Você está na página 1de 22

OPTION 1 New 9-12 High School 6-8 at Current Middle School 6-8 at

Current High School


Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

New 9-12 High School

TBD

No Work

Existing Site

Upgrades & Renovations

Existing Site

Classrooms/
Core

New School

9th-12th Grade

Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields
Auditorium

6th-8th Grade

1,800/
2,000
600/675

6th-8th Grade

600/675

New Stadium for Football, Soccer & Track, New Tennis Courts, and
New Baseball and Softball Fields at New High School
New Auditorium Included at New High School Existing
Auditorium to Remain at HHS
ADVANTAGES
DISADVANTAGES
Provides opportunity for a more state of the art
Separating the population into competitive Middle
school- better technology, lab access, additional
Schools
course options, environmentally friendly, etc.
Have and have nots with two Middle Schools
All new construction
Site TBD
Less traffic congestion
Too expensive
New auditorium
Would add more space than the enrollment
projections indicate for the long term.
Grades 9-12 will have more extracurricular
options
High cost for athletics
Keeps current grade level structure at the HS.
Keeping 9th Grade in HS (age spread is too great)
Having centralized competitive athletic fields.
COMMENTS

This is the only 9-12 option and supports current High School academy structure
High School needs more tech
The centralized fields, specifically a field house is an absolute must.
This is really quite a deal if people step back and look at the big picture; we need to stop short changing our children.

Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION 2 New 10-12 High School 6-7 at Current Middle School 8-9
at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

Classrooms/
Core

New School
Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields
Auditorium

10th-12th
Grade
6th-7th Grade

1,350/
1,500
800/900

New 10-12 High School

MS/HP site

No Work

Existing Site

8th-9th Grade

850/950

Upgrades & Renovations

Existing Site

New Stadium for Football, Soccer & Track, New Tennis Courts, and
New Baseball and Softball Fields at New High School Site
New Auditorium Included at New High School Existing
Auditorium to Remain
ADVANTAGES
DISADVANTAGES
Site for new school determined
Not enough space the site is already too
crowded and would increase concerns related to
Grade configuration seems positive for students
parking and traffic
Keeps school centrally located in the community
3-story school creates challenges for people with
Fixes overcrowding at both HS & MS
mobility disabilities
Less grades per school and the need for
No room for expansion if needed in the future
competitive athletic fields located at the HS are
High cost for athletics
a must
Lots of transitions for students
Dislike elementary recess so close to a HS
COMMENTS

Is there enough land to add all that is needed for a high school?
Better idea leave 8-9 at MS so it is next to new high school and move grades 6-7 to the current high school.
Could the MS just be added on to rather than build a separate new high school? This seems to provide plenty of space
based on projections.
I dont mind the location, but would vote NO because it is not a 9-12 school.

Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION 2a New 10-12 High School 6-7 at Current Middle School 8-9
at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

Classrooms/
Core

New School
Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields
Auditorium

10th-12th
Grade
6th-7th Grade

1,350/
1,500
800/900

New 10-12 High School

TBD

No Work

Existing Site

8th-9th Grade

850/950

Upgrades & Renovations

Existing Site

New Stadium for Football, Soccer & Track, New Tennis Courts, and
New Baseball and Softball Fields at New High School Site
New Auditorium Included at New High School Existing
Auditorium to Remain
ADVANTAGES
DISADVANTAGES
Having a new high school that can be designed
Site TBD
in a way that supports current programming
9th graders not having access to HS activities and
athletics
New auditorium and athletic fields that keep us
competitive with other school districts in area
Too expensive and doesnt fully utilize existing
A newer/high-tech campus will keep student in
space
Hudson and draw new families to the district
Too many transitions
Pride of the community
Pouring money into the current HS is a waste, it
Mechanical, electrical, and technical
should be razed and a new HS built on the current
infrastructure taken care of at the HS
site
Provides extra space if needed for expansion
COMMENTS

Hard to fully understand the ramifications of this option with knowing the site, infrastructure needs, traffic safety, water,
sewer, etc.
Think about a new site that doesnt create more congestion
Will administrative office building be sold and move back to one of the schools?
Is there a way for the school and city to collaborate on athletic field complex?
Need to get this decision right because we will be using this new building for the next 50 years

Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION 3 New 10-12 High School 6-9 at Current Middle School 6-9
at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

