International
International Trends
Trends in
in Testing
Testing and
and Diagnosis
Diagnosis
3.
3.
Principles
Principles of
of using
using sinusoidal
sinusoidal damped
damped AC
AC voltages
voltages for
for on
on--site
site energizing
energizing of
of
power
power cables
cables
4.
4.
Examples
Examples of
of Modern
Modern Condition
Condition Assessment
Assessment of
of HV
HV Power
Power Cables
Cables
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
New installed /
repaired cables
On-site testing
to:
exclude poor
workmanship
(installation defects)
Serviced aged
cables
On-site diagnosis
to:
detect local aging and
check insulation
degradation status
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
dielectric-loss diagnosis
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Status
Condition
Maintenance goal
B Good condition
Aged: degradation
observed, possibly harmful
defects present
D Instable situation
E End of life cycle
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Cable
termination
Cable
insulation
Cable joint
Local defects
Global degradation
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Ref: NEETRAC
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Ref: NEETRAC
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Discharge test. Any particular discharge larger than q0 measured below test voltage Ut leads to
rejection of the object under test, see shaded area.
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
I.
II.
During the whole service life > 30 years they are subjected to thermal, mechanical and environmental
stresses;
III.
All these influences raise the working temperature of the HV power cable;
IV.
V.
VI.
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Conductive losses
Dipole losses
Interface losses
Partial discharges losses
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
1.
healthy cable
2.
insulation screen
damage 1cm2
3.
insulation screen
damage 6cm2
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Dielectric losses
1.
The tan measurement can be applied for the determination of the loss factor of the
insulation material. This factor increases during the ageing process of the cable.
2.
3.
L1
L2
0.5
L3
0.45
0.4
0.35
0.3
0.25
0.2
40
45
50
55
60
65
70
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
1.
1.
Basic
Basic Aspects
Aspects of
of Condition
Condition Assessment
Assessment of
of Transmission
Transmission Power
Power Cabl
Cables
es
2.
3.
3.
Principles
Principles of
of using
using sinusoidal
sinusoidal damped
damped AC
AC voltages
voltages for
for on
on--site
site energizing
energizing of
of
power
power cables
cables
4.
4.
Examples
Examples of
of Modern
Modern Condition
Condition Assessment
Assessment of
of HV
HV Power
Power Cables
Cables
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Standards/norms/guides
Description
IEC 60840
IEC 62067
IEC 60141
IEC 60060-3
IEEE 400
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
International recommendations
Cable type
MV
(630 kV)
XLPE
PILC
(E) HV
(30 400 kV)
XLPE
Oil-filled
Internationally not
recommended
DC
VLF 0.1 Hz
AC 50 Hz
DAC 20-300 Hz
No
Yes*
Yes
Yes
No
Yes*
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No ***
No **
Yes
Yes
No ***
No **
Yes
Yes
Yes
No **
Yes
Yes
No
No **
Yes
Yes
Internationally
recommended
* Partial discharge (PD) inception voltage (PDIV) can be different as compared to continuous and damped AC stresses
** according to
[1] IEC 60840 Power cables with extruded insulation and their accessories for rated voltages above 30 kV (Um = 36 kV) up to
150 kV (Um = 170 kV) Test methods and requirements.
[2] IEC 62067, Standard Power cables with extruded insulation and their accessories for rated voltages above 150 kV (Um =
170 kV) up to 500 kV (Um
*** according to
[3] Recommendations for a new after laying test method for HV extruded cable systems CIGRE 1990, Paris, paper 21-105
[4] CIGRE WG 21-09; After-laying tests o HV extruded cable systems; Elektra 173, August 1997
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Type of
insulation defect
A.
B.
C.
Homogenous
Weak
inhomogeneo
us
Strong
inhomogeneo
us
Example
Failure type
AC
DAC
24Uo
DC
e.g. less or no
insulation, moisture
Breakdown,
No partial
discharges
/ --
/ --
/-
/ --
Not necessary a
breakdown;
possible predischarges
/ -+
/ -+
/-
/-
/ -+
/-
Partial discharges
+ breakdown
NO PD -> No breakdown
/ ++
++
NO PD -> NO breakdown
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
TEST TYPE
DESCRIPTION
I.
a.
b.
c.
II.
a.
b.
