Você está na página 1de 2

24666 Federal Register / Vol. 71, No.

80 / Wednesday, April 26, 2006 / Notices

3. Reporting: At the end of your Individuals with disabilities may provides for the sale of energy, capacity,
project period, you must submit a final obtain this document in an alternative and ancillary services at market-based
performance report, including financial format (e.g., Braille, large print, rates. Entergy Nuclear PM also
information, as directed by the audiotape, or computer diskette) on requested waiver of various Commission
Secretary. If you receive a multi-year request to the program contact person regulations. In particular, Entergy
award, you must submit an annual listed in this section. Nuclear PM requested that the
performance report that provides the Commission grant blanket approval
VIII. Other Information
most current performance and financial under 18 CFR part 34 of all future
expenditure information as specified by Electronic Access to This Document: issuances of securities and assumptions
the Secretary in 34 CFR 75.118. You may view this document, as well as of liability by Entergy Nuclear PM.
4. Performance Measures: The all other documents of this Department On April 19, 2006, pursuant to
Government Performance and Results published in the Federal Register, in delegated authority, the Director,
Act of 1993 (GPRA) directs Federal text or Adobe Portable Document Division of Tariffs and Market
departments and agencies to improve Format (PDF) on the Internet at the Development—West, granted the
the effectiveness of their programs by following site: http://www.ed.gov/news/ request for blanket approval under part
engaging in strategic planning, setting fedregister. 34. The Director’s order also stated that
outcome-related goals for programs, and To use PDF you must have Adobe the Commission would publish a
measuring program results against those Acrobat Reader, which is available free separate notice in the Federal Register
goals. The primary objective of the State at this site. If you have questions about establishing a period of time for the
VR Unit In-Service Training program is using PDF, call the U.S. Government filing of protests. Accordingly, any
to maintain and upgrade the knowledge Printing Office (GPO), toll free, at 1– person desiring to be heard or to protest
and skills of personnel currently 888–293–6498; or in the Washington, the blanket approval of issuances of
employed in the public VR system. DC area at (202) 512–1530. securities or assumptions of liability by
Grantees must provide training that Note: The official version of this document Entergy Nuclear PM should file a
responds to the needs identified in the is the document published in the Federal motion to intervene or protest with the
Comprehensive System for Personnel Register. Free Internet access to the official Federal Energy Regulatory Commission,
Development (CSPD) required in section edition of the Federal Register and the Code 888 First Street, NE., Washington, DC
101(a)(7) of the Rehabilitation Act of of Federal Regulations is available on GPO 20426, in accordance with Rules 211
1973, as amended. Access at: http://www.gpoaccess.gov/nara/ and 214 of the Commission’s Rules of
index.html.
In order to measure the success of the Practice and Procedure. 18 CFR 385.211,
State VR Unit In-Service Training Dated: April 21, 2006. 385.214 (2004).
program grantees in meeting this John H. Hager, Notice is hereby given that the
objective, State VR agencies are required Assistant Secretary for Special Education and deadline for filing motions to intervene
to submit performance data through the Rehabilitative Services. or protest is May 19, 2006.
in-service annual performance report [FR Doc. E6–6284 Filed 4–25–06; 8:45 am] Absent a request to be heard in
and their State plans. At a minimum, BILLING CODE 4000–01–P
opposition by the deadline above,
the annual performance report must Entergy Nuclear PM is authorized to
include data on the percentage of issue securities and assume obligations
currently employed VR State agency or liabilities as a guarantor, indorser,
DEPARTMENT OF ENERGY
counselors who meet their States’ CSPD surety, or otherwise in respect of any
standards. Federal Energy Regulatory security of another person; provided
Commission that such issuance or assumption is for
VII. Agency Contact
some lawful object within the corporate
For Further Information Contact: [Docket Nos. ER06–653–000, ER06–653– purposes of Entergy Nuclear PM,
Marilyn Fountain, U.S. Department of 001] compatible with the public interest, and
Education, 400 Maryland Avenue, SW., is reasonably necessary or appropriate
Entergy Nuclear Power Marketing,
room 5029, Potomac Center Plaza, for such purposes.
LLC; Notice of Issuance of Order
Washington, DC 20202–2550. The Commission reserves the right to
Telephone: (202) 245–7346 or by e-mail: April 19, 2006. require a further showing that neither
Marilyn.Fountain@ed.gov. Entergy Nuclear Power Marketing, public nor private interests will be
If you use a telecommunications LLC (Entergy Nuclear PM) filed an adversely affected by continued
device for the deaf (TDD), you may call application for market-based rate approval of Entergy Nuclear PM’s
the Federal Relay Service (FRS) at 1– authority, with an accompanying rate issuances of securities or assumptions of
800–877–8339. schedule. The proposed rate schedule liability.
wwhite on PROD1PC61 with NOTICES

VerDate Aug<31>2005 16:58 Apr 25, 2006 Jkt 208001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\26APN1.SGM 26APN1
Federal Register / Vol. 71, No. 80 / Wednesday, April 26, 2006 / Notices 24667

