BTS ACCEPTANCE TEST DOCUMENT
No

Item

Check
List
Vendor

Check
List
PMO

I
II
III
IV

Cover Check List GR


Cover Doc ATP ( Foto Bangunan )
Doc. Acceptance Test Document ( ATP )
Doc. RFI Notice ( asli )
BOQ Actual Measurement ( ttd Manager
V FOC PT.HS )
VI Doc. PO
VII Doc. Berita Acara Serah Terima Site
VIII VSWR REPORT
IX WALK TEST REPORT
X FOTO DOCUMENTATION
XI Doc. As Plan Drawing & As built Drawing

Jakarta, ...2014

PT. Huawei Tech Investment

PMO

SITE ACCEPTANCE DOCUMENT CHECKLIST


SITE ID / NAME
REGION / AREA
SITE TYPE

: ..... / .....
: ..... / .....
: .....

Hereby stated description and item below refer to the documents attached have been
approved for construction:
No.
1
2.1
3.1

4.1

4.2

Table of Contents

Checked
HTI

HS

Remarks

BOQ
NodeB BOQ
NodeB ATP
Acceptance test
Installation Checklist
Indoor Installation Checklist
Outdoor Installation Checklist
Installation Checklist
Feeder System List
Fiber Optic list
BTS Commissioning Record
Network Parameter Checklist

4.3

Integration Test

4.4
4.5
4.6
4.7
5
6
7
8

Basic Service Checklist


Handover Test
24 Hours Stability Test
Alarm Query Test
Punch List Summary
VSWR Measurement
Site Documentation
Capture LMT
SIR Approve

PT. Huawei Services

PT. Huawei Tech Investment

BOQ FOR NodeB

Project Name
Customer
Site ID
Site Name
Site Type
Site Description
Date

:
:
:
:
:

.....
.....
.....
.....
.....
: .....
: .....

Type BTS 3900 BoQ


BOQ
Material

No.

>>
BTS3900A
BBU

A1/1

WRFU

Code

Description

BTS3900A WCDMA S1/1/1 (Band 1 2100M, CE U:128 D:128, DC -48V)


02113169
BTS3900 Cabinet (DC -48V)
02315848
BBU Box
MARP RFU V100R102,WD5MWFUB81,Multi-Carrier
02319231
Transceiver Unit(EDHT 80W,Band1,RX1920-1980/TX21102170MHz),9U

As
Plan

As
Built

Remark

0
0

0
0

Existing
Existing

New

WBBP

03020GSA

WCDMA Base Band Processing & Interface Unit

New

WMPT

03020JQE

WCDMA Main Processing & Transmission Unit (4E1 + 2FE), 1*1

New

UBRI

03052995

Universal Broadband Radio Interface

NA

04012542

Internal Cable Set, BTS3900, Single Cabinet Internal Cable Set

NA

Existing

NA

NA

NA

1
1

1
1

New
New

Existing

Existing

New

Existing

Existing

New

>>

B1/1

Auxiliary Kit

BTS3900A WCDMA S1/1/1 (Band 1 2100M, CE U:128 D:128, DC -48V)


02239275

Auxiliary

04046100

Auxiliary

04070012

Auxiliary

29040316

Auxiliary
Auxiliary

29041060
29041061

>>
Trunk Cable

>>

3900 Series BTS Macro, Site Auxiliary Material Kit (G/U/L)


Single Cable, Shielding Straight Through Cable, 10m, MP8-IV,
CC4P0.5P430U (S), MP8-IV, LSZH
Signal Cable, Shielded Straight Through Cable, 10m, MP8-II,
CC4P0.5GY(S), MP8-II, FTP
Blank Label, DB0699, Huawei D Blank Cable Label, 40 Groups
40 Pcs, 4 Colum*10 Rows
Signal Cable Label
Power Cable Label

BTS3900A WCDMA S1/1/1 (Band 1 2100M, CE U:128 D:128, DC -48V)


Trunkcable,20m,120ohm,4E1,0.4mm,D26M(3ROW),120CC8P0.
04120119
4P430U(S)

Jumper
Cable

04130029

CPRI 2M

04050098

Feeder Kit

02236760

Feeder 7/8

25070134

RF Cable,4.0m,7/16DIN50AM,COAX50-8.7/3.55B,DIN50SM-II
Outsourcing Cable,SFP High Speed Transmission
Cable,2.0m,SFP20M,CC2P0.32B,SFP20M,For Indoor
7/8" Aluminium Feeder Kit,Antenna Jumper Included,General
Area
Coaxial Cable,Smooth Copper
Tube,50ohm,27.8mm,21.5mm,9.3mm,Black, 7/8" Aluminium
Cable,With a package exempted from fumigating
Semi Rigid Cable