Classrooms/
Core

New School
Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields
Auditorium

10th-12th
Grade
6th-9th Grade

1,350/
1,500
825/925

New 10-12 High School

TBD

No Work

Existing Site

6th-9th Grade

825/925

Upgrades & Renovations

Existing Site

New Stadium for Football, Soccer & Track, New Tennis Courts, and
New Baseball and Softball Fields at New High School Site
New Auditorium Included at New High School Existing
Auditorium to Remain
ADVANTAGES
DISADVANTAGES
More age/developmentally appropriate age
Site TBD
groupings
9th graders not having access to HS activities and
athletics
Less transitions
Population of MS & HS smaller
Dont like having 2 competing MS
More community feel
Dont like 6th graders with 9th graders
Starting from scratch with a new HS can do
Too expensive and doesnt fully utilize the existing
state of the art approach
space
Extra space for expansion if needed
Less expensive than 9-12 HS
COMMENTS

Sell unused UU property


This option makes a lot of sense
Focus on having enough space for students to learn and teachers to teach rather than how grades should be split and or
combined
Take into account parent and student traffic and congestion and convenience
Worst option

Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION 4 New 11-12 High School 6-7 at Current Middle School 8-10
at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

New 11-12 High School

TBD

No Work

Existing Site

Upgrades & Renovations

Existing Site

Classrooms/
Core

New School
Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields
Auditorium

11th-12th
Grade
6th-7th Grade

900/
1,000
800/900

8th-10th Grade

1,300/
1,450

New Stadium for Football, Soccer & Track, New Tennis Courts, and
New Baseball and Softball Fields at New High School Site
Upgrades to existing auditorium
ADVANTAGES
DISADVANTAGES
Provides new sports facilities
Grouping 8th graders with 10th graders
Keeps students together in same school - no
How would 9th and 10th grade work with HS
competing schools
activities and athletics?
New high school
Doesnt make sense academically
Utilizes existing space well
Feel like the 9-12 HS is the option the community
favors
Cheaper high school to build
No new auditorium
Would provide new opportunities for the
students who most need them as the prep for
The idea of an 11-12 HS seems silly is there an
life beyond high school
example of other schools using this configuration?
Too expensive and doesnt fully utilize existing
space
COMMENTS

Weird grade configuration


Sell unused UU property
Where do HS students go during renovations of current HS?
I feel like our HS should be at least 3 grades if not 4. You get a better social experience!
Really dislike the idea of an 11-12 high school!

Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION A New 9-12 High School 5-6 at Current Middle School 7-8
at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

New 9-12 High School

TBD

No Work

Existing Site

Upgrades & Renovations

Existing Site

Classrooms/
Core

New School

9th-12th Grade

Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields

5th-6th Grade

1,800/
2,000
800/900

7th-8th Grade

800/900

Existing Stadium Upgrades = Synthetic Turf, Track, Bleachers &


Support Building. Baseball & Softball = Lights & Toilet Rooms.
Existing HS Site = New Tennis Courts
Auditorium
New Auditorium Included at New High School Existing
Auditorium to Remain
ADVANTAGES
DISADVANTAGES
New option from Community Workshop no
New option from Community Workshop no
community comment available
community comment available

COMMENTS
New option from Community Workshop no community comment available

Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION B Close Hudson Prairie Elem. New 10-12 HS 6-9 at Current


MS/Hudson Prairie Elementary Idle/Demolish/Sale Current HS
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location
Corner of
Highway 12
& UU
Existing Site

Classrooms/
Core

New School

Hudson Middle
School/Hudson
Prairie
Elementary
Hudson High
School
Other

10th-12th
Grade

1,350/
1,500

New 10-12 High School

6th-9th Grade

1,650/
1,850

Additions, Upgrades & Minor Renovation of


Hudson Prairie to Support Middle School
Students/Curriculum
Idled/Demolished/Sold

Kindergarten
5th Grade

Close Hudson Prairie and Complete


Reconfiguration of All Elementary Attendance
Areas and 6 Classroom Addition to River Crest
Elementary
Outdoor Athletic
New Stadium for Football, Soccer & Track, New Tennis Courts, and
& Rec. Fields
New Baseball and Softball Fields at New High School Site
Auditorium
New Auditorium Included at New High School
ADVANTAGES
DISADVANTAGES
New option from Community Workshop no
New option from Community Workshop no
community comment available
community comment available

COMMENTS
New option from Community Workshop no community comment available
Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION C New 11-12 High School 6-8 at Current Middle School 9-10
at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