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Repaired / refurbished
cables
Service aged
cables
Installation test /
Acceptance test
Maintenance test
Diagnostic test
Object
Test type
Evaluation
method
Monitored
Evaluation of the diagnostic
data
Acceptance
thresholds
Non-monitored
Criteria
Criteria Pass/Fail
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
failed
PD not
observed
Repair
Evaluation of PD
data
Harmful PD
Harmless PD
Test passed
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Ref
< 30kV
IEC 60502
Max. 3.0.2.0xUo
30kV-150kV
IEC 60840
Max. 2.01.7xUo
150kV-500kV
IEC 60067
Max. 1.71.1xUo
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
1.
1.
Basic
Basic Aspects
Aspects of
of Condition
Condition Assessment
Assessment of
of Transmission
Transmission Power
Power Cabl
Cables
es
2.
2.
International
International Trends
Trends in
in Testing
Testing and
and Diagnosis
Diagnosis
3.
4.
4.
Examples
Examples of
of Modern
Modern Condition
Condition Assessment
Assessment of
of HV
HV Power
Power Cables
Cables
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
dielectric
losses
PD level in [pC]
PD level in [pC]
PD pattern information
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
2.
50kV
100kV
150kV
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
partial discharge
measurement
voltage testing
23%
52%
25%
dielectric losses
measurement
Relevance of combining PD test and the voltage test
Yes: 50%
No: 50%
[Ref] IEEE PES Insulated Conductor Committee Spring 2008 Meeting, Minutes F05D Damped AC Voltages Testing
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
82%
0% . 2%
81%
[Ref] IEEE PES Insulated Conductor Committee Spring 2008 Meeting, Minutes F05D Damped AC Voltages Testing
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
73%
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
technological progress
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Weight: 20.000kg
Weight: 1.000kg
Load: 20 nF - 5000 nF
Load: 20 nF 13000 nF
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Uo
[kV]
HV 150
x Uo
HV 250
x Uo
HV 350
x Uo
66
38,1
2,8
110
63,5
1,7
2,8
132
76,2
1,4
2,3
150
86,6
1,2
2.0
2,8
220
127
0.8
1,4
1,9
330
190,5
0.9
1,3
380
219,4
Type HV150
Type HV350
1,1
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Important Standards
IEC 62067: Power cables with extruded insulation and the accessories
for rated voltages above 150kV;.
IEC 60141: Tests on oil-filled and gas-pressure cables and their
accessories
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Principles of damped
sinusoidal ac (dac) voltage
generation
HV Source
HV Solid-State
Switch
Inductor L
Test Object: Power Cable
Cc
HV Divider
Process Control Unit
PD Coupling Capacitor
Data Storage
PD detector
PD Analysis
Dielectric losses
estimation
For the generation of dac voltages the capacitance of the HV power cable in series in a
large air-core inductor L in the range of few Hs is charged with a continuously increasing
HV voltage with a low current in the range of 10mA up to 30mA.
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Principles of damped
sinusoidal ac (dac) voltage
generation
HV Source
HV Solid-State
Switch
Inductor L
Test Object: Power Cable
Cc
HV Divider
Process Control Unit
PD Coupling Capacitor
Data Storage
PD detector
PD Analysis
Dielectric losses
estimation
Principles of damped
sinusoidal ac (dac) voltage
generation
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
0.25
258
195
0.5
183
138
129
98
91
69
65
49
46
35
16
32
24
20
29
22
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Partial discharges
detection
Voltage
testing
Dielectric loss
measurement
Voltage withstand
test
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
1.4
1.2
1
0.8
0.6
0.4
0.2
0
0.40
L1
L2
L3
0.80
1.00
1.36
x Uo
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
PD site localisation
Condition assessment
Safe
Extruded new-installed /
service aged
cable insulation
accessories
Semi safe
Not save
PD free*
PD free*
<100pC **
>100pC**
<100pC **
<500pC **
>1000pC **
<50pC **
<200pC **
>200pC **
PD free*
<300pC **
>500pC**
PD free*
(*) PD free (PDIV > 1.3 Uo) and with an acceptable background noise level e.g. 25..50pC (standardized PD detection)
(**) only as an indication; depends on the PDIV, insulation type and condition of a individual cable
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
PD site localisation
Condition assessment
Safe
Semi safe
Not save
tan <0.1%
Extruded new-installed /
service aged
cable insulation
accessories
tan <0.1%
tan <0.1%***
tan <0.2%
tan <0.1%***
tan >0.2%
tan >0.1%***
tan <0.2%
tan <0.1%***
tan <0.3%
tan <0.2%***
tan >0.3%
tan >0.2%***
tan <0.2%
tan <0.1%***
tan <0.3%
tan <0.2%***
tan >0.3%
tan >0.2%***
tan <0.2%
tan <0.1%***
tan <0.3%
tan <0.2%***
tan >0.3%
tan >0.2%***
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
1.
