Você está na página 1de 2

Federal Register / Vol. 70, No.

239 / Wednesday, December 14, 2005 / Notices 74035

NUCLEAR REGULATORY NUCLEAR REGULATORY review, the staff has determined that
COMMISSION COMMISSION there are no additional remediation
activities necessary to complete the
[Docket No. 040–07354] proposed action. Therefore, the staff
[Docket No. 50–271; License No. Dpr–28]
considered the impact of the residual
Notice of Availability of Environmental
Entergy Nuclear Vermont Yankee, LLC radioactivity in the BTD area and
Assessment and Finding of No
and Entergy Nuclear Operations, Inc.; concluded that since the residual
Significant Impact for License
Receipt of Request for Action Under 10 radioactivity meets the requirements in
Amendment for Department of the Subpart E of 10 CFR Part 20, a Finding
CFR 2.206 Army’s Bomb Throwing Device (BTD) of No Significant Impact is appropriate.
Area in Aberdeen Proving Ground, MD
Notice is hereby given that by petition III. Finding of No Significant Impact
dated October 11, 2005, Mr. Jonathan M. AGENCY: Nuclear Regulatory
Commission. The staff has prepared the EA
Block requested that the Nuclear (summarized above) in support of the
Regulatory Commission (NRC) take ACTION: Notice of availability.
license amendment to release the BTD
action with regard to Vermont Yankee area for unrestricted use. The NRC staff
Nuclear Power Station (Vermont FOR FURTHER INFORMATION CONTACT:
has evaluated the Department of the
Yankee). The petitioner requested that Elizabeth Ullrich, Commerical and R&D
Army’s request and the results of the
the NRC require a temporary closure or Branch, Division of Nuclear Materials surveys and has concluded that the
de-rating of Vermont Yankee. Safety, Region I, 475 Allendale Road, completed action complies with the
King of Prussia, Pennsylvania 19406, criteria in Subpart E of 10 CFR Part 20.
As a basis for this request, the telephone (610) 337–5040, fax (610)
petitioner stated that evacuations would The staff has found that the radiological
337–5269; or by e-mail: exu@nrc.gov. environmental impacts from the action
be impossible as a result of recent storm SUPPLEMENTARY INFORMATION: are bounded by the impacts evaluated
damage to the city of Keene, town of
I. Introduction by NUREG–1496, Volumes 1–3,
Hinsdale in New Hampshire, and other
‘‘Generic Environmental Impact
portions of New Hampshire that are part The Nuclear Regulatory Commission Statement in Support of Rulemaking on
of existing evacuation routes for (NRC) is considering issuing a license Radiological Criteria for License
Vermont Yankee or within the effluent amendment to the Department of the Termination of NRC-Licensed
pathway in an emergency event. Army, U.S. Army Aberdeen Test Center, Facilities’’ (ML042310492,
The petition is being treated pursuant for Materials License No. SUB–834, to ML042320379, and ML042330385).
to 10 CFR 2.206 of the Commission’s authorize release of its Bomb Throwing Additionally, no non-radiological or
regulations. The petition has been Device (BTD) area in Aberdeen Proving cumulative impacts were identified. On
referred to the Director of the Office of Ground, Maryland, for unrestricted use. the basis of the EA, the NRC has
Nuclear Reactor Regulation. As NRC has prepared an Environmental concluded that the environmental
Assessment (EA) in support of this impacts from the action are expected to
provided by Section 2.206, appropriate
action in accordance with the be insignificant and has determined not
action will be taken on this petition
requirements of 10 CFR Part 51. Based to prepare an environmental impact
within a reasonable time. Copies of the on the EA, the NRC has concluded that statement for the action.
petition are available for inspection at a Finding of No Significant Impact
the Commission’s Public Document (FONSI) is appropriate. IV. Further Information
Room, located at One White Flint North, Documents related to this action,
Public File Area O1 F21, 11555 II. EA Summary including the application for the license
Rockville Pike (first floor), Rockville, The purpose of the proposed action is amendment and supporting
Maryland. Publicly available records to authorize the release of the licensee’s documentation, are available
will be accessible from the Agencywide BTD area located at Aberdeen Proving electronically at the NRC’s Electronic
Documents Access and Management Ground, Aberdeen, Maryland, for Reading Room at http://www.nrc.gov/
System (ADAMS) Public Electronic unrestricted use. The Department of the reading-rm/adams.html. From this site,
Reading Room on the Internet at the Army was authorized by AEC/NRC from you can access the NRC’s Agencywide
NRC Web site, http://www.nrc.gov/ June 4, 1965, to use radioactive Document Access and Management
reading-rm/adams.html. Persons who materials for munitions testing and System (ADAMS), which provides text
do not have access to ADAMS or who research and development purposes in and image files of NRC’s public
encounter problems in accessing the the BTD area. On January 13, 2005, the documents. The ADAMS accession
documents located in ADAMS, should Department of the Army requested that numbers for the documents related to
contact the NRC PDR Reference staff by NRC release the facility for unrestricted this Notice are: ‘‘Environmental
telephone at 1–800–397–4209 or 301– use. The Department of the Army has Assessment Related to Issuance of a
415–4737, or by e-mail to pdr@nrc.gov. conducted surveys of the facility and License Amendment of U.S. Nuclear
provided information to the NRC to Regulatory Commission Materials
demonstrate that the site meets the License No. SUB–834, Department of
Dated at Rockville, Maryland this 7th day license termination criteria in Subpart E the Army, Aberdeen, Maryland’’
of December, 2005. of 10 CFR Part 20 for unrestricted use. [ML053410059], ‘‘Radiological Final
For the Nuclear Regulatory Commission. The NRC staff has prepared an EA in Status Survey Report, Bomb Throwing
Cornelius F. Holden, support of the license amendment. The Device Site—Soils’’ [ML052770370],
Deputy Director, Division of Operating BTD area was remediated and surveyed and Remediation and Final Status
Reactor Licensing, Office of Nuclear Reactor prior to the licensee requesting the Survey, Bomb Throwing Device Site—
Regulation. license amendment. The NRC staff has Structures’’ [ML052770376]. Persons
[FR Doc. E5–7300 Filed 12–13–05; 8:45 am] reviewed the information and final who do not have access to ADAMS or
BILLING CODE 7590–01–P
status survey submitted by the who encounter problems in accessing
Department of the Army. Based on its the documents located in ADAMS,

