Escolar Documentos
Profissional Documentos
Cultura Documentos
(MR01-1 to MR01-10)
REV.
SENORO GAS DEVELOPMENT PROJECT
DATE.
SNO-S-CC-05-001
A
17-APR-13
D. DESIGN LOAD
D.1. Loading Data
Service Load
MR01 01-10
Storey
Elev. +6.000
Row 01-10
Pipe
Line <= 10 inch
Elev. +8.000
Row 01-10
Pipe
Line <= 10 inch
Pipe
16-HF-1004-6R-PP-01
Pipe
16-HF-2004-6R-PP-01
Elev. +11.000
Row 01-10
Pipe
Line <= 10 inch
Pipe
24-VH-0051-1B-01
Elev. +18.000
Row 01-10
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
________________________________________________________________________________________
Attachment D Page 2 of 15
DATE.
SNO-S-CC-05-001
A
17-APR-13
Symbol
Profile
Unit Weight
kg/m
kN/m
R1
R2
R4
R5
R7
R12
R15
R20
R21
SH
SH
SH
SH
SH
2C
2L
2L
SH
588x300x12x20
300x150x6.5x9
400x200x8x13
400x200x8x13
500x200x10x16
150x75x6.5x10
150 x 150
175 x 175
350x175x7x11
151
36.7
66
66
89.6
37.2
67.2
78.8
49.6
1.48131
0.360027
0.64746
0.64746
0.878976
0.364932
0.659232
0.773028
0.486576
EL+6.000
to
EL+8.000
R1
R2
R4
R5
R12
R13
R15
R16
R22
SH
SH
SH
SH
2C
SH
2L
SH
SH
588x300x12x20
300x150x6.5x9
400x200x8x13
400x200x8x13
150x75x6.5x10
400x200x8x13
150 x 150
450x200x8x15
350x175x7x11
151
36.7
66
66
37.2
66
67.2
76
49.6
1.48131
0.360027
0.64746
0.64746
0.364932
0.64746
0.659232
0.74556
0.486576
EL+8.000
to
EL+11.000
R1
R2
R4
R5
R8
R12
R15
R17
R23
SH
SH
SH
SH
SH
2C
2L
SH
SH
588x300x12x20
300x150x6.5x9
400x200x8x13
400x200x8x13
400x200x8x13
150x75x6.5x10
150 x 150
450x200x8x15
350x175x7x11
151
36.7
66
66
66
37.2
67.2
76
49.6
1.48131
0.360027
0.64746
0.64746
0.64746
0.364932
0.659232
0.74556
0.486576
Remarks
________________________________________________________________________________________
Attachment D Page 3 of 15
Unit Weight
kg/m
kN/m
DATE.
SNO-S-CC-05-001
A
17-APR-13
Elevation
m
EL+11.000
to
EL+15.000
Symbol
R1
R2
R4
R5
R9
R12
R15
R18
SH
SH
SH
SH
SH
2C
2L
SH
588x300x12x20
300x150x6.5x9
400x200x8x13
400x200x8x13
400x200x8x13
150x75x6.5x10
150 x 150
450x200x8x15
EL+15.000
to
EL+18.000
R1
R3
R4
R5
R6
R10
R11
R12
R14
R15
R19
R24
SH
SH
SH
SH
SH
SH
SH
SH
SH
2L
SH
SH
588x300x12x20
300x150x6.5x9
300x150x6.5x9
400x200x8x13
175x90x5x7
400x200x8x13
250x125x6x9
450x200x8x15
500x200x10x16
150 x 150
300x150x6.5x9
700x300x13x24
151
36.7
36.7
66
18.1
66
29.6
76
89.6
67.2
36.7
185
1.48131
0.360027
0.360027
0.64746
0.177561
0.64746
0.290376
0.74556
0.878976
0.659232
0.360027
1.81485
Remarks
________________________________________________________________________________________
Attachment D Page 4 of 15
DATE.
SNO-S-CC-05-001
A
17-APR-13
Tray
designations
MR01-01
Electrical tray
Instrument Tray
Length
(m)
P
(KN/m')
SF
F
(KN)
1.50
3.00
1.50
1.20
2.70
1.35
MR01-02-09
Electrical Tray
Instrument Tray
3.00
3.00
1.50
1.20
5.40
2.70
MR01-10
Electrical tray
Instrument Tray
1.50
3.00
1.50
1.20
2.70
1.35
________________________________________________________________________________________
Attachment D Page 5 of 15
DATE.
