Lechada de
cemento.Escriba C. El
consumo de cemento

kg

15,000.00

7.19 107,850.00

9.1.03.12

Lechada
qumica.Escriba D.
consumo lechada peso
seco

kg

100

9.1.03.13

Inyecciones de
consolidacin.

kg

1,000.00

9.1.03.14

Tiempo de la
lechada.En la cara

hr

150

9.1.03.15

Tiempo de la
lechada.Detrs de la
cara

hr

9.1.04.00

ROCA tnel APOYO y


portal

9.1.04.01

Temporalde instalacin Prov.Suma


de proteccin contra
cadas de roca en el
portal de aguas
abajo.Diseo de
Contratistas

9.1.04.02

Extrade escala.En la
cara.

hr

250

87.62 21,905.00

9.1.04.03

Extrade escala.Detrs
de la cara.

hr

300

69.96 20,988.00

60.68 303.4

30.3 1,363.50

26.25 131.25

23.71 2,371.00

1.9 1,900.00
605

90,750.00

15 520

7,800.00

1 25,000.00

25,000.00

BillNo.9 - Tailrace tnel


Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

DLAR
ESTADOUNIDENSE

9.1.04.04

Inviertalimpieza y
escalamiento.Detrs
de la cara.

m2

500

24.34 12,170.00

9.1.04.05

Alta presin de
descarga de
agua.Detrs de la cara

m2

500

9.06 4,530.00

9.1.04.06

Resinaextremo
anclado pernos de
roca, barra
corrugada.En la
cara.D = 20
mm.Profundidad en la
roca 2,4 m

no

700

53.27

37,289.00

9.1.04.07

Resinaextremo
anclado pernos de
roca, barra
corrugada.En la
cara.D = 20
mm.Profundidad en la
roca 2,9 m

no

2,200.00

54.35

119,570.00

9.1.04.08

Resinaextremo
anclado pernos de
roca, barra
corrugada.En la
cara.D = 20
mm.Profundidad en la
roca 3,9 m

no

2,100.00

65.04

136,584.00

9.1.04.09

Resinaextremo
no
anclado pernos de
roca, barra
corrugada.Detrs de la
cara.D = 20
mm.Profundidad en la
roca 2,4 m

100

47.72

4,772.00

9.1.04.10

Resinaextremo
no
anclado pernos de
roca, barra
corrugada.Detrs de la
cara.D = 20
mm.Profundidad en la
roca 2,9 m

100

52.95

5,295.00

9.1.04.11

Resinaextremo
no
anclado pernos de
roca, barra
corrugada.Detrs de la
cara.D = 20
mm.Profundidad en la
roca 3,9 m

100

61.32

6,132.00

9.1.04.12

Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.En la
cara.D = 20
mm.Profundidad en la
roca 2,4 m

100

49.06

4,906.00

9.1.04.13

Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.En la
cara.D = 20
mm.Profundidad en la
roca 2,9 m

1,000.00

50.65

50,650.00

9.1.04.14

Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.En la
cara.D = 20
mm.Profundidad en la
roca 3,9 m

1,000.00

61.2

61,200.00

9.1.04.15

Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.En la
cara.D = 25
mm.Profundidad en la
roca 5,9 m

1,300.00

93

120,900.00

9.1.04.16

Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.Detrs de la
cara.D = 20
mm.Profundidad en la
roca 2,4 m

100

43.62

4,362.00

9.1.04.17

Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.Detrs de la
cara.D = 20
mm.Profundidad en la
roca 2,9 m

2,650.00

47.74

126,511.00

9.1.04.18

Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.Detrs de la
cara.D = 20
mm.Profundidad en la
roca 3,9 m

2,000.00

54.26

108,520.00

9.1.04.19

Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.Detrs de la
cara.D = 20
mm.Profundidad en la
roca 5,9 m

50

106.5

5,325.00

9.1.04.20

Chainlinkedmalla fija
para el rock pernos.En
la cara.

m2

100

9.1.04.21

Chainlinkedmalla fija
para el rock
pernos.Detrs de la
cara.

m2

1,500.00

9.1.04.22

Soldadotela metlica
fijada a bulones.En la
cara.

m2

400

10.45 4,180.00

9.1.04.23

Soldadotela metlica
fijada a bulones.Detrs
de la cara.

m2

300

9.51 2,853.00

9.1.04.24

Acerocorreas fijadas
para el rock pernos.En
la cara.

300

42.01 12,603.00

9.1.04.25

Acerocorreas fijadas
para el rock
pernos.Detrs de la
cara.

500

37.89 18,945.00

9.1.04.26

El hormign
proyectado.Plain.En la
cara.

m3

300

300.41

90,123.00

9.1.04.27

El hormign
proyectado.Plain.Detr
s de la cara.

m3

200

260.72

52,144.00

9.1.04.28

El hormign
proyectado.reforzado
con fibra.En la cara.

m3

3,300.00

363.79

1,200,507.00

9.1.04.29

El hormign
proyectado.reforzado
con fibra.Detrs de la
cara.

m3

1,500.00

315.64

473,460.00

9.1.04.30

Suministro de barras de
refuerzo para las
costillas de hormign
proyectado reforzado.

kg

12,000.00

9.1.04.31

Instalacinde costillas
de hormign
proyectado
reforzado.En la cara.

500

18.87 9,435.00

9.1.04.32

Instalacinde costillas
de hormign
proyectado
reforzado.Detrs de la
cara.

300

13.7 4,110.00

9.1.04.33

Prefabricacin y
suministro de vigas de
celosa.

kg

8,000.00

9.1.04.34

Instalacinde vigas de
celosa para costillas
de hormign
proyectado.En la cara.

300

71.17 21,351.00

9.1.04.35

Instalacinde vigas de
celosa para costillas
de hormign
proyectado.Detrs de
la cara.

220

59.43 13,074.60

9.1.04.36

Concreteforro.Detrs
de la cara.

m3

140

14.48 1,448.00

13.1 19,650.00

1.8 21,600.00

3.2 25,600.00

190.04

26,605.60

9.1.04.37

Adicionalconcreto.Det
rs de la cara.

m3

9.1.04.38

Encofrado para
revestimiento de
hormign, Clase C

m2

10 190.04

1,900.40

600

136.53

81,918.00

Cantidad

Precio Unitario

Precio total

BillNo.9 - Tailrace tnel


Artculo

Descripcin

Unidad

DLAR
ESTADOUNIDENSE

9.1.04.39

Invertirhormign.En la
cara.

m3

240

9.1.04.40

Invertirhormign.Detr
s de la cara.

m3

100

9.1.04.41

Refuerzo del techo y / o


paredes

kg

7,000.00

9.1.04.42

Refuerzo de
invertido.En o detrs
de la cara

kg

16,000.00

9.1.05.00

INVESTIGACIN E
INSTRUMENTACIN.

