Você está na página 1de 5

65838 Federal Register / Vol. 70, No.

210 / Tuesday, November 1, 2005 / Rules and Regulations

DEPARTMENT OF HOMELAND Traffic Service (VTS) aspect of Sector Air Act (CAA) for the second 10-year
SECURITY Seattle to enter, move within, or exit maintenance plan for the Nashville
these security zones when they are Area.
Coast Guard enforced. Entry into these zones is In addition, in this rulemaking, EPA
prohibited unless otherwise exempted is providing information on its
33 CFR Part 165 or excluded under 33 CFR 165.1321 or transportation conformity adequacy
unless authorized by the Captain of the determination for new motor vehicle
[CGD13–05–038]
Port or his designee. The Captain of the emission budgets (MVEBs) for the year
RIN 1625–AA87 Port Puget Sound will begin enforcing 2016 that are contained in the second
the Budd Inlet security zone established 10-year 1-hour ozone maintenance plan
Security Zone; Protection of Military by 33 CFR 165.1321 on Thursday, for the Nashville Area. EPA determined
Cargo, Captain of the Port Zone Puget October 27, 2005, at 8 a.m. Pacific that the 2016 MVEBs are adequate
Sound, WA daylight time. The security zone will be through a previous action. EPA is also
enforced until Tuesday, November 1, approving the 2016 MVEBs in this
AGENCY: Coast Guard, DHS.
2005, at 11:59 p.m. Pacific standard action.
ACTION: Notice of enforcement. time. All persons and vessels are
DATES: This direct final rule is effective
SUMMARY: The Captain of the Port Puget authorized to enter, move within, and
January 3, 2006, without further notice,
Sound will begin enforcing the Budd exit the security zone on or after
unless EPA receives adverse comment
Inlet security zone in West Bay, Tuesday, November 1, 2005, at 11:59
by December 1, 2005. If adverse
Olympia, Washington on Thursday, p.m. Pacific standard time unless a new
comment is received, EPA will publish
October 27, 2005, at 8 a.m. Pacific notice of enforcement is issued before
a timely withdrawal of the direct final
Daylight Time. The security zone then.
rule in the Federal Register and inform
provides for the security of Department Dated: October 21, 2005. the public that the rule will not take
of Defense assets and military cargo in Stephen P. Metruck, effect.
the navigable waters of Puget Sound and Captain, U.S. Coast Guard, Captain of the
adjacent waters. The security zone will Port, Puget Sound.
ADDRESSES: Submit your comments,
be enforced until Tuesday, November 1, identified by Regional Material in
[FR Doc. 05–21720 Filed 10–31–05; 8:45 am]
2005, at 11:59 p.m. Pacific standard EDocket (RME) ID No. ‘‘RO4–OAR–
BILLING CODE 4910–15–P
time. 2005–TN–0006–200519’’ by one of the
following methods:
DATES: The Budd Inlet security zone set 1. Federal eRulemaking Portal:
forth in 33 CFR 165.1321 will be ENVIRONMENTAL PROTECTION http://www.regulations.gov. Follow the
enforced from Thursday, October 27, AGENCY on-line instruction for submitting
2005, at 8 a.m. Pacific daylight time to comments.
Tuesday, November 1, 2005, at 11:59 40 CFR Part 52
2. Agency Web site: http://
p.m. Pacific standard time, at which [RO4–OAR–2005–TN–0006–200519(a); FRL– docket.epa.gov/rmepub/RME, EPA’s
time enforcement will be suspended. 7990–3] electronic public docket and comment
FOR FURTHER INFORMATION CONTACT: system is EPA’s preferred method for
Captain of the Port Puget Sound, 1519 Approval and Promulgation of receiving comments. Once in the
Alaskan Way South, Seattle, WA 98134 Implementation Plans; Tennessee: system, select ‘‘quick search,’’ then key
at (206) 217–6200 or (800) 688–6664 to Nashville Area Second 10-Year in the appropriate RME Docket
obtain information concerning Maintenance Plan for the 1-Hour Ozone identification number. Follow the on-
enforcement of this rule. National Ambient Air Quality Standard line instructions for submitting
SUPPLEMENTARY INFORMATION: On August AGENCY: Environmental Protection comments:
27, 2004, the Coast Guard published a Agency (EPA). 3. E-mail:
final rule (69 FR 52603) establishing ACTION: Direct final rule.
hoffman.annemarie@epa.gov.
regulations, in 33 CFR 165.1321, for the 4. Fax: (404) 562–9019.
security of Department of Defense assets SUMMARY: The EPA is approving a 5. Mail: ‘‘RO4–OAR–2005–TN–0006’’
and military cargo in the navigable revision to the Tennessee State Regulatory Development Section, Air
waters of Puget Sound and adjacent Implementation Plan (SIP) submitted in Planning Branch, Air Pesticides and
waters. On December 10, 2004, the final form on August 10, 2005. The SIP Toxics Management Division, U.S.
Coast Guard published a final rule (69 revision provides the second 10-year Environmental Protection Agency,
FR 71709), which amended 33 CFR maintenance plan for the Nashville Region 4, 61 Forsyth Street, SW.,
165.1321 by adding Budd Inlet, (Middle Tennessee) 1-hour ozone Atlanta, Georgia 30303–8960.
Olympia, WA as a permanent security maintenance area (Nashville Area), 6. Hand Delivery or Courier, Deliver
zone. These security zones provide for which is composed of the following five your comments to Anne Marie Hoffman,
the regulation of vessel traffic in the counties: Davidson, Rutherford, Regulatory Development Section, Air
vicinity of military cargo loading Sumner, Williamson, and Wilson. The Planning Branch, Air, Pesticides and
facilities in the navigable waters of the Nashville Area is still required to fulfill Toxics Management Division, U.S.
United States. These security zones also obligations under the 1-hour ozone Environmental Protection Agency,
exclude persons and vessels from the national ambient air quality standard Region 4, 61 Forsyth Street, SW.,
immediate vicinity of these facilities (NAAQS), because EPA has deferred the Atlanta, Georgia 30303–8960, such
during military cargo loading and effective date of the designation for the deliveries are only accepted during the
unloading operations. In addition, the Nashville Area under the newer 8-hour Regional Office’s normal hours of
regulation establishes requirements for ozone NAAQS due to participation in operation. The Regional office’s official
all vessels to obtain permission of the an Early Action Compact. EPA is hours of business are Monday through
COTP or the COTP’s designated approving this SIP revision because it Friday, 8:30 to 4:30, excluding federal
representative, including the Vessel satisfies the requirement of the Clean holidays.