Copies of the full text of the Director’s ‘‘e-Filing’’ link. The Commission DEPARTMENT OF ENERGY
Order are available from the strongly encourages electronic filings.
Commission’s Public Reference Room, Federal Energy Regulatory
Magalie R. Salas, Commission
888 First Street, NE., Washington, DC
20426. The Order may also be viewed Secretary.
[Project No. 12198–001, Project No. 12213–
on the Commission’s Web site at http:// [FR Doc. E6–6236 Filed 4–25–06; 8:45 am]
001, Project No. 12274–001, Project No.
www.ferc.gov, using the eLibrary link. BILLING CODE 6717–01–P 12297–001, Project No. 12309–001, Project
Enter the docket number excluding the No. 12369–001, Project No. 12535–001]
last three digits in the docket number
filed to access the document. Green Point Hydro, LLC; Hugo Hydro,
Comments, protests, and interventions LLC; Meyers Hydro, LLC; Heflin Hydro,
may be filed electronically via the LLC; Ohio River L&D 52 Hydro, LLC;
MSR 5 Hydro, LLC; Easton Diversion
Internet in lieu of paper. See, 18 CFR
Dam Hydro, LLC; Notice of Surrender
385.2001(a)(1)(iii) and the instructions
of Preliminary Permits
on the Commission’s Web site under the
April 19, 2006.
Take notice that the permittees for the
subject projects have requested
voluntary surrender of their preliminary
permits.

Project No. Project name Stream State Expiration date

12198–001 ................... Green Point Upper Dam ................................ Green Point Creek ......................................... OR .... 11–30–2007
12213–001 ................... Hugo Dam Hydroelectric ................................ Kiamichi River ................................................ OK .... 10–31–2006
12274–001 ................... John T. Meyers L&D ...................................... Ohio River ...................................................... IN ...... 11–30–2007
12297–001 ................... Heflin L&D ...................................................... Tombigbee River ............................................ AL ..... 11–30–2007
12309–001 ................... Ohio River L&D #52 ....................................... Ohio River ...................................................... KY ..... 11–30–2007
12369–001 ................... Mississippi River L&D #5 ............................... Mississippi River ............................................ WI ..... 11–30–2007
12535–001 ................... Easton Diversion Dam ................................... Yakima River .................................................. WA .... 2–29–2008

The permits shall remain in effect 157.208 (2005)) for authorization to deliveries from the Lateral has been
through the thirtieth day after issuance reduce the maximum allowable minimal. Also, Gulf South neither
of this notice unless that day is operating pressure (MAOP) of its 8-inch foresees a material increase in demand
Saturday, Sunday, or a holiday as Jackson to Hattiesburg Lateral located in nor any market requirement for Gulf
described in 18 CFR 385.2007, in which Rankin, Simpson, Covington, Forrest, South to maintain a higher MAOP on
case each permit shall remain in effect and Jones Counties, Mississippi, under this Lateral. Furthermore, Gulf South
through the first business day following Gulf South’s blanket certificate issued in explains that over the years there has
that day. New applications involving Docket No CP82–430–000 pursuant to been a significant encroachment of the
these project sites, to the extent section 7(c) of the Natural Gas Act, all pipeline in this area due to an increase
provided for under 18 CFR part 4, may as more fully set forth in the application in population density. As a result, Gulf
be filed on the next business day. which is on file with the Commission South believes that it is acting in the
and open to public inspection. The public interest in lowering the MAOP of
Magalie R. Salas,
filing may also be viewed on the Web the line due to this encroachment. Also,
Secretary.
at http://www.ferc.gov using the Gulf South states that their proposal to
[FR Doc. E6–6238 Filed 4–25–06; 8:45 am] ‘‘eLibrary’’ link. Enter the docket lower the MAOP of Index 387 will
BILLING CODE 6717–01–P number excluding the last three digits in permit them to continue to operate the
the docket number field to access the Lateral well within safe limits given the
document. For assistance, contact FERC age of the line and the increase in
DEPARTMENT OF ENERGY at FERCOnlineSupport@gerc.gov or call population density without adversely
Federal Energy Regulatory toll-free, (886) 208–3676 or TYY, (202) affecting the reliability of the line.
Commission 502–8659. Finally, Gulf South states that no
Gulf South proposes to reduce the construction activities will be required
[Docket No. CP06–124–000] MAOP of Index 387, between milepost to facilitate the MAOP reduction.
Gulf South Pipeline Company; Notice 0.00 and milepost 80, from 419 psig to Any person or the Commission’s Staff
of Request Under Blanket 165 psig. Gulf South confirms that may, within 45 days after the issuance
Authorization recent operating history of this Lateral of the instant notice by the Commission,
shows that customers consistently have file pursuant to Rule 214 of the
April 19, 2006. requested and used substantially lower Commission’s Procedural Rules (18 CFR
Take notice that on April 7, 2006, volumes of gas. Gulf South states that 385.214) a motion to intervene or notice
Gulf South Pipeline Company, LP (Gulf the current firm transportation of intervention and, pursuant to section
South), 20 East Greenway, Houston, obligations on Index 387 are 157.205 of the Commission’s
wwhite on PROD1PC61 with NOTICES

Texas 77046, filed in Docket No. CP06– approximately 12.0 MMcf per day, and Regulations under the Natural Gas Act
124–000, a request pursuant to sections that the proposed reduction of the (NGA) (18 CFR 157.205) a protest to the
157.205 and 157. 208 of the MAOP will not affect their ability to request. If no protest is filed within the
Commission’s regulations under the meet its contractual firm obligations, time allowed therefore, the proposed
Natural Gas Act (18 CFR 157.205 and since the demand for natural gas activity shall be deemed to be

VerDate Aug<31>2005 16:58 Apr 25, 2006 Jkt 208001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\26APN1.SGM 26APN1

Você também pode gostar