9.1.05.01

Investigacin y pruebas
subterrneas.Tiempo
de inactividad.

hr

9.1.05.02

Perforacin de
base.Puesta en
marcha en cada lugar
de perforacin.

no

9.1.05.03

Ncleode perforacin,
dimetro mnimo de 76
mm.Profundidad 0-30
m

50 125.06

6,253.00

9.1.05.04

Ncleode perforacin,
dimetro mnimo de 76
mm.Profundidad 30100 m

30 171.84

5,155.20

9.1.05.05

Perforacin de
base.Estabilizacin
Hole.Lechada de
cemento.

kg

9.1.05.06

Packerescenario de
no
prueba de presin de
agua.Prueba
concurrente con la
perforacin (envasador
individual).Profundidad
0-100 m

115.56

577.8

9.1.05.07

Packerescenario de
no
prueba de presin de
agua.Pruebas despus
de la perforacin
completa (doble
packer).Profundidad 0100 m

135.56

677.8

9.1.05.08

Pruebas Lugeon

no

9.1.05.09

Estacin de
Convergencia.Max.3
pines.

no

9.1.06.0

DRENAJE Y EROSIN
DE PROTECCIN

9.1.06.01

Erosinde proteccin
con roca triturada 50200 mmMin.espesor
300 mm

9.1.06.02

Rip-rap

m3

100.41

DLAR
ESTADOUNIDENSE

99.56 9,956.00
2.31 16,170.00
2.4 38,400.00

40 605

1 1,108.00

100

24,200.00

1,108.00

1.01 101

10
2 3,269.62

100

24,098.40

95.56 955.6
6,539.24

18.08 1,808.00

a) Tamao de piedra
300-500 mm

m3

b) bloques
seleccionados> 500
mm

m3

100

20.43 2,043.00

a) Mnimo de 250 g /
m2

m2

200

6.66 1,332.00

9.1.06.04

Gaviones Colchones

m2

150

24.4 3,660.00

9.1.06.05

Gaviones

m3

9.1.07.0

OBRAS DE
CONCRETO.

9.1.07.01

Encofrado Clase B.
Plain.Inclinada o
vertical.

m2

2,300.00

67.26 154,698.00

9.1.07.02

Encofrado Clase B.
curvada.

m2

350

96.29 33,701.50

9.1.07.03

Hormign Clase C.

m3

920

9.1.07.04

Refuerzo.Barras
corrugadas.

9.1.07.05

Concretopavement.Co
ncrete Clase B. espesor
mnimo de 150
mm.Malla de refuerzo
min 6,5 kg / m2

9.1.06.03

60

20.04 1,202.40

Filtro de tela

80

46.44 3,715.20

142.91

131,477.20

60 1,459.67
3,340.00

87,580.20

179.14

598,327.60

Proyecto de Ley No.


9 - Tailrace Tnel

11,147,799.11

BillNo.10 - Picunche Presa y Embalse de Compensacin


Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

10.1.01.0

MOVIMIENTOS DE
TIERRA

10.1.01.01

Retire la madera
utilizable

no

10.1.01.02

Compensacin y
arranque

ja

10.1.01.03

Excavacin Topsoil

10.1.01.04

Excavacin del suelo

30 105.23
6 9,990.00

DLAR
ESTADOUNIDENSE

3,156.90
59,940.00

m3

450

3.34 1,503.00

a) la excavacin a
granel, para estropear
depsito

m3

10,500.00

3.68 38,640.00

b) Excavacin de pila
de almacenamiento
(grava, cantos rodados)

m3

3,000.00

3.68 11,040.00

c) Las excavaciones
para cimientos

m3

2,000.00

3.68 7,360.00

10.1.01.05

Preparacin de la
fundacin de la roca
para el hormigonado

m2

500

3.59 1,795.00

10.1.01.06

Llenar y rellenar
a) de relleno del
terrapln / grava

m3

2,000.00

16.76 33,520.00

b) relleno estructural

m3

2,000.00

15.92 31,840.00

c) El relleno de las
zanjas

m3

600

14.89 8,934.00

d) material de filtro, 060 mm

m3

600

25.96 15,576.00

e) material de drenaje,
50 - 100 mm

m3

600

26.49 15,894.00

Seccin Dique de
contencin
10.1.01.07

Relleno de terrapln de
grava bien graduada
procesado
a) Zona 2, Zona de
transicin 0-32 mm

m3

7,800.00

18.38 143,364.00

b) Zona 3, grava, 0-64


mm

m3

14,800.00

15.29 226,292.00

c) Zona 4, Piedras> 64
mm

m3

3,000.00

15.18 45,540.00

d) material de base
carretera

m3

600

25.24 15,144.00

10.1.01.08

Colocacin de tierra
vegetal

m2

800

0.32 256

10.1.01.09

Encespado (opcional)

m2

500

0.32 160

10.1.02.0

EXCAVACIN DEL
ROCK

10.1.02.01

La excavacindel
estribo derecho y
fundamento para la
estructura de toma,
pilar izquierdo:
a) de excavacin a
granel

m3

3,000.00

18.92 56,760.00

b) Trench / zanja de
excavacin

m3

300

20.37 6,111.00

400

17.98 7,192.00

10.1.02.02

Pozos de contorno

10.1.03.0

PRUEBAS DE SUELO
Y GROUTEO, APOYO
DEL ROCK

10.1.03.01

Perforacin de
percusin, dimetro
mnimo de 51 mm,
profundidad 0-20 m (en
roca y hormign)

200

15.58 3,116.00

10.1.03.02

Perforacin rotatoria
con revestimiento,
dimetro mnimo de 76
mm, profundidad de 020 m

400

66.74 26,696.00

10.1.03.03

Extra sobre 10.1.03.01


y 10.1.03.02 para
agujeros inclinados

10.1.03.04

Pruebas de presin de
agua, por ajuste
empacador

no

10.1.03.05

Grouting presin
Cemento, por ajuste
empacador

no

250

10.1.03.06

Cemento lechada: El
consumo de cemento
per ajuste envasador,
tipo B (microcemento
a) 0 - 100 kg