VerDate Aug<31>2005 15:13 Oct 31, 2005 Jkt 208001 PO 00000 Frm 00012 Fmt 4700 Sfmt 4700 E:\FR\FM\01NOR1.SGM 01NOR1
Federal Register / Vol. 70, No. 210 / Tuesday, November 1, 2005 / Rules and Regulations 65839

Instructions: Direct your comments to FOR FURTHER INFORMATION CONTACT: in an Early Action Compact (EAC). The
RME ID No. ‘‘RO4–OAR–2005–TN– Anne Marie Hoffman, Regulatory effective date of the revocation of the 1-
0006.’’ EPA’s policy is that all Development Section, Air Planning hour ozone NAAQS is one year after the
comments received will be included in Branch, Air, Pesticides and Toxics effective date of the designations for the
the public docket without change and Management Division, U.S. 8-hour ozone standard as explained in
may be made available online at Environmental Protection Agency, EPA’s April 30, 2004, final rule (69 FR
http://docket.epa.gov/rmepub, Region 4, 61 Forsyth Street, SW., 23951). For areas participating in an
including any personal information Atlanta, Georgia, 30303–8960, Phone EAC, the effective date for designations
provided, unless the comment includes (404) 562–9074. E-mail: for the 8-hour ozone NAAQS was
information claimed to be Confidential hoffman.annemarie@epa.gov. deferred until December 31, 2006, in a
Business Information (CBI) or other SUPPLEMENTARY INFORMATION: final action published by EPA on
information whose disclosure is August 29, 2005 (70 FR 50988).
restricted by statute. Do not submit Table of Contents Therefore, the 1-hour ozone NAAQS is
information that you consider to be CBI I. What Is the Background for This Action? not yet revoked for the Nashville Area
or otherwise protected through RME, II. What Is EPA’s Analysis of the Nashville and other areas participating in an EAC,
Area’s Second 10-Year Maintenance because the effective date for
regulations.gov, or e-mail. The EPA Plan?
RME website and the federal designations for the 8-hour ozone
III. What Is EPA’s Action on the Nashville
regulations.gov website are ‘‘anonymous Area’s Second 10-Year Maintenance NAAQS in EAC areas has been deferred.
access’’ systems, which means EPA will Plan? For more information, please see EPA’s
not know your identity or contact IV. What Is an Adequacy Determination and Web site on EACs at: http://
information unless you provide it in the What Is EPA’s Adequacy Determination www.epa.gov/air/eac/index.html.
body of your comment. If you send an for the Nashville Area’s New MVEBs for The original 10-year maintenance
e-mail comment directly to EPA without the Year 2016? plan for the Nashville Area established
V. Statutory and Executive Order Reviews MVEBs for the year 2006. The 2006
going through RME or regulations.gov,
your e-mail address will be I. What Is the Background for This MVEBs are 53.17 tons per day (tpd) for
automatically captured and included as Action? volatile organic compounds (VOC) and
part of the comment that is placed in the 96.60 tpd for nitrogen oxides (NOX).
In 1996, based on measured air These MVEBs are currently being used
public docket and made available on the quality data, the Nashville Area was
Internet. If you submit an electronic by the transportation partners to
able to demonstrate attainment with the demonstrate transportation conformity.
comment, EPA recommends that you 1-hour ozone National Ambient Air
include your name and contact Additionally, through this rulemaking,
Quality Standard (NAAQS) due to EPA is providing information on the
information in the body of your numerous control measures
comment and with any disk or CD–ROM status of its transportation conformity
implemented in the Nashville Area. As adequacy determination for new MVEBs