1.
Basic
Basic Aspects
Aspects of
of Condition
Condition Assessment
Assessment of
of Transmission
Transmission Power
Power Cabl
Cables
es
2.
2.
International
International Trends
Trends in
in Testing
Testing and
and Diagnosis
Diagnosis
3.
3.
Principles
Principles of
of using
using sinusoidal
sinusoidal damped
damped AC
AC voltages
voltages for
for on
on--site
site energizing
energizing of
of
power
power cables
cables
4.
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 1: New 132kV XLPE
Cable data:
Location: Malaysia
Installation year: 2009
Cable length: 7700m
Operation voltage: Uo= 76kVrms
Damped AC frequency during test: 44Hz
Cable capacitance (one phase): 1.64uF
History: Breakdown in two joints during soaking test
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 1: New 132kV XLPE
TDR analysis examples:
L1 (Red)
L2 (Yellow)
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 1: New 132kV XLPE cable
PD mappings and histograms:
Voltage
PD Mappings
PD Histograms
70kV
110kV
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 1: New 132kV XLPE
PD measurements results (after repair):
800
700
PD [pC]
600
500
L1
400
L2
L3
300
200
100
0
0
20
40
60
80
100
120
140
160
Voltage [kV]
Examples
No 2: New 132kV XLPE cable
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 3: Serviced aged 110kV XLPE cable
Installation year: 1974
Insulation type: early XLPE (manufactured by
Russian Cable Company)
Number of joint: Unknown (due to repayments
different number of joints in each cable phase)
Length: 1500m
Localization: Moscow
History:
5 years after installation, unexpected random
breakdowns in all phases due to electrical treeing.
Investigation showed that cable samples taken from
deteriorated phases showed a symptom of water
treeing phenomenon and electrical treeing.
Last breakdown occurred in 2009. Cable was repaired
and tested with OWTS 150 HV before putting to
operation service.
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 3: Serviced aged 110kV XLPE cable
Diagnostic (energizing up to Uo 64kVrms/90kVpeak) due to service history
L1
L2
L3
10kV
70/40/70kV
90kV
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 3: Serviced aged 110kV XLPE cable
[pC]
400
L1
300
L2
200
L3
100
0
0
10
20
30
40
50
60
70
80
90
100
[kVpeak]
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 3: Serviced aged 110kV XLPE cable
Dielectric loss estimation ( tan )
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 3: Serviced aged 110kV XLPE cable
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 3: Serviced aged 110kV XLPE cable
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 3: Serviced aged 110kV XLPE cable
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 3: Serviced aged 110kV XLPE cable
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 4: Serviced aged 110kV EGP
Testing 110kV external gas- pressure cable circuit (2.2 F), length 8.5 km using damped
AC voltages (40 Hz); power grid in Holland
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 4: Serviced aged 110kV EGP
L1
L2
L3
PD at Uo diagnostic results (left: IEC 60270 phase revolved PD pattern, right: HF PD pulse sequences
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 4: Serviced aged 110kV EGP
Phase 4 (yellow) shows different behavior as compared to other phases: at Uo voltage PD activity has been observed.
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 4: Serviced aged 110kV EGP
TDR analysis of data from phase 4 (yellow) shows that there are no significant concentrations of PD activity in the
cable insulation and cable accessories.
A number of PD-pulses have been localized in the total length indication distributed characteristics.
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 5: 110kV XLPE cable
Test Measurement procedure damped AC voltages
1. The test voltage is raised in steps of 10 kV and three excitations at each voltage level are
performed.
2. At the selected maximum voltage level voltage withstand test up to 1.7Uo is performed: 50
excitations (IEEE 400) or 1hrs (IEC 60840).
3. Final maximum test voltage depends on PDIV and PD magnitude at PDIV.
4. During the voltage test PD and the dielectric losses is measured.
No
.