VerDate Aug<31>2005 15:29 Dec 13, 2005 Jkt 208001 PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 E:\FR\FM\14DEN1.SGM 14DEN1
74036 Federal Register / Vol. 70, No. 239 / Wednesday, December 14, 2005 / Notices

should contact the NRC PDR Reference II. EA Summary IV. Further Information
staff by telephone at (800) 397–4209 or Documents related to this action,
(301) 415–4737, or by e-mail to The purpose of the proposed action is
to authorize the release of the licensee’s including the application for the license
pdr@nrc.gov. amendment and supporting
Documents related to operations Transonic Range located on Aberdeen
documentation, are available
conducted under this license not Proving Ground, Maryland, for
electronically at the NRC’s Electronic
specifically referenced in this Notice unrestricted use. Department of the
Reading Room at http://www.nrc.gov/
may not be electronically available and/ Army was authorized by AEC/NRC from reading-rm/adams.html. From this site,
or may not be publicly available. April 12, 1961, to use radioactive you can access the NRC’s Agencywide
Persons who have an interest in materials for munitions testing and Document Access and Management
reviewing these documents should research and development purposes at System (ADAMS), which provides text
submit a request to NRC under the the site. On January 13, 2005, the and image files of NRC’s public
Freedom of Information Act (FOIA). Department of the Army requested that documents. The ADAMS accession
Instructions for submitting a FOIA NRC release the site for unrestricted use. numbers for the documents related to
request can be found on the NRC’s Web The Department of the Army has this Notice are: ‘‘Environmental
site at http://www.nrc.gov/reading-rm/ conducted surveys of the site and Assessment Related to Issuance of a
foia/foia-privacy.html. provided information to the NRC to License Amendment of U.S. Nuclear
Dated at King of Prussia, Pennsylvania this demonstrate that the site meets the Regulatory Commission Materials
7th day of December, 2005. license termination criteria in Subpart E License No. SMB–141, Department of
For the Nuclear Regulatory Commission. of 10 CFR Part 20 for unrestricted use. the Army, Aberdeen, Maryland’’
James P. Dwyer, The NRC staff has prepared an EA in [ML053410278], ‘‘Remediation and
Chief, Commercial and R&D Branch, Division support of the license amendment. The Final Status Survey, Transonic Range
of Nuclear Materials Safety, Region I. site was remediated and surveyed prior Depleted Uranium Study Area—
[FR Doc. E5–7298 Filed 12–13–05; 8:45 am] to the licensee requesting the license Structures’’ [ML050280349 and
BILLING CODE 7590–01–P amendment. The NRC staff has ML050280354], and ‘‘Radiological Final
reviewed the information and final Status Survey, Transonic Range-Land
status survey submitted by the Areas, Depleted Uranium Study Area’’
NUCLEAR REGULATORY Department of the Army. Based on its [ML050280341]. Persons who do not
COMMISSION review, the staff has determined that have access to ADAMS or who
there are no additional remediation encounter problems in accessing the
[Docket No. 040–06394] activities necessary to complete the documents located in ADAMS, should
proposed action. Therefore, the staff contact the NRC PDR Reference staff by
Notice of Availability of Environmental considered the impact of the residual telephone at (800) 397–4209 or (301)