SNO-S-CC-05-001
A
17-APR-13
Fireproofing
t2 + 2t
concrete weight
fire proofing thickness (t)
Inner Height of fireproof (H')
Total width (W')
Section area1 (A1)
Section area2 (A2)
Total Section Area (A)
Wc
=
=
=
=
=
=
=
=
23.50 kN/m3
50 mm
t1 + 2t
H - 2t = H - 100
W + 2t = W + 100
H' * (t1 + 2t) = H' * (t1 + 100)
2*(W' *(t2 + 2t) = 2*W'*t2 + 200*W'
A1 + A2
A * c
W'
W
t2
t1
H'
________________________________________________________________________________________
Attachment D Page 6 of 15
Profile
H
W
t1
t2
H'
W'
mm mm mm mm mm mm
A
m2
588
588
300
0.18
4.15
H500X200X10
500
500
200
0.10
2.35
H400X200X8
400
200
8.0 13.0
400
200
0.08
1.88
H350X175X7
350
175
7.0 11.0
350
175
0.06
1.44
H300X300X10
300
300
150
0.05
1.06
200x100x5.5x8
200
100
200
100
0.02
0.47
8.0
A
17-APR-13
Wc
kN/m
H588X300X12
6.0
DATE.
SNO-S-CC-05-001
________________________________________________________________________________________
Attachment D Page 7 of 15
DATE.
SNO-S-CC-05-001
A
17-APR-13
kN/m2
1.177
1.668
1.668
kN/m2
1.177
9.810
19.620
10.791
21.582
1.668
14.715
29.430
16.187
32.373
1.668
18.149
36.297
19.620
39.240
1.177
11.282
22.563
1.668
12.263
22.563
1.668
24.525
22.563
1.177
17.658
17.658
15.696
17.658
17.658
17.658
1.668
68.670
68.670
68.670
58.860
68.670
68.670
1.668
29.430
27.468
22.563
27.468
27.468
25.506
Elev. +8.000
Row 01-10
Line <= 10 inch
16-HF-1004-6R-PP-01
16-HF-2004-6R-PP-01
Elev. +11.000
Row 01-10
Line <= 10 inch
24-VH-0051-1B-01
3
6
3
6
m
m
m
m
kN
kN
kN/m2
3m
6m
kN
Elev. +18.000
Row 01-10
Line <= 10 inch
CPDMR01-6-HF-2104-6R-01
CPDMR01-6-HF-2107-6R-01
CPDMR01-6-HF-2106-6R-01
CPDMR01-6-HF-1104-6R-01
CPDMR01-6-HF-1107-6R-01
CPDMR01-6-HF-1106-6R-01
kN/m2
kN
For distance between pipes, please see Attachment B Part B.1 Piping Loading Data
________________________________________________________________________________________
Attachment D Page 8 of 15
DATE.
SNO-S-CC-05-001
A
17-APR-13
THERMAL LOAD
Thermal Load in Section B.1.2 should be converted to kN unit. Thermal load with contingency 20%
can be seen in the following table.
Longitudinal Direction (Fx)
Piping Number
Unit
01
02
09
10
Elev. +6.000
Section A (Row 01-10)
Line <= 10 inch
Anchor Support <= 10 inch
kN/m
kN
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
Elev. +8.000
Section A (Row 01-10)
Line <= 10 inch
16-HF-1004-6R-PP-01
16-HF-2004-6R-PP-01
Anchor Support <= 10 inch
kN/m
kN
kN
kN
Elev. +11.000
Section A (Row 01-10)
Line <= 10 inch
24-VH-0051-1B-01
Anchor Support <= 10 inch
kN/m
kN
kN
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
7.36 7.36 7.36 7.36 7.36 7.36 7.36 7.36 7.36 7.36
0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
Elev. +18.000
Section A (Row 01-10)
Section A (Row 01-10)
Anchor Support <= 10 inch
kN/m
kN
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
3.00
8.83
9.71
0.25
3.00
8.83
9.71
0.25
3.00
8.83
9.71
0.25
3.00
8.83
9.71
0.25
3.00
8.83
9.71
0.25
3.00
8.83
9.71
0.25
________________________________________________________________________________________
Attachment D Page 9 of 15
SNO-S-CC-05-001
DATE.
17-APR-13
10
06
05
07
08
09
04
03
Wx
Wz
02
01
=
=
=
=
=
=
32.08
0.479
0.508
0.545
0.579
0.595
( Ref.3 )
Velocity Pressure up to the height of 10 m above grade are shown in below. These values are derived
from:
qz = 0.613*Kz*Kzt*Kd*V^2
Where :
qz = Velocity pressure evaluated at height z above ground (kN/m2)
Kz = Velocity pressure exposure coefficient , Exposure
:
Kzt = Topographic factor
:
Kd = Wind directional factor
:
z = Height above ground level
C
1.00
0.85
________________________________________________________________________________________
Attachment D Page 10 of 15
DATE.