New 11-12 High School

Additions & Renovations

District
Owned Land
on UU or Sell
It
Existing Site

Upgrades & Renovations

Existing Site

Classrooms/
Core

New School

Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields
Auditorium

11th-12th
Grade

900/
1,000

6th-8th Grade

1,200/
1,350
900/1,000

9th-10th Grade

New Stadium for Football, Soccer & Track, New Tennis Courts, and
New Baseball and Softball Fields at New High School Site
Upgrades to Existing
ADVANTAGES
DISADVANTAGES
New option from Community Workshop no
New option from Community Workshop no
community comment available
community comment available

COMMENTS
New option from Community Workshop no community comment available

Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION D New 10-12 High School 6-9 at Current Middle


School/Hudson Prairie Elementary Reconfigure K-5 Attendance
Boundaries
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location
Existing Site
Build on
Current
Parking Lot
Existing Site

Classrooms/
Core

New School

Hudson Middle
School
Hudson High
School
Other

10th-12th
Grade

1,350/
1,500

New 10-12 High School

6th-9th Grade

1,650/
1,850

Additions, Upgrades & Minor Renovation of


Hudson Prairie to Support Middle School
Students/Curriculum
Demolished When New High School Completed

K-5th Grade

Close Hudson Prairie and Complete


Reconfiguration of All Elementary Attendance
Areas and 6 Classroom Addition to River Crest
Outdoor Athletic
Existing Stadium Upgrades = Synthetic Turf, Track, Bleachers &
& Rec. Fields
Support Building. Baseball & Softball = Lights & Toilet Rooms.
Existing HS Site = New Tennis Courts
Auditorium
New Auditorium Included at New High School
ADVANTAGES
DISADVANTAGES
New option from Community Workshop no
New option from Community Workshop no
community comment available
community comment available

COMMENTS
New option from Community Workshop no community comment available
Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION D1 New 10-12 High School 6-9 at Current Middle


School/Hudson Prairie Elementary New Elementary to Replace Hudson
Prairie
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location
Existing Site
Build on
Current
Parking Lot
Existing Site

Classrooms/
Core

New School

Hudson Middle
School
Hudson High
School
Other

10th-12th
Grade

1,350/
1,500

New 10-12 High School

6th-9th Grade

1,650/
1,850

Additions, Upgrades & Minor Renovation of


Hudson Prairie to Support Middle School
Students/Curriculum
Demolished When New High School Completed

K-5th Grade

588

New Elementary School to House Relocated


Hudson Prairie Elementary Students

Districtowned UU
property
Outdoor Athletic
Existing Stadium Upgrades = Synthetic Turf, Track, Bleachers &
& Rec. Fields
Support Building. Baseball & Softball = Lights & Toilet Rooms.
Existing HS Site = New Tennis Courts
Auditorium
New Auditorium Included at New High School
ADVANTAGES
DISADVANTAGES
New option from Community Workshop no
New option from Community Workshop no
community comment available
community comment available

COMMENTS
New option from Community Workshop no community comment available
Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION 5 New 6-7 Middle School 8-9 at Current Middle School 1012 at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

Classrooms/
Core

New School

6th-7th Grade

800/900

New 6-7 Middle School

Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields

8th-9th Grade

850/950

No Work

DistrictOwned UU
Property
Existing Site

10th-12th
Grade

1,350/
1,500

Upgrades & Renovations

Existing Site

Existing Stadium Upgrades = Synthetic Turf, Track, Bleachers &


Support Building. Baseball & Softball = Lights & Toilet Rooms.
Existing HS Site = New Tennis Courts
Auditorium
Upgrades to Existing
ADVANTAGES
DISADVANTAGES
Small enough to be on UU without city water &
Too many transitions
sewer
Complicated renovations and updates to existing
10-12 HS and grades 8-9 together
site
District-owned site
No new auditorium or sports complex
MS costs less than a new HS
Upgrades to HS does not meet current HS
curriculum/21st century learning
Feels piece meal
How will 9th Gr. take advantage of HS activities and
athletics?
COMMENTS

No UU
Sell unused portion of UU property
Anything new should be for High schoolers. It is time to invest in our High School!

Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION 6 New 6-8 Middle School 6-8 at Current Middle School 912 at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location
DistrictOwned UU
Property
Existing Site

Classrooms/
Core

New School

6th-8th Grade

600/675

New 6-8 Middle School

Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields

6th-8th Grade

600/675

No Work

9th-12th Grade

1,800/
2,000

Additions, Upgrades & Renovations + Synthetic


Turf Phy Ed & Practice Field

Existing Site

Existing Stadium Upgrades = Synthetic Turf, Track, Bleachers &


Support Building. Baseball & Softball = Lights & Toilet Rooms.
Existing HS Site = New Tennis Courts
Auditorium
Upgrades to Existing
ADVANTAGES
DISADVANTAGES
Use existing district-owned land
Solves overcrowding issue at MS, but still doesnt
address overcrowding at HS
HS is 9-12
Significant renovations needed at HS
Helps with MS overcrowding
No new auditorium
More centralized
Patch work solution
Important to use what we have, renovations can
be creative
Two Middle Schools not practical
Renovations can easily meet the space needs.
Parking at HS is limited
Having onsite water and septic
Splitting into 2 MS requires duplication of
resources and staff
No room to expand at the HS if needed for
potential future growth
COMMENTS

Anything new should be going toward HS


Bad option, partial fix
Buy houses on west side of HS for a multi-story school

Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION 7 New 8-9 Middle School 6-7 at Current Middle School 1012 at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

Classrooms/
Core

New School

8th-9th Grade

850/950

New 8-9 Middle School

Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields

6th-7th Grade

800/900

No Work

DistrictOwned UU
Property
Existing Site

10th-12th
Grade

1,350/
1,500

Upgrades & Renovations

Existing Site

Existing Stadium Upgrades = Synthetic Turf, Track, Bleachers &


Support Building. Baseball & Softball = Lights & Toilet Rooms.
Existing HS Site = New Tennis Courts
Auditorium
Upgrades to Existing
ADVANTAGES
DISADVANTAGES
Small enough to be on UU with city water &
Too many transitions
sewer
How will 9th graders participate in HS activities &
Newer building with more technology for older
athletics
students
We need a new HS, auditorium and more fields to
District-owned site
serve the population at our schools
Minimized duplication of resources
Piecemeal approach
Good age grouping/grade configuration for
Current HS is too small and ill-equipped
students
We should put the majority of our money where is
Helps overcrowding at MS & HS
most important - HS
COMMENTS

Hate the UU property!


Sell off the unused portion of UU property
We are concerned about doing what is best for kids developmentally what is the best grade configuration?
This is the most talked about option I have heard
The community and teachers want a new high school, NOT a new junior high

Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION 8 New K-5 Elementary School 6-8 at Current Middle


School/Hudson Prairie Elementary 9-12 at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

New Elementary School to House Relocated


Hudson Prairie Elementary Students

DistrictOwned UU
Property
Existing Site

Classrooms/
Core

New School

K-5th Grade

588

Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields

6th-8th Grade

1,200/
1,350
1,800/
2,000

9th-12th Grade

Minor Renovation of Hudson Prairie to Support


Middle School Students/Curriculum
Additions, Upgrades & Renovations + Synthetic
Turf Phy Ed. & Practice Field

Existing Site

Existing Stadium Upgrades = Synthetic Turf, Track, Bleachers &


Support Building. Baseball & Softball = Lights & Toilet Rooms.
Existing HS Site = New Tennis Courts
Auditorium
Upgrades to Existing
ADVANTAGES
DISADVANTAGES
UU site is suitable for elementary
Remodeling current HS is a super job
Buses not cars at UU
Current Prairie may not convert easily to MS
houses
In direction of new growth
Athletic fields still off-site
Allows MS more space
Low priority to HS issues; such as parking,
No lighting requirements for elementary
disruption to learning, etc.
Keeps HS centrally located
We dont want to spend $86M to renovate an old
Most cost effective not as educationally
HS its a waste
effective
We dont need a new elementary school. Makes
Uses what we already have
no sense excess capacity already exists in elem.
Creates disruption at elementary level
Does not solve space issues at the HS
COMMENT

Is scope of HS remodel enough?


No want a new HS
Dont need glitz and glow to get kids educated school can be prudently equipped. Current demographics show less kids

Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION E New K-5 Elementary School 9-12 at Current Middle


School/Hudson Prairie Elementary Reconfigure K-5 Attendance
Boundaries
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location
DistrictOwned UU
Property
Existing Site
with Traffic
Improvements
Existing Site

Classrooms/
Core

K-5th Grade

588

New Elementary School to House Relocated


Hudson Prairie Elementary Students

Hudson Middle
School

9th-12th Grade

1,800/
2,000

Hudson High
School
Other
Outdoor Athletic
& Rec. Fields
Auditorium

6th-8th Grade

1,200/
1,350

Additions, Upgrades & Minor Renovation of


Hudson Prairie to Support High School
Students/Curriculum
Upgrades & Renovations Move District
Administration if Possible