Semi Rigid
Grounding
Unit
Base Frame

21120291

Grounding Unit

Existing

21150604

HERT Cabinet Base

Existing

Blue 16mm

25030533

Wire, 450/750V, 227 IEC 02 (RV) 16mm^2, black, 85A

10

10

New

Black 16mm

25030535

Wire, 450/750V, 227 IEC 02 (RV) 16mm^2, blue, 85A

10

10

New

Grounding
Cable

25030429

Wire,450/750V,60227 IEC 02(RV)16mm^2,yellow green,85A

10

10

New

*Site BOQ will base on the actual materials that installed.

NodeB ATP

2.1

REGION / AREA

: ..... / .....

SITE ID

: .....

SITE NAME

: .....

SITE TYPE

: .....

Acceptance test
Test category

Test item

Test sub-item

Test result

T01

T01-01

T01-0101

Hardware

Hardware Status
Check

Power-on Check of the BBU


T01-0102
Power-on Check of the RRU

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

T01-0103
Power-on Check of BoardsBTS3900A
T01-0104
Power-on Check of BoardsBTS3900
T01-0105
Power-on Check of Heat
Exchanger
T01-0106
Status Check of Boards
T01-0107
Status Check of E1/T1 Ports
of IuB Interface

PT. Huawei Services

PT. Huawei Tech Investment

T01-0108
Status Check of Optical
Modules of CPRI Interface

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

T01-0109
Status Check of Local
Ethernet Port
T01-0110
Status Check of Ethernet
Ports of IuB interface
T01-0101

T02

T02-01

Check Fiber optic feeder


length and overall insertion
loss compliance to design
using OTDR. Create PDF
certification report for
handover pack and .SOR file
for reference.

Fiber Optic Feeder

Fiber Optic Check

T01-0102
Check insertion loss and
reflectance of each network
component/event using
OTDR. Create PDF
certification report for
handover pack and .SOR
file for reference.
T01-0103
Check all LC feeder
connectors are clean and
free from dust, moisture,
contamination and scratches
and meet IEC-61300-3-35.
Create consolidated
certificate report of
connector for handover
pack.
T01-0104
Check BBU, RRU TX ports
are clean and free from dust,
moisture, contamination and
scratches and meet IEC61300-3-35. Create
consolidated certificate report
of connector for handover
pack.

T02

T02-01

T02-0101

Operation and
Maintenance

User Permission
Management

Login Management

Pass

Fail

NA

Locking Local Maintenance


Terminal

Pass

Fail

NA

T02-0103

Pass

Fail

NA

T02-0102

Configuration Privilege

PT. Huawei Services

PT. Huawei Tech Investment

T02-0201
Querying NodeB Software
Version

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

T02-0202
Querying Active NodeB
Versions
T02-0203
Querying Board Version
T02-0204
Downloading NodeB
Software Package
T02-02

T02-0205

Software Version
Management

Downloading BootRom
Package
T02-0206
Synchronizing Software
Version
T02-0207
Activating NodeB Software
T02-0208
Activating BootRom
Package
T02-0209
Upgrading the NodeB
Through the M2000

T02-03

T02-0301

License File
Management

Distributing a License File


to the NodeB
T02-0401

T02-04

System Restart

Equipment
Management

T02-0402
Querying NodeB Type

T02-0403
RFU Reset
T02-0404
Board Blocking and
Unblocking
T02-0405
NodeB Time Management
T02-0406
NodeB Time Zone
Management

PT. Huawei Services

PT. Huawei Tech Investment

T02-0407

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

CE Consumption of R99
AMR12.2K Service

Pass

Fail

NA

T02-0510

Pass

Fail

NA

NodeB SNTP Management


T02-0408
RFU TX Switch
Management
T02-0409
Hot Plugin on CPRI Port
T02-0410
Maintenance of the Power
Supply System
T02-0411
Maintenance of the RRU
Power System
T02-0412
Maintenance of the NodeB
Clock
T02-0413
Querying NodeB Abnormal
Status
T02-0501
E1/T1 Link Management
T02-05
IuB Interface
Management

T02-0502
IMA Group Management
T02-0503
Ethernet Link Management

T02-0504
IP Transmission Layer Link
Management
T02-0505
Standard Protocol Tracing
at IuB Interface
T02-0206
Sector Management
T02-0507
Local Cell Management
T02-0508
Local Cell Operations
T02-0509

