Você está na página 1de 9

PROXIM IDC HYDERABAD

Weekly Status report


Week2 SEP-2009
Syam Gonnalagadda
Department of Software Engineering
Table of Contents
Table of Contents....................................................................................................... 2
Narvik.........................................................................................................................3
Vegas..........................................................................................................................3
PVES 2.0..................................................................................................................... 4
Moscow.......................................................................................................................6
Milan...........................................................................................................................7
QB-FDD.......................................................................................................................8
Additional Notes......................................................................................................... 9
Narvik
Technical Manager Sunil Dutt
Current Status Testing
Release date to QA Released on 08-Sep-09
Tasks Completed this 1) Verification of the ethernet fix given by Senao.
week 2) Bootp Issue fixed in Narvik bootloader.
3) Cross verification of various register values with the Datasheets
both for Narvik and Monaco.
4) Coordinate with Nudesign for Monaco/Narvik unified configuration
support and the Cli memory issue.
5.Image and Bootloader Released to QA

Tasks Planned for this 1) Bug fixing if Test team reports any bugs on Narvik.
week 2) Coordinate with Nudesign for Monaco/Narvik unified configuration
support and the Cli memory issue.

Major Tasks pending None

Issues/Deviations/New Single flash image in current format not useful.


requirements

Dependencies(Internal/ Hardware needs to provide a way so that flash can be read using flash
External) reader

Resources Pavan, Satish.Kvv, Vishnu, Ravi.J

Vegas
Project Name Vegas
Technical Manager Krishna
Current Status Implementation
Release date to QA 24-09-2009
Tasks Completed this - WORP related merging from LOKI to Main branch
week - Bug fixing in progress
- Bugs related to features removed from the PRD are closed
- US-All country code design started

Tasks Planned for this - Continue bug fixing


week - Discuss and finalize the design of US-All country code

Major Tasks pending - 40 bugs pending to be fixed


- Integration testing

Issues/Deviations/New None
requirements

Dependencies(Internal/ None
External)

Resources Sriman, Aleksandar, Satish, Ganesh, Anand, Ramgopal, Shilpa

PVES 2.0
Project Name PVES 2.0
Technical Manager Nishanth Thomas
Current Status In QA Release Candidate
Release date to QA 10/09/2009
Tasks Completed Worked on PVES Documentation
this week Bugs Fixed:See notes for additional Information

Tasks Planned for OpenNMS Demo to Team to decide further plans


this week PVES Documentation

Major Tasks pending None

Issues/Deviations/Ne None
w requirements

Dependencies(Inter None
nal/
External)
Resources Netaji, Sasidhar, Lalitha
Moscow
Project Name Moscow
Technical Manager Sunil Dutt
Current Status Demo Build Already Delivered.
Release date to QA To be Released on 16-Sep-09
Tasks Completed this Design completed.
week

Tasks Planned for this 1) Make changes according to MOSCOW PRD


week 2) Merge the Ethernet fixes got from the Senao.
3) Change the Manufacturing data for Moscow to have new variant in
WD.
4) Basic testing
5) Release to QA.

Major Tasks pending None

Issues/Deviations/New None
requirements

Dependencies(Internal/ None
External)

Resources Satish,Vishnu,Rajeev
Milan
Project Name Milan
Technical Manager K Balaji
Current Status SRD review/Req freezing/Designing
Release date to QA To be finalized only after all Reqs are frozen. Shall be able to decide mid next week.
Tasks Completed 1. Project: SRD reviews done for DFS, Storm Threshold, Text Based Configuration and
this week IGMP Snooping. Reqs are frozen for DFS, StTh and TBC. Some inputs are needed from
PLM on IGMP final Reqs.
2. DDRS: Referred AP code for .11n DDRS. SRD ready for review. Design started.
3. 5/10 MHz ChBW: No Activities. Arada promised to provide HAL changes by 22nd
sept.
4. Slave DFS: SRD review done. Reqs are finalized. Implementation done for SU
blacklisting channels and sending RADAR event message to the BSU. Design for other
reqs going on.
5. Max MTU: No activities.
6. IGMP Snooping: SRD reviewes once. Need some input from PLM and Engg to freeze
the Reqs. Design started.
7. 11J Support - Not started.
8. T1/E1 Optimization: Debugging/testing going on. Build 206110 has errs without
daughter boards. Overnight test passes when connected to omni antenna in RF chamber.
Latest build 208291 build passes overnight test. More details in note #1.
9. Text Based Configuration: SRD reviewed. Reqs frozen. Design/Implementation
going on. Commit/Init funcationality for XML file done. Protect Err Prints done.
Duplication of entry-status is being worked on by Brian.
10. 1/ 2.5 MHz ChSp: Sent mail to Arada to confirm if HW supports this feature. As per
them not supported for PB44 driver. Need more follow-ups.
11. Storm Threshold: SRD Reviewed. Reqs frozen. Design started. Design change note
ready for review.
Tasks Planned for 1. Review of remaining SRDs. Freezing all Reqs.
this week 2. Finalize the project schedule.
2. DDRS: Finalize design. Start implemetation and testing.
3. 5/10 MHChBw: Update SRD with impact og rates. Complete implementation other
than Arada's HAL changes.
4. Slave DFS: Complete design. Further implemetatipon of other Reqs.
5. IGMP Snooping: Complete design and review. Start Implemetation.
6. TBC: Complete implementation. Start UT.
7. Storm Threshold: Start Implementation.
Major Tasks None
pending

Issues/Deviations/ None
New requirements

Dependencies(Inte None
rnal/
External)
Resources DDRS (Ramadassan), ChBw (Kiran), DFS (Phani), ChSP (Kiran), IGMPS (Leela),
StThreshold (RaviJ), TBC (Pavan), T1/E1 (Ramadassan)
QB-FDD
Project Name QB-FDD
Technical Manager K Balaji
Current Status Experimentation & Scoping
Release date to QA To be finalized only after all Reqs are frozen. Shall be able to decide mid next
week.
Tasks Completed this 1. Completed the Tx path with basic src-dst-MACAddr based caching and tested with ping
week 2. Understanding the Rx path
3. Implemented the table as an independent loadable module (.ko files)

Tasks Planned for this 1. Thourough testing of the tx path and complete rx path
week 2. Brainstorming session to see what features to be added.

Major Tasks pending NA

Issues/Deviations/New 1. Making the loadable module talk with the kernel through function pointers.....may
requirements not be advisable and have to think of alternatives.
2. Ping time is increasing when the module is inserted. Is this ok? What can be done to
decrease this?

Dependencies(Internal/ NA
External)
Resources Vishal
Additional Notes
1. Monaco Boot loader with Ethernet fix released
2. Monaco Application and single flash to be released as part of Moscow for Ethernet
fix
3. Reviewed different hardware platform option
4. Supported QA testing for AP4000 Rel 4.0.3
5. AP96 development on hold awaiting HW
6. Sunil’s team will work on Moscow and then help other projects Vegas/Milan till
AP96 starts
7. working with Nudesign support for Cli memory issue and unified configuration
feature.