New School

Build New Fields at Current Middle School (Proposed High School)


Site, Purchase Booster Fields from City
New Auditorium Added to Current Middle School (Proposed High
School)
ADVANTAGES
DISADVANTAGES
New option from Community Workshop no
New option from Community Workshop no
community comment available
community comment available

COMMENTS
New option from Community Workshop no community comment available
Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION E1 New K-5 Elementary 6-9 at Current Middle


School/Hudson Prairie Elementary 10-12 at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

New Elementary School to House Relocated


Hudson Prairie Elementary Students

DistrictOwned UU
Property
Existing Site

Classrooms/
Core

New Elementary

K-5th Grade

588

Hudson Middle
School

6th-9th Grade

1,650/
1,850

10th-12th
Grade

1,350/
1,500

Hudson High
School
Other
Outdoor Athletic
& Rec. Fields

Additions, Upgrades & Minor Renovation of


Hudson Prairie to Support Middle School
Students/Curriculum
Demolish All Existing Except the Auditorium and
Rebuild Around It

Existing Site

Existing Stadium Upgrades = Synthetic Turf, Track, Bleachers &


Support Building. Baseball & Softball = Lights & Toilet Rooms.
Existing HS Site = New Tennis Courts
Auditorium
Upgrades to Existing
ADVANTAGES
DISADVANTAGES
New option from Community Workshop no
New option from Community Workshop no
community comment available
community comment available

COMMENTS
New option from Community Workshop no community comment available
Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION 9 No New Schools 6-8 at Current Middle School 9-12 at


Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

No New Schools/Sites
Additions & Renovations

Existing Site

Classrooms/
Core

No New Schools
Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields

th

th

6 -8 Grade
9th-12th Grade

1,200/
1,350
1,800/
2,000

Additions, Upgrades & Renovations + Synthetic


Turf Phy Ed. & Practice Field

Existing Site

Existing Stadium Upgrades = Synthetic Turf, Track, Bleachers &


Support Building. Baseball & Softball = Lights & Toilet Rooms.
Existing HS Site = New Tennis Courts
Auditorium
Upgrades to Existing
ADVANTAGES
DISADVANTAGES
Should have lesser cost than new building
Problem of space doesnt really seem to be solved
No need to find a new site
Piecemeal, band aid approach. Dont like it. Waste
of money
Great idea! Largest classes in district are already
in high school; space is eased by attrition in a
Does not use the excess capacity at the
few years anyway.
elementary level.
Keep costs down, use flexible learning. Not all
No real solution here we dont have enough
high school kids need to be in the same building
room for them to learn.
at the same time.
We need a new High School, auditorium and more
fields to serve the population at our schools
COMMENT

Families will continue to pull students out of the Hudson School District to attend communities that invest in education.
Consider additional options to deal with traffic relocate parking, consider multi-level parking, overpass for pedestrians
We deserve better this option will not serve the needs of our high school students long term

Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION 10 Close Hudson Prairie 6-8 at Current Middle


School/Hudson Prairie Elementary 9-12 at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

Close Hudson Prairie and Complete


Reconfiguration of All Elementary Attendance
Areas and 6 Classroom Additions at River Crest
Minor Renovation of Hudson Prairie to Support
Middle School Students/Curriculum
Additions, Upgrades & Renovations + Synthetic
Turf Phy Ed. & Practice Field

Existing Site

Classrooms/
Core

Close Hudson
Prairie Elem.

K-5th Grade

Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields

6th-8th Grade
9th-12th Grade

1,200/
1,350
1,800/
2,000

Existing Site

Existing Stadium Upgrades = Synthetic Turf, Track, Bleachers &


Support Building. Baseball & Softball = Lights & Toilet Rooms.
Existing HS Site = New Tennis Courts
Auditorium
Upgrades to Existing
ADVANTAGES
DISADVANTAGES
Good utilization of existing space, considers
Redistricting is very emotional and controversial;
decrease in elementary enrollment
what if growth occurs that is not expected?
More cost effective
Doing a band aid fix wont solve the long term
problems
This would solve space problem at the middle
school, but I still feel the existing high school
Doesnt address core of MS & HS
even with renovations would be too small.
Dont want bigger grade schools
HS is land locked need more parking and want
fields and high school together
We need a new high school
COMMENT

Is there capacity at the elementary schools to actually do this?