Assessment and Finding of No radioactivity at the site and concluded 415–4737, or by e-mail to pdr@nrc.gov.
Significant Impact for License that since the residual radioactivity Documents related to operations
Amendment for Department of the conducted under this license not
meets the requirements in Subpart E of
Army’s Transonic Range Facility in specifically referenced in this Notice
10 CFR Part 20, a Finding of No
Aberdeen Proving Ground, MD may not be electronically available and/
Significant Impact is appropriate.
or may not be publicly available.
AGENCY: Nuclear Regulatory III. Finding of No Significant Impact Persons who have an interest in
Commission. reviewing these documents should
ACTION: Notice of availability. The staff has prepared the EA submit a request to NRC under the
(summarized above) in support of the Freedom of Information Act (FOIA).
FOR FURTHER INFORMATION CONTACT: license amendment to release the Instructions for submitting a FOIA
Elizabeth Ullrich, Commercial and R&D Transonic Range for unrestricted use. request can be found on the NRC’s web
Branch, Division of Nuclear Materials The NRC staff has evaluated the site at http://www.nrc.gov/reading-rm/
Safety, Region I, 475 Allendale Road, Department of the Army’s request and foia/foia-privacy.html.
King of Prussia, Pennsylvania 19406, the results of the surveys and has
Dated at King of Prussia, Pennsylvania this
telephone (610) 337–5040, fax (610) concluded that the completed action 7th day of December, 2005.
337–5269; or by e-mail: exu@nrc.gov. complies with the criteria in Subpart E For the Nuclear Regulatory Commission.
SUPPLEMENTARY INFORMATION: of 10 CFR Part 20. The staff has found
James P. Dwyer,
that the radiological environmental
I. Introduction Chief, Commercial and R&D Branch, Division
impacts from the action are bounded by of Nuclear Materials Safety, Region I.
The Nuclear Regulatory Commission the impacts evaluated by NUREG–1496,
[FR Doc. E5–7297 Filed 12–13–05; 8:45 am]
(NRC) is considering issuing a license Volumes 1–3, ‘‘Generic Environmental
BILLING CODE 7590–01–P
amendment to the Department of the Impact Statement in Support of
Army, U.S. Army Research Laboratory, Rulemaking on Radiological Criteria for
for Materials License No. SMB–141, to License Termination of NRC-Licensed NUCLEAR REGULATORY
authorize release of its Transonic Range Facilities’’ (ML042310492, COMMISSION
in Aberdeen Proving Ground, Maryland, ML042320379, and ML042330385).
for unrestricted use. NRC has prepared Additionally, no non-radiological or Sunshine Act: Meetings
an Environmental Assessment (EA) in cumulative impacts were identified. On
support of this action in accordance the basis of the EA, the NRC has DATES: Weeks of December 12, 19, 26,
with the requirements of 10 CFR Part concluded that the environmental 2005, January 2, 9, 16, 2006.
51. Based on the EA, the NRC has impacts from the action are expected to PLACE: Commissioners’ Conference
concluded that a Finding of No be insignificant and has determined not Room, 11555 Rockville Pike, Rockville,
Significant Impact (FONSI) is to prepare an environmental impact Maryland.
appropriate. statement for the action. STATUS: Public and closed.

VerDate Aug<31>2005 15:29 Dec 13, 2005 Jkt 208001 PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 E:\FR\FM\14DEN1.SGM 14DEN1

Você também pode gostar