you submit. If EPA cannot read your a result of the measured air quality data,
comment due to technical difficulties for the year 2016 that are contained in
Tennessee petitioned EPA for the second 10-year plan for the
and cannot contact you for clarification, redesignation. In 1996, EPA
EPA may not be able to consider your Nashville Area. The adequacy comment
redesignated the Nashville Area to period for the 2016 MVEBs began on
comment. Electronic files should avoid attainment based on the measured air
the use of special characters, any form June 9, 2005, with EPA’s posting of the
quality data and a 10-year maintenance availability of this submittal on EPA’s
of encryption, and be free of any defects plan submitted for the Nashville Area. Adequacy Web site (at http://
or viruses. The air quality maintenance plan is a www.epa.gov/otaq/transp/conform/
Docket: All documents in the requirement of the 1990 CAA adequacy.htm). The adequacy comment
electronic docket are listed in the RME amendments for nonattainment areas period for these MVEBs closed on July
index at http://docket.epa.gov/rmepub. that come into compliance with the 11, 2005. No request for, or adverse
Although listed in the index, some NAAQS to assure their continued comments on this submittal were
information is not publicly available, maintenance of that standard. Eight received during EPA’s adequacy
i.e., CBI or other information whose years after redesignation to attainment, comment period. EPA determined that
disclosure is restricted by statute. section 175A(b) of the CAA requires the the 2016 MVEBs are adequate through a
Certain other material, such as state to submit a revised maintenance separate action on September 16, 2005,
copyrighted material, is not placed on plan which demonstrates that (70 FR 2005). Please see section IV of
the Internet and will be publicly attainment will continue to be this rulemaking for further explanation
available only in hard copy form. maintained for the ten years following of this process.
Publicly available docket material are the initial ten-year period (this is known
available either electronically in RME or as the second 10-year plan). The second II. What Is EPA’s Analysis of the
in hard copy at the Regulatory 10-year plan updates the original 10- Nashville Area’s Second 10-Year
Development Section, Air Planning year 1-hour ozone maintenance plan for Maintenance Plan?
Branch, Air, Pesticides and Toxics the next 10-year period. The On August 10, 2005, the State of
Management Division, U.S. maintenance plan sets out the steps the Tennessee, through the Tennessee
Environmental Protection Agency area would take to maintain attainment Department of Environment and
Region 4, 61 Forsyth Street, SW., with the 1-hour ozone NAAQS. Conservation (TDEC), submitted a SIP
Atlanta, Georgia 30303–8960. EPA Tennessee was required to submit the revision to EPA that provided for the
requests that if at all possible, you second 10-year plan for the Nashville second 10-year plan for the Nashville
contact the person listed in the FOR Area demonstrating that it would Area as required by section 175A(b) of
FURTHER INFORMATION CONTACT section to continue to attain the 1-hour ozone the CAA. This second 10-year plan for
schedule your inspection. The Regional NAAQS through 2016. the Nashville Area includes a new
Office’s official hours of business are The Nashville Area is still required to ozone precursor emission inventory for
Monday through Friday, 8:30 to 4:30, fulfill requirements under the 1-hour 2002 for the Nashville Area which
excluding federal holidays. ozone NAAQS due to its participation reflects emission controls applicable for