CE Consumption of R99
VP Service

PT. Huawei Services

PT. Huawei Tech Investment

T02-0511

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Board Service Resource


Query

Pass

Fail

NA

T02-09

T02-0901

Pass

Fail

NA

Alarm Management

Alarm Query

CE Consumption of R99
PS384K Service
T02-0512
CE Consumption of
HSDPA Service
T02-0601
Local Maintenance through
Local Ethernet Port
T02-06
Maintenance Channel
Management

T02-0602
Remote Maintenance
through Omch Channel
T02-0603
BootP Funcion
T02-0701

T02-07

Uploading Data
configuration File

File management

T02-0702
Dowloading Data
Configuration File

T02-0801
Checking NodeB Data
Consistency
T02-0802
RTWP Measurement
Monitoring
T02-0803
CPU/DSP Usage
Monitoring
T02-08

T02-0804

Configuration
Management

RFU Temperature
Monitoring
T02-0805
Cell Service Resource
Query
T02-0806
RFU Output Power
Monitoring
T02-0807

PT. Huawei Services

PT. Huawei Tech Investment

T02-1001
NE Startup
T02-1002
NE Shutdown

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

Pass

Fail

NA

T02-1003
NodeB Software Download
Start / Finish
T02-10

T02-1004

Typical Alarms

Board Startup
T02-1005
Board Fault Alarm
T02-1006
E1/T1 Loss of Signal
T02-1007
E1/T1 Remote Alarm
Indication

T02-1008
IMA/UNI Link Loss of Cell
Delineation
T02-1009
CCP Fault
T02-1010
Tx Branch Switch off
Manually
T02-1011
RFU VSWR Abnormal
T02-1012
NodeB Clock Source
Abnormal
T02-1013
FE Interface Fault Alarm
T02-1014
External Alarm
T03-0101
T03-01
T03
Synchronization

PT. Huawei Services

Extracting Clock
Signal from IuB
Interface

Extracting Clock Signal


from E1/T1 IuB Interface
T03-0102
Extracting Clock Signal
from IP IuB Interface

T03-02

T03-0201

Free-Run

Free-Run

PT. Huawei Tech Investment

T04-01

T04
Antenna System

T04-0101

AISG ALD
Management

Pass

TMA Maintenance

Fail

NA

Conclusion: Totally 64 items included for acceptance test, in which ____passed, ____ failed, and ____ were
not applicable.
PT. Huawei Services Representative

PT. Huawei Tech Investment Representative

Signature:__________________

Signature:__________________

Date:______________________

Date:______________________

3.1

Installation Checklist

Indoor Installation Checklist


SITE: ..

SITE CONFIG: _/_/_

DATE: DD/MM/YYYY

Equipment overall condition


Procedure

Pass

Visually inspect the cabinets for any damage.

Check that the cabinet doors and locks operate


correctly. (applicable for outdoor Equipment)

Fail

N/A

Remark

Audit

Fail

N/A

Remark

Audit

Fail

N/A

Remark

Audit

Remarks
Site Documentation
Procedure
3
4

Pass

Check that the equipment is installed according to


the as plan site design package.
Check that the indoor cable ladder is installed
according to the as plan side design package
(applicable for Indoor Equipment)

Civil Works Check


Procedure

Pass

Check that the cabinets have been securely


fastened and are leveled correctly.

Check that indoor cable ladder above the cabinet


has been installed correctly (applicable for Indoor
Equipment).

Check that the DDF are grounded to the main


grounding bus bar.

Remarks
Equipment Specific Checks

PT. Huawei Services

PT. Huawei Tech Investment

Cabinet External Cabling Check


Procedure
Procedure
10
8

Check
equipment
internal
are to the
Check that
eachallthe
equipment
rack iscables
grounded
correctly
installed
and
labeled.
main grounding bus bar and labeled.

11
9

Check
cabinet
blanking
Check that
that the
the A-Bis
and
A PCMpanels
cableshave
are been
installed.
connected to the correct position of DDF.

12

Check that the alarm cabling has been connected


from the BTS to the DDF

13

Check that the extension cabinet cables are


correctly connected and labeled.

14

15

N/A

Remark

Audit

Pass

Fail

N/A

Remark

Audit

Check All fiber optic connectors are clean and free


from dust, moisture, contamination and scratches.
Create consolidated certificate report of connector
endface standard IEC-61300-3-35 for handover
pack.
Check power level BBU Transmitter (TX) port
before connection of feeder jumpers.

16

Check that the feeder jumper cables are tightened


all the NodeB.

17

Check that the external cabinet cabling has been


cable tied to the cable ladder.

