Escolar Documentos
Profissional Documentos
Cultura Documentos
Ref No
4
5
6
Ref No
4
5
6
bearing failure
seal leakage
Potential causes
Over loading
Poor wire grade
Power Supply Anomili
Humidity
Improper Lubrication
Over heating
Vibration
Improper Lubrication
CONTAMINATION
Brinelling
Misalignment
Corrosion
Tight Fits
Accelerated seal face wear
O-ring failure
Small leakage
Seal embrittlement
pitting,
unbalancing of rotors
structural failure
cavitation
deposition
Impact loading
Rusting
impeller degradation
rotor missaligment
poor lubrication
FMECA of BLOWOUT
Potential failure modes
Potential causes
FMECA of
Potential failure modes
Potential causes
Insufficient strength to
provide structural
support for the
forces inacurred
during crane
operation
Frame
structure fail because
of metal fatigue
Weak anchoring
Loading above threshold
Hoist Winch brake failure
Failure of locking mechanism
manoeuvre the
fright in a risk free and
effective manner
using the boom
hoist system.
(P) Occurance
(S) Severity
Instant stop of
pumping
Before complete
shutdown the system
Pressure/ Flowrate
would be very little
drop and can be
effected but on
permanent shutdown
shutdown the
recycling will
shutdown
Pressure/ Flowrate
drop and process
area spillage
Decrease in efficiency
of pump, can result in
overall failure
Noise/vibration in
process area
Immence leakage
Low Efficiency
Negligible effect on
system/ access water
can be flushed
(P) Occurance
(S) Severity
Maintenance Involved
and production stop
Maintenance Involved
and production stop
FMECA of Crane
Local effects of failure
(P) Occurance
(S) Severity
Frame, boom or
anchor fracture and
failure of load being
carried
Injury or fatality of
the person on site,
platform facilities or
equipment damage
Platform deprived
from rigging facility
that is used as
locking brake
only, pawl
lock acctuated
mover is stopped
Platform deprived
from rigging facility
Maintenance Involved
and production stop
Maintenance Involved
and production stop
(D) Detectability
Mitigation / Requirements
Circuit should be
fused, Fully insulated,
Regulated Power
Supply
Preventive
Maintenance
Preventive
Maintenance
Conndition
Monitoring
Scheduled Checks
Preventive
Maintenance
(D) Detectability
Mitigation / Requirements
36
36
30
25
Preventive
Maintenance
48
Conndition
Monitoring
16
Scheduled checks
48
Scheduled checks
24
Preventive
Maintenance
(D) Detectability
Mitigation / Requirements
30
32
Scheduled inspection
of internal parts, xray immaging can be
used for microscopic
crake detection
32
25
Preventive
Maintenance
48
Conndition
Monitoring
16
Scheduled checks
48
Scheduled checks
24
Preventive
Maintenance