U rms [kV]
U peak [kV]
7.1
10
14.1
20
21.2
30
140
28.3
40
120
35.4
50
42.4
60
49.5
70
56.6
80
63.6
90
10
70.7
100
11
77.8
110
20
12
84.9
120
13
91.9
130
14
99.0
140
15
106.1
150
U peak [kV
160
100
80
60
40
0.1 0.2 0.3 0.4 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.6 1.7
x Uo
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 5: 110kV XLPE cable
Goal field investigation:
1.
2.
3.
4.
5.
6.
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 5: 110kV XLPE cable
Phase C
Phase B
90kV (Uo)
140kV (1.55xUo)
90kV (Uo)
120kV (1.33xUo)
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 5: 110kV XLPE cable
600
L2 B
Q-V graphics
L3 C
500
[pC]
400
300
200
100
0
0
20
40
60
80
100
120
140
160
[kV] peak
90kV (Uo)
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 5: 110kV XLPE cable
PD mapping @ 140 kV (1.6 Uo)
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 5: 110kV XLPE cable
0.25
Dielectric loss
[%]
0.2
0.15
0.1
0.05
0
0.4 Uo
Uo
1.3 Uo
Ur
Phase B
Phase C
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 6: Serviced aged 50kV oil-filled cable
Installation year:
1958
Insulation type:
oil filled
Cable length:
9.6km
Power cable capacitance:
2.8uF
Damped AC frequency:
35Hz
Service history:
Oil-leakages in L1 and L2
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 6: Serviced aged 50kV oil-filled cable
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 7: Serviced aged 230kV oil-filled cable
2
1.8
Installation year:
Insulation type:
Cable length:
Voltage ratting:
Cable capacitance:
On-site testing using
damped ac voltages:
1976
Oil-filled
13.314 m
Uo = 132 kVrms
4 F
Diel. Losses
1.6
1.4
1.2
1
0.8
0.6
0.4
0.2
0
0.40
L1
L2
L3
0.80
1.00
1.36
x U_0
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Examples
No 8: Serviced aged 230kV oil-filled cable
2
1.8
Installation year:
Insulation type:
Cable length:
Voltage ratting:
Cable capacitance:
On-site testing using
damped ac voltages:
1982
Oil-filled
27.513 m
Uo = 132 kVrms
8.5 F
Diel. Losses
1.6
1.4
1.2
1
0.8
0.6
0.4
0.2
0
0.40
L1
L2
L3
0.80
1.00
1.36
x Uo
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Conclusions
1.
Electrical testing on-site is an important step of quality insurance of new/repaired and service aged cable
systems.
2.
Enhanced voltage testing up to e.g. 2.5xU0 of defect-free /non aged insulation does not have destructive
influence on the service life of the component.
3.
Enhanced voltage testing up to e.g. 2.5xU0 of defective/aged insulation may have destructive influence on
the service life of the component. Even if no breakdown has occurred.
4.
The Utest/U0 ratio decreases for on-site testing of HV cables above 150kV and therefore it has to be
compensated by additional measures e.g. PD detection.
5.
Service aged HV power cables are important assets and there is an increasing need to obtain information
about actual condition by applying integral and defect related on-site diagnostics.
6.
Sinusoidal damped AC voltages (DAC) can be applied for voltage testing of power cables (up to 380kV
cable systems) in combination with diagnostic measurements.
7.
Partial discharges, dielectric losses diagnostic measurements at damped AC voltages can be used for nondestructive on-site testing and diagnosis of new and service aged power cables.
8.
Combining on-site testing with PD detection provides information about discharging insulation defects and
about the fact if the on-site test had a destructive impact on the insulation system.
9.
For HV and EHV power cables more attention is needed to implement on-site testing and diagnosis.
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables
Seitz Instruments AG
Mellingerstrasse 12
5443 Niederrohrdorf
Switzerland
phone 41 56 496 7480
fax +41 56 496 7485
www.seitz-instruments.ch
SebaKMT GmbH
Dr. Herbert Iann Str.6
96148 Baunach
Germany
phone +49 9544 680
fax
+49 9544 2273
www.sebakmt.com
onsite.hv.solutions AG
Tpferstrasse 5
6004 Luzerne
Switzerland
phone: + 41 41 500 0550
fax: + 41 41 500 0551
www.onsitehv.com
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables