(SB/M03b/PTKH/II)
On ____ day of ____, 20____, _____, henceforth(hereafter,refersto) Contractor, and
____, henceforth Subcontractor, HEREBY ENTER into the following subcontract:
WITNESSETH:
WHEREAS Contractor has entered into, or will hereafter enter into, a general
construction contract, henceforth The Prime Contract with: ____ (Owner or General
Contractor), to perform in accordance with various contract documents and specifications
certain work prepared by: ____, henceforth Architect, and/or to furnish labor,
materials, supplies, labor and/or goods required to construct the following named and
described construction project: ____, henceforth The Project, located in ____ county, at
____ address, and
WHEREAS Contractor desires to retain Subcontractor to perform certain contract work
in accordance with various contract documents and specifications and/or to furnish labor,
materials, supplies, labor and/or goods for the Project;
NOW THEREFORE Contractor and Subcontractor agree as follows:
ARTICLE I.: SUBCONTRACT WORK
PASAL I.:
1.1. Subcontractor shall be employed as an independent contractor and shall provide and
furnish all labor, materials, tools, supplies, equipment (perlengkapan), services(jasa),
facilities, supervision(pengawasan), and administration necessary for the proper and
complete performance and acceptance of the following portions of the work,
hereinafter the Subcontract Work, for the Project, together with such other portions
of the drawings, specifications and addendum as related thereto:
SEE EXBIBIT A: Scope, Conditions, And List of Attachments
ARTICLE II: SUBCONTRACTOR PRICE
though rendered by a court of law and shall be enforceable in any court having
jurisdiction over the same.
THIS SUBCONTRACT IS ACKNOWLEDGED AND EXECUTED AS OF DATE SET FORTH ABOVE:
___________________
SUBCONTRACTOR
___________________
CONTRACTOR
By:_________________
By:_________________
Title:_______________
Title:_______________
(SB/WC:707)
PERJANJIAN SUBKONTRAK
(SB/M03b/PTKH/II)
Pada hari ini _____ bulan _____, 2013, dengan ini Kontraktor, dan ____, untuk
selanjutnya disebut Subkontraktor, DENGAN INI MENANDATANGANI subkontrak
berikut:
MENYAKSIKAN
BAHWA Kontraktor telah menandatangani atau selanjutnya akan menandatangani sebuah
kontrak konstruksi umum, selanjutnya disebut Kontrak Utama dengan:____ (Pemilik
atau Kontraktor umum), untuk melaksanakan sesuai dengan berbagai dokumen kontrak
dan spesifikasi kerjaan tertentu dipersiapkan oleh: ____, selanjutnya Arsitek dan/atau
menyediakan pekerja, bahan-bahan, pasokan, pekerja dan/atau barang yang dibutuhkan
untuk membangun proyek konstruksi yang diuraikan dan disebutkan dibawah ini:____,
selanjutnya disebut Proyek, berlokasi di kota ____, di alamat ____, dan
PEKERJAAN SUBKONTRAKTOR
1.1.
GAJI SUBKONTRAKTOR
Dengan mempertimbangkan kinerja subkontrakto atas subkontraktor ini, dan pada waktu
dan tunduk pada syarat dan ketentuan yang selanjutnya diatur disini, kontraktor wajib
membayar sejumlah 2 dolar yang selanjutnya disebut harga sub kontrak, harga
subkontrak tersebut tergantung pada ketentuan2 bahwa semua ketentuan2 yang diatur
pada lampiran A telah dipenuhi oleh subkontraktor. Seandainya ketentuan tersebut tidak
dipenuhi, maka jumlah pembayaran subkontrak wajib disesuaikan sebagaimana mestinya.
PASAL III:
KETENTUAN KHUSUS
Kondisi khusus untuk subkontrak (Pasal I sampai XXI) yang tergabung dalam subkontrak
yang sepenuhnya lebih dulu ditetapkan disini. Dengan ini, subkontraktor mengakui
penerimaan Ketentuan khusus.
ARTICLE IV: COMMUNICATION AND NOTICE
4.1 All communications between Subcontractor and General Contractor, Owner or
Architect shall be via Contractor.
4.2 Subcontractor shall furnish Contractor with periodic progress report as required by
Contractor, including status of material, equipment, manpower and submittal.
4.3 Subcontractor shall be deemed to have received notice of a fact, request, order, or
demand when its Superintendent is notified, either orally or in writing, or three (3) days
after written notice is sent by registered or certified mail addressed to Subcontractors last
known place of business, whichever is sooner.
4.4 Contractor shall be deemed to have received notice of a fact, request, order, or
demand three (3) days after written notice is sent by registered or certified mail addressed
to the following address: (Contractors address).
PASAL IV: KOMUNIKASI DAN PEMBERITAHUAN
4.1 Semua komunikasi antara Subkontraktor dan Kontraktor Umum, Pemilik atau Arsitek
harus melalui Kontraktor.
4.2 Subkontraktor wajib memberi laporan kemajuan periodik kepada Kontraktor seperti
yang dipersyaratkan oleh Kontraktor, termasuk status bahan, peralatan, tenaga kerja dan
submittal.
4.3 Subkontraktor akan dianggap telah menerima pemberitahuan dari fakta, permintaan,
perintah, atau keinginan ketika Pengawasnya diberitahu, baik secara lisan maupun
tertulis, atau tiga (3) hari setelah pemberitahuan tertulis dikirim melalui alamat surat
terdaftar atau bersertifikat ditujukan kepada tempat bisnis terakhir Subkontraktor yang
diketahui, manapun yang lebih cepat.
PASAL V: HUKUM DAN ATURAN KONSTRUKSI
5.1 Validitas, interpretasi, dan kinerja Subkontrak ini diatur oleh hukum yurisdiksi di
mana Proyek ini berlokasi.
5.2 Judul, keterangan, atau catatan untuk apapun ketentuan, artikel, dll, tidak akan
membatasi keseluruhan isi. Artikel ini memiliki kekuatan penuh dan berefek seolah-olah
tidak ada judul.
5.3 Jika ada istilah atau ketentuan Subkontrak ini yang ditentukan tidak sah, tidak akan
mempengaruhi keabsahan dan penegakan persayaratan dan ketentuan yang tersisa dalam
Subkontrak ini.
5.4 Kontrak ini akan mengikat dan diberlakukan untuk kepentingan penerus, orang-orang
yang diangkat, para wakil dan ahli waris antar pihak didalamnya.
PASAL VI: PERUBAHAN
6.1 Subkontrak ini hanya boleh diubah atau dimodifikasi oleh dokumen tertulis yang
dilaksanakan oleh para perwakilan Kontraktor dan Subkontraktor yang berwenang.