kg

8,000.00

0.88 7,040.00

b) 0 a 200 kg

kg

6,000.00

1.05 6,300.00

c) 0 a 300 kg

kg

2,000.00

1.27 2,540.00

d) 0 - 500 kg

kg

2,000.00

1.63 3,260.00

e) Ms de 500 kg

kg

1,000.00

2.61 2,610.00

10.1.03.07

Acelerador

kg

10.1.03.08

Lechada qumica.Tipo
de lechada: Epoxi

kg

10.1.03.09

Pernos de anclaje con


lechada.D = 32 mm
a) Longitud 2.0 m

no

50

69.18 3,459.00

5 119.42

129.12

50
100

597.1

32,280.00

2.5 125
23.71 2,371.00

20

56.9 1,138.00

b) Longitud 3.0 m

no

10

c) Longitud 4.0 m

no

d) Longitud 6.0 m

no

5 102.26

511.3

e) Longitud 8.0 m

no

5 129.48

647.4

f) Longitud 10.0 m

no

5 161.85

809.25

10.1.04.0

DRENAJE Y EROSIN
DE PROTECCIN

10.1.04.01

Erosinde proteccin
con roca triturada 50200 mmMin.espesor
300 mm

10.1.04.02

Rip-rap

68.24 682.4
79.57 397.85

m3

1,000.00

18.08 18,080.00

a) Tamao de piedra
150-300 mm

m3

500

20.01 10,005.00

b) Tamao de piedra
300-600 mm

m3

500

20.04 10,020.00

c) los bloques
seleccionados> 600
mm

m3

1,000.00

20.43 20,430.00

d) lechada Rip rap

m3

1,290.00

a) Mnimo de 180 g /
m2

m2

1,800.00

6.41 11,538.00

b) Un mnimo de 250
g / m2

m2

500

6.66 3,330.00

c) Un mnimo de 300
g / m2

m2

500

7.01 3,505.00

10.1.04.04

La perforacin de
agujeros de drenaje,
vertical o inclinada
agujeros.Dimetro
min.51 mm

10.1.04.05

La excavacin de
zanjas y drenajes
permanentes
catchwater

10.1.04.06

Reforzado tuberas de
drenaje concretas
incluyendo curvas y
tees.Dimetro interior:

10.1.04.03

167,209.80

Filtro de tela

50

15.58 779

m3

100

a) 150 mm

200

24.32 4,864.00

b) 200 mm

100

33.28 3,328.00

10.1.05.0

OBRAS DE
CONCRETO

10.1.05.01

Lechadapernos de
anclaje.D = 25
mmLongitud en
concreto 1,5 m

10.1.05.02

129.62

3.41 341

a) La profundidad en la
roca 2,0 m

no

20

77.22 1,544.40

b) Profundidad en la
roca 3,0 m

no

30

88.36 2,650.80

c) Profundidad en la
roca 4,0 m

no

97.35 486.75

Lechadapernos de
anclaje.D = 32
mmLongitud de
hormign de 1,5 m

BillNo.10 - Picunche Presa y Embalse de Compensacin


Artculo

Descripcin

Unidad

Cantidad

Precio Unitario
DLAR
ESTADOUNIDENSE

Precio total
DLAR
ESTADOUNIDENSE

10.1.05.03

10.1.05.04

a) La profundidad en la
roca 2,0 m

no

10

68.24 682.4

b) Profundidad en la
roca 3,0 m

no

10

79.57 795.7

c) Profundidad en la
roca 4,0 m

no

5 102.26

511.3

d) Profundidad en la
roca 6,0 m

no

5 129.48

647.4

Encofrado Clase A.
Llano.
a) Dam, seccin
cerrada y puente

m2

4,500.00

53.95 242,775.00

b) la casa Puerta

m2

250

53.95 13,487.50

m2

500

73.51 36,755.00

a) Dam, seccin
cerrada y puente

m2

100

53.99 5,399.00

b) la casa Puerta

m2

c) Dique de contencin:
cara de concreto y
zcalo

m2

2,000.00

53.99 107,980.00

a) Dam, seccin
cerrada y puente

m2

6,000.00

51.55 309,300.00

b) La construccin y
juntas de dilatacin
incl.chavetas de
cizalladura

m2

300

51.55 15,465.00

100

33.5 3,350.00

Encofrado A. Curved
Clase
a) Dam, seccin
cerrada y puente

10.1.05.05

10.1.05.06

10.1.05.07

Encofrado Clase B.
Llano

53.99 3,779.30

Encofrado Clase C.

Surcos
a) triangulares,
gargantas de goteo, 25
mm

10.1.05.08

70

Huecos rectangulares
a) Seccin transversal
no exceda de 0,1 m2

no

26.7 106.8

b) Seccin transversal
desde 0,1 hasta 0,5 m2

no

26.7 133.5

c) de encofrado para el
hormigonado de
huecos.Clase de
acuerdo con la
superficie adyacente

m2

53.95 269.75

10.1.05.09

Teclas cortantes en
juntas de construccin

50

22.63 1,131.50

10.1.05.10

PVC waterstop
a) 150 mm de ancho

50

15.27 763.5

b) 225 mm de ancho

750

a) Suministro e
instalacin de tubos

100

3.67 367

b) lechada de cemento

kg

100

1.01 101

10.1.05.11

24.93 18,697.50

Lechada de las
articulaciones y los
interfases

c) grouting Qumica

40

2.5 100

6.2 310

Escriba (a rellenar por


el Contratista):
10.1.05.12

Revestimiento
bituminoso sobre
superficie de hormign

m2

50

10.1.05.13

Compuesto de sellado
de juntas.

kg

60

18.25 1,095.00

10.1.05.14

Cubiertas de hormign
de conducto en
bridgedeck incluyendo
marcos de acero etc.
Ancho 500 mm

40

72.58 2,903.20

10.1.05.15

10.1.05.16

Refuerzo.Todas las
dimensiones
a) barras corrugadas

950

1,459.67

1,386,686.50

b) Las barras lisas

2 1,459.67

2,919.34

c) refuerzo de malla
soldada

2 2,812.50

5,625.00

Deformadosbarras de
acero de calidad
soldable para la fijacin
de estructuras de acero
hidrulico tales como
revestimiento de acero,
guas de compuerta,
etc. Longitud .2.0 aprox
m parcialmente
embutidos

a) D = 20 mm

no

b) D = 25 mm

no

c) D = 32 mm

no

50

17.63 881.5

d) las barras de acero


inoxidable.D = 32 mm

no

10

27.28 272.8

e) las barras de acero


inoxidable.D = 25 mm

no

10

17.95 179.5

a) D = 50 mm

20

5.45 109

b) D = 75 mm

30

7.15 214.5

c) D = 100 mm

50

8.92 446

d) D = 150 mm

35

16.9 591.5

10.1.05.18

Barrancos piso de
hierro fundido
Embedded con
galvanizado cubierta
de acero caliente

no

10.1.05.19

Aceroseccin angular
de 100 x 100 con
anclaje c / c de 300
mm, encerrado en
primera etapa concreta

kg

60

7.41 444.6

10.1.05.20

Paso hierro
parcialmente
incrustado en el
hormign

no

20

15.71 314.2

10.1.05.21

Guas y alfizares de
las trozas de parada
Embebido en hormign

kg

10.1.05.22

Hormign Clase B

10.1.05.17

10.1.05.23

10.1.05.24

20

8.05 161

140

11.14 1,559.60

PVC-tubos empotrados,
incluida curvas y
accesorios

3 123.23

400

369.69

7.41 2,964.00

a) Casa Puerta

m3

70 129.94

9,095.80

b) las alcantarillas,
conductos

m3

200

129.94

25,988.00

a) Dam, seccin
cerrada y puente

m3

12,000.00

137.07

1,644,840.00

b) la casa Puerta

m3

c) losas de proteccin
contra la erosin

m3

2,800.00

137.07

383,796.00

d) Muros

m3

500

137.07

68,535.00

e) Dique de contencin:
cara de concreto y
zcalo

m3

1,100.00

137.07

150,777.00

m3

100

167.38

16,738.00

Hormign Clase C

25 137.07

3,426.75

Hormign Clase D
a) Cubierta de puente

10.1.05.25

Hormign Clase E
a)aberturas de
puertas, piso y partes
inferiores de los
muelles y muros de
proteccin contra la
erosin y la losa.