SNO-S-CC-05-001
A
17-APR-13
Velocity Pressure
Height (z)
feet
Kz
m
19.69
6.00 0.89
26.25
8.00 0.95
36.09
11.00 1.02
49.21
15.00 1.08
59.06
18.00 1.11
Wind Load
Platform surface wind pressure on projected area has been adjusted by the proper shape and
height factor that required by the basic design specification and applied as a horizontal force
at joint.
Wind Force shall be calculated based on :
F = qz x G x Cf x wf
where :
qz = vellocity pressure
G = Gust Effect factor
: 0.85
Cf = Pressure coeficient
: 1.80
wf = Projected width see table
Profil
MH -588
MH -588
MH -588
MH -588
MH -588
SH -350
SH -350
SH -350
SH -300
SH -300
SH -500
SH -400
SH -400
SH -400
SH -400
SH -500
z
m
6
8
11
15
18
6
8
11
15
18
6
8
11
15
18
18
wf
mm
588
588
588
588
588
350
350
350
300
300
500
400
400
400
400
500
X Direction
qz
kN/m2
0.48
0.51
0.55
0.58
0.60
0.48
0.51
0.55
0.58
0.60
0.48
0.51
0.55
0.58
0.60
0.60
F
kN/m
0.43
0.46
0.49
0.52
0.54
0.26
0.27
0.29
0.27
0.27
0.37
0.31
0.33
0.35
0.36
0.46
wf
mm
300
300
300
300
300
350
350
350
300
300
400
-
Z Direction
qz
F
kN/m2
kN/m
0.48
0.22
0.51
0.23
0.55
0.25
0.58
0.27
0.60
0.27
0.48
0.26
0.51
0.27
0.55
0.29
0.58
0.27
0.60
0.27
0.60
0.36
-
Remarks
Column El + 6
Column El + 8
Column El + 11
Column El + 15
Column El + 18
Sec. Beam El + 6
Sec. Beam El + 8
Sec. Beam El + 11
Sec. Beam El + 15
Sec. Beam El + 18
Main Beam El + 6
Main Beam El + 8
Main Beam El + 11
Main Beam El + 15
Main Beam El + 18
Main Beam El + 18
________________________________________________________________________________________
Attachment D Page 11 of 15
DATE.
SNO-S-CC-05-001
A
17-APR-13
Wind load on piping shall be calculated based on equation in ASCE 7-10 as below:
Basic wind speed =
Velocity Pressure :
Kz :
Kzt :
Kd :
32.08 m/s
0.613 Kz Kzt Kd V^2
0.96
1
1
Velocity Pressure :
606 N/m2
V G Cf A
G
Cf
A
:
:
:
:
606 N/m2
0.85
1.2
Projected Area, depends on pipe size diameter
Diameter (in)
W (kN)
36
24
18
16
14
12
10
8
6
4
3
2
3
3
3
3
3
3
3
3
3
3
3
3
3.29
2.19
1.65
1.46
1.28
1.10
0.91
0.73
0.55
0.37
0.27
0.18
2.03
1.36
1.02
0.90
0.79
0.68
0.56
0.45
0.34
0.23
0.17
0.11
________________________________________________________________________________________
Attachment D Page 12 of 15
SNO-S-CC-05-001
DATE.
17-APR-13
=
=
Fi
Wi
0.264
0.212
x Wt
x Wt
Transverse
Longitudinal
Wi x hi
(Wi x hi)
(D+Po) + 0.25 L
Vx
Ex
02
04
03
06
05
07
08
09
10
Ez
01
F5
TOS El + 15.00
F4
TOS El + 11.00
F3
TOS El + 8.00
F2
TOS El + 6.00
F1
8m
________________________________________________________________________________________
Attachment D Page 13 of 15
DATE.