VerDate Aug<31>2005 15:13 Oct 31, 2005 Jkt 208001 PO 00000 Frm 00013 Fmt 4700 Sfmt 4700 E:\FR\FM\01NOR1.SGM 01NOR1
65840 Federal Register / Vol. 70, No. 210 / Tuesday, November 1, 2005 / Rules and Regulations

the Nashville Area, and actual and The emission reduction measures for projected emissions estimates. The
projected emissions for 2002, 2006, ozone precursor emissions implemented following two tables provide emissions
2009, 2012 and 2016. The SIP revision in the Nashville Area from 1996 to 2006, data and projections, calculated using
also establishes new MVEBs for 2016 for and measures that are projected to occur MOBILE6.2, for the ozone precursors,
the Nashville Area. between 2006 and 2016, are accounted VOC and NOX.
for in the 2002 emission inventory and
TABLE 1.—NASHVILLE 1-HOUR OZONE AREA
[Emission inventory and projected VOC emissions (2002–2016)]

Safety margin
Non-road On-road
Area Point Total based on 2002
mobile mobile emissions

2002 ......................................................... 80.63 27.53 51.21 19.97 179.34 n/a


2006 ......................................................... 85.56 24.01 37.28 13.05 159.90 19.44
2009 ......................................................... 89.03 20.30 31.03 14.02 154.38 24.96
2012 ......................................................... 92.75 18.45 24.91 15.09 151.20 28.14
2016 ......................................................... 98.87 16.77 19.18 17.02 151.84 27.50

TABLE 2.—NASHVILLE 1-HOUR OZONE AREA


[Emission inventory and projected NOX emissions (2002–2016)]

Safety margin
Non-road On-road
Area Point Total based on 2002
mobile mobile emissions

2002 ......................................................... 21.13 47.85 136.00 53.29 258.27 n/a


2006 ......................................................... 23.48 44.74 97.89 61.01 227.11 31.15
2009 ......................................................... 24.45 41.18 77.65 61.57 204.85 53.42
2012 ......................................................... 25.69 37.71 56.02 64.21 183.63 74.64
2016 ......................................................... 26.53 32.97 36.01 65.21 160.72 97.55

The attainment level of emissions is emissions (from all sources) and the Maintenance plans and other control
the level of emissions during one of the projected level of emissions (from all strategy SIPs create MVEBs for criteria
years in which the area met the NAAQS. sources) in the maintenance plan. The pollutants and/or their precursors to
The Nashville Area attained the 1-hour safety margin is for the entire Nashville address pollution from cars and trucks.
ozone NAAQS based on air quality data Area and is not sub-allocated by county. The MVEB is the portion of the total
for the 2000–2002 time period. The safety margin credit, or a portion allowable emissions that is allocated to
Therefore, in this SIP revision, the thereof, can be allocated to the highway and transit vehicle use and
emissions from the year 2002 are used transportation sector, however, the total emissions. The MVEB serves as a ceiling
to calculate a new attainment emissions emission level must stay below the on emissions from an area’s planned
level for the Nashville Area. The attainment level. The safety margin for transportation system. In this SIP
emissions from point, area, nonroad, VOC is the difference between these revision, the Nashville Area used
and mobile sources in 2002 equal amounts or, in this case, 27.50 tpd for MOBILE6.2 to establish MVEBs for VOC
179.34 tpd of VOC for the entire 2016. By this same method, 97.55 tpd and NOX for the year 2016. In a previous
Nashville Area. Projected VOC (258.27 tpd less 160.72 tpd) is the safety action on September 16, 2005, (70 FR
emissions to the year 2016 equal 151.84 margin for NOX for 2016. The emissions 54738) EPA determined that the new
tpd of VOC. are projected to maintain the Nashville 2016 MVEBs are adequate for the
The safety margin is the difference Area’s air quality consistent with the Nashville Area. These MVEBs are listed
between the attainment level of NAAQS. in Tables 3.1 and 3.2.