600

174.57

104,742.00

m3

100

124.14

12,414.00

a) Clase UA

m2

1,200.00

b) Clase UB

m2

200

4.65 930

c) Clase de la UB,
superficies curvas

m2

100

4.65 465

d) Clase UC

m2

300

4.85 1,455.00

10.1.05.28

Blockout para y
rejuntado de los postes
de la cerca en losas de
hormign

no

10.1.05.29

Lechada de las juntas


de construccin con
mortero a base de
cemento.Incl.posicion
amiento planta

10.1.05.30

Lechada acera
alrededor hidrulicos
con la expansin de
mortero.Incl.posiciona
miento planta

10.1.05.26

Hormign Clase F

10.1.05.27

El acabado de
superficies formadas

m3

4.2 5,040.00

30

48.2 1,446.00

250

2.5 625

40

2.5 100

BillNo.10 - Picunche Presa y Embalse de Compensacin


Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

10.1.05.31

Lechadade las juntas


de construccin con
lechada de base
qumica tal como fue
aprobado por el
Ingeniero.Incl.posicion
amiento de la planta.

20

10.1.05.32

Arenado de superficies
de hormign

m2

20

10.1.06.0

INTERFACE CON H,
Integracin de los
HIDRULICO
STEELWORKS

DLAR
ESTADOUNIDENSE

2.5

10.64 212.8

50

ReferenciaH-tierna
documentos, Parte D,
Seccin 2Esta partida
incluir todos los
trabajos relacionados
con la formacin de
huecos, bloqueadores y
similares para dividir
entre la primera y
segunda etapa de
hormigonado, provisin
y remocin de los
encofrados para
elementos para ser
embebido, extra ms
para empotramiento y
segunda etapade
hormigonado y
similares, para acera
hidrulicos como se
indica a
continuacin.Los
volmenes de concreto
y refuerzo de concreto
son atendidos bajo
Concrete Works.

10.1.06.01

Inundaciones Flushing
Puertas

LS

1 8,099.74

8,099.74

10.1.06.02

Descargue Reguladora
de Gates

LS

1 2,945.36

2,945.36

10.1.06.03

Detener registro Guas,


Flushing Puertas

LS

1 26,508.24

26,508.24

10.1.06.04

Detener Guas registro,


descarga Reguladora
de Gates

LS

1 17,672.16

17,672.16

10.1.06.05

Otros (describir):

LS

10.1.07.0

OBRAS DEL
CONSTRUCTOR

10.1.07.01

Perpiao Walling
a) 150 mm

m2

50

73.3 3,665.00

b) 100 mm

m2

20

73.3 1,466.00

10.1.07.02

Membrana para techos

m2

10.1.07.03

Puertas

10.1.07.04

125

146.58

18,322.50

a)aislados puertas de
acero
individuales.Clasificaci
n fuego
A60.Dimensiones
externas
1000x2100mm

no

5 3,049.00

15,245.00

b) las puertas de acero


con aislamiento
doble.Clasificacin
fuego
A60.Dimensiones
externas
1600x2100mm

no

1 3,415.00

3,415.00

c) puertas de acero con


aislamiento
doble.Clasificacin
fuego
A60.Dimensiones
externas
2200x2200mm

no

1 5,542.00

5,542.00

d) Individual puerta de
madera interior.La
apertura al exterior
900 x 2100

no

4 1,044.67

4,178.68

Ventanas

10.1.07.05

10.1.07.06

a) Ventana de aluminio
con paneles fijos
Tamao 1000 x 1200
mm

no

8 427.5

3,420.00

b)las rejillas de
ventilacin de lamas de
aluminio con marco de
aluminio y tamao de
pantalla de
insectos500 x 400 mm

no

4 464

1,856.00

c) de acristalamiento 5
mm de vidrio flotado y
acristalamiento en
paneles de cualquier
tamao.

m2

5 1,044.67

5,223.35

Piso, Pared y Techo


Acabados
a) baldosas de
cermica

m2

10

28.43 284.3

b) Los revestimientos
cermicos

m2

20

28.43 568.6

c) Suelo de vinilo

m2

20

70.98 1,419.60

d) enlucido de paredes

m2

42.76 5,986.40

Pintura y
decoracin.Pintura de:
a) metalistera Interna
o estructuras de acero

m2

20

b) trabajos en metal
galvanizado

m2

c) Las superficies
externas de estructuras
de acero

m2

30

d) las superficies de
concreto externos

m2

115

24.43 2,809.45

e)Internos enyesado o
superficies de
hormignParedes

m2

200

24.43 4,886.00

f)Internos enyesado o
superficies de concreto,
techos

m2

100

24.43 2,443.00

g)Los pisos de
concreto con cargas
moderadas, EpoxiTipo
(a rellenar por el
Contratista):

m2

60

24.43 1,465.80

h)Los pisos de
concreto con cargas
pesadas, incluyendo
salas de bateras.Auto
Epoxi nivelacinTipo (a
rellenar por el
Contratista):

m2

40

24.43 977.2

10.1.08.0

INVESTIGACIN E
INSTRUMENTACIN

10.1.08.01

Piezmetro
Electric.Dispositivo de
medicin

no

10.1.08.02

Piezmetro elctrico,
tuberas

10.1.08.03

Monumentos de
liquidacin de
superficie

10.1.08.04

140

4 975.67

80

24.43 488.6

24.43

73.29

24.43 732.9

3,902.68

9.75 780

a) de la Fundacin en la
roca

no

2 911.3

1,822.60

b) Fundacin en suelo

no

3 842.95

2,528.85

Punto de asentamiento
superficie fija

a) de la Fundacin en la
roca

no

2 915.86

1,831.72

b) Fundacin en suelo

no

3 847.51

2,542.53

10.1.09.0

OBRAS DIVERSAS

10.1.09.01

Tapa de la escotilla de
poca potencia

kg

10.1.09.02

Heavy Duty tapa de


escotilla
incl.accesorios con
hormign, Clase C y
acabado de superficies

kg

100

6.34 634

10.1.09.03

Arrabio resistente del


enrejado de canales de
drenaje

kg

100

6.34 634

10.1.09.04

Cubierta del conducto


de poca potencia

kg

200

7.01 1,402.00

10.1.09.05

Cubierta del conducto


de alta resistencia

kg

1,200.00

6.34 7,608.00

10.1.09.06

Barandillas exteriores,
fijas o desmontables
a) Tipo A

kg

2,000.00

7.01 14,020.00

b) Tipo B

kg

500

7.01 3,505.00

10.1.09.07

Escaleras de acero

kg

120

7.01 841.2

10.1.09.08

Esgrima, excavacin y
vaciado de fundacin
individuo incluidos

160

85.5 13,680.00

10.1.09.09

Puertas de la cerca, y
la excavacin para
hormigonado de
fundaciones
individuales incluidos