19

Fail

Check fiber optic link length and qualify overall


loss (dB) and individual loss of each network
component/event using OTDR. Create PDF
certification report for handover pack and .SOR file
for reference.

16

18

Pass

Check that the indoor feeder cable labeling is


correct.
Check that the DC power cable is the correct size
and is terminated correctly.

20

Check the transmission cables, DC Cables and


feeder jumpers are be correctly labeled

21

Check that accessory equipment is installed


correctly.

Remarks
Final Checks
Procedure
20

Check that all installation and packing materials


have been removed from the site.

Remarks

Outdoor Installation Checklist


PT. Huawei Services

PT. Huawei Tech Investment

SITE: ..

SITE CONFIG: _/_/_

DATE: DD/MM/YYYY

Antennas
Procedure

Pass

21

Visually inspect the antennas and feeders for any


installation damage.

22

Check that the correct type of antenna has been


installed.

Fail

N/A

Remark

Fail

N/A

Remark

Fail

N/A

Remark

Fail

N/A

Remark

Remarks
Feeders
Procedure

Pass

23

Check that the bending radius of all feeders is


greater than 20 x .

24

Check that outdoor feeder labeling is correct at


the top and the bottom of the tower.

25

Check that the top feeder grounding is correctly


terminated.

Remarks

Connectors
Procedure

Pass

26

Check that all top feeder connectors are tight.

27

Check that all top feeders to jumper connections


are tight.

28

Check that all top jumpers to antenna


connections are tight.

Remarks

Weather sealing
Procedure
29

Check all top grounding kits are weather-sealed


correctly.

30

Check all feeders to jumper connections are


weather-sealed correctly.

31

Check all jumpers to antenna connections are


weather-sealed correctly.

PT. Huawei Services

Pass

PT. Huawei Tech Investment

Antenna Steelwork
Procedure

Pass

32

Check that the antenna supporting steelwork is


correctly installed.

33

Check all antenna mounting clamps and


brackets have been tightened.

Fail

N/A

Remark

N/A

Remark

Remarks
Antenna Installation Check
Procedure

Pass

34

Check that the antennas are mounted at the


correct height.

35

Check that the direction of all antennas in all


sectors is correct.

Fail

Remarks
Antenna Installation Date

Antenna

Sector 1
RXD12

Height

Sector 2

Sector 3

Direction
Down tilt
M/E
Remarks
Outdoor Site Documentation
Procedure

Pass

36

Check that the antenna layout is according to


the site drawing.

37

Check that the feeder cable ladder is installed


as per the site drawing.

38

Check that the feeder gland plate is installed as


per the site drawing (applicable for Indoor
Equipment)

Fail

N/A

Remark

Remarks

SITE: ..

SITE CONFIG: _/_/_

DATE: DD/MM/YYYY

Civil Works Inspection


Procedure

PT. Huawei Services

Pass

Fail

N/A

Remark

PT. Huawei Tech Investment

39

40

Check that the feeder cable ladder is correctly


installed
Check that the feeder grand plate has been
correctly installed (applicable for Indoor
Equipment).

Remarks
Feeder Grounding
Procedure

Pass

41

Check number/location of feeder grounding kits.

42

Check all bottom grounding are correctly


terminated

43

Check all bottom grounding kits are weather


sealed correctly.

Fail

N/A

Remark

Fail

N/A

Remark

Concluding Checks
Pass

Procedure
44

Check that all installation and packing materials


have been removed from the site.

PT. Huawei Services

PT. Huawei Tech Investment

4.1

Installation Checklist

Feeder System List

SITE: ..

SITE CONFIG: _/_/_ DATE: DD/MM/YYYY

VS WR T EST

RRU
Board

No.

RRU Panel N port

RFU 0

RFU 2
RFU 4

VSWR

Feeder
Length(m)

Distance To Fault (DTF)

Audit

RFU _TXM
RFU _TXD
RFU _TXM
RFU _TXD
RFU _TXM
RFU _TXD

Notes:
1.
2.
3.
4.
5.

VSWR value shall be referring to the specification manual from the supplier.
Setting at site master for cable 7/8" (VF and cable loss shall refer to the specification manual from the supplier).
Setting at site master for cable 1-5/8" (VF and cable loss shall refer to the specification manual from the
supplier).
VSWR 1.3
DTF test will be carried out according to the test procedure and test result included in the test documentation.

4.2

BTS Commissioning Record

Network Parameter Checklist

SITE: ..