TABLE 3.1.—2016 MVEB WITH SAFETY MARGIN INCLUDED


2016 esti- 2016 MVEB
2016 safety 10% of safety mated on-road with safety
margin margin mobile margin
emissions

VOC ................................................................................................................. 27.50 2.75 19.18 21.93


NOX .................................................................................................................. 97.54 9.75 36.01 45.76

The MVEBs presented in Table 3.2 are Nashville Area that the transportation TABLE 3.2.—2006 AND 2016 MVEBS
directly reflective of the combined partners must use are provided in the
onroad (or ‘‘highway’’) emissions for the table below. 2006 2016
Nashville Area for VOC and NOX, plus
allocation from the available safety VOC .................................. 53.17 21.93
margin. In summary, the MVEBs for the NOX .................................. 96.60 45.76

VerDate Aug<31>2005 15:13 Oct 31, 2005 Jkt 208001 PO 00000 Frm 00014 Fmt 4700 Sfmt 4700 E:\FR\FM\01NOR1.SGM 01NOR1
Federal Register / Vol. 70, No. 210 / Tuesday, November 1, 2005 / Rules and Regulations 65841

III. What Is EPA’s Action on the those MVEBs can be used by the State significantly or uniquely affect small
Nashville Area’s Second 10-Year and Federal agencies in determining governments, as described in the
Maintenance Plan? whether proposed transportation Unfunded Mandates Reform Act of 1995
EPA is approving Tennessee’s SIP projects ‘‘conform’’ to the SIP even (Pub. L. 104–4).
though the approval of the SIP revision This rule also does not have tribal
revision pertaining to the Nashville
containing those MVEBs has not yet implications because it will not have a
Area’s second 10-year plan, including
been finalized. EPA’s substantive substantial direct effect on one or more
the new 2016 MVEBs for VOC and NOX.
criteria for determining ‘‘adequacy’’ of Indian tribes, on the relationship
IV. What Is an Adequacy Determination MVEBs in submitted SIPs are set out in between the Federal Government and
and What Is EPA’s Adequacy EPA’s Transportation Conformity Rule Indian tribes, or on the distribution of
Determination for the Nashville Area’s at 40 CFR 93.118(e)(4). power and responsibilities between the
New MVEB for the Year 2016? In a letter dated August 16, 2005, to Federal Government and Indian tribes,
At various times under the CAA, Barry Stephens, Director of the Air as specified by Executive Order 13175
states are required to submit control Pollution Control Division of TDEC, (65 FR 67249, November 9, 2000). This
EPA informed the State of its intention action also does not have Federalism
strategy SIP revisions and maintenance
to find the new 2016 MVEBs adequate implications because it does not have
plans for ozone areas. These control
for transportation conformity purposes. substantial direct effects on the states,
strategy SIP submittals (e.g., reasonable
Subsequently, in a Final Federal on the relationship between the national
further progress SIP submittals and
Register notice dated September 16, government and the states, or on the
attainment demonstration SIP
2005, (70 FR 54738) EPA found the distribution of power and
submittals) and maintenance plans
Nashville Area’s 2016 MVEBs adequate. responsibilities among the various
create MVEBs for criteria pollutants
These MVEBs meet the adequacy levels of government, as specified in
and/or their precursors to address
criteria contained in the Transportation Executive Order 13132 (64 FR 43255,
pollution from cars and trucks. Per 40
Conformity Rule. Both the 2006 and August 10, 1999). This action merely
CFR part 93, a MVEB is established for 2016 MVEBs for the Nashville Area are approves a state rule implementing a
the last year of the maintenance plan. currently being used for transportation Federal standard, and does not alter the
The MVEB is the portion of the total conformity determinations. For relationship or the distribution of power
allowable emissions in the maintenance transportation plan analysis years that and responsibilities established in the
plan that is allocated to highway and involve the year 2015 or before, the Clean Air Act. This rule also is not
transit vehicle use and emissions. The applicable budget for the purposes of subject to Executive Order 13045