SNO-S-CC-05-001
A
17-APR-13
Seismic load
MR01-07
MR01-06
MR01-05
MR01-04
MR01-03
MR01-02
MR01-01
Elevation
(m)
6
8
11
15
18
Total
6
8
11
15
18
Total
6
8
11
15
18
Total
6
8
11
15
18
Total
6
8
11
15
Total
6
8
11
15
Total
6
8
11
15
Total
(*)
h
W
kN
m
25.20
6
87.82
8
63.49 11
46.02 15
153.82 18
376.351
6
70.37
8
171.08
113.76 11
72.56 15
403.90 18
831.67
69.43
6
183.04
8
123.60 11
84.25 15
432.26 18
892.58
34.97
6
170.60
8
120.86 11
71.37 15
143.89 18
541.69
6
34.97
170.60
8
120.87 11
97.71 15
424.15
34.97
6
8
170.60
120.87 11
97.71 15
424.15
6
34.97
170.60
8
120.87 11
97.71 15
424.148
W*h
kN.m
151.21
702.54
698.41
690.29
2,768.76
5,011.21
422.24
1,368.62
1,251.37
1,088.37
7,270.13
11,400.72
416.59
1,464.30
1,359.60
1,263.72
7,780.68
12,284.89
209.84
1,364.81
1,329.50
1,070.51
2,589.95
6,564.61
209.84
1,364.80
1,329.52
1,465.65
4,369.80
209.84
1,364.80
1,329.52
1,465.65
4,369.80
209.84
1,364.80
1,329.52
1,465.65
4,369.80
V long.
V trans.
Force (kN)
kN
79.81
79.81
79.81
79.81
79.81
kN
99.31
99.31
99.31
99.31
99.31
F1
F2
F3
F4
F5
Long.
2.41
11.19
11.12
10.99
44.09
F1
F2
F3
F4
F5
Trans.
3.00
13.92
13.84
13.68
54.87
176.36
176.36
176.36
176.36
176.36
219.47
219.47
219.47
219.47
219.47
F1
F2
F3
F4
F5
6.53
21.17
19.36
16.84
112.46
F1
F2
F3
F4
F5
8.13
26.35
24.09
20.95
139.95
189.27
189.27
189.27
189.27
189.27
235.54
235.54
235.54
235.54
235.54
F1
F2
F3
F4
F5
6.42
22.56
20.95
19.47
119.88
F1
F2
F3
F4
F5
7.99
28.08
26.07
24.23
149.18
114.87
114.87
114.87
114.87
114.87
142.95
142.95
142.95
142.95
142.95
F1
F2
F3
F4
F5
3.67
23.88
23.26
18.73
45.32
F1
F2
F3
F4
F5
4.57
29.72
28.95
23.31
56.40
89.94
89.94
89.94
89.94
111.93
111.93
111.93
111.93
F1
F2
F3
F4
4.32
28.09
27.36
30.17
F1
F2
F3
F4
5.37
34.96
34.05
37.54
89.94
89.94
89.94
89.94
111.93
111.93
111.93
111.93
F1
F2
F3
F4
4.32
28.09
27.36
30.17
F1
F2
F3
F4
5.37
34.96
34.05
37.54
89.94
89.94
89.94
89.94
111.93
111.93
111.93
111.93
F1
F2
F3
F4
4.32
28.09
27.36
30.17
F1
F2
F3
F4
5.37
34.96
34.05
37.54
________________________________________________________________________________________
Attachment D Page 14 of 15
MR01-10
MR01-09
MR01-08
Elevation
(m)
6
8
11
15
18
Total
6
8
11
15
18
Total
6
8
11
15
18
Total
(*)
h
W
kN
m
34.97
6
170.60
8
120.86 11
73.30 15
114.43 18
514.162
85.79
6
193.23
8
134.27 11
183.19 15
554.05 18
1150.526
88.06
6
208.22
8
124.68 11
188.33 15
546.60 18
1155.896
W*h
kN.m
209.84
1,364.80
1,329.50
1,099.43
2,059.74
6,063.31
514.72
1,545.85
1,477.00
2,747.79
9,972.90
16,258.26
528.37
1,665.78
1,371.51
2,825.01
9,838.71
16,229.38
V long.
DATE.
V trans.
SNO-S-CC-05-001
A
17-APR-13
Force (kN)
kN
109.03
109.03
109.03
109.03
109.03
kN
135.68
135.68
135.68
135.68
135.68
Long.
F1
F2
F3
F4
F5
3.77
24.54
23.91
19.77
37.04
F1
F2
F3
F4
F5
Trans.
4.70
30.54
29.75
24.60
46.09
243.97
243.97
243.97
243.97
243.97
303.61
303.61
303.61
303.61
303.61
F1
F2
F3
F4
F5
7.72
23.20
22.16
41.23
149.65
F1
F2
F3
F4
F5
9.61
28.87
27.58
51.31
186.24
245.11
245.11
245.11
245.11
245.11
305.03
305.03
305.03
305.03
305.03
F1
F2
F3
F4
F5
7.98
25.16
20.71
42.67
148.59
F1
F2
F3
F4
F5
9.93
31.31
25.78
53.10
184.92
________________________________________________________________________________________
Attachment D Page 15 of 15