SITE CONFIG: _/_/_

Cell parameter

Plan

DATE: DD/MM/YYYY

Actual

Remark

CI
Sector 1

Antenna direction
(Azimuth)
Antenna Tilt (M+E)
(Degree)
CI

Sector 2

Sector 3

Antenna
direction(Azimuth
)
Antenna Tilt (M+E)
(Degree)
CI

PT. Huawei Services

PT. Huawei Tech Investment

Antenna
direction(Azimuth
)
Antenna Tilt (M+E)
(Degree)

4.3

Integration Test

Basic Service Checklist

SITE: ..

SITE CONFIG: _/_/_

DATE: DD/MM/YYYY

Basic Service Test


Cell No.

Test Item

Pass

Fail

Remark

Incoming Call (3G-3G)


Incoming Call (2G-3G)
Incoming Call (PSTN-3G)
Outgoing Call (3G-3G)
Cell 1

Outgoing Call (3G-2G)


Outgoing Call (3G-PSTN)
SMS Incoming
SMS Outgoing
HSDPA Browsing
HSDPA Downlink
Incoming Call (3G-3G)
Incoming Call (2G-3G)
Incoming Call (PSTN-3G)
Outgoing Call (3G-3G)

Cell 2

Outgoing Call (3G-2G)


Outgoing Call (3G-PSTN)
SMS Incoming
SMS Outgoing
HSDPA Browsing
HSDPA Downlink
Incoming Call (3G-3G)
Incoming Call (2G-3G)
Incoming Call (PSTN-3G)
Outgoing Call (3G-3G)

Cell 3

Outgoing Call (3G-2G)


Outgoing Call (3G-PSTN)
SMS Incoming
SMS Outgoing
HSDPA Browsing
HSDPA Downlink

4.4

Handover Test

PT. Huawei Services

PT. Huawei Tech Investment

SITE: ..

SITE CONFIG: _/_/_

DATE: DD/MM/YYYY

Call Test
Origin

Target

Cell

Cell

Target Cell
Pass
ARFCN/BCCH

Fail

Remark

Audit

S-code/BSIC

CELL2
CELL3
CELL(2G)A
CELL1
CELL3
CELL(2G)B
CELL1
CELL2
CELL3

CELL(2G)C

CELL(2G)A

CELL 1

CELL(2G)B

CELL 2

CELL(2G)C

CELL 3

Notes:
1.
2.
3.

In the Target cell column, the parameter ARFCN &S-code is for 3G cell, the parameter BCCH &BSIC is
for 2G cell.
Verify with the TOC if inter site neighbor relationship has been defined before test.
GSM 2G cell mush add corresponding 3G neighbor cell.

4.5

24 Hours Stability Test

Site Name: ..
Check Result:
OK
--

This is to be confirmed that the BTS 3G has been running at least 24 hours without any
related self fault.

Remarks

PT. Huawei Services

PT. Huawei Tech Investment

Notes: The 24 hours is to be done in TOC/NOC, which will be passed if NODEB is normal operation and no alarm.

4.6

Alarm Query Test

Site Name: ..
Check Result:
OK
--

1.
2.

This test will be done from OMC (Region TOC).


This is to be confirmed that the BTS alarm is visible and there are no active alarms.

Remarks

PT. Huawei Services

PT. Huawei Tech Investment

Notes: if the site is no active alarms then write OK, no active alarm, otherwise record the alarm information in detail

4.7

Punch List Summary

Site Name: ..
Check Result:
Note:
Please record in detailed for testing items that unable to complete.

No
.

Items

Rectified By

Description

Remark

HTI

HS

NodeB Site Binder


XL Rollout Project 2014

Site ID
PT. Huawei Services

: ..
PT. Huawei Tech Investment

Site Name
: ..
Site Type
: ..
BTS Type
: ..
Site Description: ..
Proj Def
: ..

C ERTIFICATE
of

Preliminary Acceptance
PT. Huawei Services

PT. Huawei Tech Investment

It is agreed that, from


for site

to

, the acceptance test

has been successfully held by both the PT. Huawei

Services and Huawei Tech Investment engineer.


It also had been proved by both parties that Huaweis NodeB
equipments can fully satisfy the need of PT . XL AXIATA under the contract
and can be rightly put into full service.