MVEB serves as a ceiling on emissions conducting transportation conformity ‘‘Protection of Children from
from an area’s planned transportation analysis will be the 2006 MVEBs for Environmental Health Risks and Safety
system. The MVEB concept is further VOC of 53.17 tpd and for NOX of 96.60 Risks’’ (62 FR 19885, April 23, 1997),
explained in the preamble to the tpd for the Nashville Area. For because it is not economically
November 24, 1993, transportation transportation plan analysis years that significant.
conformity rule (58 FR 62188). The involve the year 2016 or beyond, the In reviewing SIP submissions, EPA’s
preamble also describes how to applicable budget for the purposes of role is to approve state choices,
establish and revise MVEBs in the SIP. conducting transportation conformity provided that they meet the criteria of
Under section 176(c) of the CAA, new analysis will be the 2016 MVEB for VOC the Clean Air Act. In this context, in the
transportation projects, such as the of 19.18 tpd and for NOX of 36.01 tpd absence of a prior existing requirement
construction of new highways, must for the Nashville Area. for the state to use voluntary consensus
‘‘conform’’ to (e.g. be consistent with) standards (VCS), EPA has no authority
the part of the State’s air quality plan V. Statutory and Executive Order to disapprove a SIP submission for
that addresses pollution from cars and Reviews failure to use VCS. It would thus be
trucks. ‘‘Conformity’’ to the SIP means Under Executive Order 12866 (58 FR inconsistent with applicable law for
that transportation activities will not 51735, October 4, 1993), this action is EPA, when it reviews a SIP submission,
cause new air quality violations, worsen not a ‘‘significant regulatory action’’ and to use VCS in place of a SIP submission
existing violations, or delay timely therefore is not subject to review by the that otherwise satisfies the provisions of
attainment of the NAAQS. Under the Office of Management and Budget. For the Clean Air Act. Thus, the
transportation conformity rule, at 40 this reason, this action is also not requirements of section 12(d) of the
CFR part 93, projected emissions from subject to Executive Order 13211, National Technology Transfer and
transportation plans and programs must ‘‘Actions Concerning Regulations That Advancement Act of 1995 (15 U.S.C.
be equal to or less than MVEBs for the Significantly Affect Energy Supply, 272 note) do not apply. This rule does
area. If a transportation plan does not Distribution, or Use’’ (66 FR 28355, May not impose an information collection
‘‘conform,’’ most new projects that 22, 2001). This action merely approves burden under the provisions of the
would expand the capacity of roadways state law as meeting Federal Paperwork Reduction Act of 1995 (44
cannot go forward. Regulations at 40 requirements and imposes no additional U.S.C. 3501 et seq.).
CFR part 93 set forth EPA policy, requirements beyond those imposed by The Congressional Review Act, 5
criteria and procedures for state law. Accordingly, the U.S.C. 801 et seq., as added by the Small
demonstrating and assuring conformity Administrator certifies that this rule Business Regulatory Enforcement
of such transportation activities to a SIP. will not have a significant economic Fairness Act of 1996, generally provides
Until MVEBs in a SIP submittal are impact on a substantial number of small that before a rule may take effect, the
approved by EPA, they cannot be used entities under the Regulatory Flexibility agency promulgating the rule must
for transportation conformity purposes Act (5 U.S.C. 601 et seq.). Because this submit a rule report, which includes a
unless EPA makes an affirmative finding rule approves pre-existing requirements copy of the rule, to each House of the
that MVEBs contained therein are under state law and does not impose Congress and to the Comptroller General
‘‘adequate.’’ Once EPA affirmatively any additional enforceable duty beyond of the United States. EPA will submit a
finds the submitted MVEBs adequate for that required by state law, it does not report containing this rule and other
transportation conformity purposes, contain any unfunded mandate or required information to the U.S. Senate,