10.1.09.10

60

7.01 420.6

a) la puerta doble ala

no

1 4,275.00

4,275.00

b) de puerta nica ala

no

1 1,832.00

1,832.00

Preparacin de nivel
subrasante

m2

1,000.00

0.88 880

BillNo.10 - Picunche Presa y Embalse de Compensacin


Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

DLAR
ESTADOUNIDENSE

10.1.09.11

Subbasede roca
triturada (0-75 mm)
Espesor min.200 mm

m3

240

29.25 7,020.00

10.1.09.12

Llevarcurso de roca
triturada (0-30 mm)
Espesor min.150 mm

m3

180

29.25 5,265.00

10.1.09.13

Tratamiento de la
superficie bitumenous
Doble

m2

1,000.00

10.1.09.14

Electrodos de puesta a
tierra

10.1.09.15

4.37 4,370.00

a) 1 x 95 hilos de cobre

300

21.34 6,402.00

b) varillas de puesta a
tierra, 6 m de largo

no

5 101.2

c) Cadwelding de
juntas, conexiones e
intersecciones

no

50 230.3

Ampliadode
poliestireno en los
estribos del puente50
mm de espesor

m2

506

11,515.00

8.5

17

10.1.10.0

VENTILACIN Y AIRE
ACONDICIONADO

10.1.10.01

Ventilacin y aire
acondicionado en la
casa de la puerta de
entrada.Diseo,
suministro e
instalacin.

10.1.11.0

SUMINISTRO DE
AGUA, FONTANERIA
E INSTALACION
SANITARIA Y
ALCANTARILLADO

10.1.11.01

El aguade
alimentacin,
fontanera e instalacin
sanitaria y
alcantarillado en la
casa de la puerta de
entrada.Diseo,
suministro e
instalacin.

10.1.12.0

LUCHA CONTRA
INCENDIOS
INSTALACIONES

10.1.12.01

Instalaciones de lucha
contra incendios y
equipos de rescate.

LS

1 5,006.00

5,006.00

LS

1 11,075.00

11,075.00

LS

1 5,006.00

5,006.00

Proyecto de Ley No.


10 - Picunche Presa
y Embalse de
Compensacin

5,943,047.73

BillNo.11 - Obras
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

DLAR
ESTADOUNIDENSE

01.11.00

SwitchyardY
CREACIN DE
SERVICIO EN TNEL
DE ACCESO

11.1.01.0

MOVIMIENTOS DE
TIERRA

11.1.01.01

Compensacin y
arranque

m2

4,400.00

0.99 4,356.00

11.1.01.02

Excavacin del suelo.A


granel.

m3

500

5.86 2,930.00

11.1.01.03

Excavacin del
suelo.Fundaciones,
zanjas, etc.

m3

500

5.86 2,930.00

11.1.01.04

Compactadoroca
triturada 16-32
mm.Por supuesto Base
para losas de concreto,
canales de cables,
fundaciones, etc.

m3

11.1.01.05

Compactado tnel
proyectado botn 30-60
mm en Switchyard

m3

50

2,500.00

26.18 1,309.00

23.1 57,750.00

11.1.01.06

Compactado roca
triturada 8-16 mm a lo
largo de las tuberas de
drenaje, tubos para
cables, etc.

m3

50

22.24 1,112.00

11.1.01.07

De desage de PVCpipe.Incluyendo curvas


y
accesorios.Complete.
D = 100 mm

150

8.92 1,338.00

11.1.01.08

PVC-pipe para curvas


cables.Including y
accesorios.Complete.
D = 150 mm

200

16.9 3,380.00

11.1.01.09

Filtro de tela (300 g /


m2)

m2

1,500.00

7.01 10,515.00

11.1.01.10

Turfing

m2

1,000.00

11.1.01.11

Rellenos sanitarios,
material de escombros
del tnel, la proteccin
permanente cada de
rocas.

m3

9,500.00

11.1.02.0

EXCAVACIN DEL
ROCK

11.1.02.01

La excavacin de
zanjas para cimientos,
canales de cables,
paredes, etc.

m3

100

11.1.03.0

OBRAS DE
CONCRETO

1,100.00

0.32 320
23.68 224,960.00

5.86 586

Muros de
contencin,
fundaciones, cable
conducto etc.
11.1.03.01

Encofrado Clase B.
Plain.Inclinada o
vertical.

m2

53.95 59,345.00

11.1.03.02

Encofrado Clase B.
Plain.Curvo

m2

30

53.99 1,619.70

11.1.03.03

Encofrado Clase B.
Plain.Horizontal.

m2

50

53.99 2,699.50

11.1.03.04

Encofrado Clase C.
Plain.Inclinada o
vertical.

m2

11.1.03.05

Encofrado Clase C.
Plain.Curvadas.

m2

20

51.55 1,031.00

11.1.03.06

Encofrado Clase C.
Plain.Horizontal.

m2

50

51.55 2,577.50

11.1.03.07

Teclas cortantes en
juntas de construccin

11.1.03.08

Refuerzo.Barras
corrugadas.

50 1,459.67

11.1.03.09

Refuerzo.Las barras
lisas.

1 1,459.67

11.1.03.10

Preparacin de
superficie de la roca
para el hormigonado.

m2

11.1.03.11

Hormign Clase C.

m3

500

11.1.03.12

El acabado de
superficies no
formadas, Clase UA.

m2

100

11.1.03.13

Waterstop PVC, 150


mm de ancho.

11.1.03.14

Parcialmenteincrustad
o PVC-pipe.Incluyendo
curvas y
accesorios.Complete.
D = 200 mm

1,100.00

51.55 56,705.00

200

22.63 4,526.00

50

1,459.67
3.59 179.5

137.07

68,535.00
4.2 420

50
100

72,983.50

15.27 763.5
43.34 4,334.00

11.1.03.15

Bloqueadores para y
rejuntado de los postes
de la cerca en losas y
muros de hormign

no

80

48.2 3,856.00

Edificio de servicios
y zona al aire libre

11.1.03.16

Encofrado Clase A.
Llano.Inclinada o
vertical.

m2

150

53.95 8,092.50

11.1.03.17

Encofrado Clase B.
Plain.Inclinada o
vertical.

m2

400

53.99 21,596.00

11.1.03.18

Encofrado Clase B.
Plain.Horizontal.

m2

11.1.03.19

Encofrado Clase C.
Plain.Inclinada o
vertical.

m2

150

51.55 7,732.50

11.1.03.20

Teclas cortantes en
juntas de construccin

200

22.63 4,526.00

11.1.03.21

Vaco rectangular, de
hasta 0,1 m2.

no

20

26.7 534

11.1.03.22

Vaco rectangular, 0,1 a


0,5 m2.

no

10

26.7 267

11.1.03.23

Refuerzo.Barras
corrugadas.

35 1,459.67

11.1.03.24

Refuerzo.Las barras
lisas.

1 1,459.67

11.1.03.25

Preparacin de
superficie de la roca
para el hormigonado.

m2

11.1.03.26

Hormign Clase C.

m3

11.1.03.27

El acabado de
superficies no
formadas, Clase UA.

m2

90

11.1.03.28

El acabado de
superficies no
formadas, UB Clase.

m2

20

4.65

11.1.03.29

Parcialmenteincrustad
o PVC-pipe.Incluyendo
curvas y
accesorios.Complete.
D = 100 mm

50

8.92 446

11.1.03.30

Parcialmenteincrustad
o PVC-pipe.Incluyendo
curvas y
accesorios.Complete.
D = 150 mm

50

8.92 446

11.1.03.31

Parcialmenteincrustad
o PVC-pipe.Incluyendo
curvas y
accesorios.Complete.
D = 200 mm

50

43.34 2,167.00

11.1.04.0

OBRAS DEL
CONSTRUCTOR

20

53.99 1,079.80

50

450

51,088.45
1,459.67
3.59 179.5

137.07

61,681.50
4.2 378

Edificio de servicios
11.1.04.01

Baldosas de cermica.

m2

35

28.43 995.05

11.1.04.02

Azulejo cermico.

m2

25

28.43 710.75

11.1.04.03

Los pisos de vinilo.

m2

15

70.98 1,064.70

11.1.04.04

Mampostera de
bloques de
hormign.150 mm
Espesor nominal

m2

65

31.55 2,050.75

11.1.04.05

Enyesado, interno.

m2

200

17.58 3,516.00

11.1.04.06

Rendering, teido,
externo.

m2

150

17.1 2,565.00

93

11.1.04.07

Suspendido del techo.

m2

20

27.35 547

11.1.04.08

Aisladospuertas de
acero
individuales.Clasificaci
n fuego
A60.1000x2100mm
abertura en la pared

no

4 3,049.00

12,196.00

11.1.04.09

Aisladospuertas de
acero
dobles.Clasificacin
fuego
A60.1600x2200mm
abertura en la pared

no

1 3,415.00

3,415.00

11.1.04.10

Puertas de madera
interiores
individuales.900x2100
abertura en la pared.

no

2 1,044.50

2,089.00

11.1.04.11

Solteropuertas de
madera interiores.Con
ranura de
aire.900x2100
abertura en la pared.

no

1 1,044.50

1,044.50

11.1.04.12

Aluminioventana con
combinacin de louvres
/ paneles fijos.Tamao
2000x1000 mm

no

1 1,044.50

1,044.50

BillNo.11 - Obras
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

DLAR
ESTADOUNIDENSE

11.1.04.13

Aluminioventana con
combinacin de louvres
/ paneles fijos.Tamao
1000x1000 mm

no

1 1,044.50

1,044.50

11.1.04.14

Acristalamiento 5 mm
de vidrio flotado y
acristalamiento en
paneles de cualquier
tamao.

m2

3 1,044.67

3,134.01

11.1.04.15

Pintura del
suelo.Epoxi.Escriba
Sherwin Williams policote 4685

m2

11.1.04.16

Pintura de
paredes.Interna.

m2

400

24.43 9,772.00

11.1.04.17

Pintura de
paredes.Externo.

m2

150

24.43 3,664.50

11.1.04.18

La pintura de las
puertas de acero, solo

no

11.1.04.19

La pintura de las
puertas de acero, doble

no

1 119.5

11.1.04.20

Pintura de puertas
interiores de madera

no

11.1.04.21

Cinta cncava suave


techo de acero
laminado
incl.parpadear,
mosquitera etc.

m2

11.1.04.22

Canalones y tubos para


drenaje del techo

LS

11.1.04.23

100 mm de alta
densidad de lana
mineral fijado a correas
de acero de calibre
ligero.

m2

11.1.05.0

OBRAS DIVERSAS

45

155

61.12 244.48

119.5

34 102
25.34 3,927.70

1 35,523.00

115

24.43 1,099.35

35,523.00

6.67 767.05

El vallado de la zona
servicebuilding.
11.1.05.01

Valla

75

85.51 6,413.25

11.1.05.02

Puerta de dos alas

no

1 4,275.00

4,275.00

11.1.05.03

nica puerta ala

no

1 1,832.00

1,832.00

El vallado de la zona de
maniobras.
11.1.05.04

Valla

11.1.05.05

Puerta de dos alas

no

1 4,275.00

4,275.00

11.1.05.06

nica puerta ala

no

1 1,832.00

1,832.00

11.1.05.07

Cubierta del conducto


de alta resistencia.

kg

11.1.05.08

Guardia casa

no

11.1.06.0

SERVICIOS
ELCTRICOS

11.1.06.01

Tomas de tierra
enterrados.Hilos de
cobre 1 x 95 mm2.

11.1.06.02

Varillas de puesta a
tierra, min.Longitud 6
m

no

8 101.2

11.1.06.03

Cadwelding de juntas,
conexiones e
intersecciones

no

10 230.3

11.1.07.0

VENTILACIN Y AIRE
ACONDICIONADO

11.1.07.01

Ventilacin y aire
acondicionado.Diseo,
suministro e instalacin

11.1.08.0

SUMINISTRO DE
AGUA, FONTANERIA
E INSTALACION
SANITARIA Y
ALCANTARILLADO

11.1.08.01

El aguade
LS
alimentacin,
fontanera e instalacin
sanitaria y el sistema
de
alcantarillado.Diseo,
suministro e
instalacin.

