Você está na página 1de 1

77432 Federal Register / Vol. 70, No.

250 / Friday, December 30, 2005 / Notices

Arnold is approved, subject to the Office of Nuclear Reactor Regulation in 4. Committee Reports.
following conditions: writing of the date of closing of the 5. Consideration of Board Resolution on
(1) Prior to completion of the transfer of the transfer of the IPL 70-percent interest in Capital Funding.
license, FPLE Duane Arnold shall provide DAEC no later than 5 business days 6. Annual Report on Government in the
the Director of the Office of Nuclear Reactor prior to closing. Should the transfer of Sunshine Act Compliance.
Regulation satisfactory documentary the license not be completed by 7. Fiscal Year 2005 Comprehensive
evidence that it has obtained the appropriate December 31, 2006, this Order shall Statement on Postal Operations,
amount of insurance required of licensees
become null and void, provided including the Preliminary Fiscal
under 10 CFR Part 140 of the Commission’s
regulations. however, that upon written application Year 2007 Annual Performance
(2) At the time of the closing of the transfer and for good cause shown, such date Plan—GPRA.
of the license from Interstate Power and Light may be extended by order. 8. Capital Investment—Northeast Metro
Company (IPL) to FPLE Duane Arnold, IPL This Order is effective upon issuance. Michigan Processing & Distribution
shall transfer to FPLE Duane Arnold IPL’s For further details with respect to this Center.
decommissioning funds accumulated as of Order, see the initial application dated 9. Election of Chairman and Vice
such time, with an aggregate minimum value August 1, 2005, and supplemental Chairman of the Board of
of at least $186 million, and FPLE Duane letters dated October 11, November 1, Governors.
Arnold shall deposit such funds in an
November 2, and November 28, 2005, 10. Tentative Agenda for the February
external decommissioning trust fund
established by FPLE Duane Arnold for DAEC. and the non-proprietary safety 7–8, 2006, meeting in Washington,
FPLE Duane Arnold shall take all necessary evaluation dated December 15, 2005, DC.
steps to ensure that this external trust fund which is available for public inspection
at the Commission’s Public Document Tuesday, January 10 at 10 a.m. (Closed)
is maintained in accordance with the
requirements of this order approving the Room (PDR), located at One White Flint 1. Filing with the Postal Rate
license transfer, NRC regulations, and North, Public File Area 01 F21, 11555 Commission for Extension of
consistent with the safety evaluation Rockville Pike (first floor), Rockville, Market Test for Repositionable
supporting this order. The trust agreement Maryland and accessible electronically Notes.
shall be in a form acceptable to the NRC.
(3) By the date of closing of the transfer of
from the Agencywide Documents 2. Strategic Planning.
the 70 percent ownership interest in DAEC Access and Management System 3. Financial Update.
from IPL to FPLE Duane Arnold, FPLE Duane (ADAMS) Public Electronic Reading 4. Rate Case Planning.
Arnold shall obtain a parent company Room on the Internet at the NRC Web 5. Labor Negotiations Planning.
guarantee from FPL Group Capital in an site, http://www.nrc.gov/reading-rm/ 6. Personnel Matters and Compensation
initial amount of at least $75 million (in 2005 adams.html. Persons who do not have Issues.
dollars) to provide additional access to ADAMS or who encounter FOR FURTHER INFORMATION CONTACT:
decommissioning funding assurance problems in accessing the documents William T. Johnstone, Secretary of the
regarding such ownership interest, which located in ADAMS, should contact the
guarantee must be in accordance with NRC Board, U.S. Postal Service, 475 L’Enfant
regulations regarding such documents.
NRC PDR Reference staff by telephone Plaza, SW., Washington, DC 20260–
Required funding levels shall be recalculated at 1–800–397–4209, 301–415–4737, or 1000. Telephone (202) 268–4800.
annually and, as necessary, FPLE Duane by e-mail to pdr@nrc.gov.
William T. Johnstone,
Arnold shall either obtain appropriate Dated at Rockville, Maryland, this 23rd day
adjustments to the parent guarantee or Secretary.
of December 2005.
otherwise provide any additional [FR Doc. 05–24685 Filed 12–28–05; 11:36
For the Nuclear Regulatory Commission.
decommissioning funding assurance am]
necessary for FPLE Duane Arnold to meet R. William Borchardt,
BILLING CODE 7710–12–M
NRC requirements under 10 CFR 50.75. Acting Director, Office of Nuclear Reactor
(4) FPLE Duane Arnold shall take no action Regulation.
to cause FPL Group Capital, or its successors [FR Doc. E5–8204 Filed 12–29–05; 8:45 am]
and assigns, to void, cancel, or modify its $50 RAILROAD RETIREMENT BOARD
BILLING CODE 7590–01–P
million contingency commitment to FPLE
Duane Arnold, as represented in the Proposed Collection; Comment
application, or cause it to fail to perform or Request
impair its performance under the POSTAL SERVICE
SUMMARY: In accordance with the
commitment, without the prior written
consent from the NRC. An executed copy of United States Postal Service Board of requirement of section 3506(c)(2)(A) of
the Support Agreement shall be submitted to Governors; Sunshine Act Meeting the Paperwork Reduction Act of 1995
the NRC no later than 30 days after which provides opportunity for public
completion of the license transfer. Also, DATE AND TIMES: Tuesday, January 10, comment on new or revised data
FPLE Duane Arnold shall inform the NRC in 2006; 8 a.m. and 10 a.m. collections, the Railroad Retirement
writing any time that it draws upon the $50 PLACE: Washington, DC, at U.S. Postal Board (RRB) will publish periodic
million commitment. Service Headquarters, 475 L’Enfant summaries of proposed data collections.
It is further ordered that, consistent Plaza, SW., in the Benjamin Franklin Comments are invited on: (a) Whether
with 10 CFR 2.1315(b), a license Room. the proposed information collection is
amendment that makes changes, as STATUS: January 10—8 a.m. (Open); 10 necessary for the proper performance of
indicated in Enclosure 2 to the cover a.m. (Closed). the functions of the agency, including
letter forwarding this Order, to conform MATTERS TO BE CONSIDERED: whether the information has practical
the license to reflect the subject license utility; (b) the accuracy of the RRB’s
transfer is approved. The amendment Tuesday, January 10 at 8 a.m. (Open) estimate of the burden of the collection
wwhite on PROD1PC61 with NOTICES

shall be issued and made effective at the 1. Minutes of the Previous Meeting, of the information; (c) ways to enhance
time the proposed license transfer is December 6, 2005. the quality, utility, and clarity of the
completed. 2. Remarks of the Postmaster General information to be collected; and (d)
It is further ordered that FPLE Duane and CEO Jack Potter. ways to minimize the burden related to
Arnold shall inform the Director of the 3. Holiday Mailing Recap. the collection of information on

VerDate Aug<31>2005 18:16 Dec 29, 2005 Jkt 208001 PO 00000 Frm 00061 Fmt 4703 Sfmt 4703 E:\FR\FM\30DEN1.SGM 30DEN1

Você também pode gostar