VerDate Aug<31>2005 15:13 Oct 31, 2005 Jkt 208001 PO 00000 Frm 00015 Fmt 4700 Sfmt 4700 E:\FR\FM\01NOR1.SGM 01NOR1
65842 Federal Register / Vol. 70, No. 210 / Tuesday, November 1, 2005 / Rules and Regulations

the U.S. House of Representatives, and extend the time within which a petition PART 52—[AMENDED]
the Comptroller General of the United for judicial review may be filed, and
States prior to publication of the rule in shall not postpone the effectiveness of ■ 1. The authority citation for part 52
the Federal Register. A major rule such rule or action. This action may not continues to read as follows:
cannot take effect until 60 days after it be challenged later in proceedings to
Authority: 42 U.S.C. 7401 et seq.
is published in the Federal Register. enforce its requirements. (See section
This action is not a ‘‘major rule’’ as 307(b)(2). Subpart RR—Tennessee
defined by 5 U.S.C. 804(2). List of Subjects in 40 CFR Part 52
Under section 307(b)(1) of the Clean Environmental protection, Air ■ 2. Section 52.2220(e) is amended by
Air Act, petitions for judicial review of pollution control, Intergovernmental adding a new entry at the end of the
this action must be filed in the United relations, Nitrogen dioxide, Ozone, table for ‘‘Nashville 1-Hour Ozone
States Court of Appeals for the Volatile organic compounds. Second 10-Year Maintenance Plan’’ to
appropriate circuit by January 3, 2006. read as follows:
Filing a petition for reconsideration by Dated: October 17, 2005.
the Administrator of this final rule does A. Stanley Meiburg, § 52.2220 Identification of plan.
not affect the finality of this rule for the Acting Regional Administrator, Region 4.
(e) * * *
purposes of judicial review nor does it ■ 40 CFR part 52 is amended as follows:

EPA APPROVED TENNESSEE NON-REGULATORY PROVISIONS


Applicable geo-
Name of nonregulatory SIP provision graphic or nonattain- State effective date EPA approval date Explanation
ment area

* * * * * * *
Nashville 1-Hour Ozone Second 10-Year Nashville .................. August 10, 2005 ...... November 1, 2005 [Insert
Maintenance Plan. first page of publica-
tion].

[FR Doc. 05–21528 Filed 10–31–05; 8:45 am] Commonwealth’s) SIP-approved generic available at the Pennsylvania
BILLING CODE 6560–50–P RACT regulations. EPA is approving Department of Environmental
these revisions in accordance with the Protection, Bureau of Air Quality, P.O.
Clean Air Act (CAA). Box 8468, 400 Market Street, Harrisburg,
ENVIRONMENTAL PROTECTION DATES: This rule is effective on Pennsylvania 17105.
AGENCY December 1, 2005. FOR FURTHER INFORMATION CONTACT:
ADDRESSES: EPA has established a Amy Caprio, (215) 814–2156, or by e-
40 CFR Part 52
docket for this action under Regional mail at caprio.amy@epa.gov.
[R03–OAR–2005–PA–0013; FRL–7992–2] Material in EDocket (RME) ID Number
R03–OAR–2005–PA–0013. All SUPPLEMENTARY INFORMATION:
Approval and Promulgation of Air documents in the docket are listed in I. Background
Quality Implementation Plans; the RME index at http://docket.epa.gov/
Pennsylvania; VOC and NOX RACT rmepub/. Once in the system, select On June 10, 2005 (70 FR 33850) and
Determinations for Seven Individual ‘‘quick search,’’ then key in the June 16, 2005 (70 FR 35162), EPA
Sources appropriate RME identification number. published a notice of proposed
AGENCY: Environmental Protection Although listed in the electronic docket, rulemaking (NPR) and a correction for
Agency (EPA). some information is not publicly the Commonwealth of Pennsylvania.
available, i.e., confidential business The NPR proposed approval of formal
ACTION: Final rule.
information (CBI) or other information SIP revisions submitted by
SUMMARY: EPA is taking final action to whose disclosure is restricted by statute. Pennsylvania on January 27, 2005. The
approve revisions to the Commonwealth Certain other material, such as correction addresses the location of the
of Pennsylvania State Implementation copyrighted material, is not placed on NPR publication in the Federal
Plan (SIP). The revisions were the Internet and will be publicly Register. These SIP revisions consist of
submitted by the Pennsylvania available only in hard copy form. source-specific operating permits and/or
Department of Environmental Protection Publicly available docket materials are plan approvals issued by PADEP to
(PADEP) to establish and require available either electronically in RME or establish and require RACT pursuant to
reasonably available control technology in hard copy for public inspection the Commonwealth’s SIP-approved
(RACT) for seven major sources of during normal business hours at the Air generic RACT regulations. The
volatile organic compounds (VOC) and Protection Division, U.S. Environmental following table identifies the sources
nitrogen oxides (NOX) pursuant to the Protection Agency, Region III, 1650 and the individual plan approvals (PAs)
Commonwealth of Pennsylvania’s Arch Street, Philadelphia, Pennsylvania and operating permits (OPs) which are
(Pennsylvania’s or the 19103. Copies of the State submittal are the subject of this rulemaking.

VerDate Aug<31>2005 15:13 Oct 31, 2005 Jkt 208001 PO 00000 Frm 00016 Fmt 4700 Sfmt 4700 E:\FR\FM\01NOR1.SGM 01NOR1

Você também pode gostar