11.1.09.0

Figthing FUEGO
INSTALACIONES

11.1.09.01

Instalaciones figthing
Bomberos y equipos de
rescate

02.11.00

INVESTIGACIN E
INSTRUMENTACIN

02.11.01

Extensmetros de
pozos

02.11.02

90

85.51 7,695.90

16,000.00

6.34 101,440.00

1 1,222.00

300

LS

1,222.00

21.34 6,402.00

809.6

2,303.00

1 70,087.00

70,087.00

34,842.00

34,842.00

LS

1 15,749.00

15,749.00

a) la profundidad de
anclaje 2 m

no

5 3,181.96

15,909.80

b) la profundidad de
anclaje 4 m

no

5 3,550.52

17,752.60

c) Ancla profundidad de
8m

no

5 4,169.20

20,846.00

Metros Conjunta
deformacin

no

5 707.4

3,537.00

02.11.03

Estacin con muesca


en V vertedero para
medir y registrar las
fugas en los tneles

11.02.04

Monitoreo del agua


subterrnea durante el
perodo de
construccin

03.11.00

no

5 731.8

3,659.00

a) Presa Huaura

LS

1 4,269.00

4,269.00

b) Presa Checras

LS

1 7,319.00

7,319.00

c) Picunche Presa

LS

1 4,269.00

4,269.00

d) Tneles y Casa de
Mquinas

LS

1 13,111.00

13,111.00

ANCLA DEL SUELO


Obras concretas que
figuran en los puntos
de facturas por encima
de

03.11.01

03.11.02

Autoancla de
perforacin del suelo
(tipo Ischebeck Titan
(40/16) o similar),
incluyendo las placas y
accesorios, totalmente
inyectados.

a) Nmero de Anclas

no

10

98.71 987.1

b) Longitud total de
Anclas

80

3.1 248

a) Nmero de Anclas

no

10 131.27

b) Longitud total de
Anclas

Ancla Auto perforacin


del suelo (tipo
Ischebeck Titan 52/20 o
similar), totalmente
lechada

100

1,312.70
3.1 310

Proyecto de Ley No.


11 - Obras

1,197,632.08

BillNo.12 - Dayworks
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario
DLAR
ESTADOUNIDENSE

01.12.00

TRABAJO

Precio total
DLAR
ESTADOUNIDENSE

Lastasas dayworks
cotizados para el
trabajo sern las
cantidades totales a
pagar, e incluirn todos
los costos, tales como
subsidios para el
cumplimiento de la
legislacin laboral,
seguros, alojamiento,
tiempo de viaje,
compensacin por
horas extras, uso y
mantenimiento de
pequeas herramientas
de trabajo, supervisin,
gastos generales y
ganancias.Las tarifas
sern aplicables a
todas las categoras
funciona

independiente de la
cantidad de
trabajo;dentro del
turno-disposicin
utilizada en el
sitio.Slo el tiempo
real dedicado a la obra
ser pagado.
01.12.01

Ingeniero

hr

1,000.00

65 65,000.00

01.12.02

Capataz

hr

1,000.00

20.6 20,600.00

01.12.03

Topgrafo

hr

500

20.6 10,300.00

01.12.04

Trabajador no
cualificado

hr

20,000.00

16 320,000.00

01.12.05

Obrero semicualificado

hr

3,000.00

16 48,000.00

01.12.06

Obrero cualificado

hr

3,000.00

16 48,000.00

12.01.07

Conductor

hr

3,000.00

19.9 59,700.00

01.12.08

Operador de equipo

hr

1,000.00

19.9 19,900.00

12.01.09

Operador de equipo
pesado

hr

1,000.00

20.92 20,920.00

02.12.00

MATERIALES

02.12.01

Todos losmateriales
Prov.suma
utilizados en dayworks
debern cumplir con
las
especificaciones.Las
tarifas incluirn la
entrega en el lugar y el
almacenamiento
necesario y la
manipulacin.

02.12.02

Los gastos generales


del contratista y el
beneficio sobre el
punto 12.2.01

100,000.00

12.02.03

Lechada de
cemento.Tipo B.
Expirado material

kg

2,000.00

1.42 2,840.00

02.12.04

Lechada de
cemento.Tipo C.
Expirado material

kg

2,000.00

6.02 12,040.00

12.02.05

Contacto
mampostera.Tipo D.
Expirado material

kg

2,000.00

20.24 40,480.00

12.02.06

Contacto
mampostera.Tipo E.
material caducado

kg

2,000.00

23.9 47,800.00

02.12.07

Las regalas de
materiales de cantera

100,000.00

Prov.Suma

1 100,000.00

30 30,000.00

1 -200,000.00

-200,000.00

12.03.00

EQUIPO /
MAQUINARIA
Lastarifas de los
equipos debern incluir
todos los costos de
operacin y
mantenimiento,
combustible, aceite,
grasa, operadores y
turnboys salarios,
gastos generales y
beneficio.Slo el
tiempo empleado
realmente en el trabajo
se ha pagado y las
tasas deber incluir la
compensacin por
tiempo de inactividad,
viajar y con el tiempo.

03.12.01

Tunneljumbo

hr

500

369.32

03.12.02

Robot de proyeccin de
hormign, Capacidad 4
m3 / hs

hr

500

99.8 49,900.00

03.12.03

Aparejo de
atornillamiento

hr

600

84.48 50,688.00

03.12.04

Equipo completo para


la lechada

hr

600

34.6 20,760.00

12.03.05

Equipo completo para


escalamiento hidrulico
(20 toneladas)

hr

200

74.3 14,860.00

12.03.06

Cargador frontal con la


cesta de escala fija

hr

500

74.3 37,150.00

12.03.07

Mobilegra con cesta y


mquina de
perforacin para la
perforacin de agujeros
para pernos de
anclaje.La gra podr
acceder y llegar a
todas las alturas en las
cavernas

hr

200

12.03.08

Generador de energa
75-115 KVA

hr

200

12.03.09

D6 Dozer o equivalente

hr

300

221.31

66,393.00

12.3.10

D6 Dozer o equivalente

hr

300

221.31

66,393.00

12.3.11

D7 Dozer o equivalente

hr

300

296.91

89,073.00

03.12.12

D8 Dozer o equivalente

hr

300

331.11

99,333.00

12.03.13

Motoniveladoras
completo con ripper,
Cat.D12 o equivalente

hr

300

161.91

48,573.00

03.12.14

Ditto, Cat.14 o
equivalente

hr

300

179.91

53,973.00

12.03.15

Excavadora,
retroexcavadora 0,7
m3

hr

200

125.91

25,182.00

03.12.16

Cargadora de
ruedas.Gato.966 o
equivalente

hr

200

170.91

34,182.00

03.12.17

10 t rodillo rueda lisa

hr

200

71.61 14,322.00

12.03.18

6 t rodillo vibrante
remolcado

hr

200

71.61 14,322.00

12.03.19

Rodillo de vibracin
mano-impulsado o
vibracin compactador
de placa

hr

200

23.31 4,662.00

12.03.20

8 t camin

hr

500

62.91 31,455.00

129.4

184,660.00

25,880.00

84.34 16,868.00

03.12.21

8 t volquete camin

hr

500

71.91 35,955.00

12.03.22

11 t camin volquete

hr

200

80.91 16,182.00

12.03.23

0,75 a 1,0 t de
capacidad de recogida

hr

500

44.91 22,455.00

03.12.24

Gra mvil, hasta 25 t


de capacidad.

hr

200

98.91 19,782.00

12.03.25

Gra mvil, 25 capacidad de 50 t.

hr

200

116.91

23,382.00

03.12.26

Gra mvil, 50 capacidad de 75 t.