The athletic fields should be a separate bond issue.
Issues we have in the district are not at the elementary level. Why would we focus our energy there, and upset a system
that is working?
We deserve better.
Home owners around HP wont support this option losing a school students can walk to.

Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION 11 K-6 Elementary School 7-8 at Current Middle School 912 at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

Classrooms/
Core

6th Grade
Relocated to
Elem.
Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields

K-6th Grade

Complete Reconfiguration of All Attendance Areas


and Additions to Existing Elementary School

7th-8th Grade

800/900

9th-12th Grade

1,800/
2,000

No Work

Existing Site

Additions, Upgrades & Renovations + Synthetic


Turf Phy Ed. & Practice Field

Existing Site

Existing Stadium Upgrades = Synthetic Turf, Track, Bleachers &


Support Building. Baseball & Softball = Lights & Toilet Rooms.
Existing HS Site = New Tennis Courts
Auditorium
Upgrades to Existing
ADVANTAGES
DISADVANTAGES
th
6 Grade more developmentally appropriate at
Sixth graders are ready to leave the elementary
elementary
school environment and enter the MS
Should be the least expensive option and fully
Concern with additional transition
utilizes the infrastructure that already exists
Reconfiguration of school population is disruptive
Least disruptive for students, faculty and
Creates HUGE problem of space at the elementary
community
schools
Would solve space issue at MS
Doing a band aid fix wont solve the long term
problems
We need a new HS, auditorium and more fields
COMMENT

Is there capacity to actually do this?


Very against this option it is a non-starter
Consider an underpass/overpass for pedestrians at the HS

Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION F K-6 Elementary School 7-9 at Current Middle School


10-12 at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

Complete Reconfiguration of All Attendance


Areas and Additions to Existing Elementary
School
Additions & Renovations

Existing Site

Upgrades & Renovations

Existing Site

Classrooms/
Core

6th Grade
Relocated to
Elem.
Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields

K-6th Grade

7th-9th Grade
10th-12th
Grade

1,250/
1,400
1,350/
1,500

Existing Stadium Upgrades = Synthetic Turf, Track, Bleachers &


Support Building. Baseball & Softball = Lights & Toilet Rooms.
Existing HS Site = New Tennis Courts
Auditorium
Upgrades to Existing
ADVANTAGES
DISADVANTAGES
New option from Community Workshop no
New option from Community Workshop no
community comment available
community comment available

COMMENTS
New option from Community Workshop no community comment available
Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION G K-5 Elementary School 6-9 at Current Middle


School/Hudson Prairie Elementary
10-12 at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

Close Hudson Prairie and Complete


Reconfiguration of All Attendance Areas and 6
Classroom Additions to River Crest
Additions, Upgrades & Minor Renovation of
Hudson Prairie Elementary to Support MS
Students/Curriculum
Upgrades & Renovations

Existing Site

Classrooms/
Core

Close Hudson
Prairie
Elementary
Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields

K-5th Grade

6th-9th Grade

1,650/
1,850

10th-12th
Grade

1,350/
1,500

Existing Site

Existing Stadium Upgrades = Synthetic Turf, Track, Bleachers &


Support Building. Baseball & Softball = Lights & Toilet Rooms.
Existing HS Site = New Tennis Courts
Auditorium
Upgrades to Existing
ADVANTAGES
DISADVANTAGES
New option from Community Workshop no
New option from Community Workshop no
community comment available
community comment available

COMMENTS
New option from Community Workshop no community comment available
Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

OPTION H No New Schools 6-9 at Current Middle School


10-12 at Current High School
Building/Location

Grade Config.

Capacity

Potential Scope/Solution

Site/Location

No New Schools/Sites
Additions, Upgrades & Renovations

Existing Site

Classrooms/
Core

No New Schools
Hudson Middle
School
Hudson High
School
Other
Outdoor Athletic
& Rec. Fields

th

th

6 -9 Grade
10th-12th
Grade

1,650/
1,850
1,350/
1,500

Demolish All Existing Except the Auditorium and


Rebuild Around It

Existing Site

Existing Stadium Upgrades = Synthetic Turf, Track, Bleachers &


Support Building. Baseball & Softball = Lights & Toilet Rooms.
Existing HS Site = New Tennis Courts
Auditorium
Upgrades to Existing
ADVANTAGES
DISADVANTAGES
New option from Community Workshop no
New option from Community Workshop no
community comment available
community comment available

COMMENTS
New option from Community Workshop no community comment available
Round 1

Round 2

Round 3

Round 4

Round 5

Round 6

Você também pode gostar