Você está na página 1de 1

58784 Federal Register / Vol. 70, No.

194 / Friday, October 7, 2005 / Notices

National park/abutting Tribal land Operator name DBA IOA auth/yr

Windrock Aviation Inc ............................... Windrock Aviation, Windrock Airlines, Sky 3


Eye Air Tours.
1 Subsequent to the June 23, 2005 notice, each of the listed air tour operators formally withdrew their application for commercial air tour oper-
ating authority for this park unit. FAA has responded by removing this park from the operator’s Interim Operating Authority. No commercial air
tour operations are currently authorized over this park unit.
2 Subsequent to the June 23, 2005 notice, each of the listed air tour operators formally withdrew their application for commercial air tour oper-
ating authority for this park unit. FAA has responded by removing this park from the operator’s Interim Operating Authority. No commercial air
tour operations are currently authorized over this park unit.
3 See note 2 above.
4 The National Parks Air Tour Management Act of 2000 and Title 14, Code of Federal Regulations, Part 136.3(d)(1)(i) excepts operations con-
ducted solely for the purposes of takeoff or landing from the definition of a commercial air tour operation. Subsequent to the June 23, 2005 no-
tice, each of the listed air tour operators formally withdrew their applications for commercial air tour operating authority for this park unit. The
FAA has responded by removing the Memorial from each of the operator’s Interim Operating Authority (IOA).

Dated: September 20, 2005. scoping, we do not propose to re-initiate the process of seeking FAA approval to
James J. Ballough, scoping meetings. For the reasons stated amend its airport layout plan to depict
Director, Flight Standards Service. above, the FAA is canceling the EIS and the O’Hare Modernization Program
[FR Doc. 05–20185 Filed 10–6–05; 8:45 am] will prepare an Environmental (OMP). The city is also seeking the other
BILLING CODE 4910–13–P
Assessment to analyze the impacts of necessary FAA approvals to implement
the proposed action. the OMP and associated capital
FOR FURTHER INFORMATION CONTACT: improvements and procedures. The
DEPARTMENT OF TRANSPORTATION Questions may be directed to Doug FAA prepared an Environmental Impact
Graham, FAA Environmental Specialist, Statement (EIS) addressing specific
Federal Aviation Administration c/o ICF Consulting, 9300 Lee Highway, improvements at and adjacent to
Fairfax, VA 22031 or (202) 267–8568. Chicago O’Hare International Airport,
Cancellation of Environmental Impact Chicago, Illinois. The Draft EIS was
Date Issued: September 30, 2005.
Statement for the Oklahoma Launch issued on January 21, 2005 and the
Site Operator License for the Clinton- Herbert Bachner,
Final EIS was issued on July 22, 2005.
Sherman Industrial Airpark (CSIA) Manager, Space Systems Development
Division. The FAA also held three public hearings
AGENCY: Federal Aviation on February 22, 23, and 24, 2005. The
[FR Doc. 05–20180 Filed 10–6–05; 8:45 am]
Administration (FAA), Department of FAA’s EIS presents an evaluation of the
BILLING CODE 4910–13–P
Transportation. City’s proposed project and reasonable
SUMMARY: On October 23, 2002, the FAA alternatives. Under the City’s concept,
published a Notice of Intent to prepare DEPARTMENT OF TRANSPORTATION O’Hare’s existing seven-runway
an environmental impact statement configuration would be replaced by an
(EIS) for the Oklahoma Space Industry Federal Aviation Administration eight-runway configuration, in which
Development Authority’s (OSIDA’s) six runways would be oriented
proposal to operate a commercial Notice of the Availability of the Record generally in the east/west direction, the
launch site at the Clinton-Sherman for Decision of O’Hare Modernization, existing northeast/southwest-oriented
Industrial Airpark (CSIA) in the Federal at Chicago O’Hare International Runways 4L/22R and 4R/22L would
Register (67 FR 65169). The original Airport, Chicago, IL remain, and Runways 14L/32R and 14R/
proposed action included horizontal AGENCY: Federal Aviation 32L would be closed.
and vertical launches, significant On September 29, 2005 the FAA
Administration, DOT.
construction activities, orbital launches, approved the Record of Decision for
ACTION: Notice of the Availability of the
and vehicle manufacturing. The nature O’Hare Modernization which approves:
Record of Decision for O’Hare A. The unconditional approval of the
of these activities necessitated that the Modernization.
proposed action be addressed through revised Airport Layout Plan (ALP) for
the preparation of an EIS. Location of Proposed Action: O’Hare the projects summarized in Chapter 3 of
Subsequent changes to the proposed International Airport, Chicago, Illinois, the Final EIS, which constitute the
action have eliminated the need for (Sections 4, 5, 6, 7, 8, 9, 16, 17, and 18, proposed development.
vertical launch, construction of any Township 41 North, Range 10 East, 3rd B. Eligibility for Federal grant-in-aid
kind, orbital launches, and vehicle P.M.). funds and/or PFC, including the
manufacturing. The proposed action as SUMMARY: The Federal Aviation following elements:
Administration (FAA) announces the 1. Land Acquisition.
currently stated involves the horizontal 2. Site Preparation.
launch of suborbital Reusable Launch Record of Decision (ROD) for O’Hare
3. Runway, Taxiway, and Runway
Vehicles from an existing runway at the Modernization, for Chicago O’Hare
Safety Area Construction.
CSIA. The horizontal launch activities International Airport, Chicago, Illinois 4. Terminal and Other Landside
are similar to the current Air Force is available. Development.
activities at the CSIA and are not SUPPLEMENTARY INFORMATION: The City 5. Installation of Navigational Aids.
expected to produce significant impacts, of Chicago (City), Department of 6. Environmental Mitigation.
indicating that an EA would be the most Aviation, as owner and operator of 7. Noise Mitigation Projects.
appropriate NEPA analysis for OSIDA’s Chicago O’Hare International Airport C. Determination and actions, through
proposed activities. (O’Hare or the Airport), PO Box 66142, the aeronautical study process of any
Scoping meetings were held in Chicago, IL, 60666, proposes to off-airport obstacles that might be
Oklahoma in November 2002. Because modernize O’Hare to address existing obstructions to the navigable airspace
the proposed action is a subset of the and future capacity and delay problems. under the standards and criteria of 14
information originally presented during The City initiated master planning and CFR part 77 and evaluate the

VerDate Aug<31>2005 18:27 Oct 06, 2005 Jkt 208001 PO 00000 Frm 00123 Fmt 4703 Sfmt 4703 E:\FR\FM\07OCN1.SGM 07OCN1

Você também pode gostar