PT. HUAWEI SERVICES

Date

PT. Huawei Services

PT. Huawei Tech Investment

Date

PT. Huawei Tech Investment

5 VSWR Measurement
V S W R
3 G _ N G IN G A S _ S ID O A R J O S E C T O R 1 A
M 1 : 1 .2 2 6

1 .5

@ 1 9 8 5 .1 1 6 M H z

V S W

1 .4

1 .3

L im it : 1 .3

1 .2

1 .1
M 1

1 .0
1975

2000

2025

2050
2075
2100
F r e q u e n c y ( 1 9 7 0 . 0 - 2 1 7 0 .0 M H z )

R es o lu tio n : 5 1 7
S td : U M T S IV U p lin k (G e n e r (_ )
D ate: 0 4 /2 7 /2 0 1 0
M o d el: S 3 3 1 D

2125

2150

C A L :O N (C O A X )
C h an n el: N /A
T im e: 1 2 :4 9 :0 6
S e ria l # : 0 0 9 1 4 1 4 8

C W : O N

D is ta n c e -to -f a u lt
3 G _ N G IN G A S _ S ID O A R J O S E C T O R 1 A
M 1 : 1 .0 0 9

1 .3 0

@ .0 0 0 M e te r

M 2 : 1 .0 1 6

@ 3 .4 0 1 M e te r

M 3 : 1 .0 4

@ 3 2 .6 1 6 M e te r

M 4 : 1 .0 9

@ 3 4 .7 9 7 M e te r

1 .2 5

V S W

1 .2 0
1 .1 5
1 .1 0
L i m it : 1 .0 5

1 .0 5

M 1

M 2

M 3

M 4

1 .0 0
0

10

R es o lu tio n : 5 1 7
S td : U M T S IV U p lin k (G e n e r (_ )
D ate: 0 4 /2 7 /2 0 1 0
M o d el: S 3 3 1 D

PT. Huawei Services

15

20
25
D i s t a n c e ( 0 .0 - 4 5 .0 M e te r )

C A L :O N (C O A X )
C h an n el: N /A
T im e: 1 2 :4 9 :2 8
S e ria l # : 0 0 9 1 4 1 4 8

30

35

40

45

C W : O N
I n s .L o s s : 0 .0 8 0 d B / m
P r o p .V e l : 0 .8 9 0

PT. Huawei Tech Investment

V S W R
3 G _ N G IN G A S _ S ID O A R J O S E C T O R 1 B
M 1 : 1 .2 8 6

1 .5

@ 1 9 9 1 .3 1 8 M H z

V S W

1 .4

1 .3

L im it : 1 .3

1 .2

1 .1
M 1

1 .0
1975

2000

2025

2050
2075
2100
F r e q u e n c y ( 1 9 7 0 . 0 - 2 1 7 0 .0 M H z )

R es o lu tio n : 5 1 7
S td : U M T S IV U p lin k (G e n e r (_ )
D ate: 0 4 /2 7 /2 0 1 0
M o d el: S 3 3 1 D

2125

2150

C A L :O N (C O A X )
C h an n el: N /A
T im e: 1 2 :5 1 :0 7
S e ria l # : 0 0 9 1 4 1 4 8

C W : O N

D is ta n c e -to -f a u lt
3 G _ N G IN G A S _ S ID O A R J O S E C T O R 1 B
M 1 : 1 .0 3 4
M 3 : 1 .0 2 6

1 .3 0

@ .0 0 0 M e te r

M 2 : 1 .0 2 6

@ 3 2 .3 5 5 M e te r

M 4 : 1 .0 7

@ 3 .3 1 4 M e te r
@ 3 4 .7 9 7 M e te r

1 .2 0

V S W

1 .2 5

1 .1 5
1 .1 0
L i m it : 1 .0 5

1 .0 5

M 1

M 2

M 3

M 4

1 .0 0
0

10

R es o lu tio n : 5 1 7
S td : U M T S IV U p lin k (G e n e r (_ )
D ate: 0 4 /2 7 /2 0 1 0
M o d el: S 3 3 1 D

PT. Huawei Services

15

20
25
D i s t a n c e ( 0 .0 - 4 5 .0 M e te r )

C A L :O N (C O A X )
C h an n el: N /A
T im e: 1 2 :5 1 :2 3
S e ria l # : 0 0 9 1 4 1 4 8

30

35

40

45

C W : O N
I n s .L o s s : 0 .0 8 0 d B / m
P r o p .V e l : 0 .8 9 0

PT. Huawei Tech Investment

V S W R
3 G _ N G IN G A S _ S ID O A R J O S E C T O R 2 A
M 1 : 1 .2 3

1 .5

@ 1 9 7 6 .5 8 9 M H z

V S W

1 .4

1 .3

L im it : 1 .3

1 .2

1 .1
M 1

1 .0
1975

2000

2025

2050
2075
2100
F r e q u e n c y ( 1 9 7 0 . 0 - 2 1 7 0 .0 M H z )

R es o lu tio n : 5 1 7
S td : U M T S IV U p lin k (G e n e r (_ )
D a te: A p r/2 7 /2 0 1 0
M o d el: S 3 3 1 D