hr

200

143.91

28,782.00

12.03.27

Gra mvil, ms de 75
t de capacidad.

hr

200

287.91

57,582.00

12.03.28

Camin mezclador de
concreto.Capacidad 610 m3.

hr

200

107.91

21,582.00

12.03.29

Bomba de
hormign.Capacidad
de hasta 50 m3 / hora.

hr

200

107.91

21,582.00

03.12.30

Bomba de
hormign.Capacidad
de ms de 50 m3 /
hora.

hr

200

179.91

35,982.00

03.12.31

Airecompresor con
accesorios.Capacidad
10-20 m3 / min.

hr

200

53.91 10,782.00

03.12.32

Airecompresor con
accesorios.Capacidad
mnima de 20 m3 / min.

hr

200

71.91 14,382.00

12.03.33

Tractor, hasta 100 CV.

hr

200

71.91 14,382.00

03.12.34

Pick-up, 0.75 t capacidad de 1,0 t.

hr

500

44.91 22,455.00

03.12.35

Completo de la bomba
de agua.Capacidad
1.000 l / min

hr

300

03.12.36

Cisterna de agua,
min.8 000 l de
capacidad.

hr

300

3.6 1,080.00

81.32 24,396.00

BillNo.12 - Dayworks
Artculo

Descripcin

Unidad

Cantidad

Precio Unitario

Precio total

DLAR
ESTADOUNIDENSE

DLAR
ESTADOUNIDENSE

12.04.00

OTROEQUIPOQUE
SE DESCRIBEN EN
CONTRATISTA

12.04.01

Planta de trituracin (w
/ o mano de obra)

hr

200

12.04.02

Bscula (w / o mano de
obra)

hr

200

12.04.03

Bao de hormign (w /
o mano de obra)

hr

200

12.04.04

Shotcrete Bthing (w / o
mano de obra)

hr

200

40.17 8,034.00

12.04.05

Camin mezclador de 4
m3

hr

200

66.18 13,236.00

04.12.06

Manitou

hr

200

49.32 9,864.00

12.04.07

Unidad de ventilacin
D = 900 mm

hr

200

29.24 5,848.00

12.04.08

Unidad de ventilacin
D = 1200 mm

hr

200

30.5 6,100.00

04.12.09

Unidad de ventilacin
D = 1400 mm

hr

200

35.8 7,160.00

12.04.10

Microbus 9 pasajeros

hr

200

64.25 12,850.00

12.04.11

Autobuses 51 pasajeros

hr

200

378.8

75,760.00

17.15 3,430.00
118.25

148.87

23,650.00

29,774.00

12.04.12

Generadores 1000 KVA

hr

200

220.71

04.12.13

Equipo de Soldadura

hr

200

16.44 3,288.00

12.05.00

VARIOS PRECIOS DE
LA UNIDAD

12.05.01

Sand cargado en
camin / camin

m3

200

21.45 4,290.00

12.05.02

Grava cargado en
camin / camin

m3

200

30.63 6,126.00

12.05.03

Adoqun, guijarro
cargado en camin /
camin

m3

200

15.1 3,020.00

12.05.04

Botn tnel cargado en


camin / camin

m3

200

15.1 3,020.00

05.12.05

Aplastamiento /
tamizadode despojo
tnel (tamao 0-30
mm)y se almacena en
el rea de depsito de
despojos.

tonelada

500

22.8 11,400.00

12.05.06

Aplastamiento /
tamizadode despojo
tnel (tamao 30 a 120
mm)y se almacena en
el rea de depsito de
despojos.

tonelada

500

22.02 11,010.00

12.05.07

Hormign Clase C
entregado en el sitio

m3

100

06.12.00

TRANSPORTE
depende de la
distancia
TRANSPORTE

255.13

44,142.00

25,513.00

Lossiguientes tipos se
utilizan para los
camiones / volquetes
en el sitio o de tamao
similar, donde el
transporte de
transporte no es parte
de la obra contractual
o donde los costos de
transporte se ajustarn
de acuerdo a la
longitud de transporte,
segn el acuerdo con el
Ingeniero.Para
distancias mayores de
0,2 km y entre dos de
las distancias indicadas
en la tabla, lineal

12.06.01

a) Longitud de
transporte 0,2
kilometros

m3

100

1.35 135

12.06.02

b) Longitud de
transporte 0,5
kilometros

m3

100

1.39 139

12.06.03

c) Longitud de
transporte 1,0
kilometros

m3

100

1.69 169

12.06.04

d) Longitud de
transporte 2,0
kilometros

m3

100

2.39 239

12.06.05

e) Longitud de
transporte 5,0
kilometros

m3

100

4.32 432

12.06.06

f) Longitud de
transporte 10
kilometros

m3

100

7.52 752

12.06.07

longitud g) Transporte
20 kilometros

m3

100

13.68 1,368.00

12.06.08

longitud h) Transporte
30 kilometros

m3

100

20.5 2,050.00

12.06.09

i) Longitud de
transporte 50
kilometros

m3

100

33.26 3,326.00

12.06.10

j) Longitud de
transporte en exceso
de 50 km, por km

m3

100

0.68

12.06.11

k) La carga de
camiones / camiones /
volquetes

m3

1,000.00

2.81 2,810.00

12.06.12

l) Las camas de
Personal (1 persona /
habitacin)

cama x da

22,800.00

25 570,000.00

12.06.13

m) Las camas de mano cama x da


de obra especializada
(2 personas /
habitacin)

43,300.00

15 649,500.00

Proyecto de Ley No.


12 - Dayworks

68

3,503,455.00

BillNo.14 - Alternativa Precio por unidad


Artculo

Descripcin

Unidad

Cantidad

Precio Unitario
DLAR
ESTADOUNIDENSE

14.1

Undeground
Excavacin cuarta
ronda (Mecnico)

14.01.01

Underground
Excavacin cuarta
ronda (Mecnico) Tnel
de Transferencia

3,848.52

14.01.02

Excavacin
Underground cuarta
ronda (Mecnico) Adit 1
Tnel

4,055.31

01.14.03

Underground
Excavacin cuarta
ronda (Mecnico)
sobretensiones Tunel
Tnel

4,424.31

14.01.04

Underground
Excavacin cuarta
ronda (Mecnico) de
aduccin Tnel

4,421.48

01.14.05

Underground
Excavacin cuarta
ronda (Mecnico)
Acceso Tunel

4,687.73

14.01.06

Underground
Excavacin cuarta
ronda (Mecnico) By
Pass Tunel a Tailrace

2,892.56

01.14.07

Underground
Excavacin cuarta
ronda (Mecnico) By
Pass Tunel de aduccin

2,952.68

01.14.08

Underground
Excavacin cuarta
ronda (Mecnico)
Tailrace Tnel

5,076.93

Precio total
DLAR
ESTADOUNIDENSE

Você também pode gostar