73676 Federal Register / Vol. 70, No.

238 / Tuesday, December 13, 2005 / Proposed Rules

ADDRESSES: Comments may be mailed to ENVIRONMENTAL PROTECTION Phase II Storm Water Permit
Mr. Jeff Robinson, Air Permits Section AGENCY Requirements:
(6PD–R), Environmental Protection Priority: Substantive, Significant.
Agency, 1445 Ross Avenue, Suite 1200, 40 CFR Part 122
Dallas, Texas 75202–2733. Comments Legal Authority: CWA 402(p).
[FRL–8007–7]
may also be submitted electronically or CFR Citation: 40 CFR 122.26.
through hand delivery/courier by Correction to the Fall 2005 Regulatory Legal Deadline: None.
following the detailed instructions in Agenda
the ADDRESSES section of the direct final Abstract: On Monday, August 8,
rule located in the final rules section of AGENCY: Environmental Protection President Bush signed into law The
the Federal Register. Agency. Energy Policy Act of 2005. Section 323
ACTION: Correction. of this legislation modifies section 502
FOR FURTHER INFORMATION CONTACT: Mr. of the Federal Water Pollution Control
Jeff Robinson, Air Permits Section, SUMMARY: On October 31, 2005, the Act to define the term ‘‘oil and gas
Multimedia Planning and Permitting Regulatory Plan and the Unified Agenda exploration, production, processing, or
Division (6PD–R), U.S. Environmental of the Federal Regulatory and treatment operations, or transmission
Protection Agency, Region, 6, 1445 Ross Deregulatory Actions for the facilities’’ to mean ‘‘all field activities or
Avenue, Suite 700, Dallas, Texas 75202– Environmental Protection Agency was operations associated with exploration,
2733, at (214) 665–6435, or at published in the Federal Register (70 production, processing, or treatment
robinson.jeffrey@epa.gov. FR 65206). The regulatory agenda entry operations, or transmission facilities,
for sequence number 3378, ‘‘Oil and Gas including activities necessary to prepare
SUPPLEMENTARY INFORMATION: In the
Phase II Storm Water Permit a site for drilling and for the movement
final rules section of this Federal
Requirements,’’ contains erroneous and placement of drilling equipment,
Register, EPA is approving ODEQ’s
information. This notice corrects the whether or not such field activities or
request for delegation of authority to
information that was published in the operations may be considered to be
implement and enforce certain
Federal Register (70 FR at 65345) under construction activities.’’ In order to
NESHAPs for all sources (both Part 70
the headings of Legal Authority, CFR accommodate the changes in the new
and non-Part 70 sources). The ODEQ
Citation, Abstract, and Timetable. law, EPA expects to propose
has adopted certain NESHAPs into
Oklahoma’s state regulations. In FOR FURTHER INFORMATION CONTACT: Jeff modifications to its current regulations
addition, EPA is waiving its notification Smith, Office of Wastewater governing construction site storm water
requirements so sources will only need Management, Office of Water, discharges for oil and gas activities
to send notifications and reports to Environmental Protection Agency regulated by the Phase I and Phase II
ODEQA. (4203M) Environmental Protection storm water rules.
Agency, 1200 Pennsylvania Ave., NW.,
The EPA is taking direct final action
Washington, DC 20460; telephone TIMETABLE
without prior proposal because EPA
number: (202) 564–0652; fax number:
views this is a noncontroversial action
(202) 564–6431; e-mail address: Action Date FR cite
and anticipates no adverse comments. A
smith.jeff@epa.gov.
detailed rationale for this approval is set
SUPPLEMENTARY INFORMATION: The NPRM ....................... 12/00/05
forth in the preamble to the direct final
Environmental Protection Agency (EPA) Final Action ............... 06/00/06
rule. If no adverse comments are
received in response to this action rule, publishes the semiannual regulatory
no further activity is contemplated. If agenda to update the public about: Regulatory Flexibility Analysis
EPA receives adverse comments, the Regulations and major policies currently Required: No.
direct final rule will be withdrawn, and under development, Small Entities Affected: No.
all public comments received will be Reviews of existing regulations and
major policies, and Government Levels Affected: Federal,
addressed in a subsequent final rule
Rules and major policymakings State.
based on this proposed rule. EPA will
not institute a second comment period completed or canceled since the last Additional Information: SAN No.
on this action. Any parties interested in Agenda. 4979.
commenting must do so at this time. The regulatory agenda entry in the Agency Contact:
Please note that if EPA receives adverse proposed rule section for sequence
comment on an amendment, paragraph, number 3378, ‘‘Oil and Gas Phase II Jeff Smith, Environmental Protection
or section of this rule and if that Storm Water Permit Requirements’’ (70 Agency, Water, 4203M, Washington,
provision may be served from the FR 65345) contains erroneous DC 20460. Phone: 202–564–0652. Fax:
remainder of the rule, EPA may adopt information. The Agency did not intend 202–564–6431. E-mail:
as final those provisions of the rule that to express an interpretation of the smith.jeff@epa.gov.
are not the subject of an adverse Energy Policy Act of 2005 in advance of Deborah Nagle, Environmental
comment. For additional information, the EPA publishing the proposed rule. Protection Agency, Water, 4203M,
see the direct final rule which is This notice corrects the information that Washington, DC 20460. Phone: 202–
published in the Rules section of this was provided under the headings of 564–1185. Fax: 202–564–6431. E-
Federal Register. Legal Authority, CFR Citation, Abstract, mail: nagle.deborah@epa.gov.
Authority: 42 U.S.C. 7412. and Timetable for the Oil and Gas Phase Dated: December 7, 2005.
II Storm Water Permit Requirements
Dated: November 27, 2005. Louise P. Wise,
action. The following agenda item
Carl E. Edlund, replaces in its entirety the agenda item Deputy Associate Administrator, Office of
Acting Regional Administrator, Region 6. that was provided in the EPA’s Policy, Economics, and Innovation.
[FR Doc. 05–23969 Filed 12–12–05; 8:45 am] Semiannual Regulatory Agenda for [FR Doc. E5–7274 Filed 12–12–05; 8:45 am]
BILLING CODE 6560–50–M sequence number 3378, Oil and Gas BILLING CODE 6560–50–P