2125

2150

C A L :O N (C O A X )
C h an n el: N /A
T im e: 1 2 :3 3 :1 4
S e ria l # : 0 0 9 1 4 1 4 8

C W : O N

D is ta n c e -to -f a u lt
3 G _ N G IN G A S _ S ID O A R J O S E C T O R 2 A
M 1 : 1 .0 1 1
M 3 : 1 .0 2 5

1 .3 0

@ .0 0 0 M e te r

M 2 : 1 .0 4 1

@ 3 2 .5 2 9 M e te r

M 4 : 1 .0 8 3

@ 3 .3 1 4 M e te r
@ 3 4 .7 9 7 M e te r

1 .2 0

V S W

1 .2 5

1 .1 5
1 .1 0
L i m it : 1 .0 5

1 .0 5

M 1

M 2

M 3

M 4

1 .0 0
0

10

R es o lu tio n : 5 1 7
S td : U M T S IV U p lin k (G e n e r (_ )
D ate: 0 4 /2 7 /2 0 1 0
M o d el: S 3 3 1 D

PT. Huawei Services

15

20
25
D i s t a n c e ( 0 .0 - 4 5 .0 M e te r )

C A L :O N (C O A X )
C h an n el: N /A
T im e: 1 2 :3 3 :5 8
S e ria l # : 0 0 9 1 4 1 4 8

30

35

40

45

C W : O N
I n s .L o s s : 0 .0 8 0 d B / m
P r o p .V e l : 0 .8 9 0

PT. Huawei Tech Investment

V S W R
3 G _ N G IN G A S _ S ID O A R J O S E C T O R 2 B
M 1 : 1 .2 3 6

1 .5

@ 2 1 1 7 .6 7 4 M H z

V S W

1 .4

1 .3

L im it : 1 .3

1 .2

1 .1
M 1

1 .0
1975

2000

2025

2050
2075
2100
F r e q u e n c y ( 1 9 7 0 . 0 - 2 1 7 0 .0 M H z )

R es o lu tio n : 5 1 7
S td : U M T S IV U p lin k (G e n e r (_ )
D a te: A p r/2 7 /2 0 1 0
M o d el: S 3 3 1 D

2125

2150

C A L :O N (C O A X )
C h an n el: N /A
T im e: 1 2 :3 6 :1 5
S e ria l # : 0 0 9 1 4 1 4 8

C W : O N

D is ta n c e -to -f a u lt
3 G _ N G IN G A S _ S ID O A R J O S E C T O R 2 B
M 1 : 1 .0 4 8
M 3 : 1 .0 4 6

1 .3 0

@ .0 0 0 M e te r

M 2 : 1 .0 2 4

@ 3 2 .3 5 5 M e te r

M 4 : 1 .0 5 6

@ 3 .4 0 1 M e te r
@ 3 4 .7 9 7 M e te r

1 .2 0

V S W

1 .2 5

1 .1 5
1 .1 0
L i m it : 1 .0 5

1 .0 5

M 1

M 2

M 3

M 4

1 .0 0
0

10

R es o lu tio n : 5 1 7
S td : U M T S IV U p lin k (G e n e r (_ )
D ate: 0 4 /2 7 /2 0 1 0
M o d el: S 3 3 1 D

PT. Huawei Services

15

20
25
D i s t a n c e ( 0 .0 - 4 5 .0 M e te r )

C A L :O N (C O A X )
C h an n el: N /A
T im e: 1 2 :3 5 :4 5
S e ria l # : 0 0 9 1 4 1 4 8

30

35

40

45

C W : O N
I n s .L o s s : 0 .0 8 0 d B / m
P r o p .V e l : 0 .8 9 0

PT. Huawei Tech Investment

V S W R
3 G _ N G IN G A S _ S ID O A R J O S E C T O R 3 A
M 1 : 1 .2 1

1 .5

@ 2 0 5 2 .6 5 8 M H z

V S W

1 .4

1 .3

L i m it : 1 .3

1 .2

1 .1
M 1

1 .0
1975

2000

2025

2050
2075
2100
F r e q u e n c y ( 1 9 7 0 .0 - 2 1 7 0 .0 M H z )

R eso lu tio n : 5 1 7
S td : U M T S IV U p lin k (G e n e r (_ )
D ate: 0 4 /2 8 /2 0 1 0
M o d el: S 3 3 1 D

C A L : O N (C O
C h an n e l: N
T im e: 1 2 :5 1
S e rial # : 0 0 9 1

2125

2150

A X )
/A
:1 6
4148

C W : O N

D is ta n c e - to - f a u lt
3 G _ N G IN G A S _ S ID O A R J O S E C T O R 3 A
M 1 : 1 .0 4 4
M 3 : 1 .0 2 2

1 .3 0

@ .0 0 0 M e te r

M 2 : 1 .0 4

@ 3 2 .7 0 3 M e te r

M 4 : 1 .0 6 2

@ 3 .4 0 1 M e te r
@ 3 4 .8 8 4 M e te r

1 .2 0

V S W

1 .2 5

1 .1 5
1 .1 0
L im it : 1 .0 5

1 .0 5

M 1

M 2

M 3

M 4

1 .0 0
0

10

R eso lu tio n : 5 1 7
S td : U M T S IV U p lin k (G e n e r (_ )
D ate: 0 4 /2 8 /2 0 1 0
M o d el: S 3 3 1 D

PT. Huawei Services

15

20
25
D i s t a n c e ( 0 . 0 - 4 5 .0 M e t e r )

C A L : O N (C O
C h an n e l: N
T im e: 1 2 :5 0
S e rial # : 0 0 9 1

A X )
/A
:5 1
4148

30

35

40

45

C W : O N
I n s .L o s s : 0 .0 8 0 d B / m
P r o p .V e l : 0 .8 9 0

PT. Huawei Tech Investment

V S W R
3 G _ N G IN G A S _ S ID O A R J O S E C T O R 3 B
M 1 : 1 .2 5 5

1 .5

@ 1 9 8 9 .0 9 2 M H z

V S W

1 .4

1 .3

L im it : 1 .3

1 .2

1 .1
M 1

1 .0
1975

2000

2025

2050
2075
2100
F r e q u e n c y ( 1 9 7 0 . 0 - 2 1 7 0 .0 M H z )

R es o lu tio n : 5 1 7
S td : U M T S IV U p lin k (G e n e r (_ )
D ate: 0 4 /2 7 /2 0 1 0
M o d el: S 3 3 1 D

2125

2150

C A L :O N (C O A X )
C h an n el: N /A
T im e: 1 2 :3 0 :3 0
S e ria l # : 0 0 9 1 4 1 4 8

C W : O N

D is ta n c e -to -f a u lt
3 G _ N G IN G A S _ S ID O A R J O S E C T O R 3 B
M 1 : 1 .0 2
M 3 : 1 .0 5 5

1 .3 0

@ .0 0 0 M e te r

M 2 : 1 .0 1 8

@ 3 2 .5 2 9 M e te r

M 4 : 1 .0 5 8

@ 3 .3 1 4 M e te r
@ 3 4 .8 8 4 M e te r

1 .2 0

V S W

1 .2 5

1 .1 5
1 .1 0
L i m it : 1 .0 5

1 .0 5

M 1

M 2

M 3

M 4

1 .0 0
0

10

R es o lu tio n : 5 1 7
S td : U M T S IV U p lin k (G e n e r (_ )
D ate: 0 4 /2 7 /2 0 1 0
M o d el: S 3 3 1 D

PT. Huawei Services

15

20
25
D i s t a n c e ( 0 .0 - 4 5 .0 M e te r )

C A L :O N (C O A X )
C h an n el: N /A
T im e: 1 2 :3 0 :0 6
S e ria l # : 0 0 9 1 4 1 4 8

30

35

40

45

C W : O N
I n s .L o s s : 0 .0 8 0 d B / m
P r o p .V e l : 0 .8 9 0

PT. Huawei Tech Investment

6 Site Documentation
REFER TO FILE List site picture ATP

PT. Huawei Services

PT. Huawei Tech Investment

DATA CAPTURE
1. RRU Physical Topology

2. Main Cabinet

PT. Huawei Services

PT. Huawei Tech Investment

3. Display VSWR

4. List Alarm

PT. Huawei Services

PT. Huawei Tech Investment

5. Display Locell

6. Display RRU Traffic Capability

PT. Huawei Services

PT. Huawei Tech Investment

PT. Huawei Services

PT. Huawei Tech Investment

PT. Huawei Services

PT. Huawei Tech Investment

7. Display Board Status

8. List NodeB Type

PT. Huawei Services

PT. Huawei Tech Investment

9. Display Cell Config

10. Display Software Version

PT. Huawei Services

PT. Huawei Tech Investment

11. Display License

12. Traffic

PT. Huawei Services

PT. Huawei Tech Investment

PT. Huawei Services

PT. Huawei Tech Investment

PT. Huawei Services

PT. Huawei Tech Investment

PT. Huawei Services

PT. Huawei Tech Investment